checkAd

     113  0 Kommentare Marvel Completes Drilling at Duhamel, Nickel-Copper-Cobalt Project, North of Quebec City - Seite 2

    Figure 3: Massive sulfide band intersected in hole DH24-01 (69.8m - 70.1m)

    The second hole drilled, DU24-02, intersected a wide, 13.9m, interval of disseminated sulfides mineralization from a hole depth 7.5m- 21.4m and within this are semi-massive stringers and massive sulfide zones ranging from widths of 10cm-70cm. An example of one of these semi-massive sulfide bands with shows tremendous potential for nickel, copper, and cobalt mineralization intersected in drillhole DU24-02 is highlighted in figure 4. Other same disseminated sulfides intervals with semi-massive stringers and massive sulfide zones ranging from widths of 5cm-40cm were intersected at 32.0 (0.8m), at 37.8m (5.9m), at 99.8m (3.6m), at 135.8m (7.6m), at 169.8m (18.2m), and at 231.2m (5.7m). Semi-massive and massive Fe-Ti oxide (MOX) bands ticking up to several meters in width were also intersected in this hole some of which contains sulfides clusters and stringers.

    Figure 4: Massive sulfide band and cluster Intersected in Hole DH24-02 (43.1m - 43.7m)

    Hole DU24-03, intersected a wide, 10.3m, interval of disseminated mineralization from a hole depth 88.6m - 98.9m and within this are semi-massive sulfide stringers and clusters zones ranging from widths of 10-50cm. Other same disseminated mineralized intervals with semi-massive stringers and massive sulfide zones ranging from widths of 5cm-80cm were intersected at 111.3m (2.5m), and at 121.5m (2.0m). Semi-massive and massive Fe-Ti oxide (MOX) bands ticking up to several meters in width were also intersected in this hole.

    The Hole DU24-04 intersected a wide, 17.3m, interval of disseminated sulfides mineralization from a hole depth 21.7m - 39.0m and within this are semi-massive stringers zone 10cm-90cm. Noteworthy within hole DU24-04 is a significant vein of massive chalcopyrite with pyrrhotite mineralization over the interval of 79.7m - 80.1m which is highlighted in figure 5. Other same disseminated sulfide intervals with semi-massive stringers zones ranging from widths of 5cm-70cm were intersected at 71.9m (2.0m), at 76.0m (2.1m), at 89.2m (3.6m), and at 104m (1.3m).

    Seite 2 von 5



    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Marvel Completes Drilling at Duhamel, Nickel-Copper-Cobalt Project, North of Quebec City - Seite 2 VANCOUVER, BC / ACCESSWIRE / March 6, 2024 / Marvel Discovery Corp. (TSX-V:MARV)(Frankfurt:O4T)(MARVF:OTCQB); ( "Marvel " or the "Company" ) is pleased to report that the Company has completed drilling operations on its Ni-Cu-Co and Ti-V-Cr Duhamel …