checkAd

     129  0 Kommentare Silver Spruce and partner Colibri Resource Launch 2024 Drilling Program on El Pillado Polymetallic Target at Diamante Au-Ag Project, Sonora, Mexico - Seite 3

    The targets under consideration for current and future drilling include La Prieta-Aguaje, El Chon-El Chon Oeste, La Olla-La Cruz, Pillado-El Caso, Calton, El Cumbro and Mezquite-Raizudo targets (see Silver Spruce press releases of April 26, 2021, January 24, 2022, and April 10, 2024, and Colibri press release January 9, 2024). Disseminated and stockwork mineralization at Anomalía Sur and El Puerto offer two known bulk tonnage targets for subsequent drilling programs.

    Project Background

    Silver Spruce can acquire up to 50% interest in the Diamante concessions with a cumulative land position of 1,057 hectares (see Press Release of April 29, 2021). The Diamante property consists of the Diamante 1 and Diamante 2 concessions located adjacent to the Jackie property which covers 1,113 hectares providing Silver Spruce with a total of 2,170 hectares of exploration ground. The Property is very well situated in terms of resource and logistics for exploration and is easily accessible from Sonora state Highway 16 which transects Diamante 1 and on several ranch trails and dry river beds to Diamante 2.

    The Property is located within the west-central portion of the Sierra Madre Occidental Volcanic Complex within the northwest-trending "Sonora Gold Belt" of northern Mexico. Mining and exploration in the surrounding area is very active with adjacent and nearby properties held by Alamos Gold, Argonaut, Agnico Eagle, Evrim, Newmont, Garibaldi, Kootenay Silver and Penoles among others. Diamante is located approximately 12 km northwest of Minera Alamos' Santana Au development project which is nearing commercial production.

    Figure 3. New drill pad ready for rig mobilization on the El Pillado target at Diamante 1.

    Qualified Person

    Greg Davison, PGeo, Silver Spruce VP Exploration and Director, is the Company's internal Qualified Person for the Diamante Project and is responsible for approval of the technical content of this press release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), under TSX guidelines.

    Lesen Sie auch

    Jamie Lavigne, P. Geo. and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical information in this press release.

    Figure 4. Preliminary examples of high quality drill core from the El Pillado target. Close-up image on the right clearly shows altered volcanics with multiple stages and orientations of veinlets and brecciation with dark blue and green metal sulphides along fractures and fragments within quartz-carbonate matrix.

    Seite 3 von 4


    Diskutieren Sie über die enthaltenen Werte


    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Silver Spruce and partner Colibri Resource Launch 2024 Drilling Program on El Pillado Polymetallic Target at Diamante Au-Ag Project, Sonora, Mexico - Seite 3 Silver Spruce Resources Inc. ("Silver Spruce" or the "Company") along with our partner Colibri Resource Corp. ("Colibri" and together with Silver Spruce, the "Companies"), jointly announce the initiation of core drilling operations at the El Pillado …