checkAd

     116  0 Kommentare Titan Mining Drills Two New Zones of Near-Surface Mineralization, Including 80 Feet of 5.8% Zinc, 2.8% Lead and 28.2 g/t Silver - Seite 3

    Hoist House Zone Drill Results

    Drill holes SX19-2478, SX19-2479 SX19-2480 and SX19-2484 were drilled from surface and are part of a four-hole fan which targets the Hoist House zone and is located 50 feet to the southwest of the previously-reported drill holes (SX19-2475, SX19-2476 and SX19-2477). All four holes intercepted the HW and FW mineralized horizons, demonstrating the continuity of mineralization down-dip and along strike. Intercepts from the four holes are vertically spaced about 50 feet apart in FW mineralization.

    Significant mineralized intervals from SX19-2478 were:

    • 8.0 feet assaying 11.0% zinc, 0.7% lead and 13.2 g/t silver (HW)
    • 31.5 feet assaying 2.5% zinc, 0.2% lead and 7.8 g/t silver (FW)

    Notable mineralized intervals from SX19-2479 were:

    • 15.9 feet assaying 5.6% zinc, 0.9% lead and 18.5 g/t silver (HW)
      ◦  
      Including 5.8 feet assaying 10.2% zinc, 2.0% lead and 27.5 g/t silver
    • 47.5 feet assaying 2.2% zinc, 0.1% lead and 4.1 g/t silver (FW)
      ◦  
      Including 3.5 feet assaying 7.9% zinc, 0.1% lead and 7.4 g/t silver

    Noteworthy mineralized interval from SX19-2480 were:

    • 25.0 feet assaying 4.5% zinc, 0.5% lead and 20.3 g/t silver (HW)
    • 25.0 feet assaying 4.6% zinc, 0.3% lead and 6.3 g/t silver (FW)

    Significant mineralized intervals from SX19-2484 were:

    • 20.0 feet assaying 7.3% zinc, 0.9% lead and 11.7 g/t silver (HW)
      ◦  
      Including 10.0 feet assaying 13.5% zinc, 1.6% lead and 19.1 g/t silver
    • 31.0 feet assaying 4.2% zinc, 0.5% lead and 10.3 g/t silver (FW)
      ◦  
      Including 10.0 feet assaying 10.1% zinc. 0.9% lead and 11.6 g/t silver

    Turnpike Zone Drill Results

    Lesen Sie auch

    Drill holes SX19-2482, SX19-2483 and SX19-2485 were drilled from surface and are part of a three-hole fan targeting the Turnpike zone. The three holes intercepted a broad zone of mineralization averaging 80 feet in true thickness, confirming the presence of near-surface mineralization and establishing continuity of mineralization at depth. Intercepts from the three-hole fan are vertically spaced 50 feet apart. SX19-2481 targeted the northeast extent of Turnpike mineralization and intercepted a narrow zone.

    Mineralization intercepted in SX19-2481 was:

    • 2.0 feet assaying 2.8% zinc, <0.1% lead and 5.0 g/t silver

    Notable mineralized interval from SX19-2482 was:

    • 207.0 feet assaying 3.1% zinc, 1.1% lead and 10.4 g/t silver
      ◦  
      Including 101.0 feet assaying 5.4% zinc, 2.1% lead and 18.1 g/t silver

    Significant mineralized interval from SX19-2483 was:

    Seite 3 von 5



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Titan Mining Drills Two New Zones of Near-Surface Mineralization, Including 80 Feet of 5.8% Zinc, 2.8% Lead and 28.2 g/t Silver - Seite 3 VANCOUVER, British Columbia, Jan. 14, 2020 (GLOBE NEWSWIRE) - Titan Mining Corporation (TSX:TI) (“Titan” or the “Company”) is pleased to announce drill results of two new zones of near-surface mineralization at the Company’s Empire State Mine …