Banyan Gold Announces Closing of Upsized $17 M Private Placement Financing - Seite 3
Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off - AurMac Property
Deposit |
Au Cut-Off |
g/t
Tonnage
M Tonnes
Average Au Grade
g/t
Au Content
k oz.
Airstrip
0.2
42.5
0.64
874
Powerline
0.2
152.0
0.59
2,898
Aurex Hill
0.3
12.5
0.53
215
Total Combined
0.2 - 0.3
207.0
0.60
3,990
Notes to Table 1:
- The effective date for the Resource Estimate is May 13, 2022. The updated Resource Estimate for the AurMac Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI 43-101. Mr. Jutras is preparing a technical report supporting the Resource Estimate (the "Technical Report") in accordance with the requirements of NI 43-101, which will be filed on SEDAR at www.sedar.com within forty-five (45) days of the date of the initial news release. Please see the news release of May 17, 2022.
- Mineral resources which are not mineral reserves do not have demonstrated economic viability. The Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
- The definitions of inferred mineral resources that are contained in the Definition Standards of the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM Definition Standards"), which are incorporated by reference into National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") were followed to classify the mineral resources in the Resource Estimate. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred mineral resources as an indicated mineral resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured mineral resource category.
- Mineral resources are reported at a cut-off grade of 0.2 g/t Au for the Airstrip and Powerline deposits and 0.3 g/t Au for the Aurex Hill deposits, using a US$/CAN$ exchange rate of 0.75 and constrained within an open-pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,700/ounce, US$2.50/t mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% heap leach recoveries, and 45° pit slope. The gold price and cost assumptions are consistent with current pricing assumptions and costs, and in particular are consistent with those employed for recent technical reports for similar pit-constrained Yukon gold projects.
- The number of tonnes was rounded to the nearest hundred thousand. The number of ounces was rounded to the nearest thousand and final result to three significant figures. Any discrepancies in the totals are due to rounding effects.
Lesen Sie auch
In addition to the AurMac Property, the Company holds the Hyland Gold Project, located 70 kilometres Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the "Hyland Project"). The Hyland Project represents a sediment hosted, structurally controlled, intrusion related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads.