    VANCOUVER, British Columbia, Sept. 28, 2023 (GLOBE NEWSWIRE) -- NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”), is pleased to announce the engagement of GEMTEC Consulting Engineers and Scientists Limited (“GEMTEC”) and the completion of their site visit and baseline water, trace metals and flow sampling program for the Nine Mile Brook Lens Bulk Sample Project (the “Project”).

    • GEMTEC completed the water, sediment, and flow sampling program on September 8, 2023, in support of the Project.
    • Per the Province of New Brunswick Department of Natural Resource and Energy Development Minerals and Petroleum Development Branch’s “Guide to the Development of a Mining and Reclamation Plan” document, the program will aim to provide the baseline surface water chemistry data, and baseline metal concentrations in sediment samples collected from watercourses that may be impacted by the development or operation of the Project.
    • A total of six surface water and six sediment samples were collected (see attached Figure 1 for approximate locations) for laboratory analysis.

    The surface water samples were submitted to RPC Science and Engineering (“RPC”) in Fredericton, NB, for analysis of general chemistry, total suspended solids, total metals, as well as dissolved manganese, zinc, organic carbon, and petroleum hydrocarbons. The sediment samples were also sent for analysis, specifically for available metals and petroleum hydrocarbons (see Figures 2, 3, 4, 5, 6, and 7).

    Field water quality parameters, including conductivity, dissolved oxygen, pH, and temperature, were measured using a multiparameter water quality meter. Proper QA/QC protocols were followed, which included submitting two duplicate samples for laboratory analyses—namely, one surface water sample and one sediment sample.

    In addition to surface water sampling, flow measurements were recorded at each of the 6 sampling sites (3 – 5 points along a transect perpendicular to the flow at each sampling site) using a Marsh M2000 Flo-Mate device (Figure 8). This allows for the calculation of watercourse discharge rates, volume, and speed.

    Lesen Sie auch

    The locations were selected based on 1:50,000 topo map drainage, and cover Nine Mile Brook, Boucher Brook, and a tributary to Nine Mile Brook located south of the Project. Sample locations were chosen to represent both upgradient and downgradient areas to provide reference data as the Project progresses.

    Seite 1 von 4



    Diskutieren Sie über die enthaltenen Werte



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Nine Mile Metals Engages GEMTEC and Completes Nine Mile Brook Lens Bulk Sample Baseline Sampling VANCOUVER, British Columbia, Sept. 28, 2023 (GLOBE NEWSWIRE) - NINE MILE METALS LTD. (CSE: NINE, OTCQB: VMSXF, FSE: KQ9) (the “Company” or “Nine Mile”), is pleased to announce the engagement of GEMTEC Consulting Engineers and Scientists Limited …