checkAd

     325  0 Kommentare Calibre Mining and B2Gold Begin Diamond Drilling Program at the Minnesota Gold Project, Borosi Concessions, Nicaragua

    VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct. 28, 2014) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce that a Phase 1 diamond drilling program has begun on the Minnesota Gold Project within the B2Gold Corp. ("B2Gold") (TSX:BTO)(NYSE MKT:BTG) Joint Venture on the Borosi concessions, northeast Nicaragua. Calibre controls a 49.0% interest in the joint venture and B2Gold has a 51.0% interest and is project operator. B2Gold has the right to earn an additional 19.0% in the Borosi concessions joint venture by spending $6.0 million in additional project expenditures over three years.

    The Phase 1 diamond drilling program at the Minnesota gold project will consist of a planned 1500 metres in up to 13 drill holes. The drilling is designed to test several gold zones along the three km strike length of the strong auger and soil gold anomaly. Several drill holes are planned in the vicinity of contiguous Trenches MINTR14-006 to 011 and MINTR14-016 which intersected 109.6 metres grading 1.58 g/t Au.* This trench interval includes the recently received assay results from Trench MINTR14-016 that returned 15.1 m grading 1.2 g/t.

    Greg Smith, President and CEO of Calibre stated: "With the start of the Minnesota gold project drilling program with B2Gold and with the on-going drilling program with IAMGOLD Corp at the Eastern Borosi gold project Calibre and our partners will be completing a combined 6,500 metres of drilling in up to 58 drill holes on the two gold projects at no cost to Calibre. Additional drill results from the Eastern Borosi gold project and initial drill results from the Minnesota gold project will be released when available".

    Quality assurance and quality control procedures include the systematic insertion of blanks, standards and duplicates into the rock and soil sample strings. Samples are placed in sealed bags and shipped directly to Acme Labs in Managua, Nicaragua for sample preparation and then to Acme Labs in Vancouver, Canada for gold fire assay and ICP-MS multi element analyses. The technical content in this news release was read and approved by Gregory Smith, P.Geo, President and CEO of the Company who is the Qualified Person as defined by NI 43-101.

    Lesen Sie auch

    Seite 1 von 2



    Diskutieren Sie über die enthaltenen Werte




    Verfasst von Marketwired
    Calibre Mining and B2Gold Begin Diamond Drilling Program at the Minnesota Gold Project, Borosi Concessions, Nicaragua VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct. 28, 2014) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce that a Phase 1 diamond drilling program has begun on the Minnesota Gold Project within the B2Gold …

    Schreibe Deinen Kommentar

    Disclaimer