checkAd

    RED 5 Limited - Auf geht`s nach Australien. (Seite 3)

    eröffnet am 23.10.17 13:09:13 von
    neuester Beitrag 25.04.24 12:16:27 von
    Beiträge: 31
    ID: 1.264.791
    Aufrufe heute: 7
    Gesamt: 3.928
    Aktive User: 0

    ISIN: AU000000RED3 · WKN: A0DNNW · Symbol: RKM
    0,2620
     
    EUR
    +0,77 %
    +0,0020 EUR
    Letzter Kurs 06.05.24 Tradegate

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    0,5500+17,02
    2,0500+13,89
    3,3400+10,60
    1,4300+10,00
    35,60+8,50
    WertpapierKursPerf. %
    0,7200-9,43
    0,7340-12,62
    0,6000-18,37
    0,6601-26,22
    1,1600-46,79

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 3
    • 4

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 19.03.18 06:33:40
      Beitrag Nr. 11 ()
      Antwort auf Beitrag Nr.: 57.259.984 von 50Bagger am 13.03.18 10:03:03
      Zitat von 50Bagger: Halbjahreszahlen sind da:

      • Sales revenue of A$37.5m
      • Net cash flow from operating activities of A$8.2m
      A$21.8m in cash and in metal accounts
      • Darlot gold production of 17,777oz and gold sales of 16,150oz since acquisition in October 2017
      • Darlot all-in sustaining costs (AISC) of A$1,291 per ounce
      Net loss of the consolidated entity before income tax was A$1.6m, inclusive of a net profit
      before income tax from Darlot operations of A$2.8m

      Die Guidance für das März 2018 Quartal wurde auf 12.000-16.000 Unzen reduziert.

      Weitere Informationen auf: http://red5limited.com



      Ist das aktuell eine super Einstiegsmöglichkeit vorm 21.3. (Fed Zinsentscheid) oder lieber Finger weg? Was meinst du?
      Avatar
      schrieb am 13.03.18 10:03:03
      Beitrag Nr. 10 ()
      Halbjahreszahlen sind da:

      • Sales revenue of A$37.5m
      • Net cash flow from operating activities of A$8.2m
      A$21.8m in cash and in metal accounts
      • Darlot gold production of 17,777oz and gold sales of 16,150oz since acquisition in October 2017
      • Darlot all-in sustaining costs (AISC) of A$1,291 per ounce
      Net loss of the consolidated entity before income tax was A$1.6m, inclusive of a net profit
      before income tax from Darlot operations of A$2.8m

      Die Guidance für das März 2018 Quartal wurde auf 12.000-16.000 Unzen reduziert.

      Weitere Informationen auf: http://red5limited.com
      1 Antwort
      Avatar
      schrieb am 10.03.18 09:34:12
      Beitrag Nr. 9 ()
      Antwort auf Beitrag Nr.: 57.241.363 von 50Bagger am 10.03.18 09:11:57Nein. Recherche ist schwer...
      Avatar
      schrieb am 10.03.18 09:11:57
      Beitrag Nr. 8 ()
      Antwort auf Beitrag Nr.: 57.241.000 von Maximum100 am 10.03.18 07:27:42Ich weiß, dass ich mir die vor Monaten mal angeguckt habe und dann dagegen entschieden habe, aber warum genau weiß ich auch nicht mehr.
      Habe in den letzten Wochen so viele Klitschen durchgearbeitet, man kann ja nicht jede kaufen :laugh:

      Aber ich glaube ich schaue mir die in den nächsten Tagen noch mal genauer an. Hast du noch mehr Informationen dazu, die interessant wären?
      1 Antwort
      Avatar
      schrieb am 10.03.18 07:27:42
      Beitrag Nr. 7 ()
      Antwort auf Beitrag Nr.: 57.087.372 von 50Bagger am 22.02.18 08:50:53
      Zitat von 50Bagger: Es gibt eine neue Präsentation auf der Webseite. http://red5limited.com" target="_blank" rel="nofollow ugc noopener">http://red5limited.com


      Sowie folgende Bohrergebnisse:

      High-Grade Drilling Results Confirm Potential for Resource Extensions within Key Mining Area at Darlot:

      Key Points
      • Encouraging initial results received from recently commenced underground diamond drilling program in the CDA Oval mining area, part of the Centenary underground workings at the recently acquired Darlot Gold Mine.

      • Drilling targeting extensions to the gold mineralisation immediately along strike and down-plunge from the CDA Oval workings has intersected mineralisation (based on estimated true widths), including:


      o 12.9m @ 7.9g/t Au from 78.02m down-hole (Hole GC3748)
      o 4.0m @ 9.4g/t Au from 113.15m down-hole (Hole GC3746)
      o 5.0m @ 8.2g/t Au from 111.2m down-hole (Hole GC3747)
      o 6.0m @ 5.1g/t Au from 62.2m down-hole (Hole CAD0396)


      • Drilling continuing with additional holes planned as part of the resource extension and infill program.

      • Further drilling is planned targeting the area further down-dip of the existing workings and up-dip targeting mineralisation adjacent to the regional lamprophyre located approximately 100m to the west of current workings.

      • The CDA Oval workings have been a key source of high-grade ore feed to the Darlot plant since mining commenced in this sector in February 2017.

      • Drilling of a 1200m deep surface diamond drill-hole has commenced at the high-priority Aurora target, located approximately 1km to the south-east of the Centenary mine.

      • The Aurora target represents a potential analogue of Centenary, sitting in the same host magnetic dolerite position and with closely-matched geochemical characteristics.


      Du bist ja Spezislist für heiße Eisen 😉... bist du auch bei Goldgroup Mining dabei und/oder hast du ne Story dazu?
      2 Antworten

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1995EUR +3,64 %
      InnoCan Pharma: Q1 2024 Monster-Zahlen “ante portas”?!mehr zur Aktie »
      Avatar
      schrieb am 22.02.18 08:50:53
      Beitrag Nr. 6 ()
      Es gibt eine neue Präsentation auf der Webseite. http://red5limited.com" target="_blank" rel="nofollow ugc noopener">http://red5limited.com


      Sowie folgende Bohrergebnisse:

      High-Grade Drilling Results Confirm Potential for Resource Extensions within Key Mining Area at Darlot:

      Key Points
      • Encouraging initial results received from recently commenced underground diamond drilling program in the CDA Oval mining area, part of the Centenary underground workings at the recently acquired Darlot Gold Mine.

      • Drilling targeting extensions to the gold mineralisation immediately along strike and down-plunge from the CDA Oval workings has intersected mineralisation (based on estimated true widths), including:


      o 12.9m @ 7.9g/t Au from 78.02m down-hole (Hole GC3748)
      o 4.0m @ 9.4g/t Au from 113.15m down-hole (Hole GC3746)
      o 5.0m @ 8.2g/t Au from 111.2m down-hole (Hole GC3747)
      o 6.0m @ 5.1g/t Au from 62.2m down-hole (Hole CAD0396)


      • Drilling continuing with additional holes planned as part of the resource extension and infill program.

      • Further drilling is planned targeting the area further down-dip of the existing workings and up-dip targeting mineralisation adjacent to the regional lamprophyre located approximately 100m to the west of current workings.

      • The CDA Oval workings have been a key source of high-grade ore feed to the Darlot plant since mining commenced in this sector in February 2017.

      • Drilling of a 1200m deep surface diamond drill-hole has commenced at the high-priority Aurora target, located approximately 1km to the south-east of the Centenary mine.

      • The Aurora target represents a potential analogue of Centenary, sitting in the same host magnetic dolerite position and with closely-matched geochemical characteristics.
      3 Antworten
      Avatar
      schrieb am 19.02.18 08:24:15
      Beitrag Nr. 5 ()
      Darlot und King of the Hills waren wirklich gute Akquisitionen. Eventuell kommt bald die nächste:

      Red 5 Limited (ASX: RED) (“Red 5” or “the Company”) advises of its intention to make a conditional off- market takeover bid (“Offer”) for all of the fully paid ordinary shares (“Shares”) in Bullseye Mining Limited (“Bullseye”).

      Bullseye is an unlisted public company whose Western Australian-based gold portfolio includes the Laverton Project, located ~30km to the north of the Darlot Gold Mine, the Southern Cross Gold Project and the Aurora Gold Project.

      The proposed transaction is consistent with Red 5’s previously announced Eastern Goldfields Consolidation Strategy, given the proximity of the Laverton Project to the centrally located processing facility at Darlot.

      Bullseye shareholders will be offered 1 fully-paid ordinary share in Red 5 for every 5 Bullseye Shares they hold1. The Offer values the equity in Bullseye at approximately A$4.016 million2 at the current trading price of Red 5 shares.

      Red 5 wrote to the directors of Bullseye and sought to commence discussions in December 2017, but has been unable to initiate any meaningful engagement. Accordingly, Red 5 intends to make an Offer directly to Bullseye shareholders, to enable all Bullseye shareholders to consider and assess what Red 5 believes is an attractive Offer providing a clear pathway to the commercialisation of Bullseye’s projects as part of a stronger, larger ASX-listed gold producing company.
      Avatar
      schrieb am 31.01.18 13:52:52
      Beitrag Nr. 4 ()
      December 2017 Quarterly Activities Report

      Strong first quarter for Red 5 as an Australian gold producer with production of 17,777oz; maiden 895koz JORC Resource and 131koz Reserve at Darlot underpins 2018 outlook; Group Mineral Resources in WA increased to 1.3Moz1 inclusive of King of the Hills, where underground mining is underway
      Operations – Darlot Gold Mine, Western Australia

      • Acquisition of the Darlot mining operation completed on 2 October 2017, with the ownership transition, integration of the operation and existing workforce successfully completed.

      • Gold production of 17,777oz and gold sales of 16,150oz for the quarter, representing a strong maiden production performance under Red 5’s ownership. All-in sustaining costs (AISC) of A$1,291 per ounce.

      • Encouraging results from the remnant mining program in the upper and mid-levels of the mine, with stopes in the first 3 extensions to existing mining areas exceeding expectations in terms of mined tonnages and grade.

      • Strong performance by the Darlot processing plant, with periods of throughput reaching up to 100 tonnes per hour and opportunities identified to increase capacity.
      Development – King of the Hills Gold Project (KOTH), Western Australia

      • The first stockpiled ore from King of the Hills was successfully trucked and milled at Darlot.

      • Underground mining contract awarded to experienced underground mining contractor, Pit N Portal Mining
      Services, and underground mining commenced in early January 2018 following receipt of mining approvals.

      • Initial results from heap leach amenability test work on lower grade ores shows potential for a longer term growth project at KOTH which will be pursued in 2018.
      Exploration and Resource Development

      • Maiden JORC 2012 Mineral Resource estimate completed for Darlot, delivering a significant increase in contained gold ounces over the previously reported SAMREC estimates (1.2Mt @ 5.97g/t Au for 224,000oz2):
      Measured, Indicated and Inferred Mineral Resource of 6.0Mt @ 4.6 g/t Au for 895koz of contained gold

      • JORC 2012 Resource includes a maiden Probable Ore Reserve of 1.0Mt @ 4.0 g/t Au for 131koz of contained gold, delivering additional mine life for the Darlot mining operations.

      • Multi-pronged exploration and resource definition programs commenced post quarter end at Darlot and King of the Hills to further expand and de-risk the Resource and Reserve base, with numerous high-priority targets identified, including targeting immediate extensions of the CDA Oval deposit immediately along strike of and below current workings.

      • Grade and resource drilling also commenced in January 2018 at King of the Hills with drilling initially targeting the northern section of the mine.
      Finance and Outlook

      • Group cash and metal in account of A$21.8M as at 31 December 2017.

      • Gold production3 for calendar year 2018 expected to be in the range of 85-95,000oz.
      Avatar
      schrieb am 21.12.17 06:23:30
      Beitrag Nr. 3 ()
      Neuigkeiten von RED 5:


      • Maiden 895koz JORC 2012 Resource and 131koz Ore
      Reserve for Darlot Gold Mine Sets Foundation for Gold

      • JORC 2012 Resource includes a maiden Probable Ore Reserve of 1.0Mt @ 4.0 g/t Au for 131koz of contained gold, delivering additional mine life for the Darlot mining operations.

      • Gold production for calendar year 2018 is expected to be in the range of 85-95,000oz.


      http://red5limited.com/asx-announcements/" target="_blank" rel="nofollow ugc noopener">http://red5limited.com/asx-announcements/
      Avatar
      schrieb am 25.10.17 06:10:42
      Beitrag Nr. 2 ()
      Könnte Siana bald wieder in Betrieb sein? Auf den Philippinen scheint ein Umschwung zu beginnen:

      http://www.mining.com/philippines-open-pit-mining-ban-lifted…

      Eine Mine wurde bereits wieder freigegeben:

      https://www.reuters.com/article/us-philippines-mining-lepant…
      • 1
      • 3
      • 4
       DurchsuchenBeitrag schreiben


      RED 5 Limited - Auf geht`s nach Australien.