Tocvan Samples High-Grade Gold and Silver 6-kilometers from Pilar Main Zone Returns up to 1,225 g/t Ag and 3.2 g/t Au - Seite 3
Pilar Drill Highlights:
- 2022 Phase III Diamond Drilling Highlights include (all lengths are drilled thicknesses):
- 116.9m @ 1.2 g/t Au, including 10.2m @ 12 g/t Au and 23 g/t Ag
- 108.9m @ 0.8 g/t Au, including 9.4m @ 7.6 g/t Au and 5 g/t Ag
- 63.4m @ 0.6 g/t Au and 11 g/t Ag, including 29.9m @ 0.9 g/t Au and 18 g/t Ag
-
2021 Phase II RC Drilling Highlights include (all lengths are drilled thicknesses):
- 39.7m @ 1.0 g/t Au, including 1.5m @ 14.6 g/t Au
- 47.7m @ 0.7 g/t Au including 3m @ 5.6 g/t Au and 22 g/t Ag
- 29m @ 0.7 g/t Au
- 35.1m @ 0.7 g/t Au
-
2020 Phase I RC Drilling Highlights include (all lengths are drilled thicknesses):
- 94.6m @ 1.6 g/t Au, including 9.2m @ 10.8 g/t Au and 38 g/t Ag;
- 41.2m @ 1.1 g/t Au, including 3.1m @ 6.0 g/t Au and 12 g/t Ag ;
- 24.4m @ 2.5 g/t Au and 73 g/t Ag, including 1.5m @ 33.4 g/t Au and 1,090 g/t Ag
-
15,000m of Historic Core & RC drilling. Highlights include:
- 21.0m @ 38.3 g/t Au and 38 g/t Ag
- 13.0m @ 9.6 g/t Au
- 9.0m @ 10.2 g/t Au and 46 g/t Ag
- 61.0m @ 0.8 g/t Au
Pilar Bulk Sample Summary:
- 62% Recovery of Gold Achieved Over 46-day Leaching Period
- Head Grade Calculated at 1.9 g/t Au and 7 g/t Ag; Extracted Grade Calculated at 1.2 g/t Au and 3 g/t Ag
- Bulk Sample Only Included Coarse Fraction of Material (+3/4" to +1/8")
- Fine Fraction (-1/8") Indicates Rapid Recovery with Agitated Leach
- Agitated Bottle Roll Test Returned Rapid and High Recovery Results: 80% Recovery of Gold and 94% Recovery of Silver after Rapid 24-hour Retention Time
Additional Metallurgical Studies:
- Gravity Recovery with Agitated Leach Results of Five Composite Samples Returned
- 95 to 99% Recovery of Gold
- 73 to 97% Recovery of Silver
- Includes the Recovery of 99% Au and 73% Ag from Drill Core Composite at 120-meter depth.
About Tocvan Ventures Corp.
Lesen Sie auch
Tocvan is a well-structured exploration development company. Tocvan was created in order to take advantage of the prolonged downturn in the junior mining exploration sector, by identifying and negotiating interest in opportunities where management feels they can build upon previous success. Tocvan has approximately 43 million shares outstanding and is earning 100% into two exciting opportunities in Sonora, Mexico: the Pilar Gold-Silver project and the Picacho Gold-Silver project. Management feels both projects represent tremendous opportunity to create shareholder value.
Diskutieren Sie über die enthaltenen Werte
Aktuelle Themen
Weitere Artikel des Autors
1 im Artikel enthaltener WertIm Artikel enthaltene Werte