checkAd

     678  0 Kommentare Orvana Closes US$7.9 Million Loan Facility for Don Mario CIL Recommissioning - Seite 2

    At Don Mario, historical mining took place in the Lower Mineralized Zone ("LMZ") and this material was processed by the now decommissioned CIL circuit, with an average gold recovery of over 80%. The Company has recently started to mine the upper extension of the LMZ. Results of a metallurgical testing program on this ore indicate potential gold recovery of higher than historical rates may be achieved by processing the LMZ material through the recommissioned CIL circuit and existing flotation circuit.

    About Orvana
    Orvana is a multi-mine gold and copper producer. Orvana's operating assets consist of the producing gold-copper-silver El Valle mine in northern Spain and the producing gold-copper-silver Don Mario mine in Bolivia.  Additional information is available at Orvana's website (www.orvana.com).

    Cautionary Statements - Forward-Looking Information
    Certain statements in this information constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, potentials, future events or performance (often, but not always, using words or phrases such as "believes", "expects", "plans", "estimates" or "intends" or stating that certain actions, events or results "may", "could", "would", "might", "will" or "are projected to" be taken or achieved) are not statements of historical fact, but are forward-looking statements.

    The forward-looking statements herein relate to, among other things, Orvana's ability to achieve improvement in free cash flow; the potential to extend the mine life of El Valle and Don Mario beyond their current life-of-mine estimates; Orvana's ability to optimize its assets to deliver shareholder value; the Company's ability to optimize productivity at Don Mario and El Valle; estimates of future production, operating costs and capital expenditures; mineral resource and reserve estimates; statements and information regarding future feasibility studies and their results; future transactions; future metal prices; the ability to achieve additional growth and geographic diversification; future financial performance, including the ability to increase cash flow and profits; future financing requirements; and mine development plans.

    Seite 2 von 4



    PR Newswire (engl.)
    0 Follower
    Autor folgen
    Verfasst von PR Newswire (engl.)
    Orvana Closes US$7.9 Million Loan Facility for Don Mario CIL Recommissioning - Seite 2 TSX:ORV TORONTO, /PRNewswire/ - Orvana Minerals Corp. (TSX: ORV) (the "Company" or "Orvana") is pleased to announce that its wholly-owned subsidiary, EMIPA S.A. ("EMIPA"), has closed a US$7.9 million loan facility (the "Loan") with Banco BISA S.A. …