checkAd

     209  0 Kommentare WESTERN GEOPOWER DRILLS 50% OF STEAM RESOURCE WITH 3 WELLS

    Corporate news announcement processed and transmitted by Hugin AS.
    The issuer is solely responsible for the content of this
    announcement.
    ----------------------------------------------------------------------
    --------------


    NEWS RELEASE

    DATE: October 22, 2008
    FOR IMMEDIATE RELEASE

    TRADING SYMBOLS: TSX-V (Canada): WGP.V FRANKFURT: WE6.F

    WESTERN GEOPOWER DRILLS 50% OF STEAM RESOURCE WITH 3 WELLS

    VANCOUVER, Canada, October 22, 2008, TSX Venture Exchange Trading
    Symbol: WGP - Western GeoPower Corp., a renewable energy development
    company, today announced that 50% of the steam resource required to
    supply the planned 35 MWe Western GeoPower Unit 1 plant at The
    Geysers Geothermal Field in California, has been successfully placed
    behind pipe with the drilling and completion of the third well,
    WGP-3. The three wells have established a power capacity of 19.7 MW
    (gross) or 17.8 MW (net). Well WGP-3 is located approximately one
    mile northwest of the WGP-1 well.

    Flow testing carried out by independent consultants GeothermEx, Inc.
    on completion of well WGP-3 has demonstrated an initial steam
    production rate of 114,000 pounds per hour at a flowing wellhead
    pressure of 80 psia. Given the plant requirement of 16,130 pounds
    per hour per MW (gross) or 17,740 pounds per hour MW (net) at a
    flowing wellhead pressure of 80 psia, this well is estimated to have
    a power capacity of 7.1 MW (gross) or 6.4 MW (net).

    Recent flow testing carried out on well WGP-1 established a power
    capacity of 10.0 MW (gross) or 9.0 MW (net) and well WGP-2
    established a power capacity of 2.6 MW (gross) or 2.3 MW (net). The
    average power capacity for the three wells is 6.5 MW (gross) or 5.9
    MW (net).

    "The results of drilling to date have been very satisfactory, with
    well WGP-1 being the most productive well drilled at the Geysers over
    the past two decades and well WGP-3 being one of the most
    productive, " said Dr. Subir Sanyal, President of GeothermEx. "The
    average well capacity of the three wells is far above the average
    capacity at The Geysers field today."

    California-based GeothermEx is a recognized international authority
    in the evaluation of geothermal resources and has been involved in
    the development of all the producing geothermal fields in the United
    States and over 750 projects worldwide. Their knowledge of The
    Geysers geothermal field is extensive, having been associated with
    the development of the field for over 30 years.

    The rig is being skidded across the pad to begin drilling well WGP-4

    Seite 1 von 2



    GlobeNewswire
    0 Follower
    Autor folgen
    Verfasst von GlobeNewswire
    WESTERN GEOPOWER DRILLS 50% OF STEAM RESOURCE WITH 3 WELLS Corporate news announcement processed and transmitted by Hugin AS. The issuer is solely responsible for the content of this announcement. NEWS RELEASEDATE: …