checkAd

     323  0 Kommentare Need for Future Terminal 3 at Frankfurt Airport Confirmed by Independent Institutes - Seite 2


    situation is similar for security, passport and custom control
    channels. Schulte explained: "Without construction of a third
    terminal, increasing numbers of large aircraft - which primarily
    serve intercontinental routes - will have to be handled at remote
    parking positions away from the terminals. This is contrary to German
    as well as European quality standards. Consequently, aircraft
    congestion and waiting times on the taxiways would reach unacceptable
    levels."

    Fraport also examined various alternatives to the new Terminal 3
    for creating additional terminal capacity and aircraft docking
    positions. The results of these assessments clearly show that all
    examined alternatives are far from being viable or suitable to meet
    future requirements. Either the alternatives are not compliant with
    existing zoning laws or they are not feasible for technical reasons,
    while other alternatives would require unrealistic demolition of
    existing buildings or place a further strain on already heavy traffic
    loads in the northern part of the airport - or they would simply not
    provide any significant capacity gains.

    Anzeige 
    Handeln Sie Ihre Einschätzung zu Fraport AG!
    Long
    47,74€
    Basispreis
    0,38
    Ask
    × 13,44
    Hebel
    Short
    54,76€
    Basispreis
    0,40
    Ask
    × 12,77
    Hebel
    Präsentiert von

    Den Basisprospekt sowie die Endgültigen Bedingungen und die Basisinformationsblätter erhalten Sie bei Klick auf das Disclaimer Dokument. Beachten Sie auch die weiteren Hinweise zu dieser Werbung.

    This detailed examination leads to the conclusion that there is no
    way to get around building the new Terminal 3. "Inaugurating Terminal
    3 only in 2021 already means that we will have to temporarily accept
    reductions in service quality. If passengers and staff have to endure
    this, then it should only be for a short period," stressed Schulte.

    In this context, Schulte also underlined that the German state of
    Hesse - with its globally leading aviation hub - has a legitimate
    right to possess a cutting-edge, innovative and sustainable Terminal
    3. The new terminal would also represent an architectural landmark
    and serve as a showcase for optimum passenger services and quality.

    Regarding the next steps to be taken, Schulte added that "Fraport
    has verified the capacity requirements of Terminal 3 in a well-
    founded and comprehensive manner. We have made all of this
    documentation available to the Hesse state government. We look
    forward to having discussions on the results at any time." In
    addition, Fraport has issued the main results of the independent
    institutes via the Internet.

    Fraport AG estimates construction costs for the new Terminal 3 -
    including all ancillary infrastructure measures such as access roads
    and parking lots - to range between E2.5 billion and E3 billion.

    Originaltext: Fraport AG
    digital press kits: http://www.presseportal.de/pm/31522
    press kits via RSS: http://www.presseportal.de/rss/pm_31522.rss2
    ISIN: DE0005773303

    Contact:
    Fraport AG
    Robert A. Payne
    International Spokesman
    Telephone: +49 69 690-78547
    E-mail: r.payne@fraport.de
    Internet: www.fraport.com
    Facebook: www.faceebook.com/FrankfurtAirport
    Seite 2 von 2


    Diskutieren Sie über die enthaltenen Werte


    news aktuell
    0 Follower
    Autor folgen

    Weitere Artikel des Autors


    Verfasst von news aktuell
    Need for Future Terminal 3 at Frankfurt Airport Confirmed by Independent Institutes - Seite 2 Passenger Numbers Expected to Rise to Between 68 Million and 73 Million Annually by 2021 - Additional Terminal Capacity Required at the Latest by the Year 2021 At a press conference today, Fraport AG (the owner and operator of Frankfurt Airport) …

    Schreibe Deinen Kommentar

    Disclaimer