checkAd

    Think big - think ZINC! Trevali Resources Produzent in 6 Monaten (Seite 161)

    eröffnet am 18.02.08 21:57:43 von
    neuester Beitrag 22.08.22 15:42:57 von
    Beiträge: 4.273
    ID: 1.138.653
    Aufrufe heute: 0
    Gesamt: 409.023
    Aktive User: 0

    ISIN: CA89531J1093 · WKN: A1H9CE
    0,1140
     
    EUR
    -3,72 %
    -0,0044 EUR
    Letzter Kurs 30.11.21 Tradegate

    Werte aus der Branche Stahl und Bergbau

    WertpapierKursPerf. %
    0,9900+130,23
    10,850+18,45
    1,0500+17,32
    3.200,00+15,90
    0,5650+14,14
    WertpapierKursPerf. %
    5.900,00-9,23
    9,9900-9,59
    67,15-10,76
    9,0100-13,37
    1,0000-53,27

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 161
    • 428

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 21.10.11 14:21:12
      Beitrag Nr. 2.673 ()
      Falls noch nicht bekannt:


      Xstrata to toll-mill and buy Trevali’s Halfmile polymetallic concentrates
      October 20, 2011 - 13:11 GMT Location: London

      KEYWORDS: Xstrata , Canada , Trevali , Halfmile , zinc , copper , lead , concentrates , ore

      Xstrata will toll-mill ore produced at Trevali Mining Corp’s Halfmile mine in New Brunswick, Canada, and buy the concentrates produced via an offtake agreement, ...


      http://www.metalbulletin.com/Article/2921407/Base-metals/Xst…
      Avatar
      schrieb am 20.10.11 15:15:51
      Beitrag Nr. 2.672 ()
      und - sorry, nicht persönlich gemeint - unter einem "no brainer" verstehe ich bestenfalls jemanden, der irgendwelche hochspekulativen Aktien auf diese Art bezeichnet.

      Mit Santander ist - neben Brunswik - eine 4000 t/d-Mine zu 90% fertig gestellt und ebenfalls ganz wesentlich ist: Das eigene dazugehoerige Kraftwerk ist ebenfalls zum ueberwiegendem Teil fertig. Hier geht es nicht um eine virtuelle PFS-CAPEX, die wahllos nach oben schiesst, weil halbseidene Schaetzer am Werk waren, sondern um den konkreten Aufbau einer Mine zu gweringen Kosten. Ich sehe keine Megadilution, auch wenn ich mir andere Marktbedingungen wuenschen wuerde.

      Das hier nun im Zuge von einer Finanzierung gezockt wird, dass duerfte allen Marktteilnehmern klar sein. Nach meinen Erfahrungen lassen sich genau an diesem Punkt Schnaeppchen machen. TV ist derzeit einfach billig und das wird sich aendern, wenn der Markt halbwegs mitspielt.

      BL
      Avatar
      schrieb am 20.10.11 11:24:48
      Beitrag Nr. 2.671 ()
      Antwort auf Beitrag Nr.: 42.231.887 von boersenbrieflemming am 19.10.11 14:40:01TV ist wieder ein Stueck mehr "No Brainer", sie scheinen die 30 Mio. zusammen zu kriegen und damit ist dann Ruhe.



      dass die ihre 30 Mio vermutlich irgendwie zusammen kriegen werden, ist nicht der Punkt.
      der Punkt sind die Bedingungen, bzw. Konditionen, ZU DENEN sie es zusammen kriegen.

      wenn man die dazugehörigen Warrants mitrechnet, gibt das eine Mega-Dilution zu Konditionen, die für jeden bereits investierten Altaktionär ein Schlag ins Gesicht sind. "Ruhe" ist dann wohl eher fürs Erste mal im Bezug auf Kursfantasie nach oben.


      und - sorry, nicht persönlich gemeint - unter einem "no brainer" verstehe ich bestenfalls jemanden, der irgendwelche hochspekulativen Aktien auf diese Art bezeichnet.
      Avatar
      schrieb am 19.10.11 19:20:31
      Beitrag Nr. 2.670 ()
      Zitat von married: Ich halte das fuer bedeutungslos.

      Du bist nicht der Markt:



      Deswegen schrieb er ja auch "Ich"... So schwer war das nicht oder?! :D :D
      Avatar
      schrieb am 19.10.11 17:59:11
      Beitrag Nr. 2.669 ()
      Antwort auf Beitrag Nr.: 42.228.045 von boersenbrieflemming am 18.10.11 20:13:10
      Ich halte das fuer bedeutungslos.

      Du bist nicht der Markt:

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1865EUR 0,00 %
      Biotech-Innovation auf FDA-Kurs!mehr zur Aktie »
      Avatar
      schrieb am 19.10.11 17:04:55
      Beitrag Nr. 2.668 ()
      Antwort auf Beitrag Nr.: 42.231.887 von boersenbrieflemming am 19.10.11 14:40:01Wir machen unser'm King Freude, wo immer wir können, Ehrensache! Unser Ronny meint, der Stehbierhallentest scheint schneller als erwartet zu kommen. Der Wurm wettet, dass sich das pralle Füllhorn noch als schlaffes Würmchen erweist. Ricky hält dagegen.


      Ey, wat jeht hier ab:?

      Trevali has filed an Amended and Restated Annual Information Form ("A&R AIF") for the year ended December 31, 2010 on SEDAR. The A&R AIF is being filed to update Trevali's previously filed amended and restated annual information form in response to comments received from the British Columbia Securities Commission as part of a continuous disclosure review performed in conjunction with Trevali's current short form prospectus offering. Changes include the consolidation of disclosure on the Halfmile and Stratmat properties into one property, removal of information from earlier technical reports and the addition of two risk factors.
      Avatar
      schrieb am 19.10.11 15:02:12
      Beitrag Nr. 2.667 ()
      :D

      Trevali Provides Construction Update on Santander Mine Project in Peru
      VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 19, 2011) - Trevali Mining Corporation ("Trevali" or the "Company") (TSX:TV)(OTCQX:TREVF)(FRANKFURT:4TI)(BVLAC:TV) is pleased to provide a construction update on its previously announced Santander zinc-lead-silver mine development project in Peru. Construction is advancing on multiple-fronts including: Mine Camp Facilities, Mine Operation Facilities, Mineral Processing Plant, and Mine Electricity and the Tingo Hydroelectric Power Plant Expansion. Production is anticipated to commence in late-Q1 to early-Q2-2012.
      MINE CAMP
      Construction and up-grades of various mine camp facilities, sufficient to support a modern 4,000-tonne-per-day mining facility commenced in late April, 2011, and is now approximately 90% complete (see Figure 1). Specific progress includes:
      Santander Construction Project		Percent Complete		Completion Date
      New Offices 95% October-2011
      Improved Communication Systems 100% August-2011
      Additional Housing, total site capacity 500 100% September-2011
      New Dining Facility, capacity 400 90% October-2011
      Health Facilities / Emergency Room 80% October-2011
      New Camp - Water Treatment System 85% October-2011
      Waste Management Plant 100% August-2011
      Explosives Magazines (3) 100% August-2011
      OPERATIONS INFRASTRUCTURE

      Construction of infrastructure to support underground mining operations began in July 2011; work is now approximately 70% complete and is on track to be finished by mid-November. Progress includes preparation of the main mine adit, compressor house, construction of mine offices, trackless equipment maintenance facilities, installation of mine electrical and ventilation systems, construction of a mine-water treatment facility, dry and lamp house, training center and other ancillary facilities.
      Following a sealed tendering process JRC Ingeneria y Construcion S.A.C. (JRC Engineering and Construction) has been selected as the mining contractor for initial development and planned production at the Magistral deposits. JRC provides contracting mining services at partner Glencore's Iscaycruz and Yauliyacu polymetallic operations also located in the Central Peruvian Polymetallic Belt.
      MINERAL PROCESSING PLANT
      Processing plant site preparation is advancing – the former Santander plant structures and equipment have been rehabilitated and earth-moving and foundation preparation is in ongoing (Figure 2). The Santander development team is in the final phases of selecting the lead-contractor to disassemble, move and reconstruct the Rosaura processing plant at Santander.
      POWER INFRASTRUCTURE
      Construction is underway at the Santander main electric sub-station (50 KW). Concurrently a 65.5-km power line is being constructed and is approximately 60% complete. The sub-station and power line will connect the Santander mine project to the national grid and is on schedule.
      TREVALI FILES AMENDED ANNUAL INFORMATION FORM
      Trevali has filed an Amended and Restated Annual Information Form ("A&R AIF") for the year ended December 31, 2010 on SEDAR. The A&R AIF is being filed to update Trevali's previously filed amended and restated annual information form in response to comments received from the British Columbia Securities Commission as part of a continuous disclosure review performed in conjunction with Trevali's current short form prospectus offering. Changes include the consolidation of disclosure on the Halfmile and Stratmat properties into one property, removal of information from earlier technical reports and the addition of two risk factors.
      ABOUT TREVALI MINING CORPORATION
      Trevali is advancing two polymetallic (zinc-lead-silver-copper) deposits to production in Canada and Peru – the Halfmile and Santander projects respectively. In Canada, Trevali has the Halfmile and Stratmat polymetallic deposits near Bathurst, New Brunswick, and the Ruttan copper-zinc deposit in northern Manitoba. Mine development is underway at Halfmile with a proposed production rate of 2,000-tonnes-per-day anticipated to commence in late 2011. In Peru, the Company has the Santander zinc-lead-silver mine project and the formerly-producing Huampar silver mine, both located in the Central Peruvian Polymetallic Belt.
      At the planned 2,000-tonne-per-day Santander operation, in conjunction with Glencore International A.G., mine commissioning is anticipated to commence at in early 2012 with full production to follow immediately thereafter. Additionally through its subsidiary Trevali Renewable Energy Inc., Trevali is undertaking a significant upgrade of its wholly-owned Tingo run-of-river hydroelectric generating facility along with transmission line upgrades and extensions to allow, in addition to supplying power to the mining operation on the property, the potential sale of surplus power into the Peruvian National Energy Grid.
      The common shares of Trevali are listed on the TSX (symbol TV), the OTCQX (symbol TREVF) and on the Lima Stock Exchange (symbol TV). For further details on Trevali, readers are referred to the Company's web site (www.trevali.com) and to Canadian regulatory filings on SEDAR at www.sedar.com.
      Qualified Person and Quality Control/Quality Assurance
      EurGeol Dr. Mark D. Cruise, Trevali's President and CEO and a qualified person as defined by National Instrument 43-101, has supervised the preparation of the scientific and technical information that forms the basis for this news release. Dr. Cruise is not independent of the Company, as he is an officer and shareholder.
      The work programs at Santander were designed by, and are supervised by, Mark D. Cruise, President & CEO of Trevali, Tim Kingsley (Senior Geologist) and Tansy O'Connor-Parsons (Chief Geochemist), who together are responsible for all aspects of the work, including the quality control/quality assurance programs. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ACME Laboratories, Vancouver, for assay. ACME's quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025: 1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Blind certified reference material is inserted at regular intervals into the sample sequence by Trevali personnel in order to independently assess analytical accuracy. Finally, representative blind duplicate samples are routinely forwarded to ACME and an ISO compliant third party laboratory for additional quality control.
      On Behalf of the Board of Directors of TREVALI MINING CORPORATION
      Mark D. Cruise, President

      http://www.marketwire.com/press-release/trevali-provides-con…
      Avatar
      schrieb am 19.10.11 14:40:01
      Beitrag Nr. 2.666 ()
      Antwort auf Beitrag Nr.: 42.231.385 von uny1989 am 19.10.11 13:16:42Es freut mich, dass Du auch bei der TV dabei bist. Was ist denn an den Saetzen verkehrt?

      ad 1. Ich halte das immer noch fuer bedeutungslos.
      ad 2. Darueber braucht man wohl nicht zu diskutieren. Bei der Cardero fliesst halt alles derzeit in das Kohle-Dings.
      ad 3. TV ist wieder ein Stueck mehr "No Brainer", sie scheinen die 30 Mio. zusammen zu kriegen und damit ist dann Ruhe.

      BL
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.10.11 13:16:42
      Beitrag Nr. 2.665 ()
      "Ich halte das für bedeutungslos"

      "und die Cardero braucht das geliehene Geld zurueck"

      :laugh:

      No brainer, Alles Em Lot King
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.10.11 06:14:04
      Beitrag Nr. 2.664 ()
      Guten Morgen,

      das ist auch nicht meine Wunsch-News, aber es gibt wesentlich Schlimmeres, da wurde jetzt noch ein kleines Steuersparmodell eingebaut, die zusaetzlichen Lasten, die durch den FT-Charakter steuerlich fuer die Company enstehen koennten, sind zu verschmerzen - wesentlich bleibt, dass hier nun die Finanzierung abgeschlossen wird, bzw. das Geld dann auf dem Konto ist.

      auf Biegen und Brechen nochmal fast ein Drittel(!) der gesamten Marketcap an frischem Kapital

      Santander, Halfmile und das Kraftwerk muessen laufen und die Cardero braucht das geliehene Geld zurueck und mit etwas Fortune haben wir dann erst einmal Ruhe und koennen Produktion und uns hoffentlich auch ueber eine Erweiterung der Res. erfreuen.:)

      BL
      • 1
      • 161
      • 428
       DurchsuchenBeitrag schreiben


      Think big - think ZINC! Trevali Resources Produzent in 6 Monaten