checkAd

     144  0 Kommentare Layne de Mexico Commences Phase 1 Drilling at Silver Spruce El Mezquite Au-Ag Project, Sonora, Mexico - Seite 2

    The environmental permit, required to drill the Property, was received from SEMARNAT (see Press Release April 20, 2021) and granted to the concession holder, Yaque Minerals S.A. de C.V. ("Yaque") by the Mexican Secretariat of Environment and Natural Resources (SEMARNAT).

    Figure 2. Location Map for El Mezquite, Jackie and Diamante Concessions. Nicho mine development by Minera Alamos located 10 km SE of El Mezquite.

    Exploration Overview

    The Company undertook an exploration program including environmental permitting for drilling, geological mapping of geologic structures and lineaments, ortho-mosaic photography, rock geochemical and hyperspectral analysis, data compilation and GIS modeling, and a LiDAR survey. Ground truthing of the Au-Ag system with geological mapping and rock sampling was completed in three campaigns between July 2020 and March 2021. All aspects of the exploration program are conducted with strict adherence to COVID-19 protocols for personal safety.

    All current samples from the 2020-2021 programs were submitted to ALS Global for gold, multi-element and hyperspectral analysis. Historical samples (>400) from the 2010-2019 programs also were submitted to provide complementary multi-element and hyperspectral data over the Property database. The final batch of assay results remain pending and will be provided shortly upon receipt and interpretation.

    LiDAR survey results were received recently and are being updated into the project GIS database.

    Lesen Sie auch

    RC Drill Program

    The permit allows for fourteen (14) drill pads over the targets in the northern area of the concession (see Figure 3). Individual holes are expected to reach depths of 100-200 metres to intersect the target intervals.

    Land surface agreements were signed recently with three ranchers to facilitate full access to the Phase 1 collar locations.

    Figure 3. Location Map of the proposed El Mezquite Phase 1 Drill Collars

    Project Background

    The 180-hectare Property is easily accessible from Mexican Highway #16 via a southerly-trending unpaved road which traverses through the centre of the known gold mineralization (see Figures 2 and 3). High voltage power lines are positioned along Highway #16.

    The El Mezquite Project is located within the west-central portion of the Sierra Madre Occidental Volcanic Complex within the prominent northwest-trending "Sonora Gold Belt" of northern Mexico and parallel to the well-known, precious metals-rich Mojave-Sonora Megashear (see Figure 4).

    Seite 2 von 4


    Diskutieren Sie über die enthaltenen Werte


    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Layne de Mexico Commences Phase 1 Drilling at Silver Spruce El Mezquite Au-Ag Project, Sonora, Mexico - Seite 2 BEDFORD, NS / ACCESSWIRE / June 3, 2021 / Silver Spruce Resources Inc. ("Silver Spruce" or the "Company") (TSXV:SSE) (FRA:S6Q1) is very pleased to announce the commencement of Phase 1 exploration drilling by Layne de Mexico at the El Mezquite Au-Ag …