checkAd

     117  0 Kommentare Roscan Expands Gold Mineralization at Kabaya Drilling highlights include 1.62 gpt gold over 24m and 2.27 gpt gold over 7m - Seite 2

    Roscan Gold Corporation, Tuesday, May 30, 2023, Press release picture
    Figure 1: Kabaya gold deposit, KB3 drilling plan view, gold contouring envelopes projected to the surface and drill hole locations.

    The Kabaya gold mineralization is disseminated and associated with a strong kaolinization. The gold host rock alternates between tuffaceous and greywacke facies crosscut by younger dolerite sills and dykes (Figures 2 and 3). At KB3, the higher-grade zone does not appear at the surface and, from the longitudinal section, the mineralization is plunging around 10-15° to the South. This relatively higher grade has not been captured in our resource estimation (Press Release June 8th, 2022).

    Roscan Gold Corporation, Tuesday, May 30, 2023, Press release picture
    Figure 2: Kabaya gold deposit, KB3 satellite North, section A 1390700N
    Roscan Gold Corporation, Tuesday, May 30, 2023, Press release picture
    Figure 3: Kabaya gold deposit, KB3 satellite North, section A 1390600N

    The Kabaya mineralization is part of the prolific regional Siribaya-Mankouke-Seko structural corridor (Figure 4). It is located on the Eastern edge of this major structure as well as Mankouke South gold body. Roscan's large land package has a strategic position covering a substantial portion of this significant structural corridor by over 25km, including the splays around the intrusive pluton of Disse, where several mineralized bodies were discovered.

    Roscan Gold Corporation, Tuesday, May 30, 2023, Press release picture
    Figure 4: Roscan permit map showing Airborne Magnetic geophysics, the resources zones, targets under development and nearby gold deposits

    Drilling and Analytical Protocol

    Lesen Sie auch

    Roscan uses Geodrill Reverse Circulation (RC) to drill until maximum 170m to reach the target. In 2021, (holes RCDBS21-026 to RCDBS21-048), the samples were sent for preparation and 50g fire assays to Bureau Veritas Bamako laboratory and since January 2022, the samples are sent to the ALS Laboratories in Bamako, Mali and assayed at their analytical facilities to Ouagadougou for 2 kg Bottle Roll with atomic absorption finish including tail analysis by fire assays for results more than 0.05ppm. Roscan applied industry-standard QA/QC procedures to the program using reference materials, blanks, standards, and duplicates.

    Seite 2 von 4


    Diskutieren Sie über die enthaltenen Werte


    Accesswire
    0 Follower
    Autor folgen
    Mehr anzeigen
    We’re a newswire service standout and fast becoming an industry disruptor. We provide regional, national and global news to thousands of clients around the world. We’re also leading the way in social engagement, targeting and analytics.
    Mehr anzeigen

    Verfasst von Accesswire
    Roscan Expands Gold Mineralization at Kabaya Drilling highlights include 1.62 gpt gold over 24m and 2.27 gpt gold over 7m - Seite 2 TORONTO, ON / ACCESSWIRE / May 30, 2023 / Roscan Gold Corporation ("Roscan" or the "Company") (TSXV:ROS)(FSE:2OJ)(OTCQB:RCGCF) is pleased to announce additional exploration results from 12 Reverse Circulation ("RC") holes totaling 1,963 meters at …