checkAd

    EQS-News  153  0 Kommentare Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany

    Für Sie zusammengefasst
    • Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany
    • Orders include 20 wind turbines for three projects in northern Germany
    • Turbines equipped with state-of-the-art technology and maintenance contracts for 15 years

    EQS-News: Nordex SE / Key word(s): Incoming Orders
    Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany

    11.01.2024 / 07:30 CET/CEST
    The issuer is solely responsible for the content of this announcement.


    Hamburg/Sehestedt, January 11, 2024. At the end of 2023, Denker & Wulf, one of the leading onshore wind farm developers in Germany, placed orders with the Nordex Group to supply and install 20 wind turbines for three projects in northern Germany. The orders also include Premium Service contracts for the maintenance of the turbines over a period of 15 years.

    Anzeige 
    Handeln Sie Ihre Einschätzung zu Nordex SE!
    Long
    11,89€
    Basispreis
    1,09
    Ask
    × 11,58
    Hebel
    Short
    13,94€
    Basispreis
    1,17
    Ask
    × 11,08
    Hebel
    Präsentiert von

    Den Basisprospekt sowie die Endgültigen Bedingungen und die Basisinformationsblätter erhalten Sie bei Klick auf das Disclaimer Dokument. Beachten Sie auch die weiteren Hinweise zu dieser Werbung.

    In Schleswig-Holstein, the 67.5 MW "Gönnebek I+II" wind farm is being built in the Segeberg district with a total of twelve turbines, eleven N149/5.X turbines and one N133/4.8. The Group will also supply one N149/5.X and one N163/6.X for the 12.7 MW "Schönermark" wind farm in the Uckermark district in Brandenburg. Denker & Wulf has further ordered six N163/6.X turbines for the 42 MW Oederquart-Wischhafen wind farm near Stade in Lower Saxony. Installations are scheduled to begin at the end of 2024.

    "Nordex gives us the confidence to realize our project needs, which has enabled the strong deal flow for more than 30 turbines in 2023. As a result, we can seamlessly build on last year's commissioning record and enter another promising wind year 2024 with momentum" says Torsten Levsen, CEO of Denker & Wulf AG.

    The turbines will be equipped with state-of-the-art technology, including Nordex' "BNK-Ready" solution for needs-based night-time marking and an ice detection system. In order to meet all requirements in terms of sound and shadow casting, as well as to take into account the extensive species protection, the turbines can be operated with different power modes and are equipped with shadow flicker and bat modules.

    Karsten Brüggemann, Vice President Region Central & Managing Director Germany of the Nordex Group, says: "We are delighted that our high-performance wind turbines will replace older, smaller turbines as part of two repowering projects. This is important for the energy transition in Germany. We would like to thank Denker & Wulf, who have been with us for many years and who have once again placed their trust in us. With these new orders, we will further strengthen our position as one of the most important suppliers of wind turbines in the region."

    Seite 1 von 3


    Diskutieren Sie über die enthaltenen Werte


    EQS Group AG
    0 Follower
    Autor folgen

    Verfasst von EQS Group AG
    EQS-News Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany EQS-News: Nordex SE / Key word(s): Incoming Orders Nordex Group receives orders for 122 MW from Denker & Wulf AG in Germany 11.01.2024 / 07:30 CET/CEST The issuer is solely responsible for the content of this announcement. Hamburg/Sehestedt, …

    Schreibe Deinen Kommentar

    Disclaimer