checkAd

    Diskussion zu Silver Elephant Mining Corp, ehemals Prophecy Development Corp. (Seite 270)

    eröffnet am 21.06.11 18:39:01 von
    neuester Beitrag 29.04.24 21:46:40 von
    Beiträge: 35.013
    ID: 1.167.075
    Aufrufe heute: 46
    Gesamt: 4.090.668
    Aktive User: 0

    ISIN: CA82770L3074 · WKN: A3DWAL
    0,2250
     
    EUR
    0,00 %
    0,0000 EUR
    Letzter Kurs 16:19:56 Lang & Schwarz

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    9,8360+17,66
    1,0950+16,00
    2,4000+14,83
    552,55+13,76
    33,17+13,52
    WertpapierKursPerf. %
    0,5500-8,33
    1,3160-9,12
    185,00-9,76
    0,7000-11,39
    12,000-25,00

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 270
    • 3502

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 10.11.19 22:14:02
      Beitrag Nr. 32.323 ()
      Antwort auf Beitrag Nr.: 61.886.300 von uralsib am 10.11.19 21:02:35Hallo. Wie erklärst du dir dann den heftigen Unterschied zur Marktkapitalisierung? Danke
      Silver Elephant Mining | 0,370 C$
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.11.19 21:33:54
      Beitrag Nr. 32.322 ()
      Das Lächerlichste ist im übrigen der Hinweis auf die fehlenden Arbeitskräfte. Nur mal ein kleiner Hinweis:

      Die Silbermine befindet sich weder im nördlichsten Alaska noch in Grönland, wo Arbeitskräfte eingeflogen und vielleicht noch mit Hundeschlitten an den Einsatzort transportiert werden müssen. :laugh::laugh:
      Silver Elephant Mining | 0,370 C$
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.11.19 21:25:24
      Beitrag Nr. 32.321 ()
      Antwort auf Beitrag Nr.: 61.886.138 von Jaci am 10.11.19 20:31:53Ach so, und nur deshalb, weil in dem Report nix über Brauchwassermengen, Mttelwerte, Peak, Minimalwerte und Arbeitskräfte steht, ist er desaströs? :confused::confused::confused:



      Sei bitte so nett und kopiere die desaströsen Stellen des Reports hier rein. Ich lerne ja gerne dazu, befürchte aber, dass das einzig Desaströse Deine Phantasie ist.
      Silver Elephant Mining | 0,370 C$
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.11.19 21:02:35
      Beitrag Nr. 32.320 ()
      Antwort auf Beitrag Nr.: 61.886.258 von uralsib am 10.11.19 20:55:24Wettbewerber NUAG hat überhaupt keine Infrastruktur vor Ort.

      Approximately 4,050 m above sea level, Silver Sand is located in approximately 25 km northeast of the world-famous Cerro Rico silver and base metal mineral system near Potosi. Access is relatively easy with a road distance of 54 km to Potosi, of which 27 km are paved road, the Bolivia National Highway 5. The rest is year-round gravel road for mining purpose of the Colavi mining district. (Location Map)

      https://newpacificmetals.com/silver-sand-project

      Keine Resoursen Schätzung, die Bohrergebnisse haben bis jetzt schlechtere Grades als bei Paca und Pulacayo aber dabei eine stolze Marktkapitalisierung von 670mio $ ( 12 fach höher als bei PCY)

      https://web.tmxmoney.com/charting.php?qm_symbol=NUAG
      Silver Elephant Mining | 0,370 C$
      Avatar
      schrieb am 10.11.19 20:55:24
      Beitrag Nr. 32.319 ()
      Antwort auf Beitrag Nr.: 61.885.484 von sebaldo am 10.11.19 17:55:27"Die desaströsen Zustände gibt es nur im Jaci-Report."

      nicht nur in seinem Report...., vor allem in seinem Kopf
      Silver Elephant Mining | 0,370 C$
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1865EUR 0,00 %
      Biotech-Innovation auf FDA-Kurs!mehr zur Aktie »
      Avatar
      schrieb am 10.11.19 20:31:53
      Beitrag Nr. 32.318 ()
      Antwort auf Beitrag Nr.: 61.885.484 von sebaldo am 10.11.19 17:55:27
      Zitat von sebaldo: Da hat ja der von PCY beauftragte NI von Mercator entweder desaströse Zustände geschildert

      Reine Erfindung. Jeder, der lesen kann, wird feststellen, dass der Mercator-Bericht in Sa. Infrastruktur genau das Gegenteil feststellt.

      Die desaströsen Zustände gibt es nur im Jaci-Report. :D


      Dann zitiere ich einfach mal aus diesem Bericht den relevanten Punkt 4.4, dann ist ja wirklich leicht zu sehen, wer von uns beiden die geneigten Leser hinter die Fichte führt:

      https://www.prophecydev.com/pdf/Pulacayo%20Project%20Technic…

      Seite 42/43:

      "4.4 Local Resources and Infrastructure

      Bolivia has a long history as a significant primary producer of silver and tin, with associated
      secondary production of gold, copper, antimony, bismuth, tungsten, sulphur and iron. The
      country also contains sizeable reserves of natural gas that have not been fully developed to date
      due to export issues and limited access to required infrastructure.

      The country has an abundance of hydroelectric power and transmission lines which parallel the
      road system provide service to most major settlements. Remote villages generally have diesel
      generators which run infrequently during evening hours. Transmission lines from the
      hydroelectric plants of Landara, Punutuma, and Yura that were reconditioned by a joint venture
      between COMIBOL and the Valle Hermoso Electrical Company pass within a few kilometres of
      Pulacayo.

      Telephone service and internet access are available in most areas and cellular telephone service
      is widespread. However, coverage is not complete and international connectivity is not ensured.
      Local communication services in the area are good and consist of an ENTEL-based long-
      distance telephone service, a GSM signal for cell phones and two antennae for reception and
      transmission of signals from national television stations. Apogee installed a satellite receiver to
      provide internet access for its operation and this service is shared with the Cooperative Social del
      Riesgo Compartido (Shared Risk Cooperative). An adequate supply of potable water for the
      town is supplied by pipeline from a dam and reservoir (Yana Pollera) facility located 28 km from
      Pulacayo in the Cerro Cosuño.

      Coeur d’Alene Mines Corporation (San Bartolome), Pan American Silver Ltd. (San Vicente),
      Glencore International plc (AR Zinc, Sinchi Wayra) and Apex Silver Mines Ltd - now Golden
      Minerals Company (San Cristóbal) have been the most significant international companies with
      producing mines in this region in recent years. Basic exploration services are available in Bolivia
      and include several small diamond core drilling contractors, the ALS Group, which operates an
      analytical services sample preparation facility in Oruro, the SGS Group, which has analytical
      services and preparation facilities in La Paz, and several locally owned assay facilities. The
      Bolivian National School of Engineering operates a technical college in Oruro (Universidad
      Técnica de Oruro) that includes a mineral processing department and laboratory facilities that
      provide commercial services to the mining industry. In general, an adequate supply of junior to
      intermediate level geologists, metallurgists, mining engineers and chemists is currently
      considered to be present in the country.

      Since down-sizing of site operations at Pulacayo by Apogee in 2013-2014, the population of the
      community has dropped to approximately 300 to 400 permanent residents, many of whom are
      associated with the Cooperativa Minera Pulacayo Ltda. (Pulacayo Mining Cooperative). The
      village has a state-run school and medical services are provided by the state’s Caja Nacional de
      Seguros (National Insurance Fund). A hospital and clinic function independently. Numerous
      dwellings and mining related buildings in Pulacayo are owned by COMIBOL and some of these
      have been donated to the Pulacayo Mining Cooperative. Under terms of the Shared Risk
      Contract, COMIBOL makes some mining infrastructure available for use by Prophecy (Figures
      4.2 and 4.3). "


      Jetzt erzähl mal, wieviel Brauchwasser wird benötigt, wieviel steht zur Verfügung?
      Woher kommen die Arbeitskräfte bei dem massiven Bevölkerungsschwund, wieviel werden benötigt?
      Wieviel elektr. Energie ist vorhanden VOR-ORT (Mittelwert, Peak, Minimalwert über 24h), wieviel wird jeweils benötigt?
      Welche der o.a. "mining releated buildings" (Anzahl und Zustand) werden PCY überlassen (bis jetzt KEINES, denn sie (einige!) wurden lediglich der PMC überlassen. Wieviel und welche (Zweck) müssen neu gebaut werden?

      Dieser ganze Infrastruktur-Bericht ist eine einzige Sammlug an Allgemeinplätzen, das Meiste davon über Bolivien allgemein, wenig zur vor-Ort-Situation und das noch schwammiger als der Rest, keine einzige konkrete relevante Zahl, niemand kann damit eine Planung oder gar eine Kosteneinschätzung machen. Aber für die Promoter reicht ja so ein Machwerk schon zum Jubeln....
      Silver Elephant Mining | 0,370 C$
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.11.19 19:47:08
      Beitrag Nr. 32.317 ()
      Antwort auf Beitrag Nr.: 61.885.685 von uralsib am 10.11.19 18:35:10nur zur Erinnerung:

      Für Pulacayo Projekt gibt es bereits ein abgeschlossenes Feasibility Study vom Apogee Silver ( 2013)
      https://secure.kaiserresearch.com/i/jk/tr16/TRAPE20130117.pd…

      Das Projekt voll genehmigt, hat 27mio oz probable Reserves, LOM 12 jahre, mit einem zugrunde
      gelegten 28USD Silver Preis - NPV ( pre Tax) - $128mio. CAPEX 45,9 $ Mio.
      Total OPEX- 8,44 $
      https://www.prophecydev.com/apogee-silvers-pulacayo-project-…


      Da OPEX ( 8,44 $) im Branchen Vergleich im niedrigen Bereich liegt ( wird auch optimiert), sollte man den CAPEX etwas "drehen".
      Z.B. In letzten Jahren hat sich an Infrastruktur etwas geändert, das mindert CAPEX.
      "A new government-funded electrical substation for the town of Uyuni is being constructed with sufficient capacity for the Pulacayo Project as well, only 27 km away from the mine. Previously, the Feasibility Study anticipated building a switching substation at Tazna, 61 km from Pulacayo and the construction of a 115 kV power line. Permitting activities for both options are already underway."

      https://www.marketwatch.com/press-release/apogee-silver-rece…

      Vor zwei Jahren hat man mir gesagt, daß CAPEX von fast 50mio bis auf 12-15mio reduziert werden konnte... wenn man im Rahmen vom Apogee's Projekt bleibt. ( nur Pulacayo)

      Nun kommt der Eric Sprott als strategischer Investor, möglicherweise kommen die anderen ( NWME, Silvercorp, American Silver) nach. Zu allen hat man jetzt die beste Kontakte ( s. die letzten News)

      Das Geld für die weitere Bohrungen ist da. Man will jetzt das Projekt anders konzipieren- jetzt ist nicht Silvercorp Model ein Vorbild sondern ein San Cristobal Projekt von Sumitomo in der nahen Nachbarschaft. Sumitomo war in letzten Jahren erfolgreich bei allen Silber Tiefen und geschweige den braucht die Wirtschaftlichkeitsberechnung den Preis von 28USD ( wie Apogee).

      Diese von Prophecy neue Strategie braucht natürlich eine Geldquelle ( Sprott am Anfang, nach IPO kommen die anderen?), und natürlich sie sollen neu Resourcen entdecken und die alten bestätigen wie latztes Mal bei Paca. ( übrigens Paca war nicht ein Bestandteil des FS von Alogee Silver)

      Wenn dem Management es gelingt, ( und an dessen Erfahrung habe ich keine Zweifeln), und Kommune Pulacayo ein Open-Pit Verfahren genehmigt ( da habe ich Zweifeln), dann kann aus dem Prophecy etwas sehr interessantes werden.

      wenn nicht, dann war es schön dieses Projekt zu verfolgen.. und ab und zu ( wie Sebaldo) "paar Tausend" durch Trading für die Weihnachtsgeschenke zu kassieren.
      Silver Elephant Mining | 0,370 C$
      Avatar
      schrieb am 10.11.19 19:24:24
      Beitrag Nr. 32.316 ()
      Antwort auf Beitrag Nr.: 61.885.451 von uralsib am 10.11.19 17:52:27Ich denke das ist davon eher unabhängig. Meiner Meinung nach war dies eine Bedingung von Sprott, der damit auf mindestens 25,1 Prozent der Stimmrechte bekommen würde.
      Silver Elephant Mining | 0,370 C$
      Avatar
      schrieb am 10.11.19 18:35:10
      Beitrag Nr. 32.315 ()
      Antwort auf Beitrag Nr.: 61.885.625 von sebaldo am 10.11.19 18:21:12eben.

      ca. 1 Jahr braucht PCY für Genehmigungen im V Projekt

      Inzwischen wird in Bolivia gebohrt, Resourcen Update und Trial Mining Projekt starten.

      Nur die Frage, wann kommt die nächste Welle, womit die PCY -Spekulanten ihr Geld verdienen:)?
      Silver Elephant Mining | 0,370 C$
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.11.19 18:21:12
      Beitrag Nr. 32.314 ()
      Antwort auf Beitrag Nr.: 61.885.526 von uralsib am 10.11.19 18:00:19Interessant wird ob LGO mit dem aktuellen V Preis wirtschaftlich bleibt.

      LGO hat im letzten Jahr so gut verdient, dass sie die Saure Gurken Zeit sicher noch eine Zeit lang kompensieren können.

      Das Problem beim Vanadium ist diese sehr starke Volatilität. Von daher bin ich ganz froh, dass John Lee sich mit der Weiterverfolgung des Silberprojekts in Bolivien durchgesetzt hat.

      Ansonsten hoffe ich, dass sich die Vanadiumpreise irgendwann stabilisieren werden. Das muss nicht unbedingt auf dem sehr hohen 2018er Niveau sein.
      Silver Elephant Mining | 0,370 C$
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      • 1
      • 270
      • 3502
       DurchsuchenBeitrag schreiben


      Diskussion zu Silver Elephant Mining Corp, ehemals Prophecy Development Corp.