checkAd

     161  0 Kommentare Golden Predator Reports Final Drill Results from Brewery Creek Mine - Seite 5

    The technical content of this news release has been reviewed and approved by Jeff Cary, CPG, a Qualified Person as defined by National Instrument 43-101 and a consultant to the Company.

    About Golden Predator Mining Corp.

    Golden Predator is advancing the past-producing Brewery Creek Mine towards a timely resumption of mining activities, under its Quartz Mining and Water Licenses, in Canada’s Yukon. With established resources grading over 1.0 g/t gold the Company is completing a Bankable Feasibility Study for the restart of heap leach operations. The Brewery Creek Mine project operates with a Socio Economic Accord with the Tr’ondëk Hwëch’in First Nation.

    For additional information:
    Janet Lee-Sheriff
    Chief Executive Officer
    (604) 260-8435
    info@goldenpredator.com
    www.goldenpredator.com

    Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This press release contains forward-looking information that involve various risks and uncertainties regarding future events. Such forward-looking information can include without limitation statements based on current expectations that the Brewery Creek will advance to an early production decision, or the extent of any additional mineral resource that could result from incorporating 2019 exploration drilling. Actual results and future events could differ materially from those anticipated in such information. These and all subsequent written and oral forward-looking information are based on estimates and opinions of management on the dates they are made and are expressly qualified in their entirety by this notice. Except as required by law, the Company assumes no obligation to update forward-looking information should circumstances or management's estimates or opinions change.

    1. The 2020 Mineral Resource Estimate was conducted in accordance with CIM guidelines and is reported in a NI 43-101 Technical Report which will be filed on SEDAR and the Company’s website within 45 days.

    Seite 5 von 5



    globenewswire
    0 Follower
    Autor folgen

    Verfasst von globenewswire
    Golden Predator Reports Final Drill Results from Brewery Creek Mine - Seite 5 Significant gold mineralization in all drill holes reaching target depthVANCOUVER, British Columbia, Feb. 09, 2021 (GLOBE NEWSWIRE) - Golden Predator Mining Corp. (TSX.V:GPY, OTCQX:NTGSF) (the “Company”) today announces the results from the final …