Interoil - Die Gelegenheit in Papua Neu Guinea - 500 Beiträge pro Seite
eröffnet am 25.08.06 16:29:49 von
neuester Beitrag 12.10.06 20:39:39 von
neuester Beitrag 12.10.06 20:39:39 von
Beiträge: 7
ID: 1.079.021
ID: 1.079.021
Aufrufe heute: 2
Gesamt: 1.123
Gesamt: 1.123
Aktive User: 0
ISIN: CA4609511064 · WKN: 121588
45,07
EUR
+0,13 %
+0,06 EUR
Letzter Kurs 29.09.16 Tradegate
Auf diesem Niveau (knapp 14,00 USD) halte ich IOC für hochinteressant.
Die haben eine Raffinierie in PNG und haben damit im letzten Q ganz schön absehbare Verluste gehabt und wurden abgestraft.
Allerdings haben sie da ein potentielles Wahnsinnsding am Bohren...
InterOil Corporation: Elk-1 ST-1 Well Drilling Report No. 9
Wednesday August 23, 9:26 am ET
TORONTO, ONTARIO--(MARKET WIRE)--Aug 23, 2006 -- InterOil Corporation (TSX:IOL.TO - News) (AMEX:IOC - News):
ADVERTISEMENT
<A TARGET="_top" HREF="http://us.ard.yahoo.com/SIG=12e1q712e/M=534249.8821159.98526… SRC="http://m1.2mdn.net/810694/300x250_boldmv_wallst.jpg" BORDER=0></A>
Elk Prospect
Type:
Oil / Gas exploration well
Location:
PPL 238, Eastern Papua Basin
145 degrees 08' 27.6" E; 007 degrees 06' 0.5" S
Current Status:
The well is now secure with zero pressure at the surface. In dealing with the high gas pressure we have experienced during the past few weeks, our goals have been to ensure the safety of our personnel, the integrity of the wellbore and to prevent loss or damage to equipment. Having achieved these goals and with the well now secure, our forward plan is to:
- Run 7" casing with the Downhole Deployment Valve (DDV) down to the top of the 7" liner at 3,258 feet (993 meters) (to control the high gas pressure - subsurface);
- Rig-up the InterOil rig with additional equipment for high gas pressure drilling. This will allow us to drill ahead with the 'Managed Pressure Drilling' (MPD) technique of pressurized mud cap drilling;
- The major additional equipment has been deployed to PNG and operations to assemble them have commenced;
- Drilling ahead to commence following the rig-up of new high pressure drilling, recording and control equipment.
Activities since last report:
We are pleased to announce that the well has been successfully killed (controlled) by pumping heavy mud down the well bore while pulling the drill pipe out of the open hole from 5,545 feet (1,690 meters) up into the 9 5/8" casing to a depth of 3,045 feet (928 meters).
The well was then temporarily plugged at the bottom of the hole through the use of a 'gunk pill' (mixture of cement/gel/diesel) in order to isolate and control the high gas bearing formation.
The entire drill string was then pulled out of the well and a drillable bridge plug was then set in the 7" casing to further secure the well.
Past Data:
The following information is the result of DST #1 as reported earlier:
- Estimated bottom hole pressure of 3,700 psi.
- Wellhead pressure of 3,150 psi.
- Calculated kh (permeability feet) of 3,000 md-ft.
- Estimated Absolute Open Flow (AOF) was calculated at 150MMCFPD
- Significant skin was observed and is primarily attributable to the flow restriction in the drill pipe due to the stuck wireline tool.
- No depletion was observed throughout the test and subsequent build up.
Note: These results are based on surface pressures only. The well flowed for approximately 25 hours and the well test calculations were based on the measured data obtained over the final 3 hours of flow.
Set 20" conductor at 15 feet (5 meters). Drilled 17 1/2" hole to 1,007 feet (307 meters) and ran 13 3/8" surface casing. Set 9 5/8" casing at 3,478 feet (1,060 meters). Ran 7" liner (casing) to 5,393 feet (1,640 meters) and cemented.
After setting a 7 inch liner at 5,381 feet (1,640 meters) InterOil drilled a 6 1/4 inch hole into the transitional Marl/Puri Limestone formations from 5,381 feet to 5,558 feet (1,640 meters to 1,694 meters). At 5,558 feet (1,694 meters) the well incurred lost circulation which then induced gas into the wellbore. While circulating out the gas kick, the well flowed gas to surface at 2,000 psi at an estimated of 30 - 50MMCFPD. The well flowed gas for approximately 30 minutes before the well was shut in.
Planned Total Depth:
Approximately 9,843 feet (3,000 meters).
Operator:
InterOil subsidiary, SPI (208) Limited.
Prospect Description:
Die haben eine Raffinierie in PNG und haben damit im letzten Q ganz schön absehbare Verluste gehabt und wurden abgestraft.
Allerdings haben sie da ein potentielles Wahnsinnsding am Bohren...
InterOil Corporation: Elk-1 ST-1 Well Drilling Report No. 9
Wednesday August 23, 9:26 am ET
TORONTO, ONTARIO--(MARKET WIRE)--Aug 23, 2006 -- InterOil Corporation (TSX:IOL.TO - News) (AMEX:IOC - News):
ADVERTISEMENT
<A TARGET="_top" HREF="http://us.ard.yahoo.com/SIG=12e1q712e/M=534249.8821159.98526… SRC="http://m1.2mdn.net/810694/300x250_boldmv_wallst.jpg" BORDER=0></A>
Elk Prospect
Type:
Oil / Gas exploration well
Location:
PPL 238, Eastern Papua Basin
145 degrees 08' 27.6" E; 007 degrees 06' 0.5" S
Current Status:
The well is now secure with zero pressure at the surface. In dealing with the high gas pressure we have experienced during the past few weeks, our goals have been to ensure the safety of our personnel, the integrity of the wellbore and to prevent loss or damage to equipment. Having achieved these goals and with the well now secure, our forward plan is to:
- Run 7" casing with the Downhole Deployment Valve (DDV) down to the top of the 7" liner at 3,258 feet (993 meters) (to control the high gas pressure - subsurface);
- Rig-up the InterOil rig with additional equipment for high gas pressure drilling. This will allow us to drill ahead with the 'Managed Pressure Drilling' (MPD) technique of pressurized mud cap drilling;
- The major additional equipment has been deployed to PNG and operations to assemble them have commenced;
- Drilling ahead to commence following the rig-up of new high pressure drilling, recording and control equipment.
Activities since last report:
We are pleased to announce that the well has been successfully killed (controlled) by pumping heavy mud down the well bore while pulling the drill pipe out of the open hole from 5,545 feet (1,690 meters) up into the 9 5/8" casing to a depth of 3,045 feet (928 meters).
The well was then temporarily plugged at the bottom of the hole through the use of a 'gunk pill' (mixture of cement/gel/diesel) in order to isolate and control the high gas bearing formation.
The entire drill string was then pulled out of the well and a drillable bridge plug was then set in the 7" casing to further secure the well.
Past Data:
The following information is the result of DST #1 as reported earlier:
- Estimated bottom hole pressure of 3,700 psi.
- Wellhead pressure of 3,150 psi.
- Calculated kh (permeability feet) of 3,000 md-ft.
- Estimated Absolute Open Flow (AOF) was calculated at 150MMCFPD
- Significant skin was observed and is primarily attributable to the flow restriction in the drill pipe due to the stuck wireline tool.
- No depletion was observed throughout the test and subsequent build up.
Note: These results are based on surface pressures only. The well flowed for approximately 25 hours and the well test calculations were based on the measured data obtained over the final 3 hours of flow.
Set 20" conductor at 15 feet (5 meters). Drilled 17 1/2" hole to 1,007 feet (307 meters) and ran 13 3/8" surface casing. Set 9 5/8" casing at 3,478 feet (1,060 meters). Ran 7" liner (casing) to 5,393 feet (1,640 meters) and cemented.
After setting a 7 inch liner at 5,381 feet (1,640 meters) InterOil drilled a 6 1/4 inch hole into the transitional Marl/Puri Limestone formations from 5,381 feet to 5,558 feet (1,640 meters to 1,694 meters). At 5,558 feet (1,694 meters) the well incurred lost circulation which then induced gas into the wellbore. While circulating out the gas kick, the well flowed gas to surface at 2,000 psi at an estimated of 30 - 50MMCFPD. The well flowed gas for approximately 30 minutes before the well was shut in.
Planned Total Depth:
Approximately 9,843 feet (3,000 meters).
Operator:
InterOil subsidiary, SPI (208) Limited.
Prospect Description:
Die haben also erst einen Miniteil des Reservoirs durchbohrt und mußten wg. des hohen Drucks neues Equipment bestellen und installieren. Einige vermuten, daß sie darunter Öl finden könnten...
Das wäre bei den Reservoirwerten DER Hammer...
Ich denke da lohnt sich das mal anzusehen...
Das wäre bei den Reservoirwerten DER Hammer...
Ich denke da lohnt sich das mal anzusehen...
Hier etwas Research dazu.
http://www.lsgifund.com/Investors/LSGI_8.1.06_Final+A.pdf
Das Bashingequivalent was einem die schönen Einsteigskurse die letzten Tage ermöglicht hat findet sich bei www.stocklemons.com
http://www.lsgifund.com/Investors/LSGI_8.1.06_Final+A.pdf
Das Bashingequivalent was einem die schönen Einsteigskurse die letzten Tage ermöglicht hat findet sich bei www.stocklemons.com
Bis Ende Oktober sollte man dsa wissen. Wie gesagt ziemlich spekulativ... Flip the coin sozusagen
Übrigens stocklemons zu den Risiken unbedingt lesen!
Übrigens stocklemons zu den Risiken unbedingt lesen!
Nachdem gestern gemeldet wurde, daß Bridge evtl. die PNG Pipeline doch nicht baut steigen die Explorer mit PNG Exposure. So logisch ist Börse.
Naja ich hab' nix dagegen.
Naja ich hab' nix dagegen.
http://www.lsgifund.com/Investors/LSGI_9.1.06+A.pdf
Neuer Report vom LSGI. Freitag bei 18.93 geschlossen.
Neuer Report vom LSGI. Freitag bei 18.93 geschlossen.
Hab den schnellen Gewinn mitgenommen. Da die das Well nicht weiterbohren konnten wird da nun ne Weile nix neues kommen. Außer tiefere Preise. Ich meld mich wenn ich wieder einsteige.
Beitrag zu dieser Diskussion schreiben
Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie eine neue Diskussion.
Investoren beobachten auch:
Wertpapier | Perf. % |
---|---|
+1,20 | |
-1,25 | |
+0,34 | |
-0,35 | |
+1,11 | |
-0,45 | |
+0,58 | |
+1,73 | |
+0,10 | |
+1,13 |
Meistdiskutiert
Wertpapier | Beiträge | |
---|---|---|
308 | ||
139 | ||
106 | ||
98 | ||
74 | ||
64 | ||
60 | ||
54 | ||
50 | ||
46 |