Altiplano Minerals Ltd. (Seite 58)
eröffnet am 22.05.17 16:13:13 von
neuester Beitrag 19.04.24 12:07:48 von
neuester Beitrag 19.04.24 12:07:48 von
Beiträge: 19.930
ID: 1.253.541
ID: 1.253.541
Aufrufe heute: 48
Gesamt: 1.999.758
Gesamt: 1.999.758
Aktive User: 0
ISIN: CA02156R1082 · WKN: A2JNFG · Symbol: APN
0,1050
CAD
+5,00 %
+0,0050 CAD
Letzter Kurs 25.04.24 TSX Venture
Neuigkeiten
31.07.23 · Accesswire |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,7950 | +30,33 | |
5,1500 | +21,75 | |
15,720 | +20,37 | |
0,9000 | +16,13 | |
15.699,00 | +15,27 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,6050 | -6,20 | |
0,5180 | -7,09 | |
10,040 | -7,89 | |
0,5400 | -8,47 | |
46,88 | -97,99 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 72.158.541 von lichtili am 09.08.22 14:47:56Nein das glaube ich nicht, ein Ausbruch ist längst überfällig.
Hallo, sind dies normale Ausschläge mittlerweile? Irgendwie hat man das Gefühl, dass Altiplano immer auf einem Level gehalten wird.
Würde mich auch ärgern, vor allem wenn ich Gebühren zahlen muss. Ich z.B. bezahle pro Ausführung. Aber so können die Kurse manipuliert werden ohne reellem Hintergrund.😵💫
Vielleicht ging die Order auch über 1XXXXXXX150 und der/die ärgert sich über diese Miniausführung . Ist aber schon krass wie sehr so eine kleine Ausführung den theoretischen Kurs nach oben treibt. Verkauft hat niemand mehr.
Da hat aber einer ordentlich zugeschlagen. 150 Stück. Hoffentlich muss er kein Gebühren zahlen.🥴
Altiplano macht seinen Weg.....etwas Geduld noch
Gerade Post bekommen von Alastair......den ich mit Euch teileHallo,
Ich hoffe, dass es Ihnen gut geht und Sie immer noch in APN investieren.
Ich wollte Sie nur informieren und Ihnen ein Update geben, dass wir kürzlich unsere Kupfer-/Gold-/Eisenmühle in Betrieb genommen haben, um die Produktion in Farellon in Chile zu unterstützen. Wir entwickeln auch einen zweiten historischen Goldproduzenten bei Maria Luisa, wo wir in einigen Monaten Einnahmen aus Gold-/Kupferverkäufen erwarten.
Darüber hinaus explorieren wir in Maricunga (Chile) bei Pastillas – einem Goldvorkommen mit Entdeckungspotenzial neben Yamana, Kinross und Rio2.
Gerne diskutieren, wenn Sie mehr erfahren möchten.
Kaum geht der Kurs nach oben, traut sich der gute nichts mehr zu schreiben. Spammt nur Foren voll mit seinen sinnlosen Kommentaren.
2600 Tonnen lagen Ende Q2 schon bei der Verarbeitungsanlage auf Halde. Na da bin ich echt mal gespannt, was die davon im nächsten Bericht gemacht haben werden.
News
https://ceo.ca/@newsfile/altiplano-reports-second-consecutiv…Altiplano Reports Second Consecutive Quarter of Record Revenues at Farellon
Edmonton, Alberta--(Newsfile Corp. - July 26, 2022) - Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on quarterly results for Q2 2022 from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile.
During Q2, 2022, the Company extracted a total 10,742 tonnes of mineralized Cu-Au material at Farellon and processed 7,488 tonnes at an average copper grade of approximately 1.96%. Sales of 310,062 pounds of copper generated approximately US$967,685 in revenue (after processing costs) which represents the highest revenue total to date from Q1 2018, beating the previous record posted in Q1 2022. At the end of June 2022, the Company had 520 tonnes in stockpiles at the Farellon site and a total of 2,600 tonnes of stockpiles at the El Peñón mill site. This material will be processed for sale and the revenue will be realized in the next coming months.
Total tonnes extracted and processed in Q2 increased by 9% and 11% respectively from the previous quarter; however overall grade, at 1.96%, represents a 5% decrease from the fourth quarter. The decrease in grade is attributed to minor dilution observed with bench mining oversize material from the ceilings of previous working levels. In addition, the waste removal in Q2 increased by 45% to 2,725 tonnes, an increase of 45% from the Q1 total of 1,870 tonnes, as a result of the Hugo Decline expansion to the 352 m level.
President and CEO Alastair McIntyre comments: "We are very pleased the results generated at the Farellon operation. Improved efficiencies and excellent grades combined with great copper prices has resulted in two very significant back-to-back quarters. The first half of 2022 has produced nearly US$2 million in revenue, after processing costs, from the sale of over 600,000 pounds of copper. These results are very significant milestones for the company and set us up well as we move to transition our processing at El Peñón."
Figure 1. Quarterly Review of US$ Revenue and Copper Pounds Sold
Period USD Revenue Cu Pounds Sold
Q1 2021 $540,713 257,522
Q2 2021 $599,711 220,660
Q3 2021 $561,345 221,518
Q4 2021 $779,054 267,927
Q1 2022 $908,419 295,199
Q2 2022 $967,685 310,062
Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
Figure 2. Mined, Processed, Waste Removed and Cu Grade by Quarter
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
Figure 3. Processed Material, Income vs. Mining Costs by Quarter
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
Figure 4. Farellon Mine Section
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/131841_b7e4389694…
The decision to commence production on the Farellon deposit is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with the production decision
During Q2 2022, extraction of copper-gold material focused on the 368 m and 360 m levels. Mining occurred in the mainly NE and SW directions along the mineralized subdrifts. Bench mining continued along the ceilings of the 360 m level to the 368 m level where 1.5 metres of height remain as a crown pillar to ensure the stability of the stope. Additional development work was conducted with the extension of the Hugo Decline to the 352 m operating level reached in late June. The advance to the next targeted operating level at the 344 m level is scheduled to begin in late August.
Continuing with the focus on sustainability, the ventilation plan was updated with the closure of previous mining levels, including the 368 m level. These closures facilitate air movement from the Almendro tunnel to the current 360 m and 352 m levels and future working faces at the lower levels of the mine. Improvements were made to the dewatering system through the construction of a collection pond at the level 376, m level. This system reduces the length of the pump circuit and improves the water extraction efficiency.
Altiplano has generated over US$9.86 million from the recovery and sale (after processing costs) of 4.47 million pounds of copper with an average grade of 1.78% Cu (2018 Q1-2022 Q2). Cash flow has been re-invested into equipment, underground drilling, expanding underground development at Farellon, enhancing ventilation to increase productivity and capacity, new underground development and exploration at Maria Luisa, and the commissioning of the El Peñón fit-for-purpose mill and flotation plant located 15 km from the Farellon site.
Altiplano Minerals Ltd.