checkAd

    Unbeachtet nach oben (Seite 11)

    eröffnet am 04.12.10 21:36:35 von
    neuester Beitrag 09.04.24 11:34:26 von
    Beiträge: 151
    ID: 1.161.706
    Aufrufe heute: 0
    Gesamt: 10.886
    Aktive User: 0

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    2,6900+23,96
    5,1500+21,75
    15,890+21,67
    0,8900+17,11
    0,9000+16,13
    WertpapierKursPerf. %
    4,5200-6,61
    0,5180-7,09
    10,040-7,89
    0,5400-8,47
    46,88-97,99

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 11
    • 16

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 05.11.14 21:15:42
      Beitrag Nr. 51 ()
      Antwort auf Beitrag Nr.: 48.231.547 von tntxrxwelle am 05.11.14 16:25:07Ging heute noch ordentlich zur Sache... 2.92 CAD -0.33 (-10.15%)
      Auch der GDXJ 22.76 USD -1.72 (-7.03%) ist auf neuem tief.

      Gerade knapp über 2 Euro gezahlt.
      Bis jetzt habe ich seit einem günstigen Einstieg im Dezember letzten Jahres die Wellen sauber erwischt und rechtzeitg komplett verkauft.
      Irgendwann werde ich da mal richtig daneben liegen...
      Wenn es jeden Tag 10 % abwärts geht.
      Avatar
      schrieb am 05.11.14 16:25:07
      Beitrag Nr. 50 ()
      Antwort auf Beitrag Nr.: 48.230.524 von NickelChrome am 05.11.14 15:20:29M.E. sind hier mindestens erstmal die Q3-Zahlen abzuwarten. Die werden nämlich ziemlich grottig. Wahrscheinlich werden sie Miese gemacht haben.

      Ausblick auf Q4: Abschreibungen auf stockpiles, Resourcen u. Sabina Silver.

      Die wildcard ist das neue Säurewerk und was dabei rumkommt.

      Geld brauchen Sie letztlich vermutlich auch noch = placement
      4 Antworten
      Avatar
      schrieb am 05.11.14 15:20:29
      Beitrag Nr. 49 ()
      Antwort auf Beitrag Nr.: 47.179.946 von NickelChrome am 19.06.14 21:12:15
      Zitat von NickelChrome: Heute nocheinmal 5.000 Stücke so um die 3,50 Euro raußgefeuert.
      Auf die beste Tranche 50 % in 6 Wochen....
      Das erscheint mir doch ziemlich übertrieben was da heute abging....
      Zum dritten Mal alle Stücke vertickt.

      Die ersten 1000 letzte Woche zu 2,40 Euro wieder zurückgekauft...
      Das war definitiv zu früh. Jetzt wird es wieder spannend.
      7 Antworten
      Avatar
      schrieb am 09.10.14 02:19:53
      Beitrag Nr. 48 ()
      Dundee Precious Metals Announces a 'Favourable Preliminary Economic Assessment', on Its Kapan Mine Expansion Study - Oct 8, 2014
      www.dundeeprecious.com/files/PressReleases/Kapan-PEA-NR-FINA…

      "Dundee Precious Metals Inc. (TSX:DPM)(TSX:DPM.WT.A) ("DPM" or "the Company") is pleased to report the favourable technical results outlined in its preliminary economic assessment ("PEA") of the potential underground expansion project (the "Project") at its Kapan Mine in Armenia.

      Highlights of PEA

      Planned expansion of the Kapan Mine to 1 million tonnes per annum ("Mtpa") based on December 31, 2013 Indicated and Inferred Mineral Resources;
      Reviewed refurbishment of existing mill equipment plus modest additional capital to restore mill to its prior 1 Mtpa operating rate;
      Considered increase of mobile fleet to accommodate the additional development and production demands; and
      Planned mine expansion proposed to be completed in year three and operate at a 1 Mtpa rate.

      Project Results Summary - Life of Mine ("LOM")
      Item Unit LOM
      Average throughput Mtpa 0.9
      Project life Years 9

      Gold price USD/oz 1,300
      Copper price USD/lb 3.00
      Silver price USD/oz 20
      Zinc price USD/lb 1.00
      Production and Revenue Summary (LOM) (1)
      Item Unit LOM
      Total quantity of material mined/milled Mt 7.6
      Gold grade g/t 2.44
      Silver grade g/t 37.60
      Copper grade % 0.33
      Zinc grade % 1.00
      Overall metallurgical recoveries
      Gold recovery % 80.9
      Silver recovery % 82.1
      Copper recovery % 96.0
      Zinc recovery % 94.0

      Total Net Revenue USD M 874.7
      Site EBITDA (2) USD M 417.1
      Average annual payable production
      Gold ozs 54,084
      Silver ozs 824,757
      Copper M lbs 5.8
      Zinc M lbs 15.8
      Operating and Capital Cost Summary (LOM)
      Item Unit LOM
      Throughput Mtpa 0.9

      mining cash cost per tonne of material USD/t 19.36
      processing cash cost per tonne of material processed USD/t 16.84
      Services cash cost per tonne material USD/t 6.88
      royalty per tonne of material processed USD/t 8.57
      admin cash cost per tonne processed USD/t 8.74
      Total cash cost per tonne of material processed USD/t 60.40
      Cash cost per ounce of gold sold, net of by-product credits(3) USD/oz 336
      Capital Costs
      Initial capital USD M 30.1
      Sustaining capital USD M 165.0
      Closure and rehabilitation costs USD M 12.0
      Total LOM capital USD M 207.2
      Project Economics
      Average Annual EBITDA USD M 52.1
      NPV at a discount rate of 5.0% USD M 141.7

      (1) Excludes first year from LOM schedule which is deemed to have occurred in 2014

      (2) EBITDA is defined as earnings before interest, taxes, depreciation and amortization

      (3) Cash cost of sales per ounce of gold sold, net of by-product credits, represents cost of sales, less depreciation, amortization and other non-cash expenses, plus treatment charges, penalties, transportation and other selling costs, less by-product zinc, copper and silver revenues, divided by the payable gold in concentrate sold.

      "We are pleased with the results of the new PEA on our Kapan underground expansion project," stated Rick Howes, President and CEO. "An underground expansion could showcase the mine's true potential and create value for our shareholders. The study shows that the incremental capital required is quite small and it results in a significant increase in net cashflow to the business and a very high return project," he added.

      Mineral Resource and Life of Mine Mineral Inventory

      Mineral Resources and LOM mineral inventory are based on the 2014 production schedule currently in operation at the Project, historic operating costs through to 2013, and projected metal prices of $1,250 per troy ounce for gold, $23 per troy ounce for silver, $2.75 per pound for copper, and $0.85 per pound for zinc.

      The Mineral Resources estimates ("MRE") have been classified as Indicated and Inferred, following the guidelines specified by the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") and adopted for technical reports in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). Mineral Resources have been estimated as at December 31, 2013, and reported using a gold equivalent (Au + Cu x 1.20 + Ag x 0.02 + Zn x 0.34) cut-off of 2.24 g/t and a breakeven net smelter royalty ("NSR") methodology.
      Grades Metal Content
      Resource Category Million
      tonnes AuEq
      g/t Au
      g/t Ag
      g/t Cu
      % Zn
      % Pb
      % S
      % Au
      M
      oz Ag
      M
      oz Cu
      M
      lbs Zn
      M
      t
      Indicated 3.0 5.33 3.21 49.88 0.44 1.77 0.19 2.08 0.312 4.848 29 0.054
      Inferred 9.5 4.62 2.83 43.34 0.43 1.21 0.10 3.13 0.863 13.210 90 0.115

      The LOM mineral inventory has been estimated as at December 31, 2013, inclusive of Inferred Mineral Resources and a number of technical-economic factors, to provide an indication of the potential life of the operation. The LOM mineral inventory has been reported using a gold equivalent (Au + Cu x 1.20 + Ag x 0.02 + Zn x 0.34) cut-off of 2.24 g/t and NSR methodology. Therefore, it is important to note that the PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves. There is no certainty that the PEA will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
      LOM Units Total Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9
      Development kt 1,372 177 187 173 214 192 178 166 65 20
      Stope kt 6,620 379 484 718 821 821 821 823 929 826
      Total Mineralized Material kt 7,992 556 672 892 1,034 1,013 998 989 994 846
      Au g/t 2.4 2.1 2.6 2.4 2.4 2.4 2.5 2.6 2.4 2.4
      Ag g/t 37.8 38.5 39.9 37.3 35.8 35.1 34.3 36.9 35.8 46.6
      Cu % 0.36 0.33 0.33 0.28 0.30 0.31 0.32 0.39 0.35 0.35
      Zn % 1.05 1.32 1.32 1.16 1.13 1.04 0.85 0.88 0.78 0.95
      Pb % 0.08 0.08 0.13 0.10 0.10 0.07 0.05 0.06 0.04 0.10
      S % 2.39 2.72 1.96 1.79 1.96 1.90 2.42 2.55 3.12 3.12
      Total Waste kt 5,484 386 625 636 640 628 643 636 645 645
      Total Material Moved kt 13,476 942 1,297 1,528 1,674 1,640 1,641 1,624 1,639 1,491

      Scope of the Project

      The mine is currently producing run-of-mine material at an average rate of 1,200 tonnes per day. The preliminary economic analysis supporting the LOM mineral inventory estimate, contemplates ramping up production during years 1 and 2, to attain an annual production rate of 1 Mt from year 3. The potential expansion would be achieved through increased development and production rates by increasing the mining equipment fleet currently in use in the operation.

      Access into the Kapan mine is via two decline ramps, one to access the south section of the mine, and one to access the north section. Crosscuts are developed from each of the declines. These intersect the veins at approximately 90°. Mine levels are at 15 m vertical intervals. Sub-level open stopes are opened up along the vein drives. Each stope is typically 56 m high and 60 m along strike. Production blast holes are drilled upwards from the lower sub-level, and consist typically of parallel holes. All mine development waste is backfilled into each completed stope.

      The veins containing most of the mineralization are narrow, down to 0.2 m in width and up to 2.0 m in width (the average width being about 1 metre). The MRE is modelled to a minimum width of 1.8 metres to include appropriate dilution when required. The minimum stoping width with the sub-level stoping method in use is around 1.8 metres. However, due to geometric, geotechnical and operating factors, stopes can be wider than 1.8 metres, resulting in additional mining dilution. The amount of mining dilution is currently being analysed and procedures reviewed. New drilling machinery is expected to improve efficiency and accuracy of the stope blasting and overall geometry.

      Processing Facility

      The original infrastructure that processed up to 1 Mtpa of Centralni ore through the 1990s is being utilized for current operations. Following conventional two-stage crushing of run-of-mine material, one of the original grinding circuits (rod mill/ball mill) provides the feed to the first of two sequential flotation circuits. These produce copper and zinc concentrates, both of which contain substantial precious metal credits. Final tailings from the plant are pumped to the tailings management facility, located on the site of the original Centralni tailing facility.

      The current milling and flotation circuits are capable of processing at the rate of approximately 750,000 tpa. The additional capacity required for the expansion in throughput may be achieved by refurbishing the currently idle second grinding line, while the capacity of the flotation and downstream circuits may be supplemented, as required, to achieve the 1 Mtpa throughput rate.

      The current tailings facility is capable of storing the LOM mineral inventory. However, a substantial upgrade of the infrastructure is required, which has been considered in the project capital estimates. This upgrade is required regardless of the expansion, although the expansion would accelerate the timing.

      As part of the ramp up, an options study is underway to compare the introduction of dense media separation to reduce the volume of material being processed, without significantly impacting on metal recoveries and the upgrade of the existing processing facility, for the increased throughput.

      Capital Cost

      The capital cost estimate reflects the initial capital cost and includes sustaining capital and closure and rehabilitation costs.
      CAPITAL COST ESTIMATE SUMMARY
      Item Total (M USD) (1)
      Initial Capital Cost
      Mine expansion 10.6
      Mill expansion 6.1
      TMF Upgrade 13.4
      Subtotal 30.1
      Sustaining capital 165.0
      Closure and rehabilitation costs 12.0
      TOTAL CAPITAL - Life of Mine 207.2

      (1) The capital cost estimate is expressed in Q3 2014 US dollars.

      Technical Information

      The Mineral Resource and LOM Mineral Inventory estimates and other scientific and technical information contained in this news release were prepared by CSA Global (UK) Ltd. ("CSA"), in accordance with Canadian regulatory requirements set out in NI 43-101, and has been reviewed and approved by, as relates to Mineral Resources, Malcolm Titley BSc, MAIG, Director and Principal Geologist, of CSA, and Julian Bennett, BSc ARSM FIMMM CEng, Mining Consultant, as relates to the LOM Mineral Inventory. Both Malcolm Titley and Julian Bennett are independent Qualified Persons ("QP"), as defined under NI 43-101. The NI 43-101 technical report entitled "NI 43-101 Technical Report, Shahumyan Project, Kapan, Republic of Armenia" dated September 30, 2014, in respect of the Mineral Resource and Life of Mine Mineral Inventory estimates disclosed herein (the "Technical Report"), is being filed today on SEDAR at www.sedar.com. Simon Meik, Corporate Director of Processing, and Edgar Urbaez, Corporate Director of Technical Services, both of DPM, who are QPs and not independent of the Company, have also reviewed and approved the contents of this release.

      The Mineral Resource and LOM Mineral Inventory estimates contained herein may be subject to legal, political, environmental or other risks that could materially affect the potential development of such estimates. See the Technical Report for more information with respect to the key assumptions, parameters, methods and risks of determination associated with the foregoing Mineral Resource and LOM Mineral Inventory estimates.

      Cautionary note to U.S. Investors concerning estimates of Mineral Resources. These estimates have been prepared in accordance with the requirements of Canadian securities laws, which differ from the requirements of U.S. securities laws. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101 and recognized by Canadian securities laws but are not defined terms under the U.S. Securities and Exchange Commission ("SEC") Guide 7 ("SEC Guide 7") or recognized under U.S. securities laws. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be upgraded to mineral reserves. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an "inferred mineral resource" will ever by upgraded to a higher category. Under Canadian securities laws, estimates of "inferred mineral resources" may not form the basis of feasibility or pre-feasibility studies. U.S. investors are cautioned not to assume that all or any part of an inferred mineral resource exists or is economically or legally mineable. Accordingly, these mineral resource estimates and related information may not be comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements under the U.S. federal securities laws and the rules and regulations thereunder, including SEC Guide 7.

      FORWARD-LOOKING STATEMENTS

      This news release contains "forward-looking statements" and "forward looking information" (together "forward-looking statements") that involve a number of risks and uncertainties. Forward-looking statements include, but are not limited to, statements with respect to the economic potential, associated costs and future production performance of the Kapan expansion Project outlined by the PEA, the future price of gold and silver, the estimation of mineral reserves and resources, the realization of mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance coverage and timing and possible outcome of pending litigation. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements are based on the opinions, assumptions and estimates of management and QP's as of the date such statements are made or as of the date they are indicated to be made. Key opinions, assumptions and estimates that apply are discussed herein and in the Technical Report.
      Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: the uncertainties inherent to a PEA, which has a lower level of confidence than feasibility studies, the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, fluctuations in metal prices, the risks inherent in operating in Armenia, including without limitation, political, activists and social risks, risks associated with corruption, differences with respect to the legal system and the rule of law and as well as those risk factors discussed or referred to in Management's Discussion and Analysis under the heading "Risks and Uncertainties" and other documents filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward-looking statements.

      NON-GAAP FINANCIAL MEASURES

      Estimated EBITDA, cash cost per tonne of material processed, cash cost per ounce of gold sold, net of by-product credits and sustaining capital are not defined measures under International Financial Reporting Standards ("IFRS"). Management and certain investors use this information to assess the Company's performance and also determine the Company's ability to generate cash flow for investing activities. In addition, management utilizes these metrics as an important management tool to monitor cost performance of the Company's operations. These measurements have no standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. These measurements are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Refer to the "Non-GAAP Financial Measures" section of the management's discussion and analysis for the three and six months ended June 30, 2014 for further discussion of these items.

      ABOUT DUNDEE PRECIOUS METALS INC.

      Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the acquisition, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a copper concentrate containing gold and silver, located east of Sofia, Bulgaria; the Kapan operation, which produces a copper concentrate and a zinc concentrate, both containing gold and silver, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including interests held through its 50.1% owned subsidiary, Avala Resources Ltd., and its 12.1% interest in Sabina Gold & Silver Corp.

      Contact Information

      Dundee Precious Metals Inc.
      Rick Howes
      President & Chief Executive Officer
      (416) 365-2836
      rhowes@dundeeprecious.com

      Dundee Precious Metals Inc.
      Lori Beak, Senior Vice President,
      Investor & Regulatory Affairs and Corporate Secretary
      (416) 365-5165
      lbeak@dundeeprecious.com "
      Avatar
      schrieb am 27.06.14 00:17:53
      Beitrag Nr. 47 ()
      ich habe die Aktie nicht.

      Dundee Precious Metals Increases Revolving Credit Facility by $125.000.000, to $275.000.000 - Jun 26, 2014
      www.dundeeprecious.com/files/PressReleases/26%2006%202014_DP…

      "TORONTO, ONTARIO--(Marketwired - June 26, 2014) - Dundee Precious Metals Inc. (TSX:DPM) (TSX:DPM.WT.A) ("DPM" or "the Company") has added $125 million of credit capacity to its existing long-term committed revolving credit facility (the "Revolving Facility"), increasing the total size of the Revolving Facility to $275 million. This increase was supported by all of the Company's existing lenders, being BNP Paribas, Canadian Imperial Bank of Commerce, European Bank for Reconstruction and Development, Raiffeisen Bank International AG Group, Royal Bank of Canada, and Unicredit Bank AG, as well as Export Development Canada, a new lender to the Company.

      "This expanded credit facility provides us with access to a cost effective and flexible source of funding that maintains our financial strength and supports the continued development of our business," said Rick Howes, DPM's President and CEO. "We are pleased with the support we received from our banking partners and are well positioned to fund our anticipated near-term discretionary growth projects."

      The expanded Revolving Facility is comprised of two evergreen tranches of $150 million (previously $125 million) and $45 million (previously $25 million) that mature in February 2017 and 2019, respectively, and a new tranche of $80 million that matures in June 2019, with quarterly reductions of $4 million beginning in the third year. The Revolving Facility is supported by guarantees from, and by pledges of the Company's investments in its wholly-owned operating subsidiaries. Interest is based on LIBOR plus a spread, which varies between 2.75% and 5.50%, depending upon the tranche and Company's debt leverage ratio (funded net debt to EBITDA), as defined in the Revolving Facility agreement.


      Dundee Precious Metals Inc. is a Canadian based, international gold mining company engaged in the acquisition, exploration, development, mining and processing of precious metals. The Company's principal operating assets include the Chelopech operation, which produces a copper concentrate containing gold and silver, located east of Sofia, Bulgaria; the Kapan operation, which produces a copper concentrate and a zinc concentrate, both containing gold and silver, located in southern Armenia; and the Tsumeb smelter, a concentrate processing facility located in Namibia. DPM also holds interests in a number of developing gold properties located in Bulgaria, Serbia, and northern Canada, including interests held through its 53.1% owned subsidiary, Avala Resources Ltd., its 45.5% interest in Dunav Resources Ltd. and its 12.1% interest in Sabina Gold & Silver Corp.
      Cautionary Note Regarding Forward Looking Statements


      This press release contains "forward looking statements" that involve a number of risks and uncertainties. Forward looking statements include, but are not limited to, statements with respect to the future price of gold, copper, zinc and silver, the estimation of mineral reserves and resources, the realization of such mineral estimates, the timing and amount of estimated future production and output, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, reclamation expenses, the potential or anticipated outcome of title disputes or claims and timing and possible outcome of pending litigation. Often, but not always, forward looking statements can be identified by the use of words such as "plans", "expects", or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "does not anticipate", or "believes", or variations of such words and phrases or that state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward looking statements are based on the opinions and estimates of management as of the date such statements are made and they involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any other future results, performance or achievements expressed or implied by the forward looking statements. Such factors include, among others: the actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold, copper, zinc and silver; possible variations in ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated;
      accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, uncertainties inherent with conducting business in foreign jurisdictions where corruption, civil unrest, political instability and uncertainties with the rule of law may impact the Company's activities; fluctuations in metal prices; unanticipated title disputes; claims or litigation; limitation on insurance coverage; as well as those risk factors discussed or referred to in the Company's MD&A under the heading "Risks and Uncertainties" and under the heading "Cautionary Note Regarding Forward Looking Statements" which include further details on material assumptions used to develop such forward looking statements and material risk factors that could cause actual results to differ materially from forward looking statements, and other documents (including without limitation the Company's 2013 AIF) filed from time to time with the securities regulatory authorities in all provinces and territories of Canada and available on SEDAR at www.sedar.com. There can be no assurance that forward looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Unless required by securities laws, the Company undertakes no obligation to update forward looking statements if circumstances or management's estimates or opinions should change. Accordingly, readers are cautioned not to place undue reliance on forward looking statements.


      CONTACT INFORMATION

      Dundee Precious Metals Inc.
      Rick Howes
      President and Chief Executive Officer
      (416) 365-2836
      rhowes@dundeeprecious.com

      Dundee Precious Metals Inc.
      Lori Beak
      Senior Vice President, Investor & Regulatory Affairs and Cor
      (416) 365-5165
      lbeak@dundeeprecious.com "

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1775EUR -7,07 %
      CEO lässt auf “X” die Bombe platzen!mehr zur Aktie »
      Avatar
      schrieb am 20.06.14 19:40:40
      Beitrag Nr. 46 ()
      Antwort auf Beitrag Nr.: 47.180.306 von Boersiback am 19.06.14 22:42:14 4.69 -0.60 (-11.34%) CAD in Toronto...
      Das gestrige Tageshoch war 5,43 CAD 1 Stunde vor Schluß also 0,74 CAD höher.
      Also 14 % verloren...
      Avatar
      schrieb am 19.06.14 22:42:14
      Beitrag Nr. 45 ()
      Antwort auf Beitrag Nr.: 47.179.946 von NickelChrome am 19.06.14 21:12:15naja das übliche... von 3 auf 6, von 6 auf 3 usw... vermutlich die nächsten jahrzehnte ;)
      1 Antwort
      Avatar
      schrieb am 19.06.14 21:12:15
      Beitrag Nr. 44 ()
      Heute nocheinmal 5.000 Stücke so um die 3,50 Euro raußgefeuert.
      Auf die beste Tranche 50 % in 6 Wochen....
      Das erscheint mir doch ziemlich übertrieben was da heute abging....
      Zum dritten Mal alle Stücke vertickt.
      10 Antworten
      Avatar
      schrieb am 12.06.14 20:44:59
      Beitrag Nr. 43 ()
      Antwort auf Beitrag Nr.: 47.145.216 von NickelChrome am 12.06.14 19:31:36machst du genau richtig... ein echter zockermarkt derzeit :cool:

      habs hier völlig verpennt bin irgendwann letztes jahr bei 3,77 cad rein und alles mitgemacht unter 3 bis 6 wieder zurück... naja anderweitig hab ichs dann wesentlich besser gemacht.

      ich glaub wenn ich hier nochmal die 6 seh probier ichs auch mal wieder bei 3,8 rum reinzukommen.

      ansonsten mag ich den wert eigentlich schon für long.
      mehr wegen dem management, den properties insgesamt als wegen aktueller produktionszahlen.

      nur long is irgendwie out in allen sektoen derzeit ;)
      Avatar
      schrieb am 12.06.14 19:31:36
      Beitrag Nr. 42 ()
      supy, supy, supy...
      Meine teuersten Tranchen gerade mit fast 10 % Plus verkauft...
      Und damit meine anderen doppelten Tranchen noch einmal verbilligt...
      1 Antwort
      • 1
      • 11
      • 16
       DurchsuchenBeitrag schreiben


      Meistdiskutiert

      WertpapierBeiträge
      215
      90
      76
      58
      54
      36
      34
      29
      27
      25
      Unbeachtet nach oben