Antwort auf Beitrag Nr.: 60.592.165 von faultcode am 17.05.19 18:22:40
ALACER GOLD DECLARES COMMERCIAL PRODUCTION AT THE ÇÖPLER SULFIDE PLANT AND INCREASES OXIDE PRODUCTION GUIDANCE
13.6.

...Alacer Gold Corp. ("Alacer" or the "Company") [TSX: ASR and ASX: AQG] is pleased to report that commercial production has been achieved at its Çöpler sulfide plant, effective May 31, 2019.

In declaring commercial production, the Company evaluated several measures including throughput, gold recovery rate, production, costs and overall sulfide plant reliability. During May, the sulfide plant operated at design for the sulfide sulfur processed and averaged a throughput rate of over 80%. Gold recovery was ~93%, plant utilization was ~85%, and over 22,000 ounces of gold were recovered with processing costs in line with expectations.

Overriding these measures was the assessment that the sulfide plant is operating consistently and sustainably as it continues to steadily ramp up. Operating metrics will be included with the second quarter operating and financial results.


...

Oxide plant guidance range has increased to 125,000 to 145,000 from 90,000 to 110,000 ounces due to the continued strong performance from the oxide plant. The increase to the oxide production guidance is a result of stacking ore from the ongoing in-pit exploration success, higher than predicted recoveries from blended ore, and positive reconciliation for the oxide ore.

Oxide AISC guidance is forecast to decline by $50/oz to $650 - $700/oz.


https://finance.yahoo.com/news/alacer-gold-declares-commerci…
Antwort auf Beitrag Nr.: 60.798.154 von faultcode am 13.06.19 13:51:11
GEDIKTEPE PROJECT: Verkauf
ALACER GOLD ANNOUNCES THE SALE OF ITS 50% NON-OPERATING OWNERSHIP INTEREST IN THE GEDIKTEPE PROJECT

July 17, 2019, Toronto: Alacer Gold Corp. ("Alacer" or the "Corporation") [TSX: ASR and ASX: AQG] announces the sale of its 50% non-operating interest in the Gediktepe Project to its joint venture partner Lidya Madencilik Sanayi ve Ticaret A.S. ("Lidya Mining").

As consideration for the sale of its 50% equity interest, Alacer will receive:

• 10% Net Smelter Return ("NSR") on all oxide ore production
• 2% NSR on all sulfide ore production
• Cash consideration of US$10 million as various development and production milestones are met



=> das ist OK. Da ging schon länger nichts mehr richtig voran. Siehe die lange versprochene DFS. Zunächst sollte die Mitte 2018 vorliegen, dann "later" in 2018 --> Beitrag Nr. 189

--> seit einiger Zeit heißt es dazu wie im letzten Management’s Discussion and Analysis, March 31, 2019:

In the other regions of Turkey, targeted exploration work continues, including the Prefeasibility Study (PFS) and ongoing work on the technical studies for the Gediktepe Project (2).

--> bislang wurde nur eine "Updated Prefeasibility Study for the Gediktepe Project, dated April 3, 2019" dazu erstellt (FC: fett)
Alacer Gold | 3,170 €
Antwort auf Beitrag Nr.: 61.053.496 von faultcode am 18.07.19 11:18:28
ALACER GOLD ANNOUNCES SECOND QUARTER 2019 OPERATING AND FINANCIAL RESULTS
30.7.

Highlights

Operational

... Commercial production at the Çöpler sulfide plant was declared as of May 31, 2019.

The Company produced 188,853 ounces of gold through June 30, 2019 with 95,234 ounces produced from the oxide plant and 93,619 ounces produced from the sulfide plant.

Sulfide ore stockpiles at June 30, 2019 represented approximately 742,000 contained gold ounces.

The oxide plant production guidance range increased to 125,000 - 145,000 from 90,000 - 110,000 ounces due to in-pit exploration success, higher recoveries, and positive reconciliation.

Mine site oxide All-in Sustaining Costs per ounce were $583, mine site sulfide All-in Sustaining Costs per ounce were $574 and Consolidated All-in Sustaining Costs per ounce were $692 through June 30, 2019.


Growth

The Company announced the sale of its 50% equity interest in the Gediktepe Project and as consideration received an uncapped net smelter return ("NSR") of 2%-10% and contingent cash.

The Company's focus is to extend the Çöpler oxide production in the near term by fast tracking the development of a number of targets.

The Company is currently drilling in the Çöpler District with nine exploration diamond drills active, including four drills at Ardich.

Drilling in the Çöpler Saddle has identified some mineralized areas and drilling and analysis continues.

Çakmaktepe had an approximate 40% positive gold reconciliation to the mine plan. Given this, some infill diamond drilling is being undertaken to help inform a review of the geological model.

Engineering to support the phase one extension of the Çöpler heap leach pad (~6 million tonnes) will be complete in Q3 2019.


Financial

The Company ended the second quarter with consolidated cash of $125 million which did not include proceeds of $20 million from bullion sales made on June 28, 2019 which were received on July 1.

Debt at the end of the quarter was reduced to $315 million resulting in net debt of $190 million - a decrease of $54 million from the start of the year.

The Company sold 192,260 ounces of gold through June 30, 2019 resulting in gold sales proceeds of $252 million .

Cash flow from operating activities through June 30, 2019 totaled $59.8 million, excluding the pre-commercial sulfide plant production.

Attributable earnings for Q2 2019 were $4.8 million or $0.02 per share and normalized attributable earnings for Q2 2019 were $23.3 million or $0.08 per share. Attributable earnings through June 30, 2019 were $8.2 million or $0.03 per share and normalized attributable earnings through June 30, 2019 were $41.5 million or $0.14 per share.



--> ganz starke Zahlen mMn; Sulfid, als auch Oxid

=>


[CAD]
Alacer Gold | 5,340 C$
na dann , wenn jetzt schon Euphorie, dann gibts im October /Nov Purzelbäume.
Mal sehen wie der Schuldenabbau funktioniert.
Alacer Gold | 3,890 €