checkAd

     370  0 Kommentare Fission Pushes Towards Pre-Feasibility and Additional Western Zone Expansion - Seite 3

    The Triple R deposit consists of the R00E zone on the western side and the much larger R780E zone further on strike to the east. Within the deposit, the R00E and R780E zones have an overall combined strike length validated by a resource estimate of approximately 1.05km with the R00E measuring approximately 105m in strike length and the R780E zones measuring approximately 945m in strike length. A 225m gap separates the R00E zone to the west and the R780E zones to the east, though sporadic narrow, weakly mineralized intervals from drill holes within this gap suggest the potential for further significant mineralization in this area. The R780E zone is located beneath Patterson Lake which is approximately six metres deep in the area of the deposit. The entire Triple R deposit is covered by approximately 50m to 60m of overburden.

    Mineralization remains open along strike in both the western and eastern directions. Basement rocks within the mineralized trend are identified primarily as mafic volcanic rocks with varying degrees of alteration. Mineralization is both located within and associated with mafic volcanic intrusives with varying degrees of silicification, metasomatic mineral assemblages and hydrothermal graphite. The graphitic sequences are, associated with the PL-3B basement Electro-Magnetic (EM) Conductor. The R840W zone, located 495m west along strike of the Triple R deposit, now has a defined strike length of 465m and is still open. The recent discovery of the high-grade R1515W zone located a further 510m to the west of the R840W zone, now has a defined strike length of 71m and an across-strike lateral width of up to 64m with vertical extension up to 171m. Mineralization is open. The R840W and R1515W zones have significantly upgraded the prospectivity for further growth on land to the west of the Triple R deposit within the Patterson Lake Corridor. The recently discovered high-grade mineralization in the R1620E zone, located 210m to the east along strike similarly has significantly upgraded the prospectivity for further growth of the PLS resource to the east of the Triple R deposit.

    Updated maps and files can be found on the Company's website at https://fissionuranium.com/project/triple-r-deposit/overview/.

    Patterson Lake South Property

    The 31,039 hectare PLS project is 100% owned and operated by Fission Uranium Corp. PLS is accessible by road with primary access from all-weather Highway 955, which runs north to the former Cluff Lake mine and passes through the nearby UEX-Areva Shea Creek discoveries located 50km to the north, currently under active exploration and development.

    Seite 3 von 4



    Diskutieren Sie über die enthaltenen Werte




    Verfasst von Marketwired
    Fission Pushes Towards Pre-Feasibility and Additional Western Zone Expansion - Seite 3 KELOWNA, BRITISH COLUMBIA--(Marketwired - Jan. 16, 2018) - FISSION URANIUM CORP. ("Fission" or "the Company") (TSX:FCU)(OTCQX:FCUUF)(FRANKFURT:2FU) is pleased to announce preparations have begun for a $9.4M winter work program at its award-winning …