Calibre Drilling Expands High Grade Blag Gold-Silver System, Eastern Borosi Project, Nicaragua Including 9.92 Metres Grading 5.36 g/t Gold and 194.6 g/t Silver - Seite 2
g/t
g/t
Notes; | - Intervals are core lengths / true width are estimated to be 70-80% of lengths |
- Length weighted averages from uncut assays. | |
- Results for drill holes BL15-010 to -012 are pending |
Drilling to date on the Blag gold-silver vein system has tested approximately 300 metres of strike length and 100 metres at depth in the vicinity of the historic small scale underground workings. The zone remains open along strike and down dip.
Lesen Sie auch
Diskutieren Sie über die enthaltenen Werte
Aktuelle Themen
1 im Artikel enthaltener WertIm Artikel enthaltene Werte