checkAd

     240  0 Kommentare Calibre Drilling Expands High Grade Blag Gold-Silver System, Eastern Borosi Project, Nicaragua Including 9.92 Metres Grading 5.36 g/t Gold and 194.6 g/t Silver - Seite 2


    g/t Ag
    g/t
    BL15-006 138.30 140.21 1.91 5.36 127.8 and 149.83 155.68 5.85 5.97 56.1 including 153.00 154.67 1.67 18.23 128.8 BL15-007 131.60 135.64 4.04 1.79 77.2 and 141.00 143.81 2.81 1.49 41.7 and 146.11 146.75 0.64 0.79 74.0 BL15-008 141.42 142.65 1.23 0.15 18.0 and 175.98 179.11 3.13 0.03 16.5 BL15-009 131.06 132.59 1.53 0.09 393.0 and 135.33 145.25 9.92 5.36 194.6 including 137.87 140.86 2.99 11.50 309.7
    Notes; - Intervals are core lengths / true width are estimated to be 70-80% of lengths
    - Length weighted averages from uncut assays.
    - Results for drill holes BL15-010 to -012 are pending

    Drilling to date on the Blag gold-silver vein system has tested approximately 300 metres of strike length and 100 metres at depth in the vicinity of the historic small scale underground workings. The zone remains open along strike and down dip.

    Lesen Sie auch

    Seite 2 von 4



    Diskutieren Sie über die enthaltenen Werte




    Verfasst von Marketwired
    Calibre Drilling Expands High Grade Blag Gold-Silver System, Eastern Borosi Project, Nicaragua Including 9.92 Metres Grading 5.36 g/t Gold and 194.6 g/t Silver - Seite 2 VANCOUVER, BRITISH COLUMBIA--(Marketwired - April 27, 2015) - Calibre Mining Corp. (TSX VENTURE:CXB) (the "Company" or "Calibre") is pleased to announce the second set of results from the 2015 drilling program on the Eastern Borosi gold-silver …

    Artikel zu den Werten

    Schreibe Deinen Kommentar

    Disclaimer