Diskussion und Meinungen zu Atico Mining (Seite 7)
eröffnet am 10.10.12 09:59:52 von
neuester Beitrag 03.08.23 11:49:35 von
neuester Beitrag 03.08.23 11:49:35 von
Beiträge: 169
ID: 1.177.186
ID: 1.177.186
Aufrufe heute: 2
Gesamt: 11.057
Gesamt: 11.057
Aktive User: 0
ISIN: CA0475591099 · WKN: A1JVJW · Symbol: ATY
0,2250
CAD
-4,26 %
-0,0100 CAD
Letzter Kurs 17.05.24 TSX Venture
Neuigkeiten
30.04.24 · globenewswire |
22.04.24 · globenewswire |
16.04.24 · globenewswire |
04.04.24 · globenewswire |
05.03.24 · globenewswire |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
16,270 | +16,71 | |
0,7400 | +16,54 | |
1,2800 | +14,29 | |
0,8450 | +14,19 | |
2,9000 | +13,28 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,8500 | -7,61 | |
240,00 | -7,69 | |
2,6100 | -9,06 | |
0,5500 | -26,67 | |
48,40 | -97,97 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 50.357.679 von Boersiback am 08.08.15 01:07:22Atico´s kosten werden zum großteil in peso abgerechnet.
die umsätze dagegen in dollar
und der peso schmiert derzeit gewaltigst ab !
also sinken auch die gesamtkosten.
das ist als ob kupfer immer noch über 6000 stehen würde
vermutlich haben einige die allin-kosten gelesen und denken es wird eng.
inzwischen hat der USD gegenüber dem peso extrem zugelegt.
USD/COP
freu mich auf montag. dann kann ich endlich nachkaufen
die umsätze dagegen in dollar
und der peso schmiert derzeit gewaltigst ab !
also sinken auch die gesamtkosten.
das ist als ob kupfer immer noch über 6000 stehen würde
vermutlich haben einige die allin-kosten gelesen und denken es wird eng.
inzwischen hat der USD gegenüber dem peso extrem zugelegt.
USD/COP
freu mich auf montag. dann kann ich endlich nachkaufen
Antwort auf Beitrag Nr.: 50.169.327 von Popeye82 am 12.07.15 16:09:49
jo, und genau jetzt bin ich wieder auf der käuferseite hier
nachdem der hype verflogen ist und das alte tief getestet wird.
...die Q-zahlen werden den markt dann wieder daran erinnern was sache ist.
Zitat von Popeye82: ist atico mining jetzt ein kauf, oder nicht?
ich überlege meine lebensversicherung aufzulösen
und dann alles auf grün
jo, und genau jetzt bin ich wieder auf der käuferseite hier
nachdem der hype verflogen ist und das alte tief getestet wird.
...die Q-zahlen werden den markt dann wieder daran erinnern was sache ist.
Antwort auf Beitrag Nr.: 50.169.327 von Popeye82 am 12.07.15 16:09:49
halte sie schon für einen kauf. bin ja noch drin aber mit wenig und 29% hinten.
gehört zu den sachen die ich nachkaufen werde.
- drill-ergebnisse weiterhin top.
- earnings letztes top.
- mit fortuna haben sie auch im grunde fast den besten silberproduzenten erschaffen.
der kurs da liegt bei jahreswechsel 2010/2011... da gibts nicht viele von bei silber.
naja wenn man wüßte bzgl. kupferpreis... hab mir mal den ganz langen chart angeschaut. 4000 wäre denkbar naja... wär schon heftig. bewertung bei atico ist so ziemlich assets minus schulden.
ja fast schon ein wenig teuer für diese zeiten.. neee passt schon
ich denke bei den kupferjuniors gibt´s kaum was besseres.
natürlich central asia. die sin ne kategorie höher..
(-> wobei mir kasachstan immer öfter als gutes minenland auffällt (centerra, goldbridges) ..auch ordentliches grades.)
halte sie schon für einen kauf. bin ja noch drin aber mit wenig und 29% hinten.
gehört zu den sachen die ich nachkaufen werde.
- drill-ergebnisse weiterhin top.
- earnings letztes top.
- mit fortuna haben sie auch im grunde fast den besten silberproduzenten erschaffen.
der kurs da liegt bei jahreswechsel 2010/2011... da gibts nicht viele von bei silber.
naja wenn man wüßte bzgl. kupferpreis... hab mir mal den ganz langen chart angeschaut. 4000 wäre denkbar naja... wär schon heftig. bewertung bei atico ist so ziemlich assets minus schulden.
ja fast schon ein wenig teuer für diese zeiten.. neee passt schon
ich denke bei den kupferjuniors gibt´s kaum was besseres.
natürlich central asia. die sin ne kategorie höher..
(-> wobei mir kasachstan immer öfter als gutes minenland auffällt (centerra, goldbridges) ..auch ordentliches grades.)
Antwort auf Beitrag Nr.: 50.036.448 von Boersiback am 23.06.15 22:32:41
ist atico mining jetzt ein kauf, oder nicht?
ich überlege meine lebensversicherung aufzulösen
und dann alles auf grün
ist atico mining jetzt ein kauf, oder nicht?
ich überlege meine lebensversicherung aufzulösen
und dann alles auf grün
geil solche bohrergebnisse und 17% grün un keiner schreibt was dazu.
so muss das sein, dann können auch solche katien wieder steigen
http://www.stockwatch.com/News/Item.aspx?bid=Z-C%3aATY-22896…
mich ärgerts eher nicht nachgekauft zu haben. die letzten Q-ergebnisse waren ja auch ganz ohne bohrungen sehr gut.
...tja es sind halt die gonzales... die macher von fortuna silver
manche wissen in dem sektor einfach offenbar was sie tun.
(solche wieerholungstäter finet man ja immer wieder)
so muss das sein, dann können auch solche katien wieder steigen
http://www.stockwatch.com/News/Item.aspx?bid=Z-C%3aATY-22896…
mich ärgerts eher nicht nachgekauft zu haben. die letzten Q-ergebnisse waren ja auch ganz ohne bohrungen sehr gut.
...tja es sind halt die gonzales... die macher von fortuna silver
manche wissen in dem sektor einfach offenbar was sie tun.
(solche wieerholungstäter finet man ja immer wieder)
Antwort auf Beitrag Nr.: 49.723.806 von Popeye82 am 06.05.15 17:15:57die drills werden auch immer besser
hier bin ich mit ner kleinen pos seit "viel zu früh" dabei irgendwas über 0,70 CAD.
tendenz "irgendwann mal nachkaufen".
kursverlauf extrem enttäuschend (da war fast jede goldbude in meinem depot besser im gleichen zeitraum)
kann denen eigentlich bisher nichts nachsagen. die zahlen jeweils für die produktionsfrühphase auch so grob ok bislang.
wenn sie weiter solche bohrergebnisse liefern wird das noch eine highgrade-mine mit langer laufzeit.
hier bin ich mit ner kleinen pos seit "viel zu früh" dabei irgendwas über 0,70 CAD.
tendenz "irgendwann mal nachkaufen".
kursverlauf extrem enttäuschend (da war fast jede goldbude in meinem depot besser im gleichen zeitraum)
kann denen eigentlich bisher nichts nachsagen. die zahlen jeweils für die produktionsfrühphase auch so grob ok bislang.
wenn sie weiter solche bohrergebnisse liefern wird das noch eine highgrade-mine mit langer laufzeit.
Atico Intercepts 'up to' 70m of 6,26% Cu, 1,85g/t Au +7,93g/t Ag +109m of 2,11% Cu, 3,79g/t Au +21,99g/t Ag, @El Roble Mine in Colombia - May 6, 2015
www.aticomining.com/i/pdf/news/2015-05-06_NR_lq816k.pdf
"VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 6, 2015) - Atico Mining Corporation (TSX VENTURE:ATY)(OTC PINK:ATCMF) ("Atico" or the "Company") is pleased to announce that ongoing infill drilling at the El Roble mine continues to extend mineralization of the Zeus body, approximately perpendicular to the strike direction of the massive sulfide body. In addition, the Company reports the results for six diamond drill core holes (ATD-0004 through ATD-0009), which included 70m of 6.26% copper and 1.85g/t gold and 109m of 2.11% copper and 3.79g/t gold, respectively.
Fernando E. Ganoza, CEO, commented: "Infill drilling at El Roble continues to intercept high grade mineralization at the Zeus massive sulfide body beyond the previously outlined mineralized shell, adding further confidence to our view that mineralization remains strong and open at depth. The on-going drill program at the mine will continue well into the second half of the year at which time the Company plans to update the resource estimate." Mr. Ganoza added, "based on the new geological information and the success of the first nine holes, management's confidence continues to increase with respect to resource growth potential at the El Roble mine."
El Roble Drilling Highlights Include:
Hole From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t)
ATD-0004 155.65 225.75 70.10 6.26 1.85 7.93
Including 186.40 225.75 39.35 7.50 1.31 5.67
ATD-0007 182.45 291.60 109.15 2.11 3.79 21.99
Including 182.45 234.80 29.60 6.07 5.65 39.86
ATD-0009 165.50 196.50 31.00 6.90 3.93 12.33
Including 176.45 196.50 10.65 11.54 7.92 19.72
True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 71% and 93% of the drill intercept.
Infill Drilling Program
The goal of the current underground drilling program at the El Roble mine is to further define the known mineralized bodies and expand the identified resource. During the fourth quarter of 2014, the Company began a drill program to specifically test the Zeus, Aquiles and Ares mineralized bodies. Infill drilling approximately perpendicular to the strike direction of the known massive sulfide bodies and drilling of new prospective areas below the 2000-meter level is being conducted from the new main level 1880 adit. Subsequent to the first three holes of the program (ATD-0001 to ATD-0003) where drilling significantly extended mineralization at Zeus as reported in March 2015 (See Atico news release dated March 10, 2015), the Company is reporting the next batch of six drill holes (ATD-0004 to ATD-0009). Infill holes ATD-0004 and ATD-0007 intercepted significantly larger intervals of massive sulfide than had been modeled in the National Instrument 43-101 inferred resource estimate wireframes of Zeus and Aquiles (See Atico technical report August 27, 2013). At the levels of mineralization drilled, interval used in the wireframe calculation of the inferred resource was approximately 49 meters for infill hole ATD-0004 and 54 meters for ATD-0007, whereas the Company intersected 70.1 meters, and 109.15 meters of mineralization, respectively. Infill hole ATD-0005 intersected 55.85 meters and ATD-0009 intersected 31 meters of mineralization while in the wireframe calculation at these levels approximately 40 meters and 30 meters respectively, were used. Infill hole ATD-0006 was designed to test the upper central limit of the Zeus mineralization and intersected 7.8 meters, while infill hole ATD-0008 was also in the upper region of Zeus mineralization but designed for immediate mine planning purposes and intersected 10.5 meters of mineralization. In the wireframe calculation approximately 20 meters and 13 meters were used for these levels.
Infill Drill Program Assay Results:
Intercept*
Hole ID Azimuth
(°) Dip
(°) Total
Length
(m) From
(m) To
(m) Interval
(m) Cu
(%) Au
(g/t) Ag
(g/t)
ATD-0004 29 -29 268.5 155.65 225.75 70.10 6.26 1.85 7.93
Including 158.40 173.10 14.70 2.71 3.93 13.53
173.10 183.25 10.15 10.11 1.53 8.53
186.40 225.75 39.35 7.50 1.31 5.67
ATD-0005 16 -23 312.15 195.40 245.90 50.50 1.19 3.59 12.88
Including 218.80 227.65 8.85 0.89 4.46 7.52
231.30 238.70 7.40 0.68 9.09 31.21
238.70 242.60 3.90 3.23 7.04 19.4
And 248.40 253.75 5.35 0.38 2.96 19.40
ATD-0006 22 -8 237.00 189.40 197.20 7.80 0.47 1.92 15.26
ATD-0007 18 -28 347.00 182.45 291.60 109.15 2.11 3.79 21.99
Including 188.10 197.00 8.90 1.16 6.51 42.72
205.20 234.80 29.60 6.07 5.65 39.86
238.20 245.25 7.05 1.17 4.11 10.85
270.00 280.40 8.40 3.87 11.77 50.94
280.40 281.80 1.40 2.21 14.6 69.10
ATD-0008 38 -16 204.90 166.05 176.55 10.50 8.00 4.11 23.87
ATD-0009 30 -17 230.80 165.50 196.50 31.00 6.90 3.93 12.33
Including 176.45 196.50 10.65 11.54 7.92 19.72
188.9 193.85 4.95 8.24 2.18 9.85
* True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 71% and 93% of the drill intercept.
Images showing the schematic Zeus-Aquiles massive sulfide bodies with above intercepts are available at the following link: http://www.aticomining.com/i/Maps/Zeus-Aquiles-Schematic-Mod…
El Roble Mine
The El Roble mine is a high grade underground copper and gold mine with nominal processing plant capacity of 650 tpd, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a nominal capacity of 400 tonnes per day. The mine has a continuous operating history of twenty two years, with recorded production of 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5 g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.
Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 11,740 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.
Inferred mineral resource of 1.58 million tonnes grading 4.45 % copper and 3.17 g/t gold, at a cut-off grade of 0.72 % copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.
Qualified Person
Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release.
About Atico Mining Corporation
Atico is a growth-oriented company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza, CEO
Atico Mining Corporation "
www.aticomining.com/i/pdf/news/2015-05-06_NR_lq816k.pdf
"VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 6, 2015) - Atico Mining Corporation (TSX VENTURE:ATY)(OTC PINK:ATCMF) ("Atico" or the "Company") is pleased to announce that ongoing infill drilling at the El Roble mine continues to extend mineralization of the Zeus body, approximately perpendicular to the strike direction of the massive sulfide body. In addition, the Company reports the results for six diamond drill core holes (ATD-0004 through ATD-0009), which included 70m of 6.26% copper and 1.85g/t gold and 109m of 2.11% copper and 3.79g/t gold, respectively.
Fernando E. Ganoza, CEO, commented: "Infill drilling at El Roble continues to intercept high grade mineralization at the Zeus massive sulfide body beyond the previously outlined mineralized shell, adding further confidence to our view that mineralization remains strong and open at depth. The on-going drill program at the mine will continue well into the second half of the year at which time the Company plans to update the resource estimate." Mr. Ganoza added, "based on the new geological information and the success of the first nine holes, management's confidence continues to increase with respect to resource growth potential at the El Roble mine."
El Roble Drilling Highlights Include:
Hole From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t)
ATD-0004 155.65 225.75 70.10 6.26 1.85 7.93
Including 186.40 225.75 39.35 7.50 1.31 5.67
ATD-0007 182.45 291.60 109.15 2.11 3.79 21.99
Including 182.45 234.80 29.60 6.07 5.65 39.86
ATD-0009 165.50 196.50 31.00 6.90 3.93 12.33
Including 176.45 196.50 10.65 11.54 7.92 19.72
True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 71% and 93% of the drill intercept.
Infill Drilling Program
The goal of the current underground drilling program at the El Roble mine is to further define the known mineralized bodies and expand the identified resource. During the fourth quarter of 2014, the Company began a drill program to specifically test the Zeus, Aquiles and Ares mineralized bodies. Infill drilling approximately perpendicular to the strike direction of the known massive sulfide bodies and drilling of new prospective areas below the 2000-meter level is being conducted from the new main level 1880 adit. Subsequent to the first three holes of the program (ATD-0001 to ATD-0003) where drilling significantly extended mineralization at Zeus as reported in March 2015 (See Atico news release dated March 10, 2015), the Company is reporting the next batch of six drill holes (ATD-0004 to ATD-0009). Infill holes ATD-0004 and ATD-0007 intercepted significantly larger intervals of massive sulfide than had been modeled in the National Instrument 43-101 inferred resource estimate wireframes of Zeus and Aquiles (See Atico technical report August 27, 2013). At the levels of mineralization drilled, interval used in the wireframe calculation of the inferred resource was approximately 49 meters for infill hole ATD-0004 and 54 meters for ATD-0007, whereas the Company intersected 70.1 meters, and 109.15 meters of mineralization, respectively. Infill hole ATD-0005 intersected 55.85 meters and ATD-0009 intersected 31 meters of mineralization while in the wireframe calculation at these levels approximately 40 meters and 30 meters respectively, were used. Infill hole ATD-0006 was designed to test the upper central limit of the Zeus mineralization and intersected 7.8 meters, while infill hole ATD-0008 was also in the upper region of Zeus mineralization but designed for immediate mine planning purposes and intersected 10.5 meters of mineralization. In the wireframe calculation approximately 20 meters and 13 meters were used for these levels.
Infill Drill Program Assay Results:
Intercept*
Hole ID Azimuth
(°) Dip
(°) Total
Length
(m) From
(m) To
(m) Interval
(m) Cu
(%) Au
(g/t) Ag
(g/t)
ATD-0004 29 -29 268.5 155.65 225.75 70.10 6.26 1.85 7.93
Including 158.40 173.10 14.70 2.71 3.93 13.53
173.10 183.25 10.15 10.11 1.53 8.53
186.40 225.75 39.35 7.50 1.31 5.67
ATD-0005 16 -23 312.15 195.40 245.90 50.50 1.19 3.59 12.88
Including 218.80 227.65 8.85 0.89 4.46 7.52
231.30 238.70 7.40 0.68 9.09 31.21
238.70 242.60 3.90 3.23 7.04 19.4
And 248.40 253.75 5.35 0.38 2.96 19.40
ATD-0006 22 -8 237.00 189.40 197.20 7.80 0.47 1.92 15.26
ATD-0007 18 -28 347.00 182.45 291.60 109.15 2.11 3.79 21.99
Including 188.10 197.00 8.90 1.16 6.51 42.72
205.20 234.80 29.60 6.07 5.65 39.86
238.20 245.25 7.05 1.17 4.11 10.85
270.00 280.40 8.40 3.87 11.77 50.94
280.40 281.80 1.40 2.21 14.6 69.10
ATD-0008 38 -16 204.90 166.05 176.55 10.50 8.00 4.11 23.87
ATD-0009 30 -17 230.80 165.50 196.50 31.00 6.90 3.93 12.33
Including 176.45 196.50 10.65 11.54 7.92 19.72
188.9 193.85 4.95 8.24 2.18 9.85
* True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 71% and 93% of the drill intercept.
Images showing the schematic Zeus-Aquiles massive sulfide bodies with above intercepts are available at the following link: http://www.aticomining.com/i/Maps/Zeus-Aquiles-Schematic-Mod…
El Roble Mine
The El Roble mine is a high grade underground copper and gold mine with nominal processing plant capacity of 650 tpd, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.
Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a nominal capacity of 400 tonnes per day. The mine has a continuous operating history of twenty two years, with recorded production of 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5 g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.
Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 11,740 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.
Inferred mineral resource of 1.58 million tonnes grading 4.45 % copper and 3.17 g/t gold, at a cut-off grade of 0.72 % copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.
Qualified Person
Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release.
About Atico Mining Corporation
Atico is a growth-oriented company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza, CEO
Atico Mining Corporation "
ja, recht erfreulich. vielleicht sollt ich nachkaufen.... bin 30% in den miesen mit ner sehr klein (gewordenen posi).
solche bohrergebnisse liest man sehr sehr selten
solche bohrergebnisse liest man sehr sehr selten
Atico Intercepts 86.4m of 5.04% Cu +3.71g/t Au, +116m of 3.05% Cu +2.38g/t Au, @El Roble Mine in Colombia - Mar 10, 2015
www.aticomining.com/i/pdf/news/2015-03-10_NR_Gker8n.pdf
"VANCOUVER, BRITISH COLUMBIA--(Marketwired - March 10, 2015) - Atico Mining Corporation (TSX VENTURE:ATY)(OTC PINK:ATCMF)("Atico" or the "Company") is pleased to announce that ongoing in-fill drilling at the El Roble mine has significantly extended mineralization at Zeus, approximately perpendicular to the strike direction of the massive sulfide body. In addition, the Company reports the results for three diamond drill core holes (ATD-0001 through ATD-0003), which included 86.4m of 5.04% copper and 3.71g/t gold and 116m of 3.05% copper and 2.38g/t gold, respectively.
Fernando E. Ganoza, CEO, commented: "The ongoing in-fill drill program at the El Roble mine has intercepted high-grade mineralization at Zeus massive sulfide body which significantly extends the mineralization beyond the previously outlined mineralized shell. The Zeus mineralized body accounts for approximately forty percent of our total identified resource and so any extensions to mineralization discovered here could have a material impact on our total identified resource." Mr. Ganoza added, "we are extremely pleased and encouraged with these results as they continue to add further confidence to our hypothesis that high-grade mineralization continues strong at depth and remains open beyond the current mine limits."
El Roble Drilling Highlights Include:
Hole From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t)
ATD-0001* 180.0 296.6 116.6 3.05 2.38 7.04
Including 192.4 234.6 42.2 6.73 1.91 7.23
ATD-0002 160.9 231.7 70.8 5.25 1.93 8.14
Including 175.3 220.8 45.5 7.52 1.45 5.10
ATD-0003 158.8 245.2 86.4 5.04 3.71 8.69
Including 194.9 227.3 32.4 9.09 1.69 6.44
194.9 199.4 4.5 15.73 3.04 11.50
* There was a cumulative core loss of 7.6 meters for the total intercept and a grade value of zero was assigned to these lost intervals in the calculation.
** True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 76% and 83% of the drill intercept.
In-fill Drilling Program
The goal of the underground drilling program at the El Roble mine is to further define the known mineralized bodies and expand the identified resource. During the fourth quarter of 2014, the Company began a drill program to specifically test the Zeus, Aquiles and Ares mineralization. In-fill drilling approximately perpendicular to the strike direction of the known massive sulfide bodies and drilling of new prospective areas below the 2000-meter level is being conducted from the new main level 1880 adit. With the first three holes of the program (ATD-0001, ATD-0002 and ATD-0003), drilling intercepted significantly larger intervals of massive sulfide than had been modeled in the NI 43-101 inferred resource estimate wireframes of Zeus and Aquiles (See Atico technical report August 27, 2013). At the levels of mineralization drilled, the average interval used in the wireframe calculation of the inferred resource was approximately 58 meters, whereas the first infill hole (ATD-0001) intersected 116.6 meters, the second hole (ATD-0002) intersected 70.8 meters and the third hole (ATD-0003) intersected 86.4 meters of mineralization.
Infill Drill Program Assay Results:
Intercept**
Hole ID Azimuth
(°) Dip
(°) Total
Length
(m) From
(m) To
(m) Interval
(m) Cu
(%) Au
(g/t) Ag
(g/t)
ATD-0001* 20 -28 314.30 180.0 296.6 116.6 3.05 2.38 7.04
Including 192.4 234.6 42.2 6.73 1.91 7.23
193.9 198.2 4.3 6.47 2.25 6.90
201.7 205.2 3.5 11.15 1.43 6.00
205.8 215.1 10.6 10.41 0.83 6.49
225.0 234.6 9.6 5.60 4.91 7.97
276.5 283.8 7.3 1.37 4.71 9.94
ATD-0002 28 -24 276.45 160.9 231.7 70.8 5.25 1.93 8.14
Including 175.3 220.8 45.5 7.52 1.45 5.10
184.2 190.6 6.4 7.49 0.74 4.15
196.3 201.0 4.7 8.98 1.38 3.62
201.5 211.3 9.8 15.00 2.31 4.34
215.1 221.8 6.7 4.35 2.14 6.46
224.2 228.1 3.85 2.84 3.75 17.29
ATD-0003 24 -31 361.50 158.8 245.2 86.4 5.04 3.71 8.69
Including 194.9 227.3 32.4 9.09 1.69 6.44
194.9 199.4 4.5 15.73 3.04 11.50
200.5 208.9 8.4 9.42 1.36 6.07
209.5 216.0 6.5 11.82 4.56 0.32
217.2 231.6 14.4 6.01 1.60 6.44
* There was a cumulative core loss of 7.6 meters for the total intercept and a grade value of zero was assigned to these lost intervals in the calculation.
** True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 76% and 83% of the drill intercept.
Images showing the schematic Zeus-Aquiles massive sulfide bodies with above intercepts are available at the following link: http://www.aticomining.com/i/Maps/Schematic-models-MAR2.jpg
Union Negotiations, +Operations Update
The Company reports it has successfully concluded negotiations with the El Roble mine union. The terms of the new agreement are for the period 2015 through 2016 and are in line with agreements negotiated recently by mining companies in Colombia.
The Company also reports commissioning of new crushing equipment has caused intermittent production at El Roble mine equivalent to approximately 25% less availability than scheduled for January and February. The Company has since stabilized production, expects equipment availability for March as scheduled and anticipates completion of commissioning by the end of the first quarter.
El Roble Mine
The El Roble mine is an underground copper, gold and silver mine and processing plant located in the Department of Choco in Colombia. Its commercial product is a copper concentrate with gold and silver by-product credits.
With a previous nominal capacity of 400 tonnes per day, the mine has processed over the past twenty-two years, a total of over 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.
On November 22, 2013, the Company completed the exercise of a property purchase option, acquiring 90% of the shares of Minera El Roble S.A. ("MINER"), the owner of the El Roble mineral property and took control of the producing El Roble mine and 6,679 hectares of surrounding claims. In 2014, the Company initiated and completed an expansion of the existing processing facility to a nominal capacity of 650 tonnes per day.
Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 11,740 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.
Inferred mineral resource of 1.58 million tonnes grading 4.45 % copper and 3.17 g/t gold, at a cut-off grade of 0.72 % copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.
Qualified Person
Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release.
About Atico Mining Corporation
Atico is a growth-oriented company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza, CEO
Atico Mining Corporation
Trading symbols: (TSX VENTURE:ATY)(OTC PINK:ATCMF) "
www.aticomining.com/i/pdf/news/2015-03-10_NR_Gker8n.pdf
"VANCOUVER, BRITISH COLUMBIA--(Marketwired - March 10, 2015) - Atico Mining Corporation (TSX VENTURE:ATY)(OTC PINK:ATCMF)("Atico" or the "Company") is pleased to announce that ongoing in-fill drilling at the El Roble mine has significantly extended mineralization at Zeus, approximately perpendicular to the strike direction of the massive sulfide body. In addition, the Company reports the results for three diamond drill core holes (ATD-0001 through ATD-0003), which included 86.4m of 5.04% copper and 3.71g/t gold and 116m of 3.05% copper and 2.38g/t gold, respectively.
Fernando E. Ganoza, CEO, commented: "The ongoing in-fill drill program at the El Roble mine has intercepted high-grade mineralization at Zeus massive sulfide body which significantly extends the mineralization beyond the previously outlined mineralized shell. The Zeus mineralized body accounts for approximately forty percent of our total identified resource and so any extensions to mineralization discovered here could have a material impact on our total identified resource." Mr. Ganoza added, "we are extremely pleased and encouraged with these results as they continue to add further confidence to our hypothesis that high-grade mineralization continues strong at depth and remains open beyond the current mine limits."
El Roble Drilling Highlights Include:
Hole From (m) To (m) Interval (m) Cu (%) Au (g/t) Ag (g/t)
ATD-0001* 180.0 296.6 116.6 3.05 2.38 7.04
Including 192.4 234.6 42.2 6.73 1.91 7.23
ATD-0002 160.9 231.7 70.8 5.25 1.93 8.14
Including 175.3 220.8 45.5 7.52 1.45 5.10
ATD-0003 158.8 245.2 86.4 5.04 3.71 8.69
Including 194.9 227.3 32.4 9.09 1.69 6.44
194.9 199.4 4.5 15.73 3.04 11.50
* There was a cumulative core loss of 7.6 meters for the total intercept and a grade value of zero was assigned to these lost intervals in the calculation.
** True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 76% and 83% of the drill intercept.
In-fill Drilling Program
The goal of the underground drilling program at the El Roble mine is to further define the known mineralized bodies and expand the identified resource. During the fourth quarter of 2014, the Company began a drill program to specifically test the Zeus, Aquiles and Ares mineralization. In-fill drilling approximately perpendicular to the strike direction of the known massive sulfide bodies and drilling of new prospective areas below the 2000-meter level is being conducted from the new main level 1880 adit. With the first three holes of the program (ATD-0001, ATD-0002 and ATD-0003), drilling intercepted significantly larger intervals of massive sulfide than had been modeled in the NI 43-101 inferred resource estimate wireframes of Zeus and Aquiles (See Atico technical report August 27, 2013). At the levels of mineralization drilled, the average interval used in the wireframe calculation of the inferred resource was approximately 58 meters, whereas the first infill hole (ATD-0001) intersected 116.6 meters, the second hole (ATD-0002) intersected 70.8 meters and the third hole (ATD-0003) intersected 86.4 meters of mineralization.
Infill Drill Program Assay Results:
Intercept**
Hole ID Azimuth
(°) Dip
(°) Total
Length
(m) From
(m) To
(m) Interval
(m) Cu
(%) Au
(g/t) Ag
(g/t)
ATD-0001* 20 -28 314.30 180.0 296.6 116.6 3.05 2.38 7.04
Including 192.4 234.6 42.2 6.73 1.91 7.23
193.9 198.2 4.3 6.47 2.25 6.90
201.7 205.2 3.5 11.15 1.43 6.00
205.8 215.1 10.6 10.41 0.83 6.49
225.0 234.6 9.6 5.60 4.91 7.97
276.5 283.8 7.3 1.37 4.71 9.94
ATD-0002 28 -24 276.45 160.9 231.7 70.8 5.25 1.93 8.14
Including 175.3 220.8 45.5 7.52 1.45 5.10
184.2 190.6 6.4 7.49 0.74 4.15
196.3 201.0 4.7 8.98 1.38 3.62
201.5 211.3 9.8 15.00 2.31 4.34
215.1 221.8 6.7 4.35 2.14 6.46
224.2 228.1 3.85 2.84 3.75 17.29
ATD-0003 24 -31 361.50 158.8 245.2 86.4 5.04 3.71 8.69
Including 194.9 227.3 32.4 9.09 1.69 6.44
194.9 199.4 4.5 15.73 3.04 11.50
200.5 208.9 8.4 9.42 1.36 6.07
209.5 216.0 6.5 11.82 4.56 0.32
217.2 231.6 14.4 6.01 1.60 6.44
* There was a cumulative core loss of 7.6 meters for the total intercept and a grade value of zero was assigned to these lost intervals in the calculation.
** True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 76% and 83% of the drill intercept.
Images showing the schematic Zeus-Aquiles massive sulfide bodies with above intercepts are available at the following link: http://www.aticomining.com/i/Maps/Schematic-models-MAR2.jpg
Union Negotiations, +Operations Update
The Company reports it has successfully concluded negotiations with the El Roble mine union. The terms of the new agreement are for the period 2015 through 2016 and are in line with agreements negotiated recently by mining companies in Colombia.
The Company also reports commissioning of new crushing equipment has caused intermittent production at El Roble mine equivalent to approximately 25% less availability than scheduled for January and February. The Company has since stabilized production, expects equipment availability for March as scheduled and anticipates completion of commissioning by the end of the first quarter.
El Roble Mine
The El Roble mine is an underground copper, gold and silver mine and processing plant located in the Department of Choco in Colombia. Its commercial product is a copper concentrate with gold and silver by-product credits.
With a previous nominal capacity of 400 tonnes per day, the mine has processed over the past twenty-two years, a total of over 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.
On November 22, 2013, the Company completed the exercise of a property purchase option, acquiring 90% of the shares of Minera El Roble S.A. ("MINER"), the owner of the El Roble mineral property and took control of the producing El Roble mine and 6,679 hectares of surrounding claims. In 2014, the Company initiated and completed an expansion of the existing processing facility to a nominal capacity of 650 tonnes per day.
Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 11,740 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.
Inferred mineral resource of 1.58 million tonnes grading 4.45 % copper and 3.17 g/t gold, at a cut-off grade of 0.72 % copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.
On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.
Qualified Person
Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release.
About Atico Mining Corporation
Atico is a growth-oriented company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
ON BEHALF OF THE BOARD
Fernando E. Ganoza, CEO
Atico Mining Corporation
Trading symbols: (TSX VENTURE:ATY)(OTC PINK:ATCMF) "
achja die hab ich ja auch noch
würde mal sagen nach den zahlen... so langsam wird´s erwartungsgemäß.
würde mal sagen nach den zahlen... so langsam wird´s erwartungsgemäß.
30.04.24 · globenewswire · Atico Mining |
22.04.24 · globenewswire · Atico Mining |
16.04.24 · globenewswire · Atico Mining |
04.04.24 · globenewswire · Atico Mining |
05.03.24 · globenewswire · Atico Mining |
05.02.24 · globenewswire · Atico Mining |
17.01.24 · globenewswire · Atico Mining |
04.01.24 · globenewswire · Atico Mining |
20.11.23 · globenewswire · Atico Mining |
15.11.23 · globenewswire · Atico Mining |