WACKER NEUSON SE (Seite 270)
eröffnet am 13.06.08 20:37:25 von
neuester Beitrag 02.04.24 11:52:20 von
neuester Beitrag 02.04.24 11:52:20 von
Beiträge: 2.821
ID: 1.142.055
ID: 1.142.055
Aufrufe heute: 4
Gesamt: 341.286
Gesamt: 341.286
Aktive User: 0
ISIN: DE000WACK012 · WKN: WACK01
17,000
EUR
-0,18 %
-0,030 EUR
Letzter Kurs 25.04.24 Lang & Schwarz
Neuigkeiten
Wacker Neuson Aktien ab 5,80 Euro handeln - Ohne versteckte Kosten!Anzeige |
26.03.24 · wO Newsflash |
26.03.24 · Markus Weingran |
26.03.24 · dpa-AFX |
Werte aus der Branche Baugewerbe
Wertpapier | Kurs | Perf. % |
---|---|---|
2,6400 | +129,57 | |
0,9799 | +58,05 | |
4,0800 | +36,00 | |
2,1800 | +26,01 | |
1,0400 | +20,93 |
Wertpapier | Kurs | Perf. % |
---|---|---|
2,0500 | -10,87 | |
1,0200 | -11,30 | |
4,2500 | -11,46 | |
2,1500 | -25,86 | |
10,510 | -48,56 |
Beitrag zu dieser Diskussion schreiben
Wacker Neuson Opens New Climate Control Facility
Wacker Neuson Corp. has opened a 168,500-square-foot manufacturing and distribution center in Norton Shores, Mich. The facility, located just outside Muskegon and directly across Lake Michigan from Wacker Neuson’s Menomonee Falls, Wis., headquarters, will manufacture the climate-control product line and assembly of light towers and will also serve as the distribution hub for the company’s new compact equipment line.
The facility, on a 37-acre parcel of land, will manufacture hydronic heaters, indirect-fired heaters, heat exchangers, air movers, dehumidifiers and light towers. It features sufficient space for current and future demand with room for expansion.
Wacker Neuson purchased the Spring Lake, Mich.-based Ground Heaters operation in 2006. The new facility is two miles from the previous manufacturing facility.
“A primary consideration for locating the new building so close to the existing facility was to utilize our talented work force,” said Ed Jaroszewicz, director of climate control for Wacker Neuson. “Their experience and dedication was critical to our success and will be essential to our future growth.”
Wacker Neuson is using a “focus factory” model to develop two factories within the new facility: one for climate-control equipment and the other for light towers. The manufacturing concept merges all aspects of the production process into a single area of concentration, divided into production stations. Every employee on the line will know the process at each station, so the worker can move with the product from start to finish. Wacker began using the focus factory process in 1995 and realized significant gains, reducing lead times as well as inventory levels.
“Our goal is to ensure quality equipment is available when our customers need it,” added Jaroszewicz.
Wacker Neuson Corp. recently opened a 168,500-square-foot manufacturing and distribution center in Norton Shores, Mich., that will manufacture the climate-control product line and assembly of light towers and will also serve as the distribution hub for the company’s new compact equipment line.
Wacker Neuson Corp. has opened a 168,500-square-foot manufacturing and distribution center in Norton Shores, Mich. The facility, located just outside Muskegon and directly across Lake Michigan from Wacker Neuson’s Menomonee Falls, Wis., headquarters, will manufacture the climate-control product line and assembly of light towers and will also serve as the distribution hub for the company’s new compact equipment line.
The facility, on a 37-acre parcel of land, will manufacture hydronic heaters, indirect-fired heaters, heat exchangers, air movers, dehumidifiers and light towers. It features sufficient space for current and future demand with room for expansion.
Wacker Neuson purchased the Spring Lake, Mich.-based Ground Heaters operation in 2006. The new facility is two miles from the previous manufacturing facility.
“A primary consideration for locating the new building so close to the existing facility was to utilize our talented work force,” said Ed Jaroszewicz, director of climate control for Wacker Neuson. “Their experience and dedication was critical to our success and will be essential to our future growth.”
Wacker Neuson is using a “focus factory” model to develop two factories within the new facility: one for climate-control equipment and the other for light towers. The manufacturing concept merges all aspects of the production process into a single area of concentration, divided into production stations. Every employee on the line will know the process at each station, so the worker can move with the product from start to finish. Wacker began using the focus factory process in 1995 and realized significant gains, reducing lead times as well as inventory levels.
“Our goal is to ensure quality equipment is available when our customers need it,” added Jaroszewicz.
Wacker Neuson Corp. recently opened a 168,500-square-foot manufacturing and distribution center in Norton Shores, Mich., that will manufacture the climate-control product line and assembly of light towers and will also serve as the distribution hub for the company’s new compact equipment line.
dies war heute das höchste Handelsvolumen auf Xetra-Basis seit 14. Mai 2008. Rund 300.000 St. wurden gehandelt. Und wir haben im Plus geschlossen. Gutes Zeichen.
Antwort auf Beitrag Nr.: 34.392.102 von hangingman am 27.06.08 17:50:22...schriftlich ist klar. Da äußert sich jede IR-Abteilung total rechtskonform und legt jedes Wort auf die Goldwaage. Mailantworten sind meistens 08/15.
@ watchlisting: Dann müssen wir uns mit der IR-Abteilung nochmal in Verbindung setzen !!!
Ich glaube aber nicht, dass sie dazu Stellung nehmen werden,dann hätten sie bei meiner letzten Anfrage darauf geantwortet.
Meine Frage lautete unteranderem,ob Fonds verkaufen würden,dieses
wurde als nicht bekannt abgetan.
Ich glaube aber nicht, dass sie dazu Stellung nehmen werden,dann hätten sie bei meiner letzten Anfrage darauf geantwortet.
Meine Frage lautete unteranderem,ob Fonds verkaufen würden,dieses
wurde als nicht bekannt abgetan.
Imre Szerdahelyi
Leiter Unternehmenskommunikation
Wacker Construction Equipment AG
Preußenstr. 41
80809 München
Tel. +49 - (0)89 - 354 02 - 251
Fax +49 - (0)89 - 354 02 - 298
ir@eu.wackergroup.com
Katrin Yvonne Neuffer
Investor Relations Managerin
Wacker Construction Equipment AG
Preußenstraße 41
80809 München
Tel. +49 - (0)89 - 354 02 -173
Fax +49 - (0)89 - 354 02 -298
ir@eu.wackergroup.com
Leiter Unternehmenskommunikation
Wacker Construction Equipment AG
Preußenstr. 41
80809 München
Tel. +49 - (0)89 - 354 02 - 251
Fax +49 - (0)89 - 354 02 - 298
ir@eu.wackergroup.com
Katrin Yvonne Neuffer
Investor Relations Managerin
Wacker Construction Equipment AG
Preußenstraße 41
80809 München
Tel. +49 - (0)89 - 354 02 -173
Fax +49 - (0)89 - 354 02 -298
ir@eu.wackergroup.com
Vielleicht haben "Katrin & Imre" hierzu ja Hintergrundinformationen und weitergehende Erkenntnisse.
Könnte mir vorstellen, daß die IR-Abteilung mit den beteiligten Fonds regelmäßig in Kontakt steht. Und somit bestens informiert ist, wer gerade aufstockt/reduziert.
Könnte mir vorstellen, daß die IR-Abteilung mit den beteiligten Fonds regelmäßig in Kontakt steht. Und somit bestens informiert ist, wer gerade aufstockt/reduziert.
Antwort auf Beitrag Nr.: 34.391.524 von Duke1976 am 27.06.08 17:01:01
@ duke
Kann sein,dass aufgrund von Mittelabflüssen, die Dws verkaufen muss !!
@ duke
Kann sein,dass aufgrund von Mittelabflüssen, die Dws verkaufen muss !!
ist schon klar, dass dies die Wackerfamilie ist. Trotzdem bin ich mir nicht sicher. Bei den Stücken sind es keine Kleinanleger. Die DWS hat meines Wissen zwischen 10 und 11 € Ihren Anteil letztmalig augestockt. Warum sollten Sie sich jetzt mit Verlust trennen?
Interwac = Anteilseigner Wackerfamilie
Die verkaufen nicht.
Die verkaufen nicht.
26.03.24 · wO Newsflash · Honeywell International |
26.03.24 · Markus Weingran · Amazon |
26.03.24 · dpa-AFX · DHL Group |
26.03.24 · dpa-AFX · HORNBACH Holding |
26.03.24 · Sharedeals · Wacker Neuson |
26.03.24 · dpa-AFX · HORNBACH Holding |
26.03.24 · dpa-AFX · SDAX |
26.03.24 · dpa-AFX · HORNBACH Holding |
26.03.24 · dpa-AFX · HORNBACH Holding |
26.03.24 · Der Aktionär TV · KWS SAAT |