Grange Resources Ltd. WKN 917447 Mit KGV von 1,5 und Hammer Wachstumstory (Seite 84)
eröffnet am 05.01.10 15:32:06 von
neuester Beitrag 04.04.24 11:42:11 von
neuester Beitrag 04.04.24 11:42:11 von
Beiträge: 1.448
ID: 1.155.152
ID: 1.155.152
Aufrufe heute: 0
Gesamt: 133.972
Gesamt: 133.972
Aktive User: 0
ISIN: AU000000GRR8 · WKN: 917447
0,2660
EUR
+0,76 %
+0,0020 EUR
Letzter Kurs 08.05.24 Lang & Schwarz
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,8100 | +11,11 | |
0,8000 | +11,11 | |
2,0800 | +10,05 | |
10,770 | +9,50 | |
200,00 | +8,11 |
Wertpapier | Kurs | Perf. % |
---|---|---|
10,520 | -12,33 | |
0,9860 | -12,74 | |
0,6000 | -18,37 | |
0,6601 | -26,22 | |
46,43 | -98,01 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 41.714.702 von mintelo am 29.06.11 09:56:42Es war eine Unverschämtheit was die Australier bzw. Anleger mit Grange res getrieben haben.
Mit einem profitalblen Eisenproduzenten.
Wahrscheinlich haben die nun genug billig eingesammelt - um nun den Kurs nach oben zu treiben.
Der Wöchentliche Chart 2 Jahre - als Grange das letzte mal wöchentlich so ausverkauft war
war Grange bei 0,24 und stieg dann auf 0,72 Aud$.
Im Wöchentlichen Chart ein grüner Hammer seit heute.
Urpferdchen
Mit einem profitalblen Eisenproduzenten.
Wahrscheinlich haben die nun genug billig eingesammelt - um nun den Kurs nach oben zu treiben.
Der Wöchentliche Chart 2 Jahre - als Grange das letzte mal wöchentlich so ausverkauft war
war Grange bei 0,24 und stieg dann auf 0,72 Aud$.
Im Wöchentlichen Chart ein grüner Hammer seit heute.
Urpferdchen
Antwort auf Beitrag Nr.: 41.713.907 von urpferdchen am 29.06.11 07:42:35Wird auch mal Zeit!
Ausverkauf beendet - heute bis jetzt 9% plus -
anscheinend haben die in den letzten Tagen bei steigenden Umsätzen genug billig -
viel zu billig - eingekauft bei Grange res.
Urpferdchen
anscheinend haben die in den letzten Tagen bei steigenden Umsätzen genug billig -
viel zu billig - eingekauft bei Grange res.
Urpferdchen
Unternehmenspräsentation vom 23.Juni
http://www.grangeresources.com.au/clients/grange/downloads/i…
http://www.grangeresources.com.au/clients/grange/downloads/i…
Ausverkauf? Oder was ist hier los?
Der 3-Jahreschart - wöchentlich - mit dem Slow-Stochiastik davon und von den
Unternehmensdaten her, sollte es demnächst kräftig aufwärts gehen.
in den letzten Tagen nimmt der Umsatz zu.
Unternehmensdaten her, sollte es demnächst kräftig aufwärts gehen.
in den letzten Tagen nimmt der Umsatz zu.
Antwort auf Beitrag Nr.: 41.644.946 von urpferdchen am 14.06.11 16:26:23Da bin ich mal gespannt...
Wenn der DOW bis zum Schluß heute so im plus bleibt - dann macht der
Australische und chin. Index einen Doppelten Boden unten / Doppeltopp.
Dann sollten wir morgen bei (fast) allen Australischen Werten einiges an plus sehen.
Urpferdench
Australische und chin. Index einen Doppelten Boden unten / Doppeltopp.
Dann sollten wir morgen bei (fast) allen Australischen Werten einiges an plus sehen.
Urpferdench
Antwort auf Beitrag Nr.: 41.630.070 von mintelo am 10.06.11 00:46:49Heute nur eine kleine Kursreaktion - der DOW und China - zogen auch die Australischen Werte
und seltsamerweise alle Eisen-Werte nach unten. Als ob Grange res ein Explorerer wäre.
Wenn die großen genug billig eingesammelt haben, erst dann geht es nach oben.
Und wenn in den USA der Haushalts-streit geklärt ist.
DOW am unteren Rand des Aufwärtstrends -
Beim DAX die wichtige Marke 7.000 - als wahrscheinliche Wendemarke nach oben.
Der Australische Index am letzten Tief von fukushima -Mitte März - da hoffe ich auf ein Doppeltopp,
dass es nun nach oben dreht.
In der Weltwirtschaft befürchtet man für nächstes Jahr einen grossen Boom in den Schwellenländern,
die zu einer Überhitzung führen können.
Urpferdchen
und seltsamerweise alle Eisen-Werte nach unten. Als ob Grange res ein Explorerer wäre.
Wenn die großen genug billig eingesammelt haben, erst dann geht es nach oben.
Und wenn in den USA der Haushalts-streit geklärt ist.
DOW am unteren Rand des Aufwärtstrends -
Beim DAX die wichtige Marke 7.000 - als wahrscheinliche Wendemarke nach oben.
Der Australische Index am letzten Tief von fukushima -Mitte März - da hoffe ich auf ein Doppeltopp,
dass es nun nach oben dreht.
In der Weltwirtschaft befürchtet man für nächstes Jahr einen grossen Boom in den Schwellenländern,
die zu einer Überhitzung führen können.
Urpferdchen
Antwort auf Beitrag Nr.: 41.630.070 von mintelo am 10.06.11 00:46:49Southdown Definitive Feasibility Study
Fully Approved and Funded
Grange Resources Limited (“Grange” or the “Company”) is pleased to announce that both owners of the Southdown project Sojitz Resources & Technology Pty Ltd and Grange Resources have approved the funding and execution of the Project Definitive Feasibility Study (DFS).
The DFS is targeted for completion in the first quarter of 2012, and is estimated to cost A$110m. Grange Resources will fund its 70% share of the study costs from existing cash reserves.
Managing Director, Russell Clark said “as a result of already having a highly profitable magnetite project at Savage River in Tasmania, we can fully fund this DFS work without needing to go back to the market. This is one of the significant advantages we have over our competitors. Savage River is performing well and generating healthy cash margins.”
Specific Definitive Study work will include:
• Detailed engineering of concentrator, port facilities, power transmission, pipeline, desalination plant and pellet plant facilities;
• Securing engineering and tender packages for long lead items;
• Further resource and reserve drilling;
• Geotechnical drilling in Albany port;
• Water permit approval;
• Completion of land access arrangements and
• Mine design and scheduling.
The ability to complete of the DFS so quickly reflects the advanced nature of the prefeasibility study where:
• Resources and reserves are in place;
• Power line easements are in place;
• Major mine and port environmental permits are in place;
• Metallurgical testwork is advanced and the concentrator flowsheet is finalised;
• Land access is very advanced.
Prefeasibility modelling indicates that the Australian based project will cost A$2.57 billion.
This will complete the mine site preparation, the concentrator facility and associated infrastructure required to load and ship approximately 10 million tonnes per annum of high grade magnetite concentrate containing 69% iron. Operating costs per tonne of concentrate
produced and loaded are estimated to be less than A$60 per tonne.
The Southdown Magnetite Project is a joint venture (JV) between Grange Resources Ltd (Grange) (70%), and Sojitz Resources & Technology Pty Ltd (Sojitz) (30%), wholly‐owned subsidiary of Sojitz Corporation, a Japanese global trading company operating in various industries and services.
About the Company:
...
Fully Approved and Funded
Grange Resources Limited (“Grange” or the “Company”) is pleased to announce that both owners of the Southdown project Sojitz Resources & Technology Pty Ltd and Grange Resources have approved the funding and execution of the Project Definitive Feasibility Study (DFS).
The DFS is targeted for completion in the first quarter of 2012, and is estimated to cost A$110m. Grange Resources will fund its 70% share of the study costs from existing cash reserves.
Managing Director, Russell Clark said “as a result of already having a highly profitable magnetite project at Savage River in Tasmania, we can fully fund this DFS work without needing to go back to the market. This is one of the significant advantages we have over our competitors. Savage River is performing well and generating healthy cash margins.”
Specific Definitive Study work will include:
• Detailed engineering of concentrator, port facilities, power transmission, pipeline, desalination plant and pellet plant facilities;
• Securing engineering and tender packages for long lead items;
• Further resource and reserve drilling;
• Geotechnical drilling in Albany port;
• Water permit approval;
• Completion of land access arrangements and
• Mine design and scheduling.
The ability to complete of the DFS so quickly reflects the advanced nature of the prefeasibility study where:
• Resources and reserves are in place;
• Power line easements are in place;
• Major mine and port environmental permits are in place;
• Metallurgical testwork is advanced and the concentrator flowsheet is finalised;
• Land access is very advanced.
Prefeasibility modelling indicates that the Australian based project will cost A$2.57 billion.
This will complete the mine site preparation, the concentrator facility and associated infrastructure required to load and ship approximately 10 million tonnes per annum of high grade magnetite concentrate containing 69% iron. Operating costs per tonne of concentrate
produced and loaded are estimated to be less than A$60 per tonne.
The Southdown Magnetite Project is a joint venture (JV) between Grange Resources Ltd (Grange) (70%), and Sojitz Resources & Technology Pty Ltd (Sojitz) (30%), wholly‐owned subsidiary of Sojitz Corporation, a Japanese global trading company operating in various industries and services.
About the Company:
...