DAX+0,60 % EUR/USD-0,13 % Gold-0,09 % Öl (Brent)+1,60 %

Diskussion und Meinungen zu Atico Mining (Seite 13)


WKN: A1JVJW | Symbol: 9AO
0,191
13.11.18
Tradegate
-2,05 %
-0,004 EUR

Begriffe und/oder Benutzer

 

Atico heute mit einem 52 Wochenhoch!

News habe ich leider keine gefunden. Hier für Interessierte die Homepage:

http://aticomining.com/
Atico Produces 4.52 Million Pounds of Cu and 2,813 Ounces of Au in Third Quarter 2016
[Marketwired]
October 18, 2016

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct 18, 2016) - Atico Mining Corporation (the "Company" or "Atico") (TSX VENTURE:ATY)(OTC PINK:ATCMF) announces its operating results for the three months ended September 30, 2016 from its El Roble mine. Production for the quarter totaled 4.52 million pounds of copper and 2,813 ounces of gold in concentrates, an increase of 39% for copper and a decrease of 5% for gold over the same period in 2015.

"The Company has had a solid operating quarter as the El Roble mine performance has stayed in line with expectations and remains on target to meet our annual consolidated production guidance," said Fernando E. Ganoza, CEO. "We commend the operation team which was able to swiftly make adjustments and partially mitigate the impact caused by the national transportation strike which began in the second quarter and concluded in late July. We look forward to strong fourth quarter and 2016 results".

Third Quarter Operational Highlights

Production of 4.52 million pounds of copper contained in concentrates; an increase of 39% over Q3 2015.
Production of 2,813 ounces of gold contained in concentrates; a decrease of 5% over Q3 2015.
Average processed tonnes per day of 766, an increase of 19.5% over Q3 2015.
Copper head grade of 3.48%, an increase of 7% over Q3 2015.
Gold head grade 2.08 grams per tonne; a decrease of 26% over Q3 2015.
Copper and gold recovery of 94.6% and 67.9%; no significant change for copper and gold over Q2 2015.

Third Quarter Operational Review

Operation for the quarter has continued at steady state production levels as it remains in line with our guidance for the year. Copper recovery has continued maintaining recently reached highs, while gold recovery still shows opportunity for further improvements. The team on site will continue to optimize the operation through the remainder of this year to capitalize on remaining opportunities particularity in gold recovery.... .

http://finance.yahoo.com/news/atico-produces-4-52-million-20…



http://incakolanews.blogspot.de/2016/10/atico-mining-atyv-3q…
Atico Mining Provides Exploration Update

Copper Colombia

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Feb. 8, 2017) - Atico Mining Corporation (TSX VENTURE:ATY)(OTC PINK:ATCMF) ("Atico" or the "Company") is pleased to announce the completion of 2,500 m of core drilling on the San Lorenzo and Santa Anita prospect on the El Roble license which covers 10 km of strike length of the prospective El Roble massive sulfide horizon and hosts the operating El Roble copper-gold mine. The drilling consisted of 4 holes on San Lorenzo and 5 holes on Santa Anita with a maximum downhole length of 335 meters.

Fernando E. Ganoza, CEO, commented: "We are pleased with the outcome of the new scout drilling at the San Lorenzo and Santa Anita targets. The results to date confirm these large target areas are highly conducive to hosting new massive sulphide mineralization and remain very prospective." Mr. Ganoza added, "We will continue assessing these results to delineate further drilling at San Lorenzo and Santa Anita while we continue to prepare additional targets for the 2017 regional surface drill program."

Regional Exploration Drilling Update

Logging of the core confirms the interpretation of the geology of the area derived from surface mapping. Significantly, it shows local development of sub-basins in the El Roble horizon topography having the potential for massive sulfide mineralization as evidenced by thickening of the "black chert" units at Santa Anita. At San Lorenzo chalcopyrite has been noted on fractures in hematite altered sediments above the 'black chert" unit and may represent bleed-through from underlying mineralization. The common occurrence of 5% or more of pyrite-pyrrhotite banded layers, nodules and stringers in the "black chert" unit, together with alteration may serve as vectors to nearby massive sulfide mineralization.

Preliminary results from two drill holes each from San Lorenzo and Santa Anita show anomalous copper, gold, silver, zinc, mercury, tellurium and other cogener trace elements to massive sulfide mineralization coincident with the basalt - "black chert" contact. As more results are received from the remaining six drill holes it may become possible to use this anomalous geochemistry to vector into massive sulfide mineralization.

El Roble Mine

The El Roble mine is a high grade underground copper and gold mine with nominal processing plant capacity of 800 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a nominal capacity of 400 tonnes per day. The mine has a continuous operating history of twenty-two years, with recorded production of 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5 g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.

Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 31,377 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.

El Roble has a measured and indicated resource of 1.87 million tonnes grading 3.46% copper and 2.27 g/t gold, at a cut-off grade of 0.93% copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.

Qualified Control

Dr. Demetrius Pohl, Ph.D., AIPG Certified Geologist, a qualified person under NI 43-101 standards and independent of the Company, is responsible for ensuring that the information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico Mining Corporation. Dr. Pohl has approved the scientific and technical content of this news release.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
Bei dem Kupferpreis müsste die Aktie eigentlich durch die Decke gehen.
Naja, in spät. 2 Wochen sollten die Q4 Zahlen kommen dann bin ich hoffentlich nicht mehr der einzige hier.
Atico Mining Reports 2016 Q4 and Full Year Production Results

Copper Colombia Production Results

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Jan. 17, 2017) - Atico Mining Corporation (the "Company" or "Atico") (TSX VENTURE:ATY)(OTC PINK:ATCMF) is pleased to announce operating results for the three and twelve month periods ended December 31, 2016 from its El Roble mine. Production totaled 5.15 million pounds of copper with 2,832 ounces of gold for the fourth quarter and 18.72 million pounds of copper with 11,159 ounces of gold in concentrates for the full year 2016.

"Atico has successfully concluded its third full year of operating the El Roble mine, exceeding the 2016 guidance while achieving the highest production to date and significantly improving the safety standards," said Fernando E. Ganoza, CEO. "In the new year the Company will continue optimizing the El Roble operation while focusing on increasing the resources at the mine and exploring the prospective 6,600 ha land package surrounding the El Roble mine."

Fourth Quarter and Full Year Operational Highlights

Fourth Quarter

Production of 5.15 million pounds of copper contained in concentrates; an increase of 33% over Q4 2015.
Production of 2,832 ounces of gold contained in concentrates; a decrease of 18% over Q4 2015.
Average processed tonnes per day of 790; an increase of 8% over Q4 2015.
Copper and gold head grades of 3.92% and 2.19 grams per tonne; an increase of 17% for copper and a decrease of 17% for gold over Q4 2015.
Copper and gold recovery of 94.7% and 63.8%; an increase of 0% for copper and a decrease 12% for gold over Q4 2015.

2016 Year-end

Production of 18.72 million pounds of copper contained in concentrates; an increase of 55% over 2015.
Production of 11,159 ounces of gold contained in concentrates; an increase of 2% over 2015.
Average processed tonnes per day of 788; an increase of 24% over 2015.
Copper and gold head grades of 3.71% and 2.17 grams per tonne; an increase of 14% for copper and a decrease of 22% for gold over 2015.
Copper and gold recovery of 94.2% and 66.1%; an increase of 0% for copper and a decrease of 5% for gold over 2015.

Fourth Quarter and Full Year Operational Details
Q1
Total Q2
Total Q3
Total Q4
Total 2016
Total
Production (Contained in Concentrates)
Copper (000s pounds) 4,277 4,787 4,515 5,146 18,724
Gold (ounces) 2,566 2,948 2,813 2,832 11,159
Mine
Tonnes of ore mined 53,752 63,112 63,539 64,314 244,717
Mill
Tonnes processed 53,715 64,246 61,886 62,870 242,717
Tonnes processed per day 778 814 766 790 788
Copper grade (%) 3.81 3.63 3.48 3.92 3.71
Gold grade (g/t) 2.21 2.19 2.08 2.19 2.17
Recoveries
Copper (%) 94.4 93.0 94.6 94.7 94.2
Gold (%) 67.3 65.0 67.9 63.8 66.1
Concentrates
Copper and Gold Concentrates (dmt) 9,674 10,718 10,221 10,881 41,494

Payable copper produced (000s lbs) 4,048 4,527 4,312 4,889 17,776

Note: Metal production figures are subject to adjustments based on final settlement.

El Roble Mine

The El Roble mine is a high grade underground copper and gold mine with nominal processing plant capacity of 800 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a nominal capacity of 400 tonnes per day. The mine has a continuous operating history of twenty-two years, with recorded production of 1.5 million tonnes of ore at an average head grade of 2.6% copper and an estimated gold grade of 2.5 g/t. Copper and gold mineralization at the El Roble property occurs in volcanogenic massive sulfide ("VMS") lenses.

Since entering into the option agreement in January 2011 to acquire 90% of El Roble, Atico has aggressively explored the mine and surrounding claims. The Company has completed 31,377 meters of diamond drilling and identified numerous prospective targets for VMS deposits on the 6,679-hectare property. This exploration led to the discovery of high-grade copper and gold mineralization below the 2000 level, the lowest production level of the El Roble mine. Atico has developed a new adit access from the 1880 elevation to develop these new resources.

El Roble has a measured and indicated resource of 1.87 million tonnes grading 3.46% copper and 2.27 g/t gold, at a cut-off grade of 0.93% copper equivalent. Mineralization is open at depth and along strike and the Company plans to further test the limits of the resource.

On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified 15 prospective target areas for VMS type mineralization occurrence, which is the focus of the surface drill program at El Roble.

Qualified Person

Mr. Thomas Kelly (SME Registered Member 1696580), advisor to the Company and a qualified person under National Instrument 43-101 standards, is responsible for ensuring that the technical information contained in this news release is an accurate summary of the original reports and data provided to or developed by Atico.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company operates the El Roble mine and is pursuing additional acquisition opportunities. For more information, please visit www.aticomining.com.
 Durchsuchen


Beitrag zu dieser Diskussion schreiben