checkAd

    Eldorado Gold Corporation - Haupt-Thread - 500 Beiträge pro Seite

    eröffnet am 06.07.06 23:15:09 von
    neuester Beitrag 30.03.07 12:15:37 von
    Beiträge: 46
    ID: 1.069.875
    Aufrufe heute: 0
    Gesamt: 6.854
    Aktive User: 0

    Werte aus der Branche Rohstoffe

    WertpapierKursPerf. %
    9,8360+17,66
    0,7875+17,54
    0,5500+17,02
    2,0500+13,89
    0,5120+13,27
    WertpapierKursPerf. %
    9,4650-9,86
    0,9760-10,87
    12,000-25,00
    0,6601-26,22
    46,24-98,00

     Durchsuchen

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 06.07.06 23:15:09
      Beitrag Nr. 1 ()
      Neuer Haupt-Thread für die Eldorado Gold Corporation

      Eldorado Gold Corporation
      http://www.eldoradogold.com

      WKN: 892560
      ISIN: CA2849021035
      Symbol: ELO.FSE, ELO.ETR
      TSX: ELD
      AMEX: EGO

      Am Donnerstag, dem 29. Juni 2006, stieß ich in der Zeitung DIE WELT (Seite 15: FINANZEN) auf den Artikel „Rohstoff-Experten sehen Kaufgelegenheit für Goldaktien“ mit der für mich recht interessanten Aussage: „Der bei Analysten beliebteste Digger-Wert ist jedoch die kanadische Eldorado Gold: 90 Prozent der Profis haben sie auf der Kaufliste.“ (vergl. http://www.welt.de/data/2006/06/29/937023.html).

      Als ich dann hier bei wallstreet:online nach Eldorado-Threads gesucht habe, ergaben sich 14 Threads, die in ihrer überwiegenden Mehrzahl jeweils nur wenige Postings mit aufgesplitterten Inhalten umfassten und meist auch ziemlich veraltet waren (s.u.).

      Deshalb möchte ich dies ab jetzt bündeln und hiermit für die Zukunft diesen Haupt-Thread für die Eldorado Gold Corporation beginnen.

      Dazu bitte ich um Eure Unterstützung!

      Insbesondere erhoffe ich mir, dass die sich die Urheber und Co-Autoren der bisherigen w:o-Threads mit einem solchen Schnitt und möglichst systematischen Neu-Start einverstanden erklären können.

      Eine Beteiligung an dieser Stelle durch neue Beiträge, insbesondere zur fachlich fundierten Bewertung, wären meiner Ansicht nach sehr zu begrüßen!!!

      Im Folgenden habe ich hier Ansatzpunkte dafür aus verschiedenen Quellen zusammengestellt. Es wäre ja traumhaft, wenn diese großteils als Anregung zur weiteren Ausarbeitung in Arbeitsteilung durch Interessierte verstanden würden, z.B. die Punkte Operations, Developments, Exploration, New Business. (s.u.):


      Stammdaten:
      (Quelle: comdirect)
      Wertpapiertyp: Auslandsaktie
      Marktsegment: Freiverkehr
      Marktkapital: 1,30 Mrd. EUR
      Streubesitz: --
      Nennwert: --
      Stücke: 341 Mio.
      Symbol: ELO.FSE, ELO.ETR
      ISIN: CA2849021035
      WKN: 892560


      Im Folgenden ist die Quelle: http://www.eldoradogold.com:

      Officers:
      Paul N. Wright: President & Chief Executive Officer
      Earl W. Price: Chief Financial Officer
      Norm Pitcher: Chief Operating Officer
      Dawn Moss: Corporate Secretary
      Berne Jansson: Vice President, Operations

      Directors:
      Wayne D. Lenton (2)
      Hugh C. Morris (1)(3): Non Executive Chairman of the Board
      Paul N. Wright: President & Chief Executive Officer
      John S. Auston (2)(3): Director
      K. Ross Cory (1)(3): Director
      Robert R. Gilmore (1)(2): Director
      Donald Shumka(1): Director
      1 Member of Audit Committee
      2 Member of Compensation Committee
      3 Member of the Corporate Governance and Nominating Committee


      Locations & contacts:

      Corporate Office: Vancouver, Canada
      Website: http://www.eldoradogold.com
      Email: info@eldoradogold.com
      Address: 1188 - 550 Burrard Street
      Bentall 5
      Vancouver, BC
      Canada V6C 2B5
      Telephone: (604) 687-4018
      Fax: (604) 687-4026
      Toll Free: 1-888-353-8166

      Corporate Office: Belo Horizonte, Brazil - São Bento Mineração S.A.
      Address: Santa Barbara, Minas Gerais
      Brazil
      Telephone: 55-31-3837-7180
      Fax: 55-31-3837-1670

      Corporate Office: Beijing, China - Eldorado Gold Corp.
      Address: Suite 1505 -- Beijing Silver Tower
      No. 2 Dongsanhuan North Road
      Beijing, Chaoyang District
      China 100027
      Telephone: 86-10-6410-6059
      Fax: 86-10-6410-6010

      Corporate Office: Ankara, Turkey - Tüprag Metal Madencilik Sanayi ve Ticaret Limited Sirketi
      Address: Iran Caddesi
      Turan Emeksiz Sok. No.-1
      Gaziosmanpasa, Ankara
      Turkey
      Telephone: 90-312-468-4536
      Fax: 90-312-468-2646


      Operations:
      - Brazil
      -- São Bento Mine

      Developments:
      - Turkey
      -- Kisladag
      -- Efemçukuru

      Exploration:
      - Turkey
      -- AS Project (Demir Joint Venture)
      -- Pontide Volcanic Belt
      -- Biga Peninsula
      - Brazil
      -- Vila Nova
      -- Cassiporé
      -- Tartarugalzinho
      -- Piaba

      New Business:
      - China
      -- Tanjianshan


      News:

      Bei den News
      (s. http://www.eldoradogold.com/s/News-2006.asp)
      ging es zuletzt z.B. um
      - das Vila Nova Gold Project (28.06.2006)
      - die Kisladag Gold Mine (12.05.2006) und
      - das Tanjianshan Project (21.04.2006).

      Neueste News vom 04.07.2006:
      Eldorado Gold Announces 2006 Second Quarter Release Date and Conference Call
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=143287&…)


      Bisherige w:o-Threads:
      (Quelle: w:o-Suche)

      Thread: was ist auf sicht 6 monate von eldorado gold zu halten. Threadtitel: was ist auf sicht 6 monate von eldorado gold zu halten. Autor: ocjm1. Forum: Gold, Silber, Minen, Explorer. Postings: 121. Letzte Antwort: 27.12.05 19:53:22.

      Thread: Übernahme? Eldorado Gold bricht aus, warum?. Threadtitel: Übernahme? Eldorado Gold bricht aus, warum?. Autor: asianum. Forum: Gold, Silber, Minen, Explorer. Postings: 2. Letzte Antwort: 22.11.05 10:38:55.

      Thread: Eldorado Gold - lohnt sich ein Investment ?. Threadtitel: Eldorado Gold - lohnt sich ein Investment ?. Autor: silvermoon69. Forum: Gold, Silber, Minen, Explorer. Postings: 9. Letzte Antwort: 20.09.02 00:12:34.

      Thread: Eldorado .... Traumland oder Aktie ?. Threadtitel: Eldorado .... Traumland oder Aktie ?. Autor: hbbbh. Forum: Gold, Silber, Minen, Explorer. Postings: 5. Letzte Antwort: 30.05.02 20:12:50.

      Thread: eldorado gold kursziele und fundamentale einschätzungen als diskusion. Threadtitel: eldorado gold kursziele und fundamentale einschätzungen als diskusion. Autor: ocjm1. Forum: Gold, Silber, Minen, Explorer. Postings: 5. Letzte Antwort: 22.05.02 10:29:14.

      Thread: Eldorado Gold ... in den letzten drei Wochen fast verdoppelt. Threadtitel: Eldorado Gold ... in den letzten drei Wochen fast verdoppelt. Autor: DagosBert_II. Forum: Gold, Silber, Minen, Explorer. Postings: 9. Letzte Antwort: 25.04.02 13:45:27.

      Thread: Tagesbericht: Gold, Analyse: Eldorado. Threadtitel: Tagesbericht: Gold, Analyse: Eldorado. Autor: Goldhotline. Forum: Gold, Silber, Minen, Explorer. Postings: 5. Letzte Antwort: 27.02.01 17:30:16.

      Thread: Eldorado Gold - Wer hat Infos?. Threadtitel: Eldorado Gold - Wer hat Infos?. Autor: Valentina. Forum: Gold, Silber, Minen, Explorer. Postings: 10. Letzte Antwort: 07.02.01 11:32:01.

      Thread: Tagesbericht: Gold, Analyse: Eldorado. Threadtitel: Tagesbericht: Gold, Analyse: Eldorado. Autor: Goldhotline. Forum: Gold, Silber, Minen, Explorer. Postings: 6. Letzte Antwort: 06.06.00 20:03:55.

      Thread: frage an goldhotline zu eldorado. Threadtitel: frage an goldhotline zu eldorado. Autor: ocjm1. Forum: Gold, Silber, Minen, Explorer. Postings: 2. Letzte Antwort: 25.03.00 12:10:42.

      Thread: an goldhotline zu eldorado, greenstone und goldfields aud.. Threadtitel: an goldhotline zu eldorado, greenstone und goldfields aud.. Autor: ocjm1. Forum: Gold, Silber, Minen, Explorer. Postings: 6. Letzte Antwort: 28.10.99 03:36:39.

      Thread: Goldhotline, Experten: Bema Gold, Black Swan, Eldorado Gold. Threadtitel: Goldhotline, Experten: Bema Gold, Black Swan, Eldorado Gold. Autor: boschler-. Forum: Gold, Silber, Minen, Explorer. Postings: 4. Letzte Antwort: 04.08.99 15:56:23.

      Thread: ECOS Group, Bema Gold, Black Swan Gold, Dakota Mining, Eldorado Gold hat die ... Threadtitel: ECOS Group, Bema Gold, Black Swan Gold, Dakota Mining, Eldorado Gold hat die ... Autor: boschler. Forum: Auslandswerteforum. Postings: 4. Letzte Antwort: 11.07.99 21:08:44.

      Thread: Eldorado Gold ; habe Fragen dazu und zu anderen Goldwerten. Threadtitel: Eldorado Gold ; habe Fragen dazu und zu anderen Goldwerten. Autor: Liane. Forum: Gold, Silber, Minen, Explorer. Postings: 3. Letzte Antwort: 06.07.99 11:28:12.


      Schluss:

      So, wer trägt bei?
      Schönen Chart?
      Hoffentlich läuft dieser Thread nun von sich aus alleine weiter!
      Ich kann nicht mehr!
      Tom
      Avatar
      schrieb am 07.07.06 06:56:50
      Beitrag Nr. 2 ()
      hast du schön gemacht ;)
      Avatar
      schrieb am 07.07.06 10:47:44
      Beitrag Nr. 3 ()
      Antwort auf Beitrag Nr.: 22.443.988 von Nemisis am 07.07.06 06:56:50
      Nemisis,
      Dein Lob motiviert mich. So nehme ich mir also vor, das Thema (je nach verfügbarar Zeit) stückweise weiter auszuarbeiten, z.B. über einzelne Minen und Projekte oder neue Meldungen.
      Ich hoffe ja darauf, dass solche Beiträge auch von anderen w:o-Freunden beigesteuert werden.
      Das Interesse daran ist meiner Ansicht nach vorhanden, denn aus den früheren Threads konnte ich u.a. entnehmen, dass es richtige ELD-Fans gibt, die seinerzeit der Meinung waren, dass das Unternehmen im jeweiligen Thread nicht adäquat repräsentiert wurde.
      Bis bald! (Hoffentlich)
      Tom
      Avatar
      schrieb am 07.07.06 22:17:47
      Beitrag Nr. 4 ()
      Eldorado Gold Corporation. Hier: Vila Nova Gold Project

      Eldorado Gold Corporation (ELD)
      http://www.eldoradogold.com

      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      Im Folgenden ist die Quelle: http://www.eldoradogold.com.
      (Bei Unsicherheiten in der Übersetzung aus dem Englischen sind die ursprünglichen Fachausdrücke in Englisch angegeben.)

      Die Eldorado Gold Corporation (ELD) hat insgesamt folgende
      Properties & Projects:
      Operations:
      - Brazil
      -- São Bento Mine
      Developments:
      - Turkey
      -- Kisladag
      -- Efemçukuru
      Exploration:
      - Turkey
      -- AS Project (Demir Joint Venture)
      -- Pontide Volcanic Belt
      -- Biga Peninsula
      - Brazil
      -- Vila Nova
      -- Cassiporé
      -- Tartarugalzinho
      -- Piaba
      New Business:
      - China
      -- Tanjianshan

      Unter den letzten News
      (s. http://www.eldoradogold.com/s/News-2006.asp)
      ging es am 28.06.2006 um das Vila Nova-Goldproject
      („Wed Jun 28, 2006, Vila Nova Gold Project Update, ELD No. 06-10”,
      s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=142499&…).

      Das Vila Nova-Goldprojekt gehört zu den Aktivitäten von ELD in Brasilien. Dabei handelt es sich um Exploration in Nord-Bralisien im Amapa State.

      Amapa State liegt in einem Mineral-Korridor, der sich von Venezuela über Guyana und Brasilien bis West-Afrika erstreckt (s.u., Abb. 1). In diesem Gürtel liegen mehrere bedeutende Gold-Lagerstätten.

      ELD hält dort eine Option zur Übernahme von 84 % des Vila Nova-Goldprojekts als Teil einer Joint Venture-Übereinkunft mit DSI Consult & Mineracao Amapa (DSI). Die Liegenschaften von ELD in dem Mineral-Korridor belaufen sich insgesamt auf 120.000 Hektar. Das Arbeitsprogramm von ELD konzentriert sich auf geologische Kartierung, Fluss- und Boden-Probennahme sowie geophysikalische Untersuchungen zum Zwecke der Bestimmung von Bohrzielen.


      Abbildung 1
      (Weitere Abbildungen s. http://www.eldoradogold.com/s/EB_Bonfim.asp)

      In der o.g. Mitteilung „Wed Jun 28, 2006, Vila Nova Gold Project Update, ELD No. 06-10
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=142499&…)
      wird dargelegt, dass das Projekt in den zwei Gebieten „Vila Nova North“ und „Vila Nova South“ nördlich bzw. südlich vom Vila Nova-Fluss liegt.
      (Abbildungen hierzu s. http://www.eldoradogold.com/i/pdf/2006-06-28_NR-fig.pdf)

      In Vila Nova North hatte bereits erhebliches „Artisanal Mining“ [Abbau mit einfachen handwerklichen Mitteln] stattgefunden, wie z.B. in 2 Grubenfeldern namens Croado and Gaivotas. In Vila Nova South war vereinzelter Abbau verstreut vorgekommen.

      Das Arbeitsprogramm von ELD hatte 3 Hauptziele:
      - Die Durchführung ausreichender Bohrungen als Grundlage für eine Anfangs-Ressourcenberechnung in Croado und Gaivotas.
      - Tests des Tiefenpotenzials der Mineralisierung in Croado und Gaivotas sowie einem weiteren Gebiet namens Santa Maria in Vila Nova North.
      - Erkundung des „on-strike potential“ von Vila Nova North und Vila Nova South.

      ELD hat 2,8 Mio. USD für Exploration im Jahre 2006 vorgesehen. Dies umfasst 12.000 Meter Bohrungen und 5.000 Meter Gräben sowie geochemische und geophysikalische Surveys.

      Das diesjährige Arbeitsprogramm begann in Croado and Gaivotas als Fortsetzung des Vorjahres-Programms. Derzeit [28.06.2006] sind in Gaivotas 1.000 Meter Oberflächen-Gräben (surface trenching) und Kanal-Probennahme (channel sampling) und 642 Meter Diamantbohrungen (diamond drilling) in 6 Bohrlöchern fertig gestellt. In Croado wurden 11 Bohrlöcher mit insgesamt 962 Metern fertig gestellt.

      Die Arbeiten werden im restlichen Jahr in Vila Nova North stufenweise in ein weiteres Gebiet namens Pedra Pintada, in das o.g. Gebiet Santa Maria und in noch ein weiteres Gebiet namens Guaxeba vorgeschoben. (Vergl. o.g. Abbildungen unter http://www.eldoradogold.com/i/pdf/2006-06-28_NR-fig.pdf)

      Zusammenfassend kann festgestellt werden, dass die bisherigen Resultate ermutigend sind. Es ergaben sich sehr gute Werte zur Gold-Mineralisation. In diesem Jahr werden noch weitere Ergebnisse erwartet.

      Die umfangreichen Details hierzu gehen weiterhin aus der o.g. Mitteilung „Wed Jun 28, 2006, Vila Nova Gold Project Update, ELD No. 06-10” hervor
      (http://www.eldoradogold.com/s/News-2006.asp?ReportID=142499&…).

      Schluss
      Für Mithilfe bei der Übersetzung von Bergbau-Fachausdrücken wäre ich dankbar. Wie drückt man die Folgenden auf Deutsch aus?
      - artisanal mining
      - on-strike potential
      - surface trenching
      - channel sampling
      - diamond drilling
      - strike length
      - depth potential



      Tom
      Avatar
      schrieb am 08.07.06 15:14:30
      Beitrag Nr. 5 ()
      Heute am 08.07.2006 von mir gegoogelt:

      04.05.2006 - 16:16 Uhr

      Eldorado Gold Kursziel 6,50 Euro

      Die Experten von "FOCUS-MONEY" sehen das Kursziel für die Aktie von Eldorado Gold (ISIN CA2849021035/ WKN 892560) bei 6,50 Euro.

      Eldorado Gold sei ein aufstrebender Gold-Explorer mit Sitz in Vancouver (Kanada). In diesem Jahr sollten bereits 220.000 und 2007 dann schon gut 400.000 Unzen Gold gefördert werden. Die reinen Abbaukosten dürften schnell von 466 auf 180 USD je Unze zurückgehen. Das EPS in 2007 sollte bei rund 0,15 Euro liegen.

      Die Bewertung bezüglich der Marktkapitalisierung je Unze Reserve falle bei Eldorado Gold mit 248 USD gegenüber großen Konzernen (210 USD) optisch hoch aus. Der Durchschnitt bei kleineren Firmen liege jedoch bei 280 USD. Des Weiteren habe das Unternehmen nach Ansicht der Experten das Potenzial, neben der Produktion auch die Reserven- und Ressourcenbasis auszuweiten.

      Die Experten von "FOCUS-MONEY" sehen das Kursziel für die Aktie von Eldorado Gold bei 6,50 Euro. Eingegangene Positionen sollten bei 3,40 Euro abgesichert werden. Analyse-Datum: 04.05.2006

      Quelle: Finanzen.net

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1960EUR +3,43 %
      InnoCans LPT-Therapie als Opioid-Alternative?! mehr zur Aktie »
      Avatar
      schrieb am 08.07.06 16:24:04
      Beitrag Nr. 6 ()
      Quelle: OnVista

      Gold Equity Fund (USD) B
      KAG: Julius Baer Investment Funds Services Ltd.
      WKN: 757324
      ISIN: LU0175576296

      Top-Holdings
      Stand: 30.11.2005
      Anteil Wertpapiername WKN Wertpapiertyp Symbol
      5,87% NEWMONT MINING CORP. REGISTERED SHARES DL 1,60 853823 Aktie NMM
      5,49% HARMONY GOLD MINING CO. LTD. REG. SHS (SP. ADRS) RC -,50 864439 Aktie HAM
      5,44% GOLD FIELDS LTD. REG. SHS (SP. ADRS) RC -,50 862484 Aktie EDG
      5,27% ELDORADO GOLD CORP. LTD. REGISTERED SHARES O.N. 892560 Aktie ELO
      5,04% CIA DE MINAS BUENAVENTURA S.A. REG.SHARES B(SPONS.ADRS) O.N. 900844 Aktie MBU
      4,71% KINGSGATE CONSOLIDATED LTD. REGISTERED SHARES O.N. 905456 Aktie KCN
      4,12% PLACER DOME INC. REGISTERED SHARES O.N. 873850 Aktie PLD
      3,73% AGNICO-EAGLE MINES LTD. REGISTERED SHARES O.N. 860325 Aktie AE9
      3,30% ALAMOS GOLD INC. REGISTERED SHARES O.N. 257506 Aktie A4L
      3,24% SINO GOLD LTD. REGISTERED SHARES O.N. 164185 Aktie SNV
      Avatar
      schrieb am 08.07.06 20:25:56
      Beitrag Nr. 7 ()
      Eldorado Gold Corporation (ELD). Hier: São Bento Mine

      http://www.eldoradogold.com
      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      Bislang liegt die Goldproduktion von ELD vor allem bei der brasilianischen São Bento Mine im Staate Minas Gerais (in der folgenden Karte im Süd-Osten: MG).



      (Aktive Karte mit Anzeige aller Staaten s. http://www.brasil.gov.br/pais/estrutura_uniao/poder_executiv…)

      Letzte Angabe über die Goldproduktion der São Bento Mine finden sich in der Mitteilung „Thu May 4, 2006, Q1 2006 Financial and Operational Results“ (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=136913&…), z.B.:
      - Im 1. Quartal 2006 produzierte die São Bento Mine 19.111 Unzen Gold bei Total Cash Cost von 429 CAD pro Unze. Im 1. Quartal 2005 waren es 14.311 Unzen Gold bei Total Cash Cost von 413 CAD gewesen.
      - Die Mine nähert sich dem Ende ihrer Lebensdauer. Es ist in Aussicht genommen, die kommerzielle Produktion São Bento Mine in der ersten Hälfte des Jahres 2007 einzustellen.

      [Dafür wurde z.B. im 2. Quartal 2006 der Betrieb in der Kisladag-Mine in der Türkei aufgenommen.]

      Zur Ergänzung hinsichtlich der São Bento Mine sind im Folgenden noch zwei Auszüge aus der Web Site von Eldorado Gold Corporation (ELD) aufgeführt (s. http://www.eldoradogold.com):

      São Bento Mine:

      ...
      São Bento is an underground mine located in an area known as the "Iron Quadrangle" in the state of Minas Gerais, Brazil. A producing mine since 1986, São Bento was acquired by Eldorado in 1996. The mine site covers an area of 800 hectares and consists of one mining concession, with an additional 1,205 hectares in contiguous concessions to the northeast.

      ...
      QUICK FACTS

      Location: Minas Gerais State, Brazil
      Property Size: 20 square kilometers
      Ownership: 100%
      Type of Mine: Underground, Conventional Mill, Flotation, Pressure Oxidation, BIOX®, Carbon In Leach

      TOTAL PRODUCTION TO DATE
      Production1,668,470 ounces (since 1987)
      (Eldorado assumed ownership of the São Bento Gold Mine in July 1996, and as of December 31, 2004, has produced 889,824 ounces)

      2005 PRODUCTION FACTS
      (all dollar amounts are US$)
      Production: 64,298 ounces
      Ore to Mill: 310,703 tonnes
      Average Grade: 7.67 grams per tonne
      Cash Operating Cost: $407
      Total Cash Cost: $ 416
      Total Production Cost: $564
      Proven and Probable Reserves: 338,000 tonnes@8.75 g/t Au ( 95,000 ounces)

      Forecast 2006 Production 71,350 oz/Au@US$405/oz
      Avatar
      schrieb am 09.07.06 14:48:44
      Beitrag Nr. 8 ()
      Eldorado Gold Corporation (ELD). Hier: Kisladag Gold Mine

      http://www.eldoradogold.com
      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      First Gold from Kisladaq Mine:




      Ein Höhepunkt diesen Jahres war für ELD zweifellos, dass die Kisladag Gold Mine in der Türkei im April 2006 ihren Betrieb aufgenommen hat.

      Darauf geht folgende Mitteilung ein:
      Fri May 12, 2006, Eldorado Announces First Gold Pour at the Kisladag Gold Mine ELD No. 06-09
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=137766&…).
      Darin heißt es:

      VANCOUVER, BC - Paul N. Wright, President and Chief Executive Officer of Eldorado Gold
      Corporation ("Eldorado" the "Company" or "we") is pleased to announce the first pouring of gold,
      today, May 12, 2006 at our Kisladag Mine in Western Turkey.

      The Company previously (April 21, 2006) announced the start up of the operation. Production at
      the mine continues to proceed according to the plan with 1,400,000 tonnes of ore presently
      placed on the leach pad.

      "The pouring of the Company's first gold in Turkey is a very special occasion for our
      shareholders, employees and the local communities, whose efforts and continued support have
      enabled our success," commented Paul Wright, President and Chief Executive Officer.

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil,
      Turkey and China. With our international expertise in mining, finance and project development,
      together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to
      grow in value as we create and pursue new opportunities.

      ON BEHALF OF
      ELDORADO GOLD CORPORATION
      "Paul N. Wright"
      Paul N. Wright
      President and Chief Executive Officer


      Bereits in der vorangegangenen Mitteilung
      Thu May 4, 2006, Q1 2006 Financial and Operational Results
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=136913&…)
      wurde dazu u.a. folgendes aufgeführt:
      ...
      Kisladag Mine Construction

      The Kisladag mine began operations in Q2 2006. All operating permits necessary for producing
      gold at Kisladag have been received, the process plant is commissioned and leaching solution
      has been applied to the leach pad.

      Our revisions to the capital budget estimates reported in Q2 2005 remain on target, and we are
      forecasting total costs of $83.4 million to completion. We expect that Kisladag will produce
      120,000 ounces of gold in 2006 at an estimated cash cost of $215 per ounce, with production
      increasing to an average of 240,000 ounces in 2007 and beyond.
      ...

      Sehr umfangreiche und detaillierte Informationen (wie z.B. die folgende Karte) findet sich auf der ELD-Web Site unter
      KISLADAG PROJECT
      (s. http://www.eldoradogold.com/s/KisladagProject.asp?ReportID=3…).

      Avatar
      schrieb am 11.07.06 00:57:18
      Beitrag Nr. 9 ()
      Eldorado Gold Corporation (ELD). Hier: Tanjianshan

      http://www.eldoradogold.com
      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      Eine Haupt-Komponente der Eldorado Gold Corporation (ELD) ist:
      Properties & Projects:
      New Business:
      - China
      -- Tanjianshan

      Das Tanjianshan-Projekt („Tanjianshan“) in China befindet sich zu 85 % im Eigentum des Unternehmens. Es liegt in der Dachaidan-Region, Haixi-Präfektur, Qinghai-Provinz in Nord-West-China.

      Die Qinghai-Provinz in Nord-West-China (hier bräunlich schattiert)




      Aus dem Quartalsbericht „Thu May 4, 2006, Q1 2006 Financial and Operational Results
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=136913&…)
      geht hervor, dass im 1. Quartal 2006 bedeutende Bauabschnitte bei der Tanjianshan-Mine fertiggestellt wurden.

      Die Bauarbeiten liegen im Zeit- und Budget-Plan. Es ist in Aussicht genommen, die Gold-Produktion im Oktober 2006 aufzunehmen. Es wird angenommen, dass im Jahre 2006 40.000 Unzen Gold bei „cash cost“ von 320 USD pro Unze produziert werden.

      Zu Tanjianshan gehören die beiden Lagerstätten Jinlonggou (JLG) und Qinglongtan (QLT). In beiden Gruben war Erz freigelegt worden.

      Anstehende Explorations-Kampagnen werden sich auf Bohrungen zur Ressourcen-Erweiterung um JLG und QLT herum erstrecken. Ferner sollen die erheblichen Pacht-Liegenschaften, die JLG und QLT weiterhin umgeben, mit Hilfe von Bodenchemie, geophysikalischen Surveys (z.B. Erdmagnetismus) und Schnittgräben („trenching“) bewertet werden. Dies soll im 2. Quartal 2006 beginnen.


      In der vorangegangenen Mitteilung „Fri Apr 21, 2006, Tanjianshan Project Update, ELD No. 06-07
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=135440&…)
      war z.B. bereits dargelegt worden, dass die zum 31.12.2005 nachgewiesenen und wahrscheinlichen Reserven bei Tanjianshan 8.456.000 Tonnen bei einem Gehalt von 4,10 Gramm Gold pro Tonne betrugen. Die Mitteilung umfasst zahlreiche weitere Angaben z.B. zu absehbarer Lebenszeit (life of mine: LOM), Wirtschaftlichkeit, Ausrüstung, Betriebsform, Kapitalkosten und Durchführung der Bauarbeiten. Für das Explorations-Programm bei Tanjianshan sollen 2,2 Millionen USD aufgewendet werden. Es soll im Juni 2006 begonnen werden.


      Die meisten für das Verständnis nötigen Informationen finden sich natürlich auf der umfassenden ELD-Web Site (s. http://www.eldoradogold.com). Daraus werden im Folgenden noch einige entsprechendeAuszüge aufgeführt:

      Aus http://www.eldoradogold.com/s/New_China.asp:
      ...
      On May 30, 2005 Eldorado entered into an agreement to acquire all outstanding shares of Afcan Mining Corporation. The transaction closed on September 13, 2005. Afcan's principal property asset the Tanjianshan Gold Project is located 80 kilometers northwest of Daichaidan in Qinghai Province in northwest China. The April 2005 Tanjianshan Gold Project Feasibility Study prepared by RSG Global of Australia estimates proven and probable reserves of 944,000 ounces. The Feasibility Study projects total gold production of 842,000 ounces over an eight-year mine life. Construction has begun on the open pit mine with planned production of 103,000 ounces of gold per annum by 2007. The deposit is open along strike and at depth.

      Aus: http://www.eldoradogold.com/s/Tanjianshan.asp:
      TANJIANSHAN GOLD PROJECT
      QUICK FACTS

      Location: Qinghai Province, Western China
      Property Size: 338 square kilometers
      Ownership: 85% Eldorado, 7.5% Dachaidan Mining Limited, 7.5% The First Brigade for Geology and Mineral Exploration of Qinghai Province (Eldorado can earn 90% interest on completion of US$50 million in capital expenditure )
      Project Status: Feasibility Study completed April 2005; Construction began July 2005. Start-up production second half 2006

      2005 Feasibility Study Highlights
      Capital cost: US$50.2 million
      Production: 140,000 ounces (year 1), 155,000 ounces (year 2)
      Total production: 842,000 ounces
      Processing average recovery: 89%
      Cash operating cost: US$226/ounce
      Total cash cost over life of mine: US$250/ounce
      Pre-tax return on project:
      Net Present Value (5%) US$58.9 million (pure equity basis)
      Internal Rate of Return 29%
      Gold price US$420/ounce (unhedged)
      ...
      Project Description & Location
      The Tanjianshan Gold Project ("TJS") is located in the Dachaidan Region, Haixi Prefecture, Qinghai Province in northwest China. TJS consists of four large contiguous exploration licenses covering 338 square kilometres and encompassing the Jinlonggou and Qinlonggou gold deposits. Operations on the Jinlonggou site -- consisting of open pit and underground methods -- have resulted in production of 110,500 ounces over a 11 year period from 1992 to 2002.
      ...

      Quinlongtan Open Pit

      Avatar
      schrieb am 11.07.06 01:24:59
      Beitrag Nr. 10 ()
      Mit den obigen Postings
      #1, Übersicht,
      #4, zum Vila Nova Gold Project (Brasilien),
      #7, zur São Bento Mine (Brasilien),
      #8, zur Kisladag Gold Mine (Türkei), und
      #9, zu Tanjianshan (China),
      ist meines Erachtens ein Verständnis des zu erwartenden Berichtes der Eldorado Gold Corporation (ELD) über das 2. Quartal 2006 (s. nächstes Posting) weitgehend vorbereitet. Zusätzlich nötige Informationen von der ELD-Web Site (http://www.eldoradogold.com) bitte ich dort selber nachzuschlagen.

      Tom
      Avatar
      schrieb am 11.07.06 01:30:32
      Beitrag Nr. 11 ()
      Tue Jul 4, 2006
      Eldorado Gold Announces 2006 Second Quarter Release Date and Conference Call


      VANCOUVER, BC -- Eldorado Gold Corporation will release its 2006 Second Quarter Financial Results after the before the market opens on Thursday, August 3, 2006. Paul Wright, President and Chief Executive Officer, of the Company will host a conference call at 8:30 AM PDT (11:30 AM EDT) on August 3, 2006.

      The call is being webcast by CCBN and can be accessed at Eldorado Gold's web site at www.eldoradogold.com or from www.ccnmatthews.com

      Teleconference call details are as follows:

      Call in numbers are:
      Toronto: 416-695-9753
      Toll Free: 1-877-888-4210
      Chairperson: Paul Wright, President & CEO

      The replay numbers are:
      Toronto: 416-695-5275
      Toll Free: 1-888-509-0081
      Passcode: 626230
      Replay will be available until August 10, 2006.

      Eldorado Gold Corporation is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      Contact:
      Nancy E. Woo, Manager Investor Relations
      Eldorado Gold Corporation
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      1188- 550 Burrard Street,
      Vancouver, BC V6C 2B5
      Email: nancyw@eldoradogold.com
      Web site: www.eldoradogold.com
      Request for information packages: info@eldoradogold.com

      View in pdf:
      File: http://www.eldoradogold.com/i/pdf/2006_07_04_NR.pdf
      63 KB, approx. 13 seconds at 56.6Kbps
      Avatar
      schrieb am 11.07.06 11:17:39
      Beitrag Nr. 12 ()
      Price History angeschaut wegen Volumina:
      Sind an der TSX meist größer als 1 Mio.

      TSX:
      Eldorado Gold
      Price History for Symbol: ELD-T
      Last: 5.400 [CAD] Last Trade: Jul 10, 2006

      Date Close High Low Volume
      Jul 10 5.400 5.520 5.350 1,552,860
      Jul 07 5.540 5.580 5.460 1,411,698
      Jul 06 5.600 5.610 5.420 2,931,515
      Jul 05 5.510 5.600 5.370 1,093,326
      Jul 04 5.530 5.570 5.410 362,986
      Jul 03 5.420 5.420 5.420 0
      Jun 30 5.420 5.480 5.330 1,951,504
      Jun 29 5.280 5.310 5.010 1,557,706
      Jun 28 4.980 5.200 4.940 1,734,503
      Jun 27 5.110 5.400 5.070 952,652
      Jun 26 5.310 5.330 5.130 853,843
      Jun 23 5.250 5.250 5.030 2,797,230
      Jun 22 5.080 5.250 5.070 1,898,977
      Jun 21 5.150 5.210 4.960 2,047,415
      Jun 20 5.000 5.000 4.750 1,395,417
      Jun 19 4.790 4.880 4.740 1,875,233
      Jun 16 4.870 5.070 4.830 2,897,173
      Jun 15 5.000 5.000 4.800 1,385,534
      Jun 14 4.680 4.790 4.570 4,755,031
      Jun 13 4.650 4.710 4.480 4,253,882
      Jun 12 4.810 5.170 4.740 3,589,451
      Jun 09 5.120 5.230 4.990 1,614,161
      Jun 08 5.130 5.160 4.880 2,864,365
      Jun 07 5.220 5.530 5.140 2,647,604
      Jun 06 5.320 5.390 5.200 1,334,479
      Jun 05 5.350 5.560 5.320 1,433,578
      Jun 02 5.490 5.630 5.410 1,797,559
      Jun 01 5.490 5.490 5.270 2,426,614
      May 31 5.580 5.580 5.280 10,535,700
      May 30 5.330 5.510 5.280 2,741,798
      Avatar
      schrieb am 11.07.06 11:49:46
      Beitrag Nr. 13 ()
      Meldungen zur Eldorado Gold Corporation:
      s. auch http://www.newratings.com/companies/Eldorado-Gold_CA28490210….

      Z.B.:
      Eldorado Gold target price raised
      Friday, June 23, 2006 11:12:18 AM ET
      Scotia
      NEW YORK, June 23 (newratings.com) - Analysts at Scotia have raised their target price for Eldorado Gold (ELD.TOR) from US$5.75 to US$7.

      [Heute (11.07.2006):
      US$5.75 = 4,52 EUR
      US$7 = 5,50 EUR]
      Avatar
      schrieb am 12.07.06 12:24:05
      Beitrag Nr. 14 ()
      Eldorado Gold Corporation (ELD). Hier: Efemçukuru

      http://www.eldoradogold.com
      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      Von besonderer Bedeutung für die Eldorado Gold Corporation (ELD) ist auch:
      Properties & Projects:
      Developments:
      - Turkey
      -- Efemçukuru


      Das Efemçukuru -Projekt („Efemçukuru“) liegt in der Türkei nahe der Westküste ungefähr 20 km von der Provinzhauptstadt Izmir entfernt.




      Im Quartalsbericht „Thu May 4, 2006, Q1 2006 Financial and Operational Results
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=136913&…)
      wurde neben den Vorhaben, die bereits in den vorangegangenen Postings geschildert sind, auch das „Development“ von Efemçukuru besonders erwähnt.

      2006 wird für Efemçukuru die Zulassung und Landerwerb vorangetrieben. Ferner sollen 2006 zwei Bohrprogramme durchgeführt und eine Machbarkeitsstudie abgeschlossen werden. Der Baubeginn ist für 2007 und der Produktionsbeginn für 2008 in Aussicht genommen.

      Wie bei ELD lobenswerterweise üblich finden sich umfassende und detaillierte Informationen auf der ELD-Web Site http://www.eldoradogold.com.


      S. http://www.eldoradogold.com/s/EfemcukuruProject.asp:

      EFEMÇUKURU PROJECT

      QUICK FACTS

      Location: Western Turkey
      Property Size: 30 square kilometers
      Ownership: 100%
      Project Status: Permitting, plus ongoing evaluation of alternative ore processing options
      Proven and Probable Reserves: 1,856,000 tonnes @ 13.14 g/t Au (784,100 ounces calculated @$325/oz Au)
      Measured & Indicated Resource: 1,828,900 tonnes @ 14,44 g/t Au (849,100 ounces)
      Inferred Resource: 590,300 tonnes @ 12.63 g/t Au (239,700 ounces)

      Efemçukuru is a 30 square kilometer property near the west coast of Turkey, approximately 20 kilometers from the provincial capital of Izmir. We completed a pre-feasibility study on Efemçukuru in 1999 and are advancing the permitting requirements for constructing the project. Proven and probable reserves are 1,856,600 tonnes at 13.14 g/tonne.

      Project Location & Description

      Efemçukuru is located in western Turkey, 20 kilometers southwest of the provincial capital Izmir in a mountainous area known as Tepe Dagi. The property is held by Tüprag Metal Madencilik San. ve Tic. Ltd. Sti., a wholly owned subsidiary of Eldorado, and covers an area of 3,000 hectares. Site access is via local paved roads from the coast and the city of Izmir to the north.

      The Efemçukuru project reached an advanced stage of development with the completion of a full pre-feasibility study in early 1999 that describes an 800 tonne per day underground mine supported by a gold flotation recovery plant.


      S. http://www.eldoradogold.com/s/EfemcukuruProject.asp?ReportID…:

      Current Development Activities

      We expect to complete the Feasibility Study in the second quarter of 2006. Construction and pre-production development will begin in the fourth quarter of 2006, and we expect to complete commissioning and start-up by the fourth quarter of 2007.

      Project information:





      Avatar
      schrieb am 14.07.06 14:46:20
      Beitrag Nr. 15 ()
      Eldorado Gold Corporation (ELD). Hier: Standard & Poor's Stock Report vom 08. Juli 2006

      http://www.eldoradogold.com
      WKN: 892560
      ISIN: CA2849021035
      TSX: ELD
      AMEX: EGO

      Umfassende Informationen finden sich auf der ELD-Web Site http://www.eldoradogold.com.

      Dazu gehört unter
      - Investor relations
      -- Analysts
      (s. http://www.eldoradogold.com/s/Analysts.asp)
      der Zugang zum Standard & Poor's Stock Report vom 08. Juli 2006
      (s. http://solutions.standardandpoors.com/NASApp/WS/EntryServlet…)

      Neben den zahlreichen detailliertenAngaben zum Unternehmen heißt es darin z.B. zur Branche auf der 4. Seite unter der Überschrift „Sub-Industry Outlook“:
      Despite disappointing performance recently, our investment outlook for the gold sub-industry is positive. Year to date through June 16, the S&P Gold Index was down 6.3% versus a 0.4% rise in the S&P 1500 Stock Index. In 2005, the sub-industry index rose 20.2% versus a 3.8% gain for the S&P 1500. Near term, despite a decline of some $139 an ounce (basis the spot price) from May 12 through June 19, we believe that gold will remain under downward pressure, mostly reflecting a bear market rally in the U.S. dollar. However, we remain positive on the industry's secular prospects. As we see it, the longer-term bullish fundamentals remain firmly intact.
      ...
      Avatar
      schrieb am 19.07.06 18:00:36
      Beitrag Nr. 16 ()
      Eldorado Gold Corporation: Kisladag Gold Mine Official Opening and Announcement of Commercial Production
      08:00 EDT Tuesday, July 18, 2006

      VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - July 18, 2006) - Paul N. Wright, President and Chief Executive Officer of Eldorado Gold Corporation ("Eldorado" the "Company" or "we") (TSX:ELD)(AMEX:EGO) is pleased to announce the official opening of the Kisladag Gold Mine in Turkey on July 11, 2006 by the Minister of Energy and Natural Resources Dr. M. Hilmi Guler. Also participating were the Governor of Usak, Mr. Kayhan Kavas, Mr. Yves Brodeur, the Canadian Ambassador to Turkey and other local and regional dignitaries. Some 1700 guests attended the ceremony including 250 of the Kisladag staff and their families.

      "We appreciate the cooperation and support of the Minister of Energy and Natural Resources, the Governor of Usak Province and the support from all the local communities at Kisladag," commented Paul Wright, President and Chief Executive Officer. "Turkey is a country where we have invested for over a decade and have successfully advanced a grass roots discovery to a producing mine. Kisladag Mine with a 14 year mine life will provide direct employment for 350 people."

      Kisladag Mine officially commenced commercial production on July 1, 2006. Mine production continues according to the 2006 plan with approximately 500,000 tonnes of ore being mined monthly. Gold production presently is approximately 350 oz. daily and continues to increase consistent with the build up of heap inventory and the expansion of area under leach.

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF ELDORADO GOLD CORPORATION

      Paul N. Wright, President and Chief Executive Officer

      Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and forward-looking statements or information within the meaning of the Securities Act (Ontario). Such forward looking statements or information include, but are not limited to statements or information with respect to unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements or information are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements or information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Specific reference is made to "Forward-Looking Statements and Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. Forward-looking statements herein include statements regarding the expectations and beliefs of management. Such factors included, amongst others the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX:ELD) and the American Stock Exchange (AMEX:EGO).

      Request for information packages: info@eldoradogold.com

      FOR FURTHER INFORMATION PLEASE CONTACT:

      Eldorado Gold Corporation
      Nancy E. Woo
      Manager Investor Relations
      (604) 601-6650 or 1-888-353-8166
      (604) 687-4026 (FAX)
      nancyw@eldoradogold.com
      www.eldoradogold.com

      The TSX has neither approved nor disapproved the form or content of this release.
      Avatar
      schrieb am 02.08.06 13:20:15
      Beitrag Nr. 17 ()
      S. TSX:
      http://www.tsx.com/HttpController?GetPage=QuotesLookupPage&D…,
      News

      (Wegen der Tabelle vergl. http://www.eldoradogold.com/s/News-2006.asp?ReportID=146044&…)


      Eldorado Updates Drill Results from Tanjianshan Project, China

      13:46 EDT Tuesday, August 01, 2006

      VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - Aug. 1, 2006) - Paul N. Wright, President and Chief Executive Officer of Eldorado Gold Corporation ( "Eldorado" the "Company" or "we" ) (TSX:ELD)(AMEX:EGO) is pleased to provide an update on exploration activities at our 90% owned Tanjianshan Project in Qinghai Province, China. The Tanjianshan Project currently consists of two deposits, Jinlonggou (JLG) and Qinlongtan (QLT), that are being readied for planned production in the fourth quarter of this year.

      Our 2006 exploration program, budgeted at US$2.2 million, is focused on targets around the existing deposits of JLG and QLT, and more regionally on the Huanglvgou (HLG) and Longbaigou (LG) Belt located between the two existing deposits. The latter effort marks the start of systematic evaluation of our 33,400 hectares of mining and exploration leases that comprise the Tanjianshan Project.

      Work around the existing deposits consists of infill drilling of inferred mineral resources in and adjacent to current open pit design boundaries, and extending zones of mineralization still open along respective strike and dip directions. At JLG, the site of most of the planned near deposit work, 4,500 metres of diamond drilling in 35 holes were drilled so far this year. The drilling focused on two areas: the north-south strike direction of the diorite hosted gold mineralization along the deposit's western margin, and the up-dip extent of the same horizon to the east (Figure 1). Work at QLT consisted of 430 metres in 3 diamond drill holes that tested down-dip projections of high grade mineralization below current pit design limits. Drilling comprised HQ size core and utilized 2 Chinese contractor drill rigs.

      The following table (Table 1) shows the results from the 33 holes from the JLG work and 2 QLT holes. Note that drill holes JD203, JD210, JD218, JD220, JD225 and JD226 did not contain any intervals of significant gold mineralization. Results for the remaining holes are still pending. The listed drill intervals represent assayed lengths, with most intersecting the mineralization near perpendicular to the interpreted orientation.

      ---------------------------------------------------------------------
      DHID From (m) To (m) Interval (m) Au g/t
      ---------------------------------------------------------------------
      JLG Drill Holes
      ---------------------------------------------------------------------
      JD199 133.00 139.00 6.00 9.41
      ---------------------------------------------------------------------
      JD200 76.56 93.30 16.74 9.11
      including 86.10 87.10 1.00 44.40
      91.10 93.30 2.20 25.30
      109.67 117.21 7.54 17.28
      including 109.67 110.50 0.83 32.70
      including 112.30 113.30 1.00 51.20
      including 115.30 116.30 1.00 33.10
      ---------------------------------------------------------------------
      JD201 102.50 120.90 18.40 12.50
      including 107.60 109.20 1.60 32.70
      including 120.00 120.90 0.90 39.60
      128.00 134.00 6.00 8.05
      including 129.50 131.00 1.50 17.80
      ---------------------------------------------------------------------
      JD202 101.00 141.00 40.00 18.99
      including 116.70 117.60 0.90 62.21
      including 123.50 125.50 2.00 145.95
      148.75 151.95 3.20 6.63
      ---------------------------------------------------------------------
      JD204 74.03 77.60 3.57 16.14
      80.85 84.55 3.70 2.82
      98.50 103.30 4.80 2.74
      106.40 121.40 15.00 4.79
      125.05 127.40 2.35 2.15
      ---------------------------------------------------------------------
      JD205 100.65 105.15 4.50 24.95
      137.50 139.50 2.00 4.56
      ---------------------------------------------------------------------
      JD206 99.00 101.50 2.50 2.17
      109.20 121.00 11.80 5.89
      ---------------------------------------------------------------------
      JD207 101.35 115.00 13.65 6.08
      including 102.50 104.00 1.50 23.80
      117.05 123.40 6.35 4.30
      143.50 148.50 5.00 3.90
      ---------------------------------------------------------------------
      JD208 96.10 98.40 2.30 2.01
      100.90 106.00 5.10 2.93
      109.20 132.50 23.30 3.88
      ---------------------------------------------------------------------
      JD209 43.35 45.60 2.25 2.52
      69.45 76.15 6.70 5.06
      ---------------------------------------------------------------------
      JD211 21.90 27.80 5.90 6.14
      56.30 66.25 9.95 7.65
      71.50 82.50 11.00 4.59
      ---------------------------------------------------------------------
      JD212 39.00 40.00 1.00 11.80
      43.50 45.00 1.50 5.13
      54.00 70.50 16.50 10.15
      ---------------------------------------------------------------------
      JD213 13.50 18.00 4.50 1.64
      32.50 41.80 9.30 7.90
      including 39.00 40.50 1.50 23.60
      45.20 48.45 3.25 22.18
      64.60 68.50 3.90 7.12
      ---------------------------------------------------------------------
      JD214 38.90 40.65 1.75 7.77
      42.80 44.60 1.80 8.55
      ---------------------------------------------------------------------
      JD215 1.00 2.00 1.00 3.72
      21.85 25.00 3.15 3.60
      ---------------------------------------------------------------------
      JD216 58.00 60.60 2.60 5.22
      ---------------------------------------------------------------------
      JD217 0.40 2.10 1.70 3.07
      18.00 20.15 2.15 2.91
      ---------------------------------------------------------------------
      JD219 0.00 2.80 2.80 1.80
      14.85 20.25 5.40 2.55
      ---------------------------------------------------------------------
      JD221 13.50 15.40 1.90 1.90
      ---------------------------------------------------------------------
      JD222 52.00 53.40 1.40 3.69
      66.50 68.00 1.50 3.64
      ---------------------------------------------------------------------
      JD223 40.50 42.30 1.80 2.18
      ---------------------------------------------------------------------
      JD224 23.30 26.40 3.10 6.40
      ---------------------------------------------------------------------
      JD227 47.80 49.90 2.10 24.32
      ---------------------------------------------------------------------
      JD228 17.05 19.90 2.85 8.05
      22.25 25.02 2.8 48.90
      40.65 46.00 5.35 3.04
      ---------------------------------------------------------------------
      JD229 92.80 112.20 19.40 11.79
      including 94.10 95.50 1.40 26.00
      including 106.00 107.50 1.50 36.60
      132.50 134.00 1.50 3.86
      ---------------------------------------------------------------------
      JD230 82.50 84.40 1.90 15.07
      95.00 99.80 4.80 9.09
      104.60 109.30 4.70 20.48
      including 105.80 107.50 1.70 43.63
      ---------------------------------------------------------------------
      JD231 86.50 95.50 9.00 9.92
      including 92.50 93.50 1.00 34.70
      100.50 110.60 10.10 7.44
      including 108.30 109.20 0.90 20.60
      ---------------------------------------------------------------------
      QLT Drill Holes
      ---------------------------------------------------------------------
      QD045 142.00 147.50 5.50 10.90
      including 144.70 145.95 1.25 38.19
      ---------------------------------------------------------------------
      QD046 120.00 123.00 3.00 5.73
      ---------------------------------------------------------------------

      The results of the drilling to date are positive and supportive of further reserve increases. Notably the existing high grade gold mineralization at the southwest end of the JLG deposit was confirmed and extended further south, beyond the current open pit design limits (Figure 2). Drilling here intersected numerous higher gold grading intervals, with hole JD202 returning the highest grades yet intersected at JLG (2 m at 145.95 g/t Au uncut). Drill testing continues to define the southwestern limit to this zone.

      Our regional exploration work in the HLG-LBG Belt area commenced late in the second quarter. Two types of work are being conducted: regularly spaced trenching and semi-detailed mapping in the two main target areas of HLG and LBG, and a belt-wide rock chip sampling and mapping effort (effective reconnaissance methods due to the lack of any vegetated cover on outcropping rocks in this region), to be followed by an IP and magnetics geophysical survey.

      The LBG target consists of work designed to follow-up on results of previous years' reconnaissance work. That work identified a gold mineralized, northwest-southeast trending structural break zone (key reconnaissance results: 8.3 m at 3.3 g/t Au and 8.0 m at 1.8 g/t Au, located about 200 m apart on this structure). This year, 18 new trenches have been dug and currently are being sampled and mapped. The work has outlined the strike length of the prospective structural zone to at least 1 km with defined widths ranging from 10 m up to 100 m. Moderate to strong silica, clay and hematite alteration is seen throughout this zone. The trenching has also exposed numerous areas of widespread pyrite mineralization (gold is intimately associated with pyrite at Tanjianshan). Results of the trenching work will assist in locating 2 to 3 diamond drill holes planned for end of the third quarter.

      Work at the HLG target is following another structural break zone that hosts a slightly different style of mineralization. Here reconnaissance work last year exposed malachite bearing quartz veins in altered meta-volcanic rocks. These mineralized zones appear to be associated with variably altered coarse grained felsic intrusive units. Last year's key trench result returned 5 g/t Au and 1.5% Cu over 5 m. This year, 10 of a planned 14 trenches have been dug to date. Ongoing trenching is continuing as will sampling and mapping of the finished trenches. The zone of interest has been outlined to at least 1 km along strike with widths around 100 m. As in LBG, results of the trenching work will assist in locating 2 to 3 diamond drill holes planned for end of the third quarter.

      "We are pleased with the very encouraging start to the Tanjianshan 2006 exploration effort. Results of the infill work will likely add additional quality reserves to the JLG deposit this year. As well, we are optimistic in the potential of the well situated HLG-LBG target areas, and confidently look forward to additional results later in the year" commented Paul N. Wright, President and Chief Executive Officer.

      Norman Pitcher, P.Geo., Chief Operating Officer is the qualified person for the technical disclosure in this press release. Samples are prepared at Eldorado's on-site facility in China and assayed at the SGS facility at Tianjin, China. Analysis for gold is done on sawn half core samples using fire assay (AA finish, high grade samples (greater than 10 g/t Au were re-assayed using a gravimetric finish). Standard reference materials, blank and field duplicate samples are inserted prior to shipment from site to monitor the quality control of the assay data. In addition, approximately 10% of the samples are re-submitted for duplicate analysis at STAR laboratory in Perth, Australia.

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF ELDORADO GOLD CORPORATION

      Paul N. Wright, President and Chief Executive Officer

      Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and forward looking statements or information within the meaning of the Securities Act (Ontario) . Such forward looking statements or information include, but are not limited to statements or information with respect to unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements or information are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements or information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward looking statements. Specific reference is made to "Forward Looking Statements and Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. Forward-looking statements herein include statements regarding the expectations and beliefs of management. Such factors included, amongst others the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX:ELD) and the American Stock Exchange (AMEX:EGO).

      Request for information packages: info@eldoradogold.com

      NOTE: To view Figure 1 and Figure 2, please click the following link: http://www.ccnmatthews.com/docs/eld0801.pdf

      FOR FURTHER INFORMATION PLEASE CONTACT:

      Eldorado Gold Corporation
      Nancy E. Woo
      Manager Investor Relations
      (604) 601-6650 or 1-888-353-8166
      (604) 687-4026 (FAX)
      nancyw@eldoradogold.com
      www.eldoradogold.com

      The TSX has neither approved nor disapproved the form or content of this release.
      Avatar
      schrieb am 02.08.06 13:58:53
      Beitrag Nr. 18 ()
      Nicht vergessen (!!!):

      Morgen, am Donnerstag, dem 03. August 2006,
      um 08:30 Uhr Vancouver-Zeit (PDT),
      d.h. um 17:30 Uhr deutscher Zeit (CEST)
      wird Mr. Paul Wright, Präsident und CEO der Eldorado Gold Corporation (ELD),
      anlässlich der Bekanntgabe der „ELD 2006 Second Quarter Financial Results“
      eine Konferenzschaltung ausrichten,
      die auf den Web sites www.eldoradogold.com oder www.ccnmatthews.com verfolgt werden können soll.

      (S.o., Posting #11. Vergl.
      http://www.eldoradogold.com/s/News-2006.asp?ReportID=143287&…)

      (Zur Uhrzeit s. http://www.timeanddate.com/worldclock/converted.html?day=3&m…)
      Avatar
      schrieb am 03.08.06 12:09:22
      Beitrag Nr. 19 ()
      Heute Konferenzschaltung (s.o.)!
      Avatar
      schrieb am 03.08.06 17:48:33
      Beitrag Nr. 20 ()
      Eldorado Gold Corporation: Q2 2006 Financial and Operating Results
      08:30 EDT Thursday, August 03, 2006
      Mit detaillierten Tabellen
      s. TSX:
      http://www.tsx.com/HttpController?GetPage=QuotesLookupPage&D…
      News


      Version ohne Tabellen:

      Thu Aug 3, 2006
      Q2 2006 Financial and Operating Results
      (Aus http://www.eldoradogold.com/s/News-2006.asp?ReportID=146234&…)
      ELD 06-13
      (all figures in United States dollars, unless otherwise noted)

      VANCOUVER, BC - Paul N. Wright, President and Chief Executive Officer of Eldorado Gold Corporation, is pleased to report on the Company's financial and operating results for the second quarter ended June 30, 2006.

      Q2 2006 Highlights
      • Commenced operations at the Kisladag mine and poured the first gold bar at the mine
      • Produced 6,872 ounces at Kisladag to the end of June at a cash operating cost of $242 per ounce
      • Continued to advance construction at the Tanjianshan mine in China, which continues on schedule to start production in October
      • Announced encouraging results from our exploration at the Vila Nova gold project in Brazil
      • Recorded a net income for the quarter of $0.2 million (or $0.00 per share) compared with a net loss of $11.1 million (or $0.04 per share) in Q2 2005
      • Sold 17,907 ounces of gold at an average price of $615 per ounce

      Financial Results
      At June 30, 2006, we held $124.6 million in cash and short-term deposits and $50.0 million in a reserve account, offsetting our debt of $52.8 million. We remain hedge free.

      Our consolidated net income for Q2 2006 was $0.2 million (or $0.00 per share) compared with a net loss of $11.1 million (or $0.04 per share) in Q2 2005. This increase in net income resulted from increased revenues from gold sales, increased interest income, and foreign exchange gains resulting primarily from Canadian dollars on hand, offset by increased exploration and administrative expenses.

      In Q2 2006, we sold 17,907 ounces of gold at an average price of $615 per ounce, compared to 12,056 ounces at an average price of $425 per ounce in Q2 2005. The increased gold production, as compared to Q2 2005, is due to higher ore production rates at the São Bento mine following the completion of the shaft-deepening project in 2005.

      Operating Performance

      São Bento
      In Q2 2006, São Bento produced 18,163 ounces of gold at a total cash cost of $441 per ounce, compared to 14,932 ounces of gold at a total cash cost of $440 per ounce in Q2 2005. The increased gold production over the comparable period from 2005 reflects higher ore production rates as a result of our completion of the shaft-deepening project in 2005.

      We expect to end commercial production at the São Bento gold mine early in 2007. We are currently reviewing alternatives regarding the future of the assets at our mine. An agreement with a third party was reached during the quarter ended June 30, 2006, for the processing of 500 tonnes of gold concentrate, which during Q3 and Q4 will yield approximately 3,000 ounces of gold to the Company's account.

      Kisladag
      In April 2006, we announced the start-up of the Kisladag mine in Turkey. As a result of slower than expected commissioning of the crushing circuit and mechanical problems with a process water supply pump, we have revised our estimates of Kisladag's 2006 production from 120,000 ounces to 70,000 ounces at a cash operating cost of $219 per ounce. We have resolved the issues with the water supply pump and we expect production to increase to the anticipated 240,000 ounces of gold per year in 2007. The mine officially began commercial production on July 1, 2006. In July we sold 11,484 ounces of Kisladag production at a realized price of $627 per ounce. In July, Kisladag produced 7,502 ounces of gold.

      Development

      China
      Construction at Tanjianshan in Q2 2006 focused on completing the mechanical and electrical works within the plant. We completed and commissioned the water and sewage treatment plants, as well as the laboratory, accommodation and canteen facilities. Other work included completing the CIL tanks, the roof structure and tank platform steel work.

      During the second quarter, we announced our intent to use an owner-operated mining option at the Tanjianshan mine, which will result in approximately $23 million savings in operating costs over the life of the mine.

      Turkey
      At Efemçukuru, we are proceeding with the permitting process and land acquisition, as well as an infill drilling program and step-out drilling program designed to test the down-dip potential of the ore zone. We plan to complete a feasibility study in Q4 2006.

      Exploration Outlook

      Our exploration budget for 2006 is $14.0 million, enabling us to continue advancing our pipeline of promising properties in Turkey, Brazil and China.

      Turkey
      We concluded our drilling program at the AS project over the Dogrudere anomaly. Results show widespread weak copper and gold mineralization; overall, the implied mineralized zone is small. We will now concentrate on surface mapping and rock sampling in key areas to the south of the Dogrudere anomaly to guide potential sites for drilling later in the year.

      We also completed the bulk of our exploration program at Mahmur Tepe. While trench results do show the presence of gold mineralized zones, the results have not identified the presence of structural zones containing economic concentrations of gold.

      Brazil
      At the Vila Nova gold project, our drill results at the Croado pit extended the gold mineralization along strike to over 300 meters and to over 80 meters below surface. At Gaivotas, trench sampling and initial drilling confirmed multiple zones of widespread lower grade mineralization interspersed with narrow higher grade intervals. Metallurgical testwork on both oxidized and sulphidic samples are encouraging.

      Drill testing with three contract diamond drill rigs will continue at Vila Nova South and in Gaivotas, and we will conduct initial testing of the Santa Maria, Santa Maria Norte and Guaxeba pits.

      We completed our data acquisition at the Vila Nova iron project. We will now update the iron project mineral resource model and revise the pit design to support a pre-feasibility study by the fourth quarter.

      China
      We began infill and exploration diamond drilling in the existing Jinlonggou ("JLG")and Qinlongtan ("QLT") deposits, extending the size and grade of a high grade gold mineralized zone in the southwest end of Jinlonggou. On August 1, 2006, we released additional positive drill results from infill drilling at JLG and QLT. We also started to explore on Huanglvgou ("HLG") and Longbaigou ("LBG"), two highly prospective mineralized trends which sit between QLT and JLG. In the third quarter, we will map and sample the trenches in the HLG and LBG target areas, conduct an induced polarization and magnetics survey and conclude the work activity in this area with 1,000 meters of diamond drilling.

      "The pouring of the first gold bar from Kisladag on May 12 was a very significant event for our employees, our company and the local communities near Kisladag", said Paul Wright, President and Chief Executive Officer. "With construction proceeding on schedule at Tanjianshan, by the end of 2006, we will be producing gold from three locations -- São Bento, Kisladag and Tanjianshan. Our strong cash position gives us the financial flexibility to continue to grow sustainably through the acquisition, exploration and development of mineral properties".

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF
      ELDORADO GOLD CORPORATION

      "Paul N. Wright"

      Paul N. Wright
      President and Chief Executive Officer

      Eldorado will host a conference call on Tuesday August 3, 2006 to discuss the Q2 2006 Financial and Operating Results at 11:30 a.m. EDT (8:30 a.m. PDT). You may participate in the conference call by dialing 416-695-9753 in Toronto or 1-877-888-4210 toll free in North America and asking for the Eldorado Conference Call with Chairperson: Paul Wright, President and CEO of Eldorado Gold. The call will be available on Eldorado's website. www.eldoradogold.com. A replay of the call will be available for one week by dialing 416-695-5275 in Toronto or 1-888-509-0081 toll free in North America and entering the Pass code: 6626230.


      Certain of the statements made may contain forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, which involve known and unknown risk, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward looking statements. Specific reference is made to "Narrative Description of the Business -- Risk Factors" in the Company's Annual Information Form, Form 40-F, dated March 23, 2006. Forward-looking statements in this release include statements regarding the expectations and beliefs of management. Such factors include, amongst others, the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Business -- Risk Factors" in the Company's Annual Information Form, Form 40F, dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities.

      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX: ELD) and the American Stock Exchange (AMEX: EGO). The TSX has neither approved nor disapproved the form or content of this release.

      Contact:
      Nancy E. Woo, Manager Investor Relations
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      Email nancyw@eldoradogold.com

      Eldorado Gold Corporation
      1188, 550 Burrard Street
      Vancouver, BC V6C 2B5
      Web site: www.eldoradogold.com

      Request for information packages: info@eldoradogold.com


      View News Release in PDF Format:
      File: http://www.eldoradogold.com/i/pdf/06-13.pdf
      83 KB, approx. 16 seconds at 56.6Kbps

      File: http://www.eldoradogold.com/i/pdf/2006Q2_ELD.pdf
      122 KB, approx. 24 seconds at 56.6Kbps
      Avatar
      schrieb am 03.08.06 23:31:27
      Beitrag Nr. 21 ()
      Zusammenstellung
      von Informationen

      zur Eldorado Gold Corporation
      s. GOLDSEITEN.DE:
      http://www.goldseiten.de/content/minen/berichte/mine.php?mid…
      Avatar
      schrieb am 31.08.06 02:06:45
      Beitrag Nr. 22 ()
      Eldorado Gold Corporation
      http://www.eldoradogold.com

      WKN: 892560
      ISIN: CA2849021035
      Symbol: ELO.FSE, ELO.ETR
      TSX: ELD
      AMEX: EGO

      Am Montag, dem 04. September 2006,
      ist in den USA der Feiertag "Labor Day".

      (Vergl. http://www.timeanddate.com/calendar/index.html?year=2006&cou…)
      Avatar
      schrieb am 13.09.06 09:31:51
      Beitrag Nr. 23 ()
      Eldorado Gold Corporation:

      S. TSX, Market Activity, Quotes & Company Information, ELD
      http://www.tsx.com/HttpController?GetPage=QuotesLookupPage&D…
      News:

      Eldorado Update
      08:30 EDT Tuesday, September 12, 2006

      Vergl.
      http://www.eldoradogold.com/s/News-2006.asp?ReportID=150061&…:

      Tue Sep 12, 2006
      Eldorado Update
      ELD 06-14

      VANCOUVER, BC -- Paul N. Wright, President and Chief Executive Officer of Eldorado Gold Corporation ("Eldorado" the "Company" or "we") is pleased to provide an update on activities at the Company's Kisladag Mine in Turkey, the Tanjianshan Project in China and recent Board and senior management appointments.

      Kisladag Mine

      Subsequent to second quarter reporting the Company has successfully resolved initial mechanical problems in the crushing circuit and with a water supply pump.

      Due to the well fractured nature of the oxide ore, the mine continues to place both crushed and run of mine ore on the leach pad. Production and costs of production in July and August exhibit the expected positive trend and will continue to improve as solution inventory increases to steady state levels allowing increased utilization of the process plant capacity.

      Month Gold Produced Cash Operating Cost Ore Mined Ore Grade
      ----- (oz) ($/oz) (t) (g/t)
      July 7,502 239 597,625 1.24
      August 9,781 235 658,714 1.14

      The mine commenced commercial production on July 1, 2006 and is planned to produce 70,000 ounces of gold in 2006 at a cash operating cost of $219 per ounce.

      Tanjianshan Project

      At the Tanjianshan Project in Qinghai Province, China, construction continues to be on schedule for October start-up. The crushing, grinding and floatation circuits are complete except for electrical and process control work. The power line has been completed to site and is presently being tied in to the site substation. Earthworks on the tailings dam are complete and the portion of the dam used for Phase 1 tailings has been lined with high density polyethelene (HDPE). Mining continues in the Qinlongtan pit area, where both ore and waste are being removed by Qinghai Dachaidan Mining Limited ('QDML') mining fleet, and being assisted by a local contractor. As of the end of August, 96,000 tons of ore has been stockpiled in preparation for the start up in October.

      Appointments

      Geoffrey Handley, Director

      The appointment of Mr. Geoffrey Handley to the Eldorado Board of Directors was effective August 29, 2006. Mr. Handley was most recently Executive Vice President, Strategic Development with Placer Dome and is an experienced mining executive. Geoff holds an Honors BSc from the James Cook University of North Queensland. He has 30 years of extensive experience in the mining resource industry. Geoff's knowledge and experience will compliment the current skill sets of our Board.

      Jinxing Ji, Manager, Metallurgy

      Mr. Jinxing Ji was appointed Manager, Metallurgy of Eldorado effective April 18, 2006 and is responsible for overseeing metallurgical matters at the Company's operations, development projects and exploration properties. Jinxing holds three degrees in extractive metallurgy, receiving his Ph.D. in hydrometallurgy from the University of British Columbia in 1993, and his Bachelor of Engineering and Master of Engineering in extractive metallurgy from Shanghai University. Most recently Jinxing was a Consulting Metallurgist with Placer Dome in Vancouver and served as the Technical Manager of Metallurgy for the Pueblo Viejo Project. The addition of Jinxing to the Company strengthens our technical team and enhances our ability to maximize productivity at our current operations and provide expertise in the evaluation of potential future acquisitions.

      Paul Mann, Corporate Controller

      Mr. Paul Mann was appointed Corporate Controller of Eldorado effective June 23, 2006. Paul is a Chartered Accountant in 1993 and also holds a BSc in Mechanical Engineering from the University of British Columbia. Prior to joining Eldorado Paul was the Corporate Controller for Hunter Dickinson Inc. and has international experience in South Africa, Chile, Mexico and China. The addition of Paul Mann brings a relevant set of skills to the finance teams in Canada and at our international operations.

      "We are very pleased to welcome Geoff, Jinxing and Paul to our Board and Management. Their collective skill sets will enhance the Company's ability to grow as an international gold mining company" said Paul Wright, President & CEO.


      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF
      ELDORADO GOLD CORPORATION

      "Paul N. Wright"


      Paul N. Wright
      President and Chief Executive Officer


      Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and forward looking statements or information within the meaning of the Securities Act (Ontario) . Such forward looking statements or information include, but are not limited to statements or information with respect to unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements or information are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements or information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward looking statements. Specific reference is made to "Forward Looking Statements and Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. Forward-looking statements herein include statements regarding the expectations and beliefs of management. Such factors included, amongst others the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX: ELD) and the American Stock Exchange (AMEX: EGO). The TSX has neither approved nor disapproved the form or content of this release.

      Contact:
      Nancy E. Woo, Manager Investor Relations
      Eldorado Gold Corporation
      1188, 550 Burrard Street
      Vancouver, BC V6C 2B5
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      Email nancyw@eldoradogold.com
      Request for information packages: info@eldoradogold.com
      Web site: www.eldoradogold.com

      View News Release in PDF Format:
      File: http://www.eldoradogold.com/i/pdf/06-14.pdf
      59 KB, approx. 12 seconds at 56.6Kbps
      Avatar
      schrieb am 16.10.06 15:24:16
      Beitrag Nr. 24 ()
      Eldorado Gold Corporation:
      www.eldoradogold.com

      Wed Oct 4, 2006
      Eldorado Gold Announces 2006 Third Quarter Release Date and Conference Call
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=152577&…)

      VANCOUVER, BC - Eldorado Gold Corporation will release its 2006 Third Quarter Financial Results after the market closes on Friday, November 3, 2006. Paul Wright, President and Chief Executive Officer, of the Company will host a conference call at 8:30 AM PST (11:30 AM EST) on Monday, November 6, 2006.

      The call is being webcast by CCBN and can be accessed at Eldorado Gold's web site at www.eldoradogold.com or from www.ccnmatthews.com

      Teleconference call details are as follows:

      Call in numbers are:
      Toronto: 416-695-9753
      Toll Free: 1-877-888-4210
      Chairperson: Paul Wright, President & CEO

      The replay numbers are:
      Toronto: 416-695-5275
      Toll Free: 1-888-509-0081
      Passcode: 632219
      Replay will be available until November 16, 2006.

      Eldorado Gold Corporation is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      Contact:

      Nancy E. Woo, Manager Investor Relations
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      Email: nancyw@eldoradogold.com

      Eldorado Gold Corporation
      1188- 550 Burrard Street,
      Vancouver, BC V6C 2B5
      Web site: www.eldoradogold.com

      Request for information packages: info@eldoradogold.com

      View News Release in PDF Format:
      File: http://www.eldoradogold.com/i/pdf/06_10_04_NR.pdf
      63 KB, approx. 13 seconds at 56.6Kbps
      Avatar
      schrieb am 16.10.06 15:34:32
      Beitrag Nr. 25 ()
      Eldorado Gold Corporation:
      www.eldoradogold.com

      Thu Oct 5, 2006
      Tanjianshan Commissioning Underway
      ELD 06-15
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=152747&…)

      VANCOUVER, BC -- Paul N. Wright, President and Chief Executive Officer of Eldorado Gold Corporation ("Eldorado" the "Company" or "we") is pleased to report the commencement of commissioning activities at its 90% owned Tanjianshan Mine ("TJS") in Qinghai Province, China.

      With 120,000 tonnes of ore stockpiled at the end of September commissioning of the Jaw Crusher and SAG Mill are presently underway.

      "We are extremely pleased with the excellent performance of our Eldorado team in China who along with our local partners, engineers and contractors succeeded in ensuring that our first mine in China has remained on schedule throughout construction" commented Paul N. Wright, President and Chief Executive Officer.

      The Tanjianshan Mine as of January 1, 2006 has proven and probable reserves of 1,115,000 oz. Au. The present operating plan is based on an 11 year mine life with estimated cash operating cost of US$232/oz. The Company is undertaking a US$2 million exploration programme designed to both increase the TJS reserve and initiate testing of previously identified mineralization.

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF
      ELDORADO GOLD CORPORATION

      "Paul N. Wright"

      Paul N. Wright
      President and Chief Executive Officer


      The terms "Mineral Reserve", "Proven Mineral Reserve" and "Probable Mineral Reserve" used in this release are Canadian mining terms as defined in accordance with National Instrument 43-101 -- Standards of Disclosure for Mineral Projects under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council on August 20, 2000 as may be amended from time to time by the CIM. These definitions differ from the definitions in the United States Securities & Exchange Commission ("SEC") Guide 7. In the United States, a mineral reserve is defined as a part of a mineral deposit which could be economically and legally extracted or produced at the time the mineral reserve determination is made.

      For a detailed discussion of reserve estimates and related matters see the Company's reports, including the Annual Information Form and FORM 40-F dated March 23, 2006 and technical reports filed under the Company's name at www.sedar.com. A qualified person has verified the data contained in this release.

      Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and forward looking statements or information within the meaning of the Securities Act (Ontario) . Such forward looking statements or information include, but are not limited to statements or information with respect to unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements or information are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements or information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward looking statements. Specific reference is made to "Forward Looking Statements and Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. Forward-looking statements herein include statements regarding the expectations and beliefs of management. Such factors included, amongst others the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.


      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX: ELD) and the American Stock Exchange (AMEX: EGO). The TSX has neither approved nor disapproved the form or content of this release.

      Contact:

      Nancy E. Woo, Manager Investor Relations
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      Email nancyw@eldoradogold.com

      Eldorado Gold Corporation
      1188, 550 Burrard Street
      Vancouver, BC V6C 2B5
      Web site: www.eldoradogold.com
      Request for information packages: info@eldoradogold.com

      View News Release in PDF Format:
      File: http://www.eldoradogold.com/i/pdf/06-15.pdf
      36 KB, approx. 8 seconds at 56.6Kbps
      Avatar
      schrieb am 18.10.06 02:07:47
      Beitrag Nr. 26 ()
      Eldorado Gold Corporation:
      www.eldoradogold.com

      Tue Oct 17, 2006
      Eldorado Gold Announces Commissioning Update - Tanjianshan Project
      (s. http://www.eldoradogold.com/s/News-2006.asp?ReportID=154320&…)

      VANCOUVER, BC - Norman S. Pitcher, Chief Operating Officer of Eldorado Gold Corporation ("Eldorado" the "Company" or "we") wishes to announce that a section of the process plant at the Tanjianshan Project has been damaged as a result of a fire.

      The fire was confined to the cyclone pack, which is a sizing unit used to classify material coming out of the SAG (semi autogenous grinding) mill. The limited extent of the fire resulted in no damage to either the SAG mill or the cyclone pumps.

      The commissioning team at TJS is currently assessing the extent of the damage and the effect this will have on the project start-up. In particular, they will determine the extent to which the equipment can be repaired or will require replacement units. Eldorado will provide an update as to the impact on commissioning when this evaluation is complete.

      The Company will release its Third Quarter Financial Results before the market opens on Monday, November 6, 2006 with a conference call scheduled at 8:30PST (11:30 AM EST).

      Eldorado is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      ON BEHALF OF
      ELDORADO GOLD CORPORATION

      "Norman S. Pitcher"

      Norman S. Pitcher
      Chief Operating Officer


      Certain of the statements made herein may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995, and forward looking statements or information within the meaning of the Securities Act (Ontario) . Such forward looking statements or information include, but are not limited to statements or information with respect to unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Forward-looking statements or information are subject to a variety of risks and uncertainties, which could cause actual events, or results to differ from those reflected in the forward-looking statements or information. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward looking statements. Specific reference is made to "Forward Looking Statements and Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. Forward-looking statements herein include statements regarding the expectations and beliefs of management. Such factors included, amongst others the following: gold price volatility; impact of any hedging activities, including margin limits and margin calls; discrepancies between actual and estimated production, between actual and estimated reserves, and between actual and estimated metallurgical recoveries; mining operational risk; regulatory restrictions, including environmental regulatory restrictions and liability; risks of sovereign investment; speculative nature of gold exploration; dilution; competition; loss of key employees; additional funding requirements; and defective title to mineral claims or property, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Annual Information Form and Form 40-F dated March 23, 2006. We do not expect to update forward-looking statements continually as conditions change and you are referred to the full discussion of the Company's business contained in the Company's reports filed with the securities regulatory authorities in Canada and the U.S.

      Eldorado Gold Corporation's shares trade on the Toronto Stock Exchange (TSX: ELD) and the American Stock Exchange (AMEX: EGO). The TSX has neither approved nor disapproved the form or content of this release.

      Contact:

      Nancy E. Woo, Manager Investor Relations
      Phone: 604.601.6650 or 1.888.353.8166
      Fax: 604.687.4026
      Email nancyw@eldoradogold.com

      Eldorado Gold Corporation
      1188, 550 Burrard Street
      Vancouver, BC V6C 2B5
      Web site: www.eldoradogold.com
      Request for information packages: info@eldoradogold.com

      View News Release in PDF Format:
      File: http://www.eldoradogold.com/i/pdf/06-16.pdf
      35 KB, approx. 8 seconds at 56.6Kbps
      Avatar
      schrieb am 04.11.06 01:23:40
      Beitrag Nr. 27 ()
      Eldorado Gold Corporation:
      www.eldoradogold.com

      Fri Nov 3, 2006
      Eldorado Announces Initial 2006 Drill Results from the Efemçukuru Project, Western Turkey
      ELD No. 06-17

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=157141&…

      Enthält Tabelle und Abbildung.
      Avatar
      schrieb am 06.11.06 19:34:47
      Beitrag Nr. 28 ()
      www.eldoradogold.com

      Mon Nov 6, 2006
      Q3 2006 Financial and Operational Results
      ELD No. 06-18

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=157251&…

      Enthält (kleine) Tabelle.
      Avatar
      schrieb am 07.11.06 18:54:45
      Beitrag Nr. 29 ()
      Antwort auf Beitrag Nr.: 25.181.091 von TomCole am 06.11.06 19:34:47
      Audio Webcast
      “Eldorado Gold Q3 2006 Financial Results Conference Call”
      (November 6, 2006 at 8:30 AM PST):

      Schon reingehört?

      Sonst s. Web Site: www.eldoradogold.com, Klick auf:



      Dauert insgesamt ca. 26 Minuten.

      Z.B.
      “Grand opening Tanjianshan Project: November 12, 2006.
      First gold pour by month’s end.”

      Kein Wunder, dass der Kurs offenbar nun erst ein Mal wieder kontinuierlich steigt.
      Avatar
      schrieb am 05.12.06 20:33:52
      Beitrag Nr. 30 ()
      www.eldoradogold.com

      Tue Dec 5, 2006
      Eldorado Announces First Gold Pour at the Tanjianshan Mine
      ELD No. 06-19

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=161250&…
      Avatar
      schrieb am 07.12.06 19:41:48
      Beitrag Nr. 31 ()
      www.eldoradogold.com

      Thu Dec 7, 2006
      Efemçukuru Drill Results -- Further Positive Results in Transition Zone

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=161495&…
      Avatar
      schrieb am 13.12.06 00:01:48
      Beitrag Nr. 32 ()
      www.eldoradogold.com

      Tue Dec 12, 2006
      Eldorado Provides 2007 Production Guidance
      ELD No. 06-21

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=162566&…
      Avatar
      schrieb am 21.12.06 10:40:14
      Beitrag Nr. 33 ()
      Folgendes übernommen und hier festgehalten aus
      http://www.wallstreet-online.de/nachrichten/nachricht/192899…:

      Nachricht vom 01.09.2006 | 16:40
      CIBC World Markets stuft ELDORADO GOLD CORP auf sector outperform

      Rating-Update:

      Toronto (aktiencheck.de AG) - Die Analysten von CIBC World Markets stufen die Aktie von Eldorado Gold (ISIN CA2849021035/ WKN 892560) unverändert mit "sector outperform" ein. Das Kursziel werde von 8,10 auf 8,60 USD angehoben. (01.09.2006/ac/a/u)

      Analyse-Datum: 01.09.2006

      Rating: sector outperform
      Analyst: CIBC World Markets
      ELDORADO GOLD CORP

      Autor: SmartHouseMedia
      © wallstreet:online AG / SmartHouse Media GmbH
      Avatar
      schrieb am 21.12.06 10:45:30
      Beitrag Nr. 34 ()
      Folgendes übernommen und hier festgehalten aus
      http://www.wallstreet-online.de/nachrichten/nachricht/198643…:

      Nachricht vom 14.12.2006 | 17:38

      RBC Capital Markets stuft ELDORADO GOLD CORP auf Sector Perform

      In ihrer Analyse vom Donnerstag, 14. Dezember 2006 stufen die Analysten von RBC Capital Markets die Aktie des Unternehmens Eldorado Gold Corp. von "Top Pick" auf "Sector Perform" herab. Das Kursziel für die Aktie liegt momentan bei 6.5 $.

      Rating: Sector Perform
      Analyst: RBC Capital Markets
      Kursziel: 6,5
      Kurszielw?ung: n/A
      ELDORADO GOLD CORP

      Autor: SmartHouseMedia
      © wallstreet:online AG / SmartHouse Media GmbH
      Avatar
      schrieb am 21.12.06 10:55:19
      Beitrag Nr. 35 ()
      Folgendes übernommen und hier festgehalten aus
      http://www.wallstreet-online.de/nachrichten/nachricht/198831…:

      goldinvest.de
      Autor: Sven Olsson
      Club:alert Nachrichten des Autors per E-Mail

      09:03 | 19.12.2006

      Nachricht vom 19.12.2006 | 09:03

      Eldorado Gold - Aufsteiger weltweit

      Laut einer Umfrage der Welt gilt 2007 unter Analysten wieder als Jahr des Goldes. Der Preis sollte nicht unter 700 Dollar liegen. Wie die meisten nordamerikanischen Analysten, die in ihren Bewertungen von nur rund 600 oder weniger Dollar ausgehen. Aber es gibt auch Leute die den Goldpreis viel höher sehen. Wie zum Beispiel Pierre Lassonde, Chef von Newmont Mining. Er propagierte in den letzten Monaten einen Goldpreis von 1.000 Dollar. Doch warum kaufte Newmont im laufenden Jahr nicht groß zu. Glaubt er selbst nicht an seine Prognosen oder wartet er nur auf ein passendes Akquisitionsobjekt? Es gäbe jedoch einige aufstrebende Minengesellschaften, die für Newmont interessant sein sollten. Eine davon ist Eldorado Gold.

      Bald könnte Eldorado Gold von einem kleinen Goldproduzenten zu einem mittelgroßen Goldproduzenten aufsteigen. Für 2007 geht das Unternehmen in seiner neuesten Schätzung von einer Produktion von 310.000 bis 330.000 Unzen bei Abbaukosten von 220 bis 230 Dollar pro Unze aus. Die Produktionsrate liegt etwas unter den zuerst vermuteten 344.000 Unzen. Bei den Abbaukosten war die Schätzung richtig. Beim Kisladag-Projekt (Türkei) erwartet Eldorado nun ein Produktionsvolumen von 190.000 bis 200.000 Unzen Gold bei Abbaukosten von 210 bis 220 US Dollar pro Unze. Beim Tanjianshan-Projekt (1,0 Millionen Unzen Goldreserven) in China geht Eldorado in seiner neuesten Prognose für 2007 von 120.000 bis 130.000 Unzen Gold bei Abbaukosten von 234 bis 245 Dollar pro Unze aus, wobei diese auch etwas höher ausfallen könnten. Insgesamt werden die Explorationsausgaben in 2007 bei 14 Millionen Dollar, also genauso hoch wie in 2006, liegen.

      Eldorado betreibt eine weitere Mine in der Türkei, nämlich das Efemcukuru-Projekt (0,8 Millionen Unzen Reserven), die dazugehörige Machbarkeitsstudie soll im April 2007 fertig sein. Diese Mine soll neun Jahre lang ausgebeutet werden können. In den letzten Jahren ist Eldorado stetig bezüglich seiner Goldproduktionsmengen gewachsen. In 2005 wurden 64.000 Unzen Gold produziert. Für 2006 werden 139.000 Unzen erwartet. In 2007 sollen es, wie bereits erwähnt etwa 330.000 Unzen und in 2008 könnten es sogar 400.000 Unzen sein. Langfristig könnte eine Produktionsrate von 450.000 Unzen Gold im Jahr zustande kommen. Da die Ressourcen insgesamt 11,5 Millionen Unzen - davon 7,1 Millionen als Reserven ausgewiesen - betragen, kann Eldorado solch eine hohe Produktion durchaus langfristig darstellen. Wenn die Projekte in China und in der Türkei wie erwartet, ablaufen, so kann Eldorado also etwa in den nächsten drei Jahren in die Reihe der Produzenten aufsteigen, die 450.000 Unzen und mehr im Jahr fördern.

      Eldorado betreibt auch eine Goldmine in Brasilien, die Sao-Bento-Mine. Von den 14 Millionen Dollar, die das Unternehmen für die Exploration in 2007 ausgeben will, sind 4,2 Millionen US-Dollar für Brasilien, das Vila-Nova-Projekt mit eingeschlossen. 6,2 Millionen US-Dollar sind für die Türkei veranschlagt. Der Goldpreis, 2006 bei ungefähr 600 US-Dollar gelegen, wird gemäß den Experten 2007 auf 700 US-Dollar ansteigen und dann vermutlich die nächsten Jahre bei wieder 600 US-Dollar liegen. Jedoch könnte sich der Preis für Gold auch auf ein höheres Niveau begeben. Der Weg für ein weiteres Wachstum von Eldorado scheint frei zu sein. Alle dafür nötigen Aspekte wie Finanzierung, Entwicklung, erfahrenes Management, etc. sind gegeben. Die Marktkapitalisierung von Eldorado beträgt ungefähr 2 Milliarden kanadische Dollar.

      Autor: Sven Olsson
      Avatar
      schrieb am 16.01.07 01:31:47
      Beitrag Nr. 36 ()
      www.eldoradogold.com

      Mon Jan 15, 2007
      Eldorado Gold Announces Increased Resources and Pre-Feasibility Study Results for the Vila Nova Iron Ore Deposit, Brazil

      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=166467&…
      Avatar
      schrieb am 01.02.07 18:16:59
      Beitrag Nr. 37 ()
      www.eldoradogold.com

      Thu Feb 1, 2007
      Tanjianshan Gold Mine Announcement of Commercial Production

      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=168990&…
      Avatar
      schrieb am 07.02.07 00:33:38
      Beitrag Nr. 38 ()
      www.eldoradogold.com

      Tue Feb 6, 2007
      Efemçukuru Drill Results -- Continued Positive Results

      S. http://www.eldoradogold.com/s/News-2006.asp?ReportID=169561&…
      Avatar
      schrieb am 16.02.07 23:25:43
      Beitrag Nr. 39 ()
      www.eldoradogold.com

      Fri Feb 16, 2007
      Eldorado Gold Corp. Press Release

      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=171323&…

      Auszug:
      ...
      "Eldorado does not intend to refute rumours on an ongoing basis. :cool:

      Although Eldorado has no plans to alter this long-standing policy, in light of today's reported statements :confused:, Eldorado feels it is necessary to respond. :cool:

      While Eldorado has been involved in discussions with Centerra regarding a possible business combination, these discussions have been discontinued." :eek:
      ...
      Avatar
      schrieb am 19.02.07 15:16:18
      Beitrag Nr. 40 ()
      Antwort auf Beitrag Nr.: 27.763.839 von TomCole am 16.02.07 23:25:43
      Hier ist die Bestätigung zur Beendigung der Gespräche seitens Centerra Gold Inc. (TSX:CG, http://www.centerragold.com):

      Centerra Gold Inc.
      FEB 16, 2007 - 16:37 ET:
      http://cnrp.ccnmatthews.com/client/centerra/release.jsp?acti…
      Avatar
      schrieb am 21.02.07 18:21:47
      Beitrag Nr. 41 ()
      Toronto Stock Exchange - TSX:

      Eldorado Gold Announces 2006 Financial Results Release Date and Conference Call
      09:01 EST Wednesday, February 21, 2007

      VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - Feb. 21, 2007) - Eldorado Gold Corporation (TSX:ELD)(AMEX:EGO) will release its 2006 Financial Results before markets open on Friday, March 23, 2007. Following the release, Paul Wright, President and Chief Executive Officer of the Company, will host a conference call at 8:00 AM PT (11:00 AM ET) on March 23, 2007.

      The call is being webcast by CCBN and can be accessed at Eldorado Gold's web site at www.eldoradogold.com or from www.ccnmatthews.com.

      Teleconference call details are as follows:

      Call in numbers are:
      Toronto: 416-695-9712
      Toll Free: 1-877-667-7774
      Chairperson: Paul Wright, President & CEO

      The replay numbers are:
      Toronto: 416-695-5275
      Toll Free: 1-888-509-0081
      Passcode: 640760
      Replay will be available until March 30, 2007.


      Eldorado Gold Corporation is a gold producing and exploration company actively growing businesses in Brazil, Turkey and China. With our international expertise in mining, finance and project development, together with highly skilled and dedicated staff, we believe that Eldorado is well positioned to grow in value as we create and pursue new opportunities.

      Request for information packages: info@eldoradogold.com

      FOR FURTHER INFORMATION PLEASE CONTACT:

      Eldorado Gold Corporation
      Nancy E. Woo
      Manager Investor Relations
      (604) 601-6650 or 1-888-353-8166
      (604) 687-4026 (FAX)
      Email: nancyw@eldoradogold.com
      Website: www.eldoradogold.com
      Avatar
      schrieb am 07.03.07 17:58:12
      Beitrag Nr. 42 ()
      www.eldoradogold.com

      Wed Mar 7, 2007
      Tanjianshan Mine Receives Gold Mining Certificate

      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=175680&…
      Avatar
      schrieb am 23.03.07 13:56:24
      Beitrag Nr. 43 ()
      Antwort auf Beitrag Nr.: 27.881.902 von TomCole am 21.02.07 18:21:47
      Heute,
      Freitag, den 23. März 2007,
      um 16:00 Uhr deutscher Zeit (CET):
      Eldorado Gold Corporation „Conference call“
      (anläßlich "release of 2006 Financial Results before markets open")
      Vorsitz: Paul Wright, President and CEO

      Wird gesendet von CCBN
      auf http://www.eldoradogold.com (Dort Klick auf !) und auch
      auf http://www.ccnmatthews.com.


      Anmerkungen zur Umrechnung der in Posting #41 (s.o.) angegebenen Uhrzeiten:

      08:00 AM PT [Pacific Daylight Time (PDT) = UTC - 7, z.B. Vancouver] =
      11:00 AM ET [Eastern Daylight Time (EDT) = UTC - 4, z.B. New York] =
      16:00 Central European Time (CET) = UTC + 1, z.B. Berlin, Frankfurt a.M.

      Umrechnung 08:00 AM PT in CET (für den 23.03.2007):
      http://www.timeanddate.com/worldclock/converted.html?day=23&…

      Umrechnung 11:00 AM ET in CET (für den 23.03.2007):
      http://www.timeanddate.com/worldclock/converted.html?day=23&…
      Avatar
      schrieb am 23.03.07 19:01:16
      Beitrag Nr. 44 ()
      Antwort auf Beitrag Nr.: 28.451.606 von TomCole am 23.03.07 13:56:24
      Die Aufzeichnung des o.g.
      Eldorado Gold Corporation „Conference call“
      von heute, Freitag, den 23. März 2007,
      kann nun abgerufen werden
      auf http://www.eldoradogold.com mit .

      Ferner:

      TSX News,
      Eldorado Gold Corporation: 2006 Financial Results,
      CCNMatthews, March 23, 2007 08:15 AM:

      Auf http://www.eldoradogold.com:

      Fri Mar 23, 2007
      2006 Financial Results
      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=178106&…
      Avatar
      schrieb am 27.03.07 20:08:26
      Beitrag Nr. 45 ()
      TSX News,
      Eldorado Gold Corporation: Efemcukuru Drilling Continues to Deliver Excellent Results, Including 5.6 Meters @ 218.6 g/t Gold
      CCNMatthews, March 27, 2007, 09:05 AM:

      Auf http://www.eldoradogold.com:
      Tue Mar 27, 2007
      Efemçukuru Drilling Continues to Deliver Excellent Results, including 5.6 Meters @ 218.6 g/t Gold
      S. http://www.eldoradogold.com/s/News-2007.asp?ReportID=178480&…
      Avatar
      schrieb am 30.03.07 12:15:37
      Beitrag Nr. 46 ()
      Über die Eldorado Gold Corporation (ELD) habe ich m.E. nun zur Genüge berichtet.
      Ich stelle meine Betreuung von diesem Thread jetzt ein.
      Hatte mir Spaß gemacht. War ein interessantes Thema.
      Alles Gute!
      Tom


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.
      Eldorado Gold Corporation - Haupt-Thread