Mindoro Resource - Why the Philippines? (Seite 813)
eröffnet am 21.11.09 12:02:49 von
neuester Beitrag 29.04.24 23:16:43 von
neuester Beitrag 29.04.24 23:16:43 von
Beiträge: 8.818
ID: 1.154.352
ID: 1.154.352
Aufrufe heute: 0
Gesamt: 726.876
Gesamt: 726.876
Aktive User: 0
ISIN: CA6029131050 · WKN: 906167
0,0030
EUR
0,00 %
0,0000 EUR
Letzter Kurs 07.07.16 Berlin
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
1,0000 | +809,09 | |
0,8500 | +26,87 | |
0,6200 | +16,98 | |
13,710 | +14,06 | |
0,7700 | +13,24 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,6750 | -12,90 | |
1,2400 | -13,89 | |
0,6166 | -19,12 | |
0,5300 | -19,70 | |
46,85 | -98,02 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 39.044.182 von Butuan am 02.03.10 19:22:04 Wed Nov 18, 2009
Major Upgrade For Agata North Nickel - Cobalt Laterite Resource
--------------------------------------------------------------------------------
- Indicated and measured resource now 26.92 million dry metric tonnes at 1.11% nickel and 0.06% cobalt, containing 657 million lbs nickel and 24 million lbs cobalt
- An additional 3.8 million dry metric tonnes in inferred category containing 89 million lbs nickel and 2 million lbs cobalt
- Exploration Target for additional laterite areas to be announced soon
746 Millionen lb Nickel mal 10 USD = ca. 74 Milliarden Doller an Rohstoff Nickel das im Boden schlummert und wir warten auf die Machbarkeitsstudie.
Hier nochmal die ganze Meldung:
Wed Nov 18, 2009
Major Upgrade For Agata North Nickel - Cobalt Laterite Resource
--------------------------------------------------------------------------------
- Indicated and measured resource now 26.92 million dry metric tonnes at 1.11% nickel and 0.06% cobalt, containing 657 million lbs nickel and 24 million lbs cobalt
- An additional 3.8 million dry metric tonnes in inferred category containing 89 million lbs nickel and 2 million lbs cobalt
- Exploration Target for additional laterite areas to be announced soon
EDMONTON, Alberta; November 18, 2009 - Mindoro Resources Ltd. (TSXV: MIO; Frankfurt: WKN 906167) is pleased to announce an upgraded mineral resource estimate for the Agata North nickel laterite, Agata Project, Surigao Gold District. The new resource estimate, shown in the table below, demonstrates a 40 percent increase in total tonnage relative to the December 16, 2008, estimate, as well as the conversion of most of the resource to indicated and measured categories.
The increase in the indicated and measured resource is mostly due to the broadening of the search parameters as a result of the detailed variographic studies and the reinterpretation of the 0.8 percent nickel domain lower surface, carried out by the independent Qualified Person who conducted the previous estimate.
The estimate covers about 80 percent of Agata North. Mindoro is carrying out reconnaissance work, including manual auger drilling on other laterite areas on its Surigao Projects. An Exploration Target will be announced for these next month.
While considerable additional resource potential exists at Agata and other Surigao projects, an adequate resource has been established to form the basis for a detailed evaluation of potential development alternatives and studies are in progress. All development alternatives are being considered. Emphasis will be on establishing an on-site processing plant. However, Mindoro notes the recent increases in direct shipping ore (DSO) prices, particularly in the higher grade categories, and will also evaluate DSO as a means to achieving short-term cash flow. Mindoro is receiving increasing expressions of interest from DSO traders and developers interested in accessing Agata North for DSO operations.
Agata North has strong competitive advantages for both DSO and processing operations: excellent infrastructure, adjacent to the ocean, proximity to China and other Asian markets, considerable upside resource potential, favorable metallurgical characteristics, and extensive limestone deposits on-site.
The company's production objectives are intended to provide an indication of management's current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met
SUMMARY OF MINERAL RESOURCE ESTIMATE
Resource @ 0.5 % Ni cutoff grade (Limonite) and 0.8% cutoff grade (Saprolite)
Category
Laterite Horizon
Mil. WMT
Mil. DMT
Ni%
Co%
Fe%
Contained Ni Metal (Mil lb)
Contained Co Metal (Mil lb)
Measured
Limonite
2.16
1.40
1.00
0.11
44
31.01
3.26
Saprolite
0.64
0.51
1.16
0.03
11
13.09
Indicated
Limonite
12.98
8.44
0.98
0.11
46
181.55
21.02
Saprolite
20.70
16.56
1.18
0.03
11
431.20
Measured + Indicated
Limonite
15.14
9.84
0.98
0.11
45
212.56
24.28
Saprolite
21.34
17.07
1.18
0.03
11
444.28
Total Measured + Indicated
36.48
26.92
1.11
0.06
24
656.84
24.28
Inferred
Limonite
1.56
1.01
0.92
0.10
44
20.49
2.17
Saprolite
3.48
2.78
1.11
0.03
12
68.26
0.00
Total
5.03
3.79
1.06
0.05
21
88.74
2.17
Total metal contents in the reported resources represent metal in the ground and have not been adjusted for metallurgical recoveries and other factors which will be considered in later study.
- Tonnage is reported in both wet metric tonnes (WMT), applicable for DSO operations, and dry metric tonnes (DMT), applicable to any processing operation
- Mineral resources which are not mineral reserves do not have demonstrated economic viability.
- The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
The Mineral Resource model was generated by Dallas Cox, BE (Min), an independent qualified person as defined by NI 43-101. A total of 408 drill holes, comprising 7300 meters of diamond drill core, and 7271 assayed samples, were used for the estimate. These drill holes cover approximately 80% of the currently delineated laterite area at Agata North. An Inverse Distance Squared grade estimation method was utilized within tightly constrained lithological and grade domains. Mr. Cox has indicated that the density of drilling and continuity of mineralization is sufficient to classify the estimated resource and has verified and authorized the technical information detailed in this release. Both dry metric tonnes (DMT) and wet metric tonnes (WMT) are quoted. The NI 43-101 compliant Technical Report will be filed on SEDAR within 45 days.
Mr. Dallas Cox has 27 years of experience in open pit mine technical services, mine operations and management in Australia, China, Indonesia and the Philippines. His engineering, mine design and development experience in the Philippines includes the Rusina Mining Limited Acoje nickel project, the Platinum Group Metals Corporation Caga4 nickel project, the Red5 Limited Siana gold project, the Metals Exploration Limited Runruno gold-molybdenum project, the Filminera Resources Masbate gold project and Mindoro's Kay Tanda gold project.
Tony Climie, P.Geol, is the Qualified Person responsible for monitoring the supervision and quality control of Mindoro's programs and who has reviewed and verified the technical information contained in this news release.
ABOUT MINDORO
Mindoro is a Tier 1 Issuer trading on the TSX Venture Exchange (MIO) and the Frankfurt Stock Exchange (WKN 906167). Mindoro is focused on copper-gold and nickel exploration in the Philippines with a strategy of advancing early stage opportunities to production or joint venture. Mindoro has NI 43-101 resource estimates on its Agata North nickel-cobalt project and on both its Lobo (SWB) and Archangel (Kay Tanda) gold-silver projects. Mindoro has identified 22 porphyry copper-gold prospects and has an active joint venture with Gold Fields covering its Batangas projects.
Mindoro is well positioned to capitalize on the expanding global demand for gold and copper, and resurging interest by China in nickel. Drilling is underway on its American Tunnels gold and copper-gold project, and on the El Paso copper-gold project, funded by Gold Fields. Final results have been received from due diligence drilling by Avocet Mining PLC on the Kay Tanda gold project, for which an upgraded resource estimate will be released next week. Additional near-term objectives include finalizing one to two joint venture arrangements on Mindoro's porphyry copper-gold prospects at Pan de Azucar and Surigao and identifying a suitable partner to fund development of the significant Agata North nickel resource.
Major Upgrade For Agata North Nickel - Cobalt Laterite Resource
--------------------------------------------------------------------------------
- Indicated and measured resource now 26.92 million dry metric tonnes at 1.11% nickel and 0.06% cobalt, containing 657 million lbs nickel and 24 million lbs cobalt
- An additional 3.8 million dry metric tonnes in inferred category containing 89 million lbs nickel and 2 million lbs cobalt
- Exploration Target for additional laterite areas to be announced soon
746 Millionen lb Nickel mal 10 USD = ca. 74 Milliarden Doller an Rohstoff Nickel das im Boden schlummert und wir warten auf die Machbarkeitsstudie.
Hier nochmal die ganze Meldung:
Wed Nov 18, 2009
Major Upgrade For Agata North Nickel - Cobalt Laterite Resource
--------------------------------------------------------------------------------
- Indicated and measured resource now 26.92 million dry metric tonnes at 1.11% nickel and 0.06% cobalt, containing 657 million lbs nickel and 24 million lbs cobalt
- An additional 3.8 million dry metric tonnes in inferred category containing 89 million lbs nickel and 2 million lbs cobalt
- Exploration Target for additional laterite areas to be announced soon
EDMONTON, Alberta; November 18, 2009 - Mindoro Resources Ltd. (TSXV: MIO; Frankfurt: WKN 906167) is pleased to announce an upgraded mineral resource estimate for the Agata North nickel laterite, Agata Project, Surigao Gold District. The new resource estimate, shown in the table below, demonstrates a 40 percent increase in total tonnage relative to the December 16, 2008, estimate, as well as the conversion of most of the resource to indicated and measured categories.
The increase in the indicated and measured resource is mostly due to the broadening of the search parameters as a result of the detailed variographic studies and the reinterpretation of the 0.8 percent nickel domain lower surface, carried out by the independent Qualified Person who conducted the previous estimate.
The estimate covers about 80 percent of Agata North. Mindoro is carrying out reconnaissance work, including manual auger drilling on other laterite areas on its Surigao Projects. An Exploration Target will be announced for these next month.
While considerable additional resource potential exists at Agata and other Surigao projects, an adequate resource has been established to form the basis for a detailed evaluation of potential development alternatives and studies are in progress. All development alternatives are being considered. Emphasis will be on establishing an on-site processing plant. However, Mindoro notes the recent increases in direct shipping ore (DSO) prices, particularly in the higher grade categories, and will also evaluate DSO as a means to achieving short-term cash flow. Mindoro is receiving increasing expressions of interest from DSO traders and developers interested in accessing Agata North for DSO operations.
Agata North has strong competitive advantages for both DSO and processing operations: excellent infrastructure, adjacent to the ocean, proximity to China and other Asian markets, considerable upside resource potential, favorable metallurgical characteristics, and extensive limestone deposits on-site.
The company's production objectives are intended to provide an indication of management's current expectations and are still conceptual in nature. It is uncertain that it will be established that these resources will be converted into economically viable mining reserves. Until a feasibility study has been completed, there is no certainty that these objectives will be met
SUMMARY OF MINERAL RESOURCE ESTIMATE
Resource @ 0.5 % Ni cutoff grade (Limonite) and 0.8% cutoff grade (Saprolite)
Category
Laterite Horizon
Mil. WMT
Mil. DMT
Ni%
Co%
Fe%
Contained Ni Metal (Mil lb)
Contained Co Metal (Mil lb)
Measured
Limonite
2.16
1.40
1.00
0.11
44
31.01
3.26
Saprolite
0.64
0.51
1.16
0.03
11
13.09
Indicated
Limonite
12.98
8.44
0.98
0.11
46
181.55
21.02
Saprolite
20.70
16.56
1.18
0.03
11
431.20
Measured + Indicated
Limonite
15.14
9.84
0.98
0.11
45
212.56
24.28
Saprolite
21.34
17.07
1.18
0.03
11
444.28
Total Measured + Indicated
36.48
26.92
1.11
0.06
24
656.84
24.28
Inferred
Limonite
1.56
1.01
0.92
0.10
44
20.49
2.17
Saprolite
3.48
2.78
1.11
0.03
12
68.26
0.00
Total
5.03
3.79
1.06
0.05
21
88.74
2.17
Total metal contents in the reported resources represent metal in the ground and have not been adjusted for metallurgical recoveries and other factors which will be considered in later study.
- Tonnage is reported in both wet metric tonnes (WMT), applicable for DSO operations, and dry metric tonnes (DMT), applicable to any processing operation
- Mineral resources which are not mineral reserves do not have demonstrated economic viability.
- The estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.
The Mineral Resource model was generated by Dallas Cox, BE (Min), an independent qualified person as defined by NI 43-101. A total of 408 drill holes, comprising 7300 meters of diamond drill core, and 7271 assayed samples, were used for the estimate. These drill holes cover approximately 80% of the currently delineated laterite area at Agata North. An Inverse Distance Squared grade estimation method was utilized within tightly constrained lithological and grade domains. Mr. Cox has indicated that the density of drilling and continuity of mineralization is sufficient to classify the estimated resource and has verified and authorized the technical information detailed in this release. Both dry metric tonnes (DMT) and wet metric tonnes (WMT) are quoted. The NI 43-101 compliant Technical Report will be filed on SEDAR within 45 days.
Mr. Dallas Cox has 27 years of experience in open pit mine technical services, mine operations and management in Australia, China, Indonesia and the Philippines. His engineering, mine design and development experience in the Philippines includes the Rusina Mining Limited Acoje nickel project, the Platinum Group Metals Corporation Caga4 nickel project, the Red5 Limited Siana gold project, the Metals Exploration Limited Runruno gold-molybdenum project, the Filminera Resources Masbate gold project and Mindoro's Kay Tanda gold project.
Tony Climie, P.Geol, is the Qualified Person responsible for monitoring the supervision and quality control of Mindoro's programs and who has reviewed and verified the technical information contained in this news release.
ABOUT MINDORO
Mindoro is a Tier 1 Issuer trading on the TSX Venture Exchange (MIO) and the Frankfurt Stock Exchange (WKN 906167). Mindoro is focused on copper-gold and nickel exploration in the Philippines with a strategy of advancing early stage opportunities to production or joint venture. Mindoro has NI 43-101 resource estimates on its Agata North nickel-cobalt project and on both its Lobo (SWB) and Archangel (Kay Tanda) gold-silver projects. Mindoro has identified 22 porphyry copper-gold prospects and has an active joint venture with Gold Fields covering its Batangas projects.
Mindoro is well positioned to capitalize on the expanding global demand for gold and copper, and resurging interest by China in nickel. Drilling is underway on its American Tunnels gold and copper-gold project, and on the El Paso copper-gold project, funded by Gold Fields. Final results have been received from due diligence drilling by Avocet Mining PLC on the Kay Tanda gold project, for which an upgraded resource estimate will be released next week. Additional near-term objectives include finalizing one to two joint venture arrangements on Mindoro's porphyry copper-gold prospects at Pan de Azucar and Surigao and identifying a suitable partner to fund development of the significant Agata North nickel resource.
Antwort auf Beitrag Nr.: 39.043.812 von Kanuu am 02.03.10 18:37:00
Vielen Dank für die Aufforderung... aber im mom. keine Zeit und...
bevor ich das mache, will ich erst mal den genauen Aktienbestand (incl. dem letzten PP) herausfinden. --- Zusätzlich -sozusagen als Zweitrechnung- alle Aktien incl. der "zukünftigen" Aktien = d.h. die noch offenstehenden Warrents.
In der Zwischenzeit kannst Du dir aber nochmal die Posts: #11 vom 09.12.09; #18 - 10.12.09; #25 - 11.12.09; #106 - 11.01.10 oder #109 (auf deutsch); #108 - 11.01.10; #234 - 28.01.10; #382 - 09.02.10. ansehen!
und mit einer zukünftigen Stückzahl von ca. 160 / 170 Mio. Aktien (das ist incl. der Warrents -- die genaue Zahl weiß ich nicht!) kannst Du Dir das ja mal selbst "überschlagen"
Übrigens der Nickel-Preis ist heute (02.03.10) ca. 10USD/lb.
Wie gesagt das alles bezieht sich nur auf das (gesamte) Mindanao-Nickel/Kobalt. Nicht dabei sind alle anderen Projekte!!
Butuan
Vielen Dank für die Aufforderung... aber im mom. keine Zeit und...
bevor ich das mache, will ich erst mal den genauen Aktienbestand (incl. dem letzten PP) herausfinden. --- Zusätzlich -sozusagen als Zweitrechnung- alle Aktien incl. der "zukünftigen" Aktien = d.h. die noch offenstehenden Warrents.
In der Zwischenzeit kannst Du dir aber nochmal die Posts: #11 vom 09.12.09; #18 - 10.12.09; #25 - 11.12.09; #106 - 11.01.10 oder #109 (auf deutsch); #108 - 11.01.10; #234 - 28.01.10; #382 - 09.02.10. ansehen!
und mit einer zukünftigen Stückzahl von ca. 160 / 170 Mio. Aktien (das ist incl. der Warrents -- die genaue Zahl weiß ich nicht!) kannst Du Dir das ja mal selbst "überschlagen"
Übrigens der Nickel-Preis ist heute (02.03.10) ca. 10USD/lb.
Wie gesagt das alles bezieht sich nur auf das (gesamte) Mindanao-Nickel/Kobalt. Nicht dabei sind alle anderen Projekte!!
Butuan
@butuan
Wärst Du so freundlich, und Deine "aktuallisierte" Berechnung unter Berücksichtung der gestiegenen Aktienzahl zu posten?
Denke, die interessiert - nicht nur mich - brennend!
:-)
Wärst Du so freundlich, und Deine "aktuallisierte" Berechnung unter Berücksichtung der gestiegenen Aktienzahl zu posten?
Denke, die interessiert - nicht nur mich - brennend!
:-)
.
realtime nickel
22162,00 21486,00 +3,15% +676,00 18:20:05 USD je Tonne
.
realtime nickel
22162,00 21486,00 +3,15% +676,00 18:20:05 USD je Tonne
.
Antwort auf Beitrag Nr.: 39.041.233 von saarwebweb am 02.03.10 14:46:07Hi Sweb
Ich bin vollkommen Deiner Meinung.
Solche Fragen düfen und sollten disktuiert werden!
Ich bin vollkommen Deiner Meinung.
Solche Fragen düfen und sollten disktuiert werden!
@ Alle, danke, für das freundliche Willkommen
Urlaub,3 Wochen Gran Canaria war prima, überwiegend
Sonne, aber zwischendurch immer mal wieder ein Unwetter,
den Tag danach war dann teilweise der Strand im Meer
versunken, am nächsten Tag wieder da, wenn auch
etwas unordenlich, mit Steinen und Ästen etc.
So was hatten wir noch nicht erlebt!
@Butuan, hast natürlich recht,dass ich mehr als skeptisch hier
war!!!Nur einfach mal meine
Meinung, hätte sich die Situation im Management nicht
so gravierend geändert, wäre der Kurs bestimmt nicht so
gestiegen, denn normalerweise passt sich der einer
PP erst mal an, so habe ich es jedenfalls bisher mitbekommen.
Und nur ein positives Schreiben im Thread, ist das wirklich
erwünscht?
Ich wage es trotzdem kritisch zu schreiben.
Was ist, wenn sich die Weltwirtschaft nicht so
schnell erholt, wie erhofft?
Wird es sich dann noch lohnen Nickel direkt zu verschiffen
oder eine Fabrik zu bauen. Nur meine Überlegung, die absolut
nicht richtig sein muss!
Ich wünsche jedenfalls eine erfolgreiche, positive
Woche, trotz meinem Meckern, mal wieder
Gruß Sweb
Urlaub,3 Wochen Gran Canaria war prima, überwiegend
Sonne, aber zwischendurch immer mal wieder ein Unwetter,
den Tag danach war dann teilweise der Strand im Meer
versunken, am nächsten Tag wieder da, wenn auch
etwas unordenlich, mit Steinen und Ästen etc.
So was hatten wir noch nicht erlebt!
@Butuan, hast natürlich recht,dass ich mehr als skeptisch hier
war!!!Nur einfach mal meine
Meinung, hätte sich die Situation im Management nicht
so gravierend geändert, wäre der Kurs bestimmt nicht so
gestiegen, denn normalerweise passt sich der einer
PP erst mal an, so habe ich es jedenfalls bisher mitbekommen.
Und nur ein positives Schreiben im Thread, ist das wirklich
erwünscht?
Ich wage es trotzdem kritisch zu schreiben.
Was ist, wenn sich die Weltwirtschaft nicht so
schnell erholt, wie erhofft?
Wird es sich dann noch lohnen Nickel direkt zu verschiffen
oder eine Fabrik zu bauen. Nur meine Überlegung, die absolut
nicht richtig sein muss!
Ich wünsche jedenfalls eine erfolgreiche, positive
Woche, trotz meinem Meckern, mal wieder
Gruß Sweb
Antwort auf Beitrag Nr.: 39.040.299 von fallstreet888 am 02.03.10 13:05:55
Gute Scheibe damals 1969 von Zager + Evans (weltweit über 4 Millionen mal verkauft - und das zu Plattenspielerzeiten)
Gute Scheibe damals 1969 von Zager + Evans (weltweit über 4 Millionen mal verkauft - und das zu Plattenspielerzeiten)
Antwort auf Beitrag Nr.: 39.039.617 von Butuan am 02.03.10 11:46:45 butuan, wie ging noch das Lied. in the year 2525...
Antwort auf Beitrag Nr.: 39.039.551 von Jambolinho am 02.03.10 11:39:07
Ich wette mit Dir um meinen ganzen Aktienbestand, dass es nicht bis Februar 2025 dauert....!
Noch nicht einmal bis Februar 2024!!!!!
..... zufrieden?
Butuan
(Eine "echte" Chance viele MIO Aktien zu gewinnen!!)
Ich wette mit Dir um meinen ganzen Aktienbestand, dass es nicht bis Februar 2025 dauert....!
Noch nicht einmal bis Februar 2024!!!!!
..... zufrieden?
Butuan
(Eine "echte" Chance viele MIO Aktien zu gewinnen!!)