Ein neuer SUPER-TREND! FYI Resources LTD WKN: A0RDPF (Seite 281)
eröffnet am 04.12.17 18:19:21 von
neuester Beitrag 15.11.23 13:15:36 von
neuester Beitrag 15.11.23 13:15:36 von
Beiträge: 10.578
ID: 1.268.745
ID: 1.268.745
Aufrufe heute: 0
Gesamt: 414.994
Gesamt: 414.994
Aktive User: 0
ISIN: AU0000310302 · WKN: A3E3UB · Symbol: SDL0
0,0405
EUR
0,00 %
0,0000 EUR
Letzter Kurs 10:06:33 Lang & Schwarz
Neuigkeiten
15.11.23 · GOLDINVEST.de Anzeige |
14.11.23 · GOLDINVEST.de Anzeige |
12.09.23 · GOLDINVEST.de Anzeige |
17.08.23 · GOLDINVEST.de Anzeige |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
14,900 | +22,13 | |
5,1500 | +21,75 | |
1,7860 | +20,03 | |
0,9000 | +16,13 | |
0,5800 | +16,00 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,6050 | -6,20 | |
1,1200 | -6,67 | |
10,040 | -7,89 | |
0,5100 | -8,11 | |
39,20 | -8,84 |
Beitrag zu dieser Diskussion schreiben
Antwort auf Beitrag Nr.: 64.624.600 von Reiners am 03.08.20 00:42:10Bin auf die Kommentare von Tro... und Co. gespannt.
Gefällt mir.
FYI SUCCESSFULLY COMPLETES SECOND TRIAL HPA PRODUCTION
Key points:
• FYI’s Stage Two pilot plant HPA production campaign successfully completed
• Pilot plant performs in line with operational parameters and expectations
• Trial HPA production samples sent to USA for independent analysis to confirm purity
• FYI HPA trial product being prepared ahead of being shipped to meet customer
requests
• Dedicated HPA product to receive additional finishing to specialty specifications as
requested by several parties for detailed qualification
• Process design improvements tested and incorporated into flowsheet design
• Further variation and efficiency test work planned shortly
• Further pilot plant operations and testwork planned
FYI Resources Ltd (ASX: FYI) (“FYI” or “the Company”) is pleased to announce the successful
completion of the Stage Two HPA production of high purity alumina (HPA) from the
Company’s pilot plant facility located in Welshpool, Western Australia.
FYI’s Stage Two pilot plant trial and HPA production run has just been completed. The
Company’s purpose-built pilot plant operated in line with expectations and design
parameters including recoveries which provides validation of the previous excellent
operational performance during Stage One operations.
Importantly, additional variability and materials handling / materials construction test work
conducted during the pilot plant operations further increased our knowledge of the
flowsheet design and product behaviour during operations. This information will assist in
optimising operational efficiency improvements and provide significant de-risking of the
process.
The HPA product generated from the pilot plant will be checked for quality control and
assurance including sending representative samples to an independent laboratory in the
US for precise analysis. Once satisfied, FYI will forward trial HPA to designated potential
customers with their requested product orders to undertake further detailed qualification
assessment. Order sizes vary from 5kg to 20kg of HPA.
FYI will also carry out supplementary finishing work to a portion of the generated product at
the request of several significant potential customers. The specially finished HPA product will
assist in the qualification process which will be directed towards the LED lighting and lithiumion battery (LiB) markets in particular.
FYI Managing Director Roland Hill said “We are incredibly pleased with the outcome of the
of the Stage Two pilot plant trial production run. This is another significant step up in terms of
our project development as the successful operation of the pilot plant is strategically
important to us. We continue to demonstrate the effectiveness and efficiency of our lowcost, innovative process flowsheet using conventional processing technologies and in so
doing continue to de-risk the project and crucially, demonstrate our HPA production
capabilities to our potential partners and off-take groups.
We are looking forward to fulfilling the HPA product orders and allowing potential customers
to progress their respective qualification process using FYI’s high-quality alumina and to
advance our off-take discussions”.
Further pilot plant operations and testwork is planned to be undertaken shortly in
anticipation of further orders from potential customers.
FYI will continue to update the market as progress of the qualification assessment continues.
FYI SUCCESSFULLY COMPLETES SECOND TRIAL HPA PRODUCTION
Key points:
• FYI’s Stage Two pilot plant HPA production campaign successfully completed
• Pilot plant performs in line with operational parameters and expectations
• Trial HPA production samples sent to USA for independent analysis to confirm purity
• FYI HPA trial product being prepared ahead of being shipped to meet customer
requests
• Dedicated HPA product to receive additional finishing to specialty specifications as
requested by several parties for detailed qualification
• Process design improvements tested and incorporated into flowsheet design
• Further variation and efficiency test work planned shortly
• Further pilot plant operations and testwork planned
FYI Resources Ltd (ASX: FYI) (“FYI” or “the Company”) is pleased to announce the successful
completion of the Stage Two HPA production of high purity alumina (HPA) from the
Company’s pilot plant facility located in Welshpool, Western Australia.
FYI’s Stage Two pilot plant trial and HPA production run has just been completed. The
Company’s purpose-built pilot plant operated in line with expectations and design
parameters including recoveries which provides validation of the previous excellent
operational performance during Stage One operations.
Importantly, additional variability and materials handling / materials construction test work
conducted during the pilot plant operations further increased our knowledge of the
flowsheet design and product behaviour during operations. This information will assist in
optimising operational efficiency improvements and provide significant de-risking of the
process.
The HPA product generated from the pilot plant will be checked for quality control and
assurance including sending representative samples to an independent laboratory in the
US for precise analysis. Once satisfied, FYI will forward trial HPA to designated potential
customers with their requested product orders to undertake further detailed qualification
assessment. Order sizes vary from 5kg to 20kg of HPA.
FYI will also carry out supplementary finishing work to a portion of the generated product at
the request of several significant potential customers. The specially finished HPA product will
assist in the qualification process which will be directed towards the LED lighting and lithiumion battery (LiB) markets in particular.
FYI Managing Director Roland Hill said “We are incredibly pleased with the outcome of the
of the Stage Two pilot plant trial production run. This is another significant step up in terms of
our project development as the successful operation of the pilot plant is strategically
important to us. We continue to demonstrate the effectiveness and efficiency of our lowcost, innovative process flowsheet using conventional processing technologies and in so
doing continue to de-risk the project and crucially, demonstrate our HPA production
capabilities to our potential partners and off-take groups.
We are looking forward to fulfilling the HPA product orders and allowing potential customers
to progress their respective qualification process using FYI’s high-quality alumina and to
advance our off-take discussions”.
Further pilot plant operations and testwork is planned to be undertaken shortly in
anticipation of further orders from potential customers.
FYI will continue to update the market as progress of the qualification assessment continues.
wenn der kurs kernig steigen würde, wärs wohl keine übertreibung mehr...
nachtigall ... ?
next week will show
nachtigall ... ?
next week will show
In addition to the A$80 million equity financing facility with GEM which significantly de-risks
the project financing,
eine haltlose Übertreibung, wenn man die Details dieser Fazilität erinnert:
"The number of shares which FYI may draw down under a notice is capped at 1,000% of the average daily number of FYI shares traded on ASX during the 15 trading days prior to that draw down notice, subject to adjustments.
the project financing,
eine haltlose Übertreibung, wenn man die Details dieser Fazilität erinnert:
"The number of shares which FYI may draw down under a notice is capped at 1,000% of the average daily number of FYI shares traded on ASX during the 15 trading days prior to that draw down notice, subject to adjustments.
Antwort auf Beitrag Nr.: 64.607.259 von Reiners am 31.07.20 11:59:54• $80m equity facility available for project development and working capital
das sind so Sätze die ich nicht mag und warum ich mich kritisch dazu äußere.
ersten stimmt es nicht, Sie haben das nicht verfügbar und wenn Sie es bekommen wollen, zu welchen Bedingungen ?
selbst bei 10 Aud cent wären das noch 1,1 Milliarden neue Shares, aktuell noch viel mehr und dann kommt erst der Anteil von dem erträumten Investor,-- das machte dann 2,5 Mrd. Shares am Ende oder mehr ?
das sind so Sätze die ich nicht mag und warum ich mich kritisch dazu äußere.
ersten stimmt es nicht, Sie haben das nicht verfügbar und wenn Sie es bekommen wollen, zu welchen Bedingungen ?
selbst bei 10 Aud cent wären das noch 1,1 Milliarden neue Shares, aktuell noch viel mehr und dann kommt erst der Anteil von dem erträumten Investor,-- das machte dann 2,5 Mrd. Shares am Ende oder mehr ?
Quartalsbericht, lesenswert.
Es wird nach meiner Sicht solide weitergearbeitet.
https://hotcopper.com.au/documentembed?id=uOMxKKzFkiWRTLKhOR…
---------------------------
Kommentar:
https://hotcopper.com.au/posts/46226897/
Es wird nach meiner Sicht solide weitergearbeitet.
https://hotcopper.com.au/documentembed?id=uOMxKKzFkiWRTLKhOR…
---------------------------
Kommentar:
https://hotcopper.com.au/posts/46226897/
!
Dieser Beitrag wurde von CloudMOD moderiert. Grund: unnötige Provokation, persönliche Angriffe bitte unterlassen
...kein Interesse an FYI....
und wenn er nicht gestorben ist, basht er noch übermorgen weiter....
irgendwie niedlich der Hilfsbasher
und wenn er nicht gestorben ist, basht er noch übermorgen weiter....
irgendwie niedlich der Hilfsbasher
Antwort auf Beitrag Nr.: 64.571.166 von umkehrformation am 28.07.20 16:29:44gestern $12k Umsatz heute $17k hahaha, da sind die ganz großen Gewinne gelaufen, mach dich nicht lächerlich.
zudem immer 2/3 Verkäufe, mal schauen wie es die nächsten Tage weiter geht.
Abgesehen davon wünsche ich sowieso jeden das er mindestens keine Verluste macht, ich habe kein Interesse an FYI, die Kommunikation ist mir einfach zu über drüber, am Ende kommt da auch nix raus so wie bei Graphex ?
zudem immer 2/3 Verkäufe, mal schauen wie es die nächsten Tage weiter geht.
Abgesehen davon wünsche ich sowieso jeden das er mindestens keine Verluste macht, ich habe kein Interesse an FYI, die Kommunikation ist mir einfach zu über drüber, am Ende kommt da auch nix raus so wie bei Graphex ?
vielleicht gibts ja bald ne beteiligung oder sowas
nachdem unser contraindikator namens hilfsbasher soetwas abschlägig beschieden hat (genau wie übrigens den kursanstieg) dürfte die wahrscheinlichkeit dafür gestiegen sein....
manchmal wissen solche jungs ja was im hintergrund läuft und versuchen durch bangemaxchen vorher noch stücke abzugreifen
ich sage ausdrücklich nicht, daß es HIER so IST - aber könnte...
nachdem unser contraindikator namens hilfsbasher soetwas abschlägig beschieden hat (genau wie übrigens den kursanstieg) dürfte die wahrscheinlichkeit dafür gestiegen sein....
manchmal wissen solche jungs ja was im hintergrund läuft und versuchen durch bangemaxchen vorher noch stücke abzugreifen
ich sage ausdrücklich nicht, daß es HIER so IST - aber könnte...