`Avino Silver´(ASM.V) besser als `Mines Management´(MGN)? (Seite 59)
eröffnet am 22.12.04 21:46:10 von
neuester Beitrag 20.05.24 10:35:01 von
neuester Beitrag 20.05.24 10:35:01 von
Beiträge: 1.468
ID: 938.312
ID: 938.312
Aufrufe heute: 18
Gesamt: 133.792
Gesamt: 133.792
Aktive User: 1
ISIN: CA0539061030 · WKN: 862191 · Symbol: GV6
0,9520
EUR
-3,64 %
-0,0360 EUR
Letzter Kurs 13:41:23 Tradegate
Neuigkeiten
08.11.23 · Accesswire |
08.11.23 · Christoph Brüning Anzeige |
03.08.23 · Accesswire |
Werte aus der Branche Rohstoffe
Wertpapier | Kurs | Perf. % |
---|---|---|
0,7405 | +33,42 | |
0,6200 | +18,10 | |
16,270 | +16,71 | |
1,2000 | +13,21 | |
1,7000 | +11,84 |
Wertpapier | Kurs | Perf. % |
---|---|---|
0,6906 | -7,30 | |
0,9450 | -7,35 | |
0,7800 | -7,69 | |
0,8806 | -8,42 | |
16.200,00 | -9,50 |
Beitrag zu dieser Diskussion schreiben
Avino Reports 1rst Quarter `14 Financial Results of $1.344.316; $0.05/Share +Cash Flow From Operations of $1.631.349; $0.05/Share; Cash cost per AgEq ounce was $8.62, compared to $14.77 in Q1 `13, Consolidated all-in sustaining cash cost per AgEq ounce was $12.85,
-----------------------------------------------------------
wie wärs mit Nachprüfung dieser Zahlen?
-----------------------------------------------------------
wie wärs mit Nachprüfung dieser Zahlen?
Zitat von Popeye82: Weil ich ja in einigen Punkten etwas nach den Kosten gefragt hatte -weisst Du vielleicht was Avino bisher für "Discovery Costs" hatte?
Das is ja auch ne Sache die noch obendrauf kommt -Erweiterung(en).
......
Gruß
P.
Also für Exploration und geologische Untersuchungen wurde 2013 $ 900k ausgegeben.
Für die Erweiterung der Produktionsanlagen insgesamt $ 3,3 Mio. in 2013.
Aus MD&A:
2013:
a) Exploration and evaluation expenditures: $ 901.912
b) Additions to plant, equipment and mining properties: $ 3.315.192
Antwort auf Beitrag Nr.: 47.160.870 von Popeye82 am 16.06.14 22:47:33Aktiensplits zeigt Yahoo Finance zumindest seit 1996 KEINE :
Warum das so ist, weiß ich auch noch nicht.
Werde mal auf SEDAR ein bißchen nachforschen.
Allerdings hat Avino ja von 1974 bis 2001 gefördert:
16 Mio. Unzen Silber
96.000 Unzen Gold
24 Mio Pfund Kupfer
Und da ist bestimmt etwas Cash hängen geblieben, was eine Verwässerung verhindert haben könnte.
Warum das so ist, weiß ich auch noch nicht.
Werde mal auf SEDAR ein bißchen nachforschen.
Allerdings hat Avino ja von 1974 bis 2001 gefördert:
16 Mio. Unzen Silber
96.000 Unzen Gold
24 Mio Pfund Kupfer
Und da ist bestimmt etwas Cash hängen geblieben, was eine Verwässerung verhindert haben könnte.
Antwort auf Beitrag Nr.: 47.159.100 von Fantomas96 am 16.06.14 15:52:01
Weil ich ja in einigen Punkten etwas nach den Kosten gefragt hatte -weisst Du vielleicht was Avino bisher für "Discovery Costs" hatte?
Das is ja auch ne Sache die noch obendrauf kommt -Erweiterung(en).
Mir scheint auch die Aktienstruktur, für diiiese, lange, Vergangenheit, seeehr ungewöhnlich, niedrig.
Kann man davon ausgehen dass es da irgendwann in der Vergangenheit einen Aktiensplit gab?
Eigentlich -fast- die einzige Erklärung durch die es für mich Sinn machen würde.
Gruß
P.
Weil ich ja in einigen Punkten etwas nach den Kosten gefragt hatte -weisst Du vielleicht was Avino bisher für "Discovery Costs" hatte?
Das is ja auch ne Sache die noch obendrauf kommt -Erweiterung(en).
Mir scheint auch die Aktienstruktur, für diiiese, lange, Vergangenheit, seeehr ungewöhnlich, niedrig.
Kann man davon ausgehen dass es da irgendwann in der Vergangenheit einen Aktiensplit gab?
Eigentlich -fast- die einzige Erklärung durch die es für mich Sinn machen würde.
Gruß
P.
Antwort auf Beitrag Nr.: 47.113.010 von Fantomas96 am 05.06.14 22:28:02San Gonzalo Expansion läuft und jetzt ist auch Avino bereit (Entwässerung beendet) für Q4 Produktion:
Avino Mine Reopening Update
http://www.juniorminingnetwork.com/junior-miner-news/news-re…
VANCOUVER, BRITISH COLUMBIA--(Marketwired - June 16, 2014) - Avino Silver & Gold Mines Ltd. (TSX VENTURE:ASM)(NYSE MKT:ASM)(FRANKFURT:GV6) ("Avino" or "the Company") is pleased to report that the dewatering operation of the Avino mine was completed as of May 28, 2014. This operation was initiated on November 24th, 2012 for a total of 482 days. During this period, a total of 1,013,069 cubic metres of acidic water were pumped and treated for the removal of base metals using lime. The treated water, which met agricultural standards for discharge was used for mill processes and the excess was gravity fed to the company built La Caricol dam; sludge from the water treatment was disposed of in the tailings storage facility.
"We are excited to be entering the final phase of our current expansion on time and on budget. The expansion will significantly increase our precious metal output starting in the fourth quarter. Avino will continue to grow rapidly and become a successful low-cost producer vaulting to mid-tier status in 2015."
- David Wolfin, President & CEO, Avino Silver & Gold Mines Ltd.
With the mine dewatering complete, rehabilitation work on the ramp and the mining area of level 11.5 has commenced. Broken mineralized material that was blasted and ready for haulage in 2001 have been identified. This material has been sampled and assayed in the mine laboratory to determine grade and will be hauled to the surface stockpiles if deemed viable for processing. Service piping for air and water, together with the electrical cables are being strung to prepare for mining.
A building to house a one Megawatt generator and air compressor has undergone the necessary repairs and is nearing completion. This equipment which is in stock has been ordered from Caterpillar/Maqsa using the credit facility. The equipment is now ready for installation upon the completion of the building repairs. The generator will supply underground power for the jumbo, ventilation fans and mine pumps. The air compressor will supply compressed air for the drills and the shotcrete machine for ground control.
A new jumbo and scoop for production mining are now on site and will be put into operation once all the services are in place.
Caterpillar/Maqsa who have been commissioned to construct the power line to supply power from the CFE grid to mill circuit 3 have advised us that they are on schedule to have grid power available by the fourth quarter of this year provided there are no delays in the permitting process or with the landowners affected by the power line. Ongoing discussions have been amicable.
In the process plant, efforts are underway to ensure all the long lead items will be delivered on time as per the supplier's schedule.
Crushing plant screens - June delivery
Mill clutch and starter - July delivery
40ft Thickener Mechanism - June delivery
Filter Press - equipment being packaged for delivery from Italy - August delivery
Based on the above delivery schedules, the Company is confident Circuit #3 will be ready as noted in our project schedule in the fourth quarter of this year.
Avino Mine Reopening Update
http://www.juniorminingnetwork.com/junior-miner-news/news-re…
VANCOUVER, BRITISH COLUMBIA--(Marketwired - June 16, 2014) - Avino Silver & Gold Mines Ltd. (TSX VENTURE:ASM)(NYSE MKT:ASM)(FRANKFURT:GV6) ("Avino" or "the Company") is pleased to report that the dewatering operation of the Avino mine was completed as of May 28, 2014. This operation was initiated on November 24th, 2012 for a total of 482 days. During this period, a total of 1,013,069 cubic metres of acidic water were pumped and treated for the removal of base metals using lime. The treated water, which met agricultural standards for discharge was used for mill processes and the excess was gravity fed to the company built La Caricol dam; sludge from the water treatment was disposed of in the tailings storage facility.
"We are excited to be entering the final phase of our current expansion on time and on budget. The expansion will significantly increase our precious metal output starting in the fourth quarter. Avino will continue to grow rapidly and become a successful low-cost producer vaulting to mid-tier status in 2015."
- David Wolfin, President & CEO, Avino Silver & Gold Mines Ltd.
With the mine dewatering complete, rehabilitation work on the ramp and the mining area of level 11.5 has commenced. Broken mineralized material that was blasted and ready for haulage in 2001 have been identified. This material has been sampled and assayed in the mine laboratory to determine grade and will be hauled to the surface stockpiles if deemed viable for processing. Service piping for air and water, together with the electrical cables are being strung to prepare for mining.
A building to house a one Megawatt generator and air compressor has undergone the necessary repairs and is nearing completion. This equipment which is in stock has been ordered from Caterpillar/Maqsa using the credit facility. The equipment is now ready for installation upon the completion of the building repairs. The generator will supply underground power for the jumbo, ventilation fans and mine pumps. The air compressor will supply compressed air for the drills and the shotcrete machine for ground control.
A new jumbo and scoop for production mining are now on site and will be put into operation once all the services are in place.
Caterpillar/Maqsa who have been commissioned to construct the power line to supply power from the CFE grid to mill circuit 3 have advised us that they are on schedule to have grid power available by the fourth quarter of this year provided there are no delays in the permitting process or with the landowners affected by the power line. Ongoing discussions have been amicable.
In the process plant, efforts are underway to ensure all the long lead items will be delivered on time as per the supplier's schedule.
Crushing plant screens - June delivery
Mill clutch and starter - July delivery
40ft Thickener Mechanism - June delivery
Filter Press - equipment being packaged for delivery from Italy - August delivery
Based on the above delivery schedules, the Company is confident Circuit #3 will be ready as noted in our project schedule in the fourth quarter of this year.
Antwort auf Beitrag Nr.: 47.087.914 von Fantomas96 am 02.06.14 17:52:11Zum zweiten Chart meines vorherigen Beitrags (Exploration San Gonzalo) gab es heute eine Pressemitteilung:
Avino Provides Update on San Gonzalo Mine Level 6 Underground Development Results and 2014 Drill Program
http://www.juniorminingnetwork.com/junior-miner-news/news-re…
Man findet weitere Adern und startet ein Über- und Untertage-Bohrprogramm, um das San Gonzalo Förderpotenzial zu erweitern. Nicht schlecht, einige Samples. Mal sehen, was die Bohrergebnisse zeigen.
Avino Provides Update on San Gonzalo Mine Level 6 Underground Development Results and 2014 Drill Program
http://www.juniorminingnetwork.com/junior-miner-news/news-re…
Man findet weitere Adern und startet ein Über- und Untertage-Bohrprogramm, um das San Gonzalo Förderpotenzial zu erweitern. Nicht schlecht, einige Samples. Mal sehen, was die Bohrergebnisse zeigen.
Antwort auf Beitrag Nr.: 47.083.490 von Popeye82 am 02.06.14 00:35:40Nein, der Hauptanteil der Gesamtproduktion kommt aus der San Gonzalo Untertage-Produktion in einer 250tpd Anlage.
Die zweite 250tpd Anlage wird von den Avino Mine Tailings "gefüttert", bis die Entwässerung der Mine beendet ist.
Die zweite 250tpd Anlage wird von den Avino Mine Tailings "gefüttert", bis die Entwässerung der Mine beendet ist.
Antwort auf Beitrag Nr.: 47.078.622 von Fantomas96 am 31.05.14 08:17:27
Ich dachte es so verstanden zu haben, beziehungsweise dazu war ich mir genau nicht sicher dass die jetzt bestehende 500tpd Förderung aus den Tailings kommt?
Gruß
P.
Zitat von Fantomas96: - wie sieht das mit den Tailings aus -das sind ja quasi die 500tpd??
Müsste man natürlich berücksichtigen.
Neben einigem anderen.
Verstehe ich nicht. Was haben die Tailings mit 500tpd zu tun ?
Ich dachte es so verstanden zu haben, beziehungsweise dazu war ich mir genau nicht sicher dass die jetzt bestehende 500tpd Förderung aus den Tailings kommt?
Gruß
P.
Zitat von Popeye82: Ich habe mal einige naive Anfängerfragen.
- sind die Erweiterungsarbeiten schon, vollständig, bezahlt?
Nein, glaube ich nicht. Aber finanziert durch das letzte PP
Und wenn nicht, wieviel ist etwas noch zu leisten?
Keine Ahnung
- muss Avino, nach der Erweiterung, Kredite bedienen(glaube, soweit ich es sehe, nur die Kreditzusage?)?
Haben nur ne Kreditaufnahme von Caterpillar für Minengeräte über $5 Mio.
- wie sieht das mit den Tailings aus -das sind ja quasi die 500tpd??
Müsste man natürlich berücksichtigen.
Neben einigem anderen.
Verstehe ich nicht. Was haben die Tailings mit 500tpd zu tun ?
Und sollte San Gonzalo relativ durchgehend, bis zum Ende, 500tpd hergeben?
wird ja noch weiter exploriert, von daher ???
- wenn die Erweiterung abgeschlossen ist, kann man dann -einigermassen berechtigterweise- ein (mindestens)ähnliches Kostenniveau erwarten?
habe leider keine Glaskugel.
- wenn der Ausbau abgeschlossen ist, dürfte ja wahrscheinlich in andere/"neue" Projekte investiert werden.
Lassen sich da irgendwelche groben Kalkulationen machen in welchem Masse das den Cashflow beeinflussen würde?
lass die erst mal die 1000tpd an den Start bringen und wieder von der Avino Mine fördern. Danach dann vielleicht die Tailings Förderung....
und daaaaannnn sehen wir weiter
Grundsätzliche Einschätzung, bisher: das sieht, (vor allem)unter einer Cashflow Perpektive, erstmal interessant aus.
Gefällt mir, auf Basis der Presentation, erstmal ganz gut.
Gruß
P.
Antwort auf Beitrag Nr.: 47.066.176 von Fantomas96 am 29.05.14 07:56:51
Ich habe mal einige naive Anfängerfragen.
- sind die Erweiterungsarbeiten schon, vollständig, bezahlt?
Und wenn nicht, wieviel ist etwas noch zu leisten?
- muss Avino, nach der Erweiterung, Kredite bedienen(glaube, soweit ich es sehe, nur die Kreditzusage?)?
- wie sieht das mit den Tailings aus -das sind ja quasi die 500tpd??
Müsste man natürlich berücksichtigen.
Neben einigem anderen.
Und sollte San Gonzalo relativ durchgehend, bis zum Ende, 500tpd hergeben?
- wenn die Erweiterung abgeschlossen ist, kann man dann -einigermassen berechtigterweise- ein (mindestens)ähnliches Kostenniveau erwarten?
- wenn der Ausbau abgeschlossen ist, dürfte ja wahrscheinlich in andere/"neue" Projekte investiert werden.
Lassen sich da irgendwelche groben Kalkulationen machen in welchem Masse das den Cashflow beeinflussen würde?
Grundsätzliche Einschätzung, bisher: das sieht, (vor allem)unter einer Cashflow Perpektive, erstmal interessant aus.
Gefällt mir, auf Basis der Presentation, erstmal ganz gut.
Gruß
P.
Ich habe mal einige naive Anfängerfragen.
- sind die Erweiterungsarbeiten schon, vollständig, bezahlt?
Und wenn nicht, wieviel ist etwas noch zu leisten?
- muss Avino, nach der Erweiterung, Kredite bedienen(glaube, soweit ich es sehe, nur die Kreditzusage?)?
- wie sieht das mit den Tailings aus -das sind ja quasi die 500tpd??
Müsste man natürlich berücksichtigen.
Neben einigem anderen.
Und sollte San Gonzalo relativ durchgehend, bis zum Ende, 500tpd hergeben?
- wenn die Erweiterung abgeschlossen ist, kann man dann -einigermassen berechtigterweise- ein (mindestens)ähnliches Kostenniveau erwarten?
- wenn der Ausbau abgeschlossen ist, dürfte ja wahrscheinlich in andere/"neue" Projekte investiert werden.
Lassen sich da irgendwelche groben Kalkulationen machen in welchem Masse das den Cashflow beeinflussen würde?
Grundsätzliche Einschätzung, bisher: das sieht, (vor allem)unter einer Cashflow Perpektive, erstmal interessant aus.
Gefällt mir, auf Basis der Presentation, erstmal ganz gut.
Gruß
P.
`Avino Silver´(ASM.V) besser als `Mines Management´(MGN)?