*** News*** Tournigan Gold. - 500 Beiträge pro Seite
eröffnet am 21.02.08 14:38:46 von
neuester Beitrag 21.02.08 15:12:57 von
neuester Beitrag 21.02.08 15:12:57 von
Beiträge: 2
ID: 1.138.775
ID: 1.138.775
Aufrufe heute: 0
Gesamt: 707
Gesamt: 707
Aktive User: 0
Top-Diskussionen
Titel | letzter Beitrag | Aufrufe |
---|---|---|
vor 50 Minuten | 4842 | |
heute 09:37 | 2677 | |
vor 1 Stunde | 2002 | |
08.05.24, 11:56 | 1504 | |
vor 1 Stunde | 1087 | |
vor 37 Minuten | 1035 | |
vor 32 Minuten | 903 | |
gestern 20:31 | 863 |
Meistdiskutierte Wertpapiere
Platz | vorher | Wertpapier | Kurs | Perf. % | Anzahl | ||
---|---|---|---|---|---|---|---|
1. | 2. | 18.729,43 | -0,24 | 138 | |||
2. | 1. | 0,1995 | -8,06 | 70 | |||
3. | 8. | 11,000 | +6,38 | 45 | |||
4. | 3. | 157,36 | +0,58 | 33 | |||
5. | 5. | 2,3615 | -0,44 | 28 | |||
6. | 6. | 0,2880 | -3,36 | 21 | |||
7. | 11. | 6,8420 | +0,62 | 19 | |||
8. | 26. | 2,8855 | +6,63 | 16 |
SOURCE: Tournigan Gold Corporation
Feb 21, 2008 08:00 ET
Kuriskova Infill Drilling Returns More High Grade Uranium
VANCOUVER, BC--(Marketwire - February 21, 2008) - Tournigan Gold Corporation (TSX-V: TVC) (FRANKFURT: TGP) today reported results from its 10,129 metre, 30-hole, 2007 infill drilling program at the Kuriskova uranium deposit in Eastern Slovakia. The company continues to intercept significant thicknesses and uranium grades on the deposit.
Highlights include:
KG-J-19A with 8.9 metres of 0.411 %eU308
KG-J-21A with 8.4 metres of 0.762 %eU308
KG-J-21D with 5.5 metres of 0.509 %eU308
KG-J-24B with 2.4 metres of 0.649 %eU308
KG-J-25A with 5.7 metres of 0.525 %eU308
KG-J-28B with 4.2 metres of 0.593 %eU308
More details of the 30 hole program are listed below.
"This drill campaign has raised our level of confidence and understanding of the deposit," said Tournigan President, James Walchuck. "The 2007 work was primarily infill drilling and the results have confirmed the geological and mineralization continuity of the main zone and hanging wall zone. These results are in line with previous drilling and support our belief that Kuriskova is a word-class deposit."
The drill results reported below are from 30 infill and exploratory drill holes the company drilled during 2007. Five of the holes did not encounter mineralization yet provided valuable geological and structural information for the project; two of the holes were lost and one is being continued in the next phase of the program.
Tournigan has 1,938 core samples at the SGS Group labs in Toronto awaiting chemical analysis. Another 402 samples are ready for dispatch from the project site.
-***-
------------------------------------------------------------------------
Hole From To Length %eU3 O8
------------------------------------------------------------------------
KG-J-19A 232.1 241.0 8.9 0.411
------------------------------------------------------------------------
KG-J-19B 216.4 217.9 1.5 0.149
------------------------------------------------------------------------
KG-J-21A 312.3 330.1 17.8 0.403
------------------------------------------------------------------------
Including 315.6 324.0 8.4 0.7621
------------------------------------------------------------------------
KG-J-21B 246.0 246.5 0.5 0.570
------------------------------------------------------------------------
KG-J-21C 289.9 291.0 1.1 0.103
------------------------------------------------------------------------
KG-J-21D 305.4 310.9 5.5 0.509
------------------------------------------------------------------------
KG-J-24A 292.6 293.7 1.1 0.124
------------------------------------------------------------------------
KG-J-24B 346.1 352.9 6.8 0.268
------------------------------------------------------------------------
Including 346.1 348.5 2.4 0.649
------------------------------------------------------------------------
KG-J-25A 301.6 307.3 5.7 0.525
------------------------------------------------------------------------
KG-J-25B 268.9 269.8 0.9 0.120
------------------------------------------------------------------------
KG-J-25C 316.6 320.0 3.4 0.386
------------------------------------------------------------------------
KG-J-26A 264.1 266.2 2.1 0.111
------------------------------------------------------------------------
KG-J-26B 219.4 220.4 1.0 0.178
------------------------------------------------------------------------
KG-J-26C 193.6 194.3 0.7 0.304
------------------------------------------------------------------------
KG-J-27A 286.3 287.8 1.5 0.047
------------------------------------------------------------------------
KG-J-27B 352.4 353.4 1.0 0.070
------------------------------------------------------------------------
KG-J-28A 335.0 337.5 2.5 0.147
------------------------------------------------------------------------
KG-J-28B 263.7 271.7 8.0 0.420
------------------------------------------------------------------------
Including 267.5 271.7 4.2 0.593
------------------------------------------------------------------------
KG-J-28C 248.7 254.2 5.5 0.251
------------------------------------------------------------------------
KG-J-30B 588.2 591.6 3.4 0.190
------------------------------------------------------------------------
KG-J-31A 383.2 385.2 2.0 0.135
------------------------------------------------------------------------
KG-J-31B 413.1 415.2 2.1 0.302
------------------------------------------------------------------------
KG-J-20A Mineralized (Instrument failure. Awaiting geochemical assays.)
------------------------------------------------------------------------
KG-J-20B No significant intersection
------------------------------------------------------------------------
KG-J-22A No significant intersection
------------------------------------------------------------------------
KG-J-23A No significant intersection
------------------------------------------------------------------------
KG-J-29A Abandoned
------------------------------------------------------------------------
KG-J-29B Drilling continues next phase
------------------------------------------------------------------------
KG-J-30A Abandoned
------------------------------------------------------------------------
KG-J-32A Main zone pinched
------------------------------------------------------------------------
-****-
A complete listing of all main zone intersections from the 2007 drill program may be found in Appendix A or by visiting Tournigan's website, http://www.tournigan.com/i/pdf/KuriskovaGammaAppendix_A.pdf.
A longitudinal projection showing the drill hole locations is also available from the website, http://www.tournigan.com/i/pdf/TVC-KU-v0802-01-Sec-VV.pdf.
The uranium grades referred to above are reported as equivalent uranium (eU3O8) as determined by downhole radiometric logging equipment. The logging was performed by Koral, s.r.o. of Slovakia. Quality control and quality assurance is being provided by Ravi Sharma, Tournigan's Manager Resources and Reserves.
In December 2007, ACA Howe provided an NI 43-101 resource estimate of the Kuriskova deposit that reported an inferred resource of 36.3 million pounds U308 at an average grade of 0.323% contained in 5.1 million tonnes at a cut-off grade of 0.035% U3O8. In the high grade main zone the estimate identified 30.9 million pounds U308 at an average grade of 0.421% contained in 3.3 million tonnes. The resource estimate included results from 10 of 13 diamond drill holes drilled by Tournigan at the Kuriskova deposit in 2006, three diamond holes drilled by Tournigan in late 2005, and 13 relevant holes of the 52 historical diamond drill holes drilled by previous government operators. The hole spacing for the inferred resource ranged between 40 to 150 metre centres.
The chemical assays from the 2007 program will be used for a new NI 43-101 resource estimate expected mid-2008. Tournigan anticipates the next estimate will upgrade a significant portion of the deposit to the indicated resource classification. Tournigan also continues its 2008 infill drilling program at Kuriskova where the company has planned more than 9,000 metres of core diamond drilling.
Appointment of Vice President, Sustainable Development
Tournigan is pleased to announce the appointment of Joseph Ringwald, P.Eng. as the company's Vice President, Sustainable Development. Mr. Ringwald will be responsible for Tournigan's sustainability initiatives, corporate social responsibility and community engagement programs throughout the exploration, feasibility, construction and production stages of the company's projects.
Joseph Ringwald P. Eng., Tournigan's VP Sustainable Development is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical disclosure contained herein.
About Tournigan
Tournigan has built a portfolio of highly prospective uranium and gold properties in both Europe and North America. Tournigan is a mineral resource company with a focus on developing its best projects. Tournigan has obtained licenses in countries that are economically and politically stable, have good infrastructure, and a highly educated population.
On behalf of the Board of Directors of
Feb 21, 2008 08:00 ET
Kuriskova Infill Drilling Returns More High Grade Uranium
VANCOUVER, BC--(Marketwire - February 21, 2008) - Tournigan Gold Corporation (TSX-V: TVC) (FRANKFURT: TGP) today reported results from its 10,129 metre, 30-hole, 2007 infill drilling program at the Kuriskova uranium deposit in Eastern Slovakia. The company continues to intercept significant thicknesses and uranium grades on the deposit.
Highlights include:
KG-J-19A with 8.9 metres of 0.411 %eU308
KG-J-21A with 8.4 metres of 0.762 %eU308
KG-J-21D with 5.5 metres of 0.509 %eU308
KG-J-24B with 2.4 metres of 0.649 %eU308
KG-J-25A with 5.7 metres of 0.525 %eU308
KG-J-28B with 4.2 metres of 0.593 %eU308
More details of the 30 hole program are listed below.
"This drill campaign has raised our level of confidence and understanding of the deposit," said Tournigan President, James Walchuck. "The 2007 work was primarily infill drilling and the results have confirmed the geological and mineralization continuity of the main zone and hanging wall zone. These results are in line with previous drilling and support our belief that Kuriskova is a word-class deposit."
The drill results reported below are from 30 infill and exploratory drill holes the company drilled during 2007. Five of the holes did not encounter mineralization yet provided valuable geological and structural information for the project; two of the holes were lost and one is being continued in the next phase of the program.
Tournigan has 1,938 core samples at the SGS Group labs in Toronto awaiting chemical analysis. Another 402 samples are ready for dispatch from the project site.
-***-
------------------------------------------------------------------------
Hole From To Length %eU3 O8
------------------------------------------------------------------------
KG-J-19A 232.1 241.0 8.9 0.411
------------------------------------------------------------------------
KG-J-19B 216.4 217.9 1.5 0.149
------------------------------------------------------------------------
KG-J-21A 312.3 330.1 17.8 0.403
------------------------------------------------------------------------
Including 315.6 324.0 8.4 0.7621
------------------------------------------------------------------------
KG-J-21B 246.0 246.5 0.5 0.570
------------------------------------------------------------------------
KG-J-21C 289.9 291.0 1.1 0.103
------------------------------------------------------------------------
KG-J-21D 305.4 310.9 5.5 0.509
------------------------------------------------------------------------
KG-J-24A 292.6 293.7 1.1 0.124
------------------------------------------------------------------------
KG-J-24B 346.1 352.9 6.8 0.268
------------------------------------------------------------------------
Including 346.1 348.5 2.4 0.649
------------------------------------------------------------------------
KG-J-25A 301.6 307.3 5.7 0.525
------------------------------------------------------------------------
KG-J-25B 268.9 269.8 0.9 0.120
------------------------------------------------------------------------
KG-J-25C 316.6 320.0 3.4 0.386
------------------------------------------------------------------------
KG-J-26A 264.1 266.2 2.1 0.111
------------------------------------------------------------------------
KG-J-26B 219.4 220.4 1.0 0.178
------------------------------------------------------------------------
KG-J-26C 193.6 194.3 0.7 0.304
------------------------------------------------------------------------
KG-J-27A 286.3 287.8 1.5 0.047
------------------------------------------------------------------------
KG-J-27B 352.4 353.4 1.0 0.070
------------------------------------------------------------------------
KG-J-28A 335.0 337.5 2.5 0.147
------------------------------------------------------------------------
KG-J-28B 263.7 271.7 8.0 0.420
------------------------------------------------------------------------
Including 267.5 271.7 4.2 0.593
------------------------------------------------------------------------
KG-J-28C 248.7 254.2 5.5 0.251
------------------------------------------------------------------------
KG-J-30B 588.2 591.6 3.4 0.190
------------------------------------------------------------------------
KG-J-31A 383.2 385.2 2.0 0.135
------------------------------------------------------------------------
KG-J-31B 413.1 415.2 2.1 0.302
------------------------------------------------------------------------
KG-J-20A Mineralized (Instrument failure. Awaiting geochemical assays.)
------------------------------------------------------------------------
KG-J-20B No significant intersection
------------------------------------------------------------------------
KG-J-22A No significant intersection
------------------------------------------------------------------------
KG-J-23A No significant intersection
------------------------------------------------------------------------
KG-J-29A Abandoned
------------------------------------------------------------------------
KG-J-29B Drilling continues next phase
------------------------------------------------------------------------
KG-J-30A Abandoned
------------------------------------------------------------------------
KG-J-32A Main zone pinched
------------------------------------------------------------------------
-****-
A complete listing of all main zone intersections from the 2007 drill program may be found in Appendix A or by visiting Tournigan's website, http://www.tournigan.com/i/pdf/KuriskovaGammaAppendix_A.pdf.
A longitudinal projection showing the drill hole locations is also available from the website, http://www.tournigan.com/i/pdf/TVC-KU-v0802-01-Sec-VV.pdf.
The uranium grades referred to above are reported as equivalent uranium (eU3O8) as determined by downhole radiometric logging equipment. The logging was performed by Koral, s.r.o. of Slovakia. Quality control and quality assurance is being provided by Ravi Sharma, Tournigan's Manager Resources and Reserves.
In December 2007, ACA Howe provided an NI 43-101 resource estimate of the Kuriskova deposit that reported an inferred resource of 36.3 million pounds U308 at an average grade of 0.323% contained in 5.1 million tonnes at a cut-off grade of 0.035% U3O8. In the high grade main zone the estimate identified 30.9 million pounds U308 at an average grade of 0.421% contained in 3.3 million tonnes. The resource estimate included results from 10 of 13 diamond drill holes drilled by Tournigan at the Kuriskova deposit in 2006, three diamond holes drilled by Tournigan in late 2005, and 13 relevant holes of the 52 historical diamond drill holes drilled by previous government operators. The hole spacing for the inferred resource ranged between 40 to 150 metre centres.
The chemical assays from the 2007 program will be used for a new NI 43-101 resource estimate expected mid-2008. Tournigan anticipates the next estimate will upgrade a significant portion of the deposit to the indicated resource classification. Tournigan also continues its 2008 infill drilling program at Kuriskova where the company has planned more than 9,000 metres of core diamond drilling.
Appointment of Vice President, Sustainable Development
Tournigan is pleased to announce the appointment of Joseph Ringwald, P.Eng. as the company's Vice President, Sustainable Development. Mr. Ringwald will be responsible for Tournigan's sustainability initiatives, corporate social responsibility and community engagement programs throughout the exploration, feasibility, construction and production stages of the company's projects.
Joseph Ringwald P. Eng., Tournigan's VP Sustainable Development is a Qualified Person as defined by National Instrument 43-101 and has reviewed and approved the technical disclosure contained herein.
About Tournigan
Tournigan has built a portfolio of highly prospective uranium and gold properties in both Europe and North America. Tournigan is a mineral resource company with a focus on developing its best projects. Tournigan has obtained licenses in countries that are economically and politically stable, have good infrastructure, and a highly educated population.
On behalf of the Board of Directors of
sehr gut!!!!!!!!!!
Beitrag zu dieser Diskussion schreiben
Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie eine neue Diskussion.
Meistdiskutiert
Wertpapier | Beiträge | |
---|---|---|
139 | ||
63 | ||
42 | ||
26 | ||
25 | ||
21 | ||
20 | ||
17 | ||
13 | ||
12 |
Wertpapier | Beiträge | |
---|---|---|
11 | ||
10 | ||
9 | ||
9 | ||
9 | ||
9 | ||
9 | ||
8 | ||
8 | ||
7 |