checkAd

    Tellurian (Seite 6)

    eröffnet am 19.05.17 09:38:44 von
    neuester Beitrag 15.02.24 23:32:31 von
    Beiträge: 55
    ID: 1.253.300
    Aufrufe heute: 1
    Gesamt: 5.591
    Aktive User: 0

    ISIN: US87968A1043 · WKN: A2DLW2 · Symbol: MPLN
    0,5100
     
    EUR
    -6,39 %
    -0,0348 EUR
    Letzter Kurs 17:18:29 Tradegate

    Werte aus der Branche Öl/Gas

    WertpapierKursPerf. %
    1,9500+1.287,90
    0,9899+1.237,70
    12,000+71,43
    42,62+20,82
    0,7800+11,43

    Beitrag zu dieser Diskussion schreiben

     Durchsuchen
    • 1
    • 6

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 20.08.19 15:57:43
      Beitrag Nr. 5 ()
      Antwort auf Beitrag Nr.: 58.953.312 von R-BgO am 14.10.18 09:09:56
      Tellurian | 6,900 $
      Avatar
      schrieb am 14.10.18 09:09:56
      Beitrag Nr. 4 ()
      weiter i.W. pre-revenue
      1 Antwort
      Avatar
      schrieb am 14.11.17 12:18:31
      Beitrag Nr. 3 ()
      Antwort auf Beitrag Nr.: 54.976.997 von R-BgO am 19.05.17 09:39:42Tellurian in $15.2 billion deal with Bechtel to deliver US Driftwood LNG export project

      US LNG export project developer, Tellurian and engineering giant Bechtel have signed four deals totaling $15.2 billion for the engineering, procurement and construction (EPC) of the proposed Driftwood LNG project near Lake Charles, Louisiana.

      The project includes 20 liquefaction units, each having an expected production capacity of 1.38 million tons per year of LNG and three 235,000 cubic meter storage tanks as well as three marine loading berths.

      Driftwood LNG will be constructed in four phases, with each phase beginning operations on a staggered basis, Tellurian said in a statement on Monday.

      The first phase will have an 11 mtpa production capacity from eight units together with storage tanks one and two and the first loading berth.

      The subsequent three phases to be developed will each bring an additional 5.5 mtpa of production capacity from four units, with loading berths two and three to be constructed in the second and third phase. The remaining storage tank is planned to be developed during the third phase.

      Speaking of the agreements Tellurian president and CEO, Meg Gentle said, “the agreements with Bechtel guarantee performance and secure the EPC cost of Driftwood LNG at $550 per tonne, one of the lowest-cost liquefaction construction projects worldwide.”

      Execution of the lump sum, turnkey EPC agreements concludes 18 months of open collaboration among Bechtel, Chart Industries, GE and Tellurian, Gentle said.

      Tellurian, the company founded by Charif Souki and Martin Houston, is developing a portfolio of natural gas production, LNG trading and infrastructure that includes the 27 mtpa LNG export facility and an associated pipeline
      Avatar
      schrieb am 19.05.17 09:39:42
      Beitrag Nr. 2 ()
      Antwort auf Beitrag Nr.: 54.976.979 von R-BgO am 19.05.17 09:38:44hierüber drauf gekommen:

      Tellurian cancels share sale

      Tellurian, the company developing the 26-mtpa Driftwood LNG export facility, and an associated pipeline canceled its plans to sell company shares.

      The cancellation comes only a day after the company revealed its plans to sell 10 million company shares.

      “Due to the current market environment and in the interest of achieving the best value for our stockholders, we have decided to withdraw our recently announced public offering of common stock,” Meg Gentle, CEO of Tellurian said.

      Tellurian was formed through a merger between Magellan Petroleum, an independent oil and gas exploration and production company and Tellurian Investments formed in February 2016, by Charif Souki, former founder and CEO of LNG export player Cheniere Energy and Martin Houston, former COO of BG Group, now owned by Shell.

      Tellurian’s two units Driftwood LNG and Driftwood Pipeline have completed the pre-filing phase in April and submitted a formal application with the Federal Energy Regulatory Commission to construct and operate an LNG export facility and a 96-mile pipeline connecting the facility to interstate pipelines.

      First LNG is expected to be produced from Driftwood LNG in 2022.
      1 Antwort
      Avatar
      schrieb am 19.05.17 09:38:44
      Beitrag Nr. 1 ()
      entwickelt das 26 Mtpa-LNG Projekt Driftwood
      2 Antworten
      • 1
      • 6
       DurchsuchenBeitrag schreiben


      Investoren beobachten auch:

      WertpapierPerf. %
      -1,71
      +0,82
      -0,18
      -0,16
      -1,45
      -0,96
      +3,84
      -1,89
      -1,18
      -0,31

      Meistdiskutiert

      WertpapierBeiträge
      99
      53
      52
      42
      29
      28
      28
      26
      23
      21
      Tellurian