checkAd

    Doug Casey empfiehlt Andina Minerals 6,62 Millionen Goldunzen - 500 Beiträge pro Seite

    eröffnet am 17.02.09 14:37:18 von
    neuester Beitrag 13.11.12 18:11:25 von
    Beiträge: 149
    ID: 1.148.384
    Aufrufe heute: 0
    Gesamt: 20.165
    Aktive User: 0


     Durchsuchen

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 17.02.09 14:37:18
      Beitrag Nr. 1 ()
      Andina Minerals ist ein Explorationsunternehmen aus Kanada, das ein Portfolio aus 5 Edelmetallprojekten in Chile besitzt. Hierbei ist vor allem ihr Hauptprojekt Volcan Gold Projekt zu nennen. Es befindet sich in einem fortgeschrittenem Stadium und umfasst Ressourcen von 6,62 Mio. Goldunzen in der Kategorie Measured and Indicated. Das Vorkommen ist offen in allen Richtungen, und umfasst noch ein enormes Explorationspotenzial. (less than 10% of property drilled to date). Zwar sind es low-grade Ressourcen, aber wirtschaftlich abbaubar, da cut-off bei 0,5 g/t Au liegt. Ausserdem ist Andina Minerals auch ein Uebernahmekandidat, da Kinross mit Ihrem Maricunga Projekt in der Nähe ist. Das Projekt von Kinross umfasst 6,4 Mio Unzen mit jeweils 0,72 g/t Au . Also braucht sich Andina Minerals nicht zu verstecken. Denn das Volcan Projekt hat im Vergleich wie oben erwähnt 6,2 Mio Unzen mit jeweils 0,85 g/t Au .

      Die Dilution liegt bei 88 Mio shares. Cash ca. 15 Mio$ Stand:31.12.2008. Enterprise Value = 8$/oz.

      Freue mich auf eine rege Diskussion.
      Avatar
      schrieb am 17.02.09 19:13:20
      Beitrag Nr. 2 ()
      Antwort auf Beitrag Nr.: 36.594.138 von Hoschie am 17.02.09 14:37:18Schön, habe die Aktie seit ein paar Monaten;)
      Avatar
      schrieb am 17.02.09 20:01:41
      Beitrag Nr. 3 ()
      Antwort auf Beitrag Nr.: 36.597.175 von MrRipley am 17.02.09 19:13:20Der Wert ist noch nicht teuer,und ein paar shares im Depot sind ja nicht schlecht.

      There are plenty of bargains to be found, according to analysts at Canaccord Adams.

      The brokerage has compiled a list of some of the top takeout candidates and is also speculating on who
      might be doing the buying:


      - Andina Minerals

      - Detour Gold

      - Premier Gold Mines

      - Yamana Gold Inc.

      - Hathor Exploration Limited
      Avatar
      schrieb am 23.02.09 17:48:54
      Beitrag Nr. 4 ()
      Antwort auf Beitrag Nr.: 36.597.589 von Hoschie am 17.02.09 20:01:41Wer zum Henker soll Doug Casey sein?
      Avatar
      schrieb am 23.02.09 17:49:40
      Beitrag Nr. 5 ()
      Antwort auf Beitrag Nr.: 36.635.624 von KaOzz am 23.02.09 17:48:54ist für die Insider;)

      Trading Spotlight

      Anzeige
      JanOne
      3,9700EUR +3,66 %
      Heftige Kursexplosion am Montag?!mehr zur Aktie »
      Avatar
      schrieb am 23.02.09 18:09:45
      Beitrag Nr. 6 ()
      Antwort auf Beitrag Nr.: 36.635.631 von MrRipley am 23.02.09 17:49:40Von mir aus kannst Du mir genauere Insider-Infos später per Boardmail schicken :p
      Avatar
      schrieb am 20.03.09 08:50:42
      Beitrag Nr. 7 ()
      Butler von Canaccord hat das Kursziel richtig hochgesetzt.
      Andina wird eine von 10 Companies die es in diesem Bereich packen!
      Canaccord ist Hauptbroker und wird dafür sorgen!
      Avatar
      schrieb am 20.03.09 20:37:53
      Beitrag Nr. 8 ()
      Antwort auf Beitrag Nr.: 36.808.662 von viena am 20.03.09 08:50:42Andina hat ja auch genug Cash, das war mir damals aufgefallen;)
      Avatar
      schrieb am 24.04.09 15:26:37
      Beitrag Nr. 9 ()
      2009-04-23 19:23 ET - In the News


      The International Speculatorin its April 1, 2009, issue refreshes its buy of Andina Minerals Inc.at $1.70, officially, "Watch for PP/Try stink bids." The newslettersaid buy on June 2, 2008, at $3.94, and on Dec. 3, 2008, at 74 cents.An investment of $1,000 for the two buys is well in the money at$2,701. The Speculator's writer begins by noting that Andina isdeveloping the Volcan gold project inChile's Maricunga copper-gold belt. The press releases tell him Andinahas hired MiconInternational as lead consultant for the company's preliminaryeconomic assessment work. He says the Micon move shows the company ismoving firmlyin the direction it needs to take to add shareholder value.The writer speaks highly of George Bee, Andina'snew chief executive officer, whom he sees as providing a "strong hand."Plus, the company's other recent appointments further point to Volcan'seventual development. He says Andina is nowone of the cheaper monster gold projects out there. However, becausethere has been such a painfully long period of transitionfrom pure exploration to mine development, Andina isalso highly vulnerable to the downside should there be anothercorrection in resources.
      Avatar
      schrieb am 24.04.09 15:27:52
      Beitrag Nr. 10 ()
      Andina wird die 2 Euro noch in diesem Jahr erreichen!
      Die sind einfach gut.
      Avatar
      schrieb am 28.04.09 00:32:12
      Beitrag Nr. 11 ()
      Antwort auf Beitrag Nr.: 37.035.666 von viena am 24.04.09 15:27:52Die 6 Mio Unzen erregen auf jeden Fall meine Aufmerksamkeit :D:eek:

      Wie kommst Du auf die 2 EUR für dieses Jahr?

      Die 2 CAD könnt ich mir vorstellen



      ANDINA Minerals Inc. Share Structure (as of April 30, 2008)
      Cusip: 034219105
      Common Shares Outstanding 79,366,907
      Warrants - $3.00 (expiry August 2009) 182,400
      Warrants - $4.00 (expiry August 2009) 3,768,700
      Options – (range $0.70 to $4.50) 4,194,000
      Fully Diluted 87,512,007


      Gruß
      Avatar
      schrieb am 05.05.09 19:20:11
      Beitrag Nr. 12 ()
      sieht heute gut aus in Can. 1,41CAD sind schonmal knapp 0,90EUR.
      Bald sollte bei uns wieder die 1 vor dem Komma stehen.
      Avatar
      schrieb am 26.05.09 12:57:12
      Beitrag Nr. 13 ()
      Andina Reports 2009 Volcan Drill Results; Provides Water and Sulphur Exploration Update

      8:33 PM ET, May 25, 2009

      TORONTO, ONTARIO, May 25, 2009 (Marketwire via COMTEX) -- ANDINA Minerals Inc. (ADM) ("Andina") today announced the results of its limited 2009 Volcan drill program totalling approximately 6,000 metres, which concluded at the end of April. Analysis of these results is ongoing in preparation for release of a resource update under the direction of Micon International Ltd., expected in the latter half of July 2009.

      "While the final effect of the new drill information is not currently available pending the resource update, it is very encouraging that in Dorado East and West we are encountering higher grade mineralization close to surface, which we believe will have a positive impact on the early stages of the conceptual mine plan," said George Bee, President & CEO.

      Volcan Drill Results

      The 2009 program included a total of approximately 3,900 metres of diamond drilling and 2200 metres of reverse circulation (RC) drilling in Dorado West, Central and East deposits. The focus of the program was on in-fill drilling to lend confidence to the Company's understanding of the Volcan resource ahead of the preparation of the Conceptual Development Plan. The latter holes in the program also had the purpose of providing fresh samples for the second phase of metallurgical testing. Currently all assays have been received from the 2009 drill program and the customary QA/QC checks are being scrutinized prior to entry into the database. The following table provides a breakdown of the drilling in the various Dorado deposits.



      -----------------------------------------------------------
      Table 1: Dorado Metres Drilled Breakdown - May 2009
      -----------------------------------------------------------
      Drilling Dorado West Dorado Central Dorado East
      -----------------------------------------------------------
      Diamond Drilling (m) 1955.15 1372.4 534.30
      -----------------------------------------------------------
      RC Drilling (m) 2200.0
      -----------------------------------------------------------
      Total Drilling (m) 4155.15 1372.4 534.30
      -----------------------------------------------------------





      Table 2 summarizes the significant drill intercepts for each of the three areas of mineralization. To access a map showing drill hole locations, click here.



      ---------------------------------------------------------
      Table 2: Dorado Area Drill Assay Results - May 2009
      ---------------------------------------------------------
      Drill Hole Dorado From To (metres) Length Grade
      Deposit (metres) (metres) (Au g/t)
      ---------------------------------------------------------
      DEA788 East 0 158 158 1.40(i)
      ---------------------------------------------------------
      DEA 789 East 96 190 94 1.10
      ---------------------------------------------------------
      DCA 785 Central 34 104 70 1.10
      178 200 22 1.22
      ---------------------------------------------------------
      DCA 786 Central 10 166 156 0.86
      ---------------------------------------------------------
      DOA 776 West 0 156 156 0.93(i)
      644 730 86 1.41
      ---------------------------------------------------------
      DOA 779 West 120 278 158 0.55
      328 408 80 0.96
      ---------------------------------------------------------
      (i) These intercepts show grades better than average
      resource grade from surface.





      Water Resource Development Program

      A series of eight exploratory water wells targeting underground aquifers were drilled in the Rio Astaburuaga water exploration concession, which was granted to Andina by the Chilean water authority (DGA or Direccion National de Aguas). All of the eight wells encountered water; three of the more promising wells were re-drilled to a larger diameter and pump tests were conducted. The results of two of the holes suggests that the wells tap into a structurally-fed water resource that will support a limited but consistent water supply as follows:



      ---------------------------------------------------------------
      Table 3: Rio Astaburuaga Water Exploration Results - May 2009
      ---------------------------------------------------------------
      Well Well Depth Water Depth Max. Flow Rate
      (metres) (metres - from (litres/sec)
      surface)
      ---------------------------------------------------------------
      PB 2 150 2.36 18.0
      ---------------------------------------------------------------
      PB 3 150 0.86 21.0
      ---------------------------------------------------------------





      While the flow rates were relatively modest, Andina will continue with the process to secure the water rights since management expects that once the system is fully drilled off and provided that Andina is awarded the rights, it should be accretive to the Company. Andina already holds sufficient water rights to develop the Volcan project but the Astaburuaga water would be of strategic value as the company continues with its exploration and resource development program building on the Volcan gold discovery.

      Sulphur Resource Update

      In November 2008, the Company announced positive sulphur metallurgical and channel sampling results from the Cerro Azufre sulphur deposit as well as the intention to perform limited drilling and collect samples for further metallurgical tests in order to better determine the potential of this deposit. While Andina's primary focus remained on the Volcan gold resources, sulphur represented an additional opportunity for the Company and accordingly a limited sulphur exploration program was undertaken as part of the 2009 drilling season.

      The limited exploration program did not produce any material results; however, it will assist with understanding this important resource. The 2009 program included developing better road access to the sulphur deposit and drilling three RC holes. While the results of surface mapping along the drill roads were in line with historic grades of up to 40% sulphur, the drilling methodology did not prove optimal for properly ascertaining the true nature and extent of the deposit.

      While current markets for sulphur are depressed, this provides Andina with the opportunity to better assess the economic viability of the deposit prior to the next upturn in sulphuric acid prices. During the upcoming field season beginning this fall, Andina will review plans to complete additional drilling on the Cerro Azufre deposit using techniques that will better preserve the sulphur in the samples.

      National Instrument 43-101 Compliance

      Under NI 43-101 of the Canadian Securities Administrators, the qualified person for the Volcan Gold Project is Michael Easdon, a resident of Santiago, Chile. Mr. Easdon is a Professional Geologist registered with the State of Oregon, USA. The July 2008 resource estimate was prepared by Maptek Sudamerica, Vina del Mar, Chile in conjunction with Andina staff and Eduardo Magri, Ph.D. in mining engineering (Witwatersrand) and a fellow of the SAIMM with over 30 years of industry experience. Mr. Easdon is an independent qualified person as defined by NI 43-101 and has reviewed the contents of this press release. A NI 43-101 compliant technical report was prepared and can be found on SEDAR system (www.sedar.com)

      Quality Assurance / Quality Control Program

      Reverse circulation ("RC") chips and diamond drill core from Andina's Volcan Gold Project drilling campaign were collected at the drill under the direct supervision of Andina staff. Both the RC samples and drill core are appropriately tagged, secured and transported to the Andina exploration camp and then to Andina's secure sample logging and preparation site at Copiapo, Chile. RC chip samples were riffle split to obtain a 15 kilogram sample for assay purposes. Representative chips were collected from each sample for logging purposes. Drill core was logged, marked at two metre intervals for sampling and split longitudinally with a diamond drill saw. One half of the core was bagged and sample tags attached at the second half of the core was returned to the core boxes and stored in a secure storage facility. All samples were appropriately tagged and securely stored prior to shipping to Asesoria Minera Geoanalitica Ltda.'s ("Geoanalitica") laboratory in La Serena, Chile. Samples were processed and analyzed for gold using fire assay techniques with atomic absorption finish. Samples which returned gold values greater than 1.00 g/t Au were re-analyzed by Geoanalitica using fire assay techniques with a gravimetric finish. Duplicate samples were inserted at a rate of approximately 5% and standard samples inserted at a rate of approximately 5% within each sample batch to ensure laboratory quality control procedures. Duplicates, standards, and blanks amount to nearly 15% of the samples assayed. In addition, the laboratory re-analyzes approximately 10% of all samples.

      About Andina Minerals Inc.

      Andina's primary focus is mining exploration and development in Chile. The Company's flagship development project is the 100%-owned Volcan Gold Project, strategically located in the prolific Maricunga Gold Belt. In July 2008, Andina provided an updated resource estimate for Volcan, resulting in a 126% increase to measured and indicated resources to 6.62 million contained ounces of gold (241.7 million tonnes grading 0.85 grams per tonne gold ("g/t Au")) and inferred resources of 3.26 million ounces of gold (114.0 million tonnes grading 0.89 g/t Au) at a 0.5 g/t Au cut-off. Andina is progressing with a Conceptual Development Plan and a Preliminary Economic Assessment for Volcan, targeted for completion in Q4 2009.


      http://cxa.marketwatch.com/tsx/en/market/article.aspx?guid=h…
      Avatar
      schrieb am 26.05.09 14:41:45
      Beitrag Nr. 14 ()
      Immer den Loonie im Auge behalten :cool:


      Avatar
      schrieb am 16.06.09 20:37:00
      Beitrag Nr. 15 ()
      ANDINA Minerals Inc. today announced that it has completed the previously announced CDN$13,500,000 financing (press release dated May 26, 2009) consisting of 9,000,000 Andina common shares offered by way of a bought deal according to today’s Financing news found on the home page of www.stockresearchportal.com.
      Avatar
      schrieb am 17.06.09 15:13:59
      Beitrag Nr. 16 ()
      Antwort auf Beitrag Nr.: 37.405.671 von viena am 16.06.09 20:37:00Ein ambivalenter Bericht zur zukünftigen Situation auf dem Goldmarkt:

      Gold wird knapp

      Obwohl es den größten Goldproduzenten weltweit gelungen ist, fast das Doppelte der Reserven zu ersetzen, die durch Produktion zwischen 1999 und 2008 verbraucht wurden, ist die Geschwindigkeit, mit der die Branche insgesamt neue Lagerstätten auftut nicht ausreichen, den Bedarf auf lange Sicht zu befriedigen. Das erklärte die kanadische Metals Economics Group (MEG).

      (weiter: http://goldinvest.de/public/story_detail.asp?l=&c=10,20020&i… )
      Avatar
      schrieb am 17.06.09 15:16:06
      Beitrag Nr. 17 ()
      Bin mal auf das Resource-Update Ende Juli gespannt :D
      Avatar
      schrieb am 01.07.09 19:32:46
      Beitrag Nr. 18 ()
      Avatar
      schrieb am 06.07.09 23:36:36
      Beitrag Nr. 19 ()
      Antwort auf Beitrag Nr.: 37.502.739 von RTLOLDY am 01.07.09 19:32:46CAD $15,525,000
      Andina Minerals Inc.

      New Issue

      Clarus Securities Inc.
      Co-Manager


      Jun 2009


      Gehts auch noch ungenauer??? Da steht ja quasi gar nix genaues zu da. Wenn Du sowas postest, am besten als Filing... ansonsten wenigstens noch n paar Worte. Sowas kann man doch nicht ernst nehmen...


      Gruß


      ------




      Avatar
      schrieb am 08.07.09 15:14:09
      Beitrag Nr. 20 ()
      Andina Announces CFO Transition; Provides Annual Meeting Update

      8:50 AM ET, July 8, 2009

      TORONTO, ONTARIO, Jul 08, 2009 (MARKETWIRE via COMTEX) -- ANDINA Minerals Inc. (ADM) ("Andina") today announced that Thomas J. Pladsen is stepping down from the position of Chief Financial Officer and is being replaced by Keith D. McKay, who was previously Executive Vice President with Andina. Both changes became effective June 30, 2009.

      George Bee, President & CEO, said, "Since joining in 2005, Tom has made a significant contribution to Andina as the Company progressed from junior exploration to early stage development. We wish him all the best as he continues management roles with several other resource companies." Mr. Bee commented, "I anticipate a seamless transition for Keith since he has been working closely with our team for several months."

      Mr. McKay, Chief Financial Officer, joined Andina in March of this year as Executive Vice President. His considerable finance and management experience at development and operating stage mining companies will assist Andina in making a successful transition from exploration to development and then on to production. Most recently Mr. McKay came to Andina from Aurelian Resources Inc., where he was Vice President and Chief Financial Officer. For more details on Mr. McKay, including other management and board experience visit http://www.andinaminerals.com/corporate/management.html.

      Andina also announced that at its annual and special meeting held on June 18, all of the resolutions were passed, including approval of the shareholder rights plan and stock option plans. All of the nominated directors were elected at the annual meeting and new committees were formed after the annual meeting, as follows:

      - Audit Committee: Melvyn Williams (Committee Chairman), R. Gregory Laing and T. Sean Harvey

      - Human Resources and Corporate Governance Committee: R. Gregory Laing (Committee Chairman), T. Sean Harvey and J. Eduardo Rosselot

      About Andina Minerals Inc.

      Andina's primary focus is mining exploration and development in Chile. The Company's flagship development project is the 100%-owned Volcan Gold Project, strategically located in the prolific Maricunga Gold Belt. In July 2008, Andina provided an updated resource estimate for Volcan, resulting in a 126% increase to measured and indicated resources to 6.62 million contained ounces of gold (241.7 million tonnes grading 0.85 grams per tonne gold ("g/t Au")) and inferred resources of 3.26 million ounces of gold (114.0 million tonnes grading 0.89 g/t Au) at a 0.5 g/t Au cut-off. Andina is progressing with a Conceptual Development Plan and a Preliminary Economic Assessment for Volcan, targeted for completion in Q4 2009.

      Forward Looking Statements

      This press release may contain statements within the meaning of safe harbour provisions as defined under Securities Laws and Regulations. The above statements are based on the current expectations and beliefs of Andina's management and are subject to a number of risks and uncertainties that may cause the actual results to differ materially from those described above.

      This release contains forward-looking statements, including, projections and forecasts. Forward-looking statements included in this press release are, but are not limited to, statements with respect to exploration results, the timing and success of exploration activities generally, permitting time lines, the use of financing proceeds, timing and results of future resource estimates or future economic studies and in particular include statements with respect to the commencement and completion of the Conceptual Development Plan and Preliminary Economic Assessment for the Volcan Project. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "planned", "expects" or "looking forward", "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipate", "does not anticipate", or "belief", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

      Forward-looking statements are based on a number of material factors and assumptions, including the result of drilling and exploration activities, results of studies, that contracted parties provide goods and/or services on the agreed timeframes, that equipment necessary for exploration and development work is available as scheduled and does not incur unforeseen break downs, that no labour shortages or delays are incurred, that plant and equipment function as specified, that no unusual geological or technical problems occur, and that laboratory and other related services are available and perform as contracted.

      Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the interpretation and actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the company's publicly filed documents. Although Andina has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

      Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
      Avatar
      schrieb am 28.07.09 15:32:23
      Beitrag Nr. 21 ()
      eindeutig schwache performance in der letzten zeit...

      die 38 tagelinie macht dem preis gerade etwas zu schaffen
      Avatar
      schrieb am 12.08.09 17:30:49
      Beitrag Nr. 22 ()
      Welches Knäcke schmeisst hier nen Block von 450.000 auf einmal raus?

      Schortattacken lohnen sich bei solchen umsatzschwachen Werten fast schon...

      Mal schauen, was die Insider-Berichte sagen... Nachher schmeisst einer aus der Führungsetage...

      Avatar
      schrieb am 13.08.09 17:09:59
      Beitrag Nr. 23 ()
      Naja die Führungsetage hat zumindest immer mal kräftig zu gegriffen dieses Jahr:

      http://www.canadianinsider.com/coReport/allTransactions.php?…
      Avatar
      schrieb am 15.08.09 19:28:38
      Beitrag Nr. 24 ()
      Why Andina?

      You can learn more about Andina by exploring our entire Web site. This summary highlights some of the key aspects that we believe make Andina shares an attractive investment opportunity.
      1. Andina’s Volcan Project is located in Chile, one of the best places in the world to develop and operate a mine.
      Chile has been ranked as one of the top ten mining jurisdictions worldwide for a number of years. The Fraser Institute ranking takes many factors into account, including mineral potential, labour, political, regulatory and taxation environment. Chile understands mining and the important contribution it makes to its economy and hence Andina finds a mining-friendly government and culture allowing us to focus more resources on the technical aspects of building a mine.
      2. Volcan rates among the largest independently held gold resources and has strong unexplored growth potential.
      To date, we have identified measured and indicated resources* of 6.6 million ounces of gold and inferred resources of 3.3 million ounces of gold. While the average grade at Volcan is only mid-range in a list of comparable large scale,low-grade, heap leach operations at 0.85 g/t, several important mines operate successfully at lower grades, one not 35 kilometres from Volcan working under very similar conditions. From an exploration standpoint, less than 10% of the Volcan property has received significant geological attention or been drilled to date and the current discoveries remain open in several directions.
      3. Volcan development is not complex and is expected to have relatively low development costs.
      This is an important consideration in today’s environment of multi-billion dollar mining projects involving complex metallurgical and/or logistical challenges. We expect a mine at Volcan to be less complex to design, build and operate based on the metallurgy testing to date, access to infrastructure, location in Chile and proximity to surface of the deposit. While we are still looking at all of the possibilities in terms of mining and processing, it looks quite likely that much of the resource will be amenable to open-pit mining, which is usually the most simple and quickest to develop.
      4. Andina has added to its substantial land position at the heart of the prolific Maricunga gold belt.
      While more than 60 million ounces of gold have already been discovered in the Maricunga, there remain many possibilities for expansion. In May 2009, Andina doubled its mineral concession area in the Maricunga through a share transaction with Barrick (more).
      5. Volcan development standards will be a model for responsible mining.
      Having good local and government relationships and solid health, safety and environmental practices is just as important to a successful mining project as strong technical expertise. Andina has demonstrated its corporate responsibility. Under the leadership of Alejandro Labbe, we will build on Andina’s positive record in Chile.
      If you are interested in investing in Andina, you should read our most recent Annual Report, quarterly reports and the other materials available in the Investors section and elsewhere in this site, to assess whether Andina shares are suitable for you in light of your risk tolerance. To this end you should review and carefully consider the "Risk Factors" section of our Annual Information Form. If you decide to invest, you must purchase shares through a broker, a financial institution providing brokerage services or through an on-line trading service.

      *Measured and indicated resource based on 241.7 million tonnes grading 0.85 g/t Au and inferred resource based on 114.0 million tonnes grading 0.90 g/t Au, both at a 0.5 g/t cut off.
      Avatar
      schrieb am 15.08.09 20:01:17
      Beitrag Nr. 25 ()
      Wird verdammt nochmal Zeit, dass der POG die 1000 nachhaltig knackt.

      -------

      Anual Information Form (9th April '09=

      http://www.sedar.com/GetFile.do?lang=EN&docClass=1&issuerNo=…


      Anual Report (20th May '09)

      http://www.sedar.com/GetFile.do?lang=EN&docClass=2&issuerNo=…


      Audited Anual Financial Statements (9th April '09)

      http://www.sedar.com/GetFile.do?lang=EN&docClass=5&issuerNo=…
      Avatar
      schrieb am 02.09.09 18:45:55
      Beitrag Nr. 26 ()
      Super der Ausbruch mit geringem Volumen heute aus dem extremst engen Seitwärtskorsett.

      Sollte schnell mal bis 1,80 oder 2 CAD laufen.

      Mittelfristig seh ich hier durchaus Kurse über 3 CAD.
      Avatar
      schrieb am 02.09.09 18:46:40
      Beitrag Nr. 27 ()
      Antwort auf Beitrag Nr.: 37.904.786 von KaOzz am 02.09.09 18:45:55PS: Nur meine Meinung, keine Handelsempfehlung, keine Garantie auf Richtigkeit
      Avatar
      schrieb am 11.09.09 13:05:43
      Beitrag Nr. 28 ()
      Antwort auf Beitrag Nr.: 37.904.789 von KaOzz am 02.09.09 18:46:40Andina Increases Measured & Indicated Resources at Volcan Gold Project

      7:00 PM ET, September 10, 2009

      http://cxa.marketwatch.com/tsx/en/market/article.aspx?guid=h…
      Avatar
      schrieb am 11.09.09 22:07:05
      Beitrag Nr. 29 ()
      Antwort auf Beitrag Nr.: 37.962.004 von KaOzz am 11.09.09 13:05:43wow, fast 10 Mio oz :D
      Avatar
      schrieb am 08.10.09 16:08:25
      Beitrag Nr. 30 ()
      Antwort auf Beitrag Nr.: 37.966.192 von SteveF am 11.09.09 22:07:05


      Volumenalarm
      Avatar
      schrieb am 08.10.09 16:28:13
      Beitrag Nr. 31 ()
      Antwort auf Beitrag Nr.: 38.140.867 von KaOzz am 08.10.09 16:08:25Hallo noch Investierte Aktionäre !
      ANDINA wird heute von einem Börsenbrief zum Kauf empfohlen. Vielleicht liegt etwas in der Luft ??
      Avatar
      schrieb am 08.10.09 17:59:37
      Beitrag Nr. 32 ()
      Es war keine Empfehlung, nur ein Hinweis.
      Übrigens schätze ich es überhaupt nicht, wenn die Infos des Abos umgehend von Dampfplauderern in die Öffentlichkeit getragen werden.
      Der Kurs wird auch ohne die bisher Investierten steigen oder fallen!

      So long
      Pommes
      Avatar
      schrieb am 08.10.09 18:29:48
      Beitrag Nr. 33 ()
      Antwort auf Beitrag Nr.: 38.141.996 von Kampfpommes1 am 08.10.09 17:59:37Also eine Depotaufnahme ist jawohl schon eine Empfehlung und kein Hinweis!
      Avatar
      schrieb am 09.10.09 00:03:40
      Beitrag Nr. 34 ()
      Antwort auf Beitrag Nr.: 38.141.077 von 2007al am 08.10.09 16:28:13Welcher BB wars denn?
      Avatar
      schrieb am 09.10.09 04:19:22
      Beitrag Nr. 35 ()
      Antwort auf Beitrag Nr.: 38.144.574 von KaOzz am 09.10.09 00:03:40RSR
      Avatar
      schrieb am 12.10.09 17:28:26
      Beitrag Nr. 36 ()
      Wieviel Stück wurden denn ins Depot gekauft?
      Ist relativ wenig Umsatz :rolleyes:
      Avatar
      schrieb am 12.10.09 22:46:42
      Beitrag Nr. 37 ()
      Weshalb wenig Umsatz, kann ich dir erklären...die meisten Börsenbriefjünglinge decken sich erst dann fett ein, wenn man ihnen die Fakten präsentiert. Da dies noch nicht der Fall war, dümpelt der Kurs vor sich hin.
      Allerdings ist es von Vorteil, sich hier einzudecken.

      Die Fakten sprechen für sich, alleine Volcan rechtfertigt einen Kurs, der um einiges höher als der aktuelle ist.
      Bei ca. 9,8 Mio NI-zertifizierten Unzen und den angegebenen niedrigen Förderkosten von umgerechnet ca. 250 USD je Unze sowie einem festgelegten seriösen Goldpreis von 850 USD ist der aktuelle Kurs von 1,84 Can$ auf Sicht 10 Jahre etwas mickrig, sozusagen stark unterbewertet.
      100% sollten durchaus möglich sein und dann wäre die Aktie noch immer nicht überbewertet.

      Was man defintiv nicht außer Acht lassen darf, Kinross Gold fördert und exploriert in unmittelbarer Nähe und es ist wohlbekannt, dass KR durchaus aggressiv bei Übernahmen ist, siehe Aurelian.
      Vorstellbar wäre auch ein JV oder eine Teilübernahme, die Kasse bei KR ist gut gefüllt.

      Lassen wir uns überraschen, ein paar Shares im Depot von Andina ist wohl kein Fehler.
      Avatar
      schrieb am 14.10.09 15:30:14
      Beitrag Nr. 38 ()
      Antwort auf Beitrag Nr.: 38.163.036 von Kampfpommes1 am 12.10.09 22:46:42Habe mir gestern auch mal ein paar Stücke ins Depot gelegt. ;)
      Avatar
      schrieb am 21.10.09 10:44:25
      Beitrag Nr. 39 ()
      Verabschiede mich hier schon wieder.
      Kleinen Gewinn vorgestern mitgenommen, allen anderen weiter viel Erfolg ;)
      Avatar
      schrieb am 21.10.09 11:52:41
      Beitrag Nr. 40 ()
      Antwort auf Beitrag Nr.: 38.220.249 von Simba2006 am 21.10.09 10:44:25Das wirst Du wohl noch bereuen, unter 2 Euro gebe ich hier nichts ab.
      Avatar
      schrieb am 26.10.09 20:27:24
      Beitrag Nr. 41 ()
      mein gott der wert wird ja immer billiger und das bei den topnews heut wahnsinn
      Avatar
      schrieb am 27.10.09 09:44:32
      Beitrag Nr. 42 ()
      Antwort auf Beitrag Nr.: 38.220.973 von ooy am 21.10.09 11:52:41So schlecht war meine Strategie nun doch nicht
      Avatar
      schrieb am 27.10.09 10:43:20
      Beitrag Nr. 43 ()
      Antwort auf Beitrag Nr.: 38.258.676 von Simba2006 am 27.10.09 09:44:32So isses, jetzt wuerde ich aber unbedingt zurueckkaufen, ich habe Abstauberlimits drin.
      Avatar
      schrieb am 03.11.09 22:13:38
      Beitrag Nr. 44 ()
      Nov 03, 2009 15:55 ET
      IIROC: Halt, Andina Minerals Inc.

      VANCOUVER, BRITISH COLUMBIA--(Marketwire - Nov. 3, 2009) - The following issue(s) have been halted on the TSXV today:




      Company / Compagnie: Andina Minerals Inc
      TSX V Symbol / Symbole: ADM
      Reason / Motif: Request of company pending news
      Halt Time (ET) / Heure de l'Arret: 15:46:00 EST
      Avatar
      schrieb am 04.11.09 07:03:58
      Beitrag Nr. 45 ()
      TORONTO, November 3, 2009 - ANDINA Minerals Inc. (TSX VENTURE:ADM) (the
      "Company") announced today that it has entered into an agreement with a syndicate of
      underwriters led by BMO Capital Markets under which the underwriters have agreed to buy
      on a bought deal basis by way of a short form prospectus, 12,500,000 units (the "Units")
      each Unit consisting of one common share and one-half of one common share purchase
      warrant, at a price of $2.00 per Unit for aggregate gross proceeds to the Company of
      $25,000,000. Each whole common share purchase warrant will entitle the holder to purchase
      one common share of the Company at a price of $2.25 prior to the date which is 24 months
      following the closing of the offering. The Company has granted the underwriters an option,
      for a period of 30 days following the closing of the offering, to purchase up to an additional
      15% of the number of Units purchased to cover over-allotments, if any. The net proceeds of
      the offering will be used to further progress the Volcan Project and for general corporate
      purposes. The offering is expected to close on or about November 24, 2009 and is subject to
      the Company receiving all necessary regulatory approvals, including the approval of the TSX
      Venture Exchange.
      Avatar
      schrieb am 04.11.09 07:56:03
      Beitrag Nr. 46 ()
      Antwort auf Beitrag Nr.: 38.315.039 von viena am 04.11.09 07:03:58Super, die wissen schon, warum sie 25 Mille in das Unternehmen pumpen, und das noch zu 2 Dollar...
      Avatar
      schrieb am 04.11.09 16:09:00
      Beitrag Nr. 47 ()
      Komisch, heute 10% runter, habe eben mal ein paar zu 1,17 zugekauft und noch ein Limit bei 1,12 drin.
      Avatar
      schrieb am 23.11.09 19:58:14
      Beitrag Nr. 48 ()
      was ist hier los jeden tag abwärts und das bei steigenden goldpreisen und hier gibts 10 millionen unzen gold bei einer marktkap. unter 100mille versteht das einer ich nicht?MEINUNGEN
      Avatar
      schrieb am 23.11.09 20:20:15
      Beitrag Nr. 49 ()
      Antwort auf Beitrag Nr.: 38.440.710 von sharp2008 am 23.11.09 19:58:14hier wird man wohl viel Geduld haben müssen...
      Förderung ist erst ab 2013 geplant; da wird das Aktienkapital wohl noch deutlich verwässert werden...
      trotzdem m.E.interessant der Wert...

      bei einer marktkap. unter 100mille
      fully diluted müsste die MK rd. 160 Mio US$ sein
      Avatar
      schrieb am 23.11.09 20:28:08
      Beitrag Nr. 50 ()
      das Ding ist und bleibt bei den Goldpreisen ein glasklarer Kauf!
      Avatar
      schrieb am 24.11.09 07:58:10
      Beitrag Nr. 51 ()
      :D:D:D:D

      Hab mir mal eine Probeausgabe von RSR gegönnt

      Netter Bericht über diese Aktie, mal sehen was da so geht..

      Stell den mal rein die Tage wenn es die Zeit erlaubt.
      Avatar
      schrieb am 24.11.09 16:20:32
      Beitrag Nr. 52 ()
      Antwort auf Beitrag Nr.: 38.259.262 von ooy am 27.10.09 10:43:20Mensch, ADM wird ja immer billiger :laugh::D
      Avatar
      schrieb am 30.11.09 19:11:52
      Beitrag Nr. 53 ()
      Antwort auf Beitrag Nr.: 38.446.159 von KaOzz am 24.11.09 16:20:32Is eindeutig nich das erste Mal, dass RSR wieder mal bei nem zyklischen Hoch zum einstieg getrommelt hat :laugh:


      Naja, bin ja mal gespannt, wo sich hier der Boden bilden wird...
      Avatar
      schrieb am 01.12.09 22:10:08
      Beitrag Nr. 54 ()
      Im Ernst, der Kursverfall war eindeutig nicht zu erklären, zumal die Aktie viel Potential hat und nachweislich stark unterbewertet ist, zieht man vergleichbare Explorer heran.
      Ich habe immer noch die Hoffnung, dass Andina in den Focus von Kinross rückt, aber warten wir es ab, man hatte jetzt gute Nachkaufmöglichkeiten ;)
      Avatar
      schrieb am 01.12.09 22:12:43
      Beitrag Nr. 55 ()
      Antwort auf Beitrag Nr.: 38.442.284 von birkos am 24.11.09 07:58:10Dazu brauche ich kein RSR, die Fakten sprechen für Andina.

      Siehe mein Posting auf Seite 3 o. 4

      Die Fakten sprechen für sich, alleine Volcan rechtfertigt einen Kurs, der um einiges höher als der aktuelle ist.
      Bei ca. 9,8 Mio NI-zertifizierten Unzen und den angegebenen niedrigen Förderkosten von umgerechnet ca. 250 USD je Unze sowie einem festgelegten seriösen Goldpreis von 850 USD ist der aktuelle Kurs von 1,84 Can$ auf Sicht 10 Jahre etwas mickrig, sozusagen stark unterbewertet.
      100% sollten durchaus möglich sein und dann wäre die Aktie noch immer nicht überbewertet.

      Was man defintiv nicht außer Acht lassen darf, Kinross Gold fördert und exploriert in unmittelbarer Nähe und es ist wohlbekannt, dass KR durchaus aggressiv bei Übernahmen ist, siehe Aurelian.
      Vorstellbar wäre auch ein JV oder eine Teilübernahme, die Kasse bei KR ist gut gefüllt.
      Avatar
      schrieb am 01.12.09 22:42:16
      Beitrag Nr. 56 ()
      Antwort auf Beitrag Nr.: 38.490.716 von Kampfpommes1 am 01.12.09 22:12:43wen du von einer Aktie überzeugt bist bleib drin!
      Avatar
      schrieb am 03.12.09 19:07:29
      Beitrag Nr. 57 ()
      :rolleyes:
      Avatar
      schrieb am 18.12.09 19:58:47
      Beitrag Nr. 58 ()
      Ich glaube fest, nächste Woche sollte man in Andina investiert sein. Die sollten eigentlich eher bei 3 EURO statt bei 1,25 EUR notieren. Hab mich heute nochmal eingedeckt. :D
      Avatar
      schrieb am 19.12.09 09:12:23
      Beitrag Nr. 59 ()
      Antwort auf Beitrag Nr.: 38.599.559 von MunichStock am 18.12.09 19:58:47Die Aktie hält sich in den letzten Wochen erstaunlich gut. Ich gehe davon aus, dass hier spätestens im Januar die Post abgeht. :)
      Avatar
      schrieb am 19.12.09 11:10:58
      Beitrag Nr. 60 ()
      Antwort auf Beitrag Nr.: 38.599.559 von MunichStock am 18.12.09 19:58:47wer weiß, wer sich hier in letzter zeit eingedeckt hat.. volumen war ja recht ordentlich. vielleicht stockt kinross ja so langsam klammheimlich auf. bin auch mal auf die neuen bohrergebnisse im nächsten jahr gespannt, bei dann über 10mio unzen.., was dann wohl mit dem kurs passiert..?? :look:

      Canaccord Daily Letter Summary | 3
      9 December 2009

      Andina Minerals | Steven Butler, 1.416.869.7918
      ADM : TSX-V : C$1.85 | C$194.2M | Speculative Buy , Target C$4.00 ?

      • Improved valuation and target price on increased peak gold scenario;
      maintain SPECULATIVE BUY rating

      Event

      We are updating our valuation on Andina Minerals to incorporate our recently increased
      peak gold/silver scenario of $1,300/$21.50 (refer to our report published on November 30,
      2009) and the recently completed C$25 million equity raise.

      Impact

      Positive.

      Valuation

      Our 12-month target price increases to C$4.00 from C$3.20 based on a 0.80x multiple to
      our 10%/$1,300 peak/diluted NAVPS estimate of US$4.84 (previously US$3.56 @$1,100
      Au) adjusted for an exchange rate of US
      .95/C$ (previously US
      .90/C$). We maintain
      our SPECULATIVE BUY rating on Andina Minerals based on the potential upside from
      further de-risking the project and moving it closer to production.

      Next catalyst

      Conceptual development plan (CDP) and preliminary economic assessment (PEA) expected
      early 2010.
      Avatar
      schrieb am 10.02.10 23:42:50
      Beitrag Nr. 61 ()
      ANDINA Provides In-Fill Drilling Update on the Volcan Gold Project

      4:59 PM ET, February 10, 2010

      http://cxa.marketwatch.com/tsx/en/market/article.aspx?guid=h…
      Avatar
      schrieb am 17.02.10 08:32:52
      Beitrag Nr. 62 ()


      Was veranlasst die Kanadier, nach Handelsschluss mit über 300.000 Aktien den Kurs hoch zu ziehen? Kann keine Meldung finden und nicht
      erst warten, bis Rohstoffraketen eine Antwort geben.

      Wer weiss mehr? ;)
      Avatar
      schrieb am 17.02.10 08:56:34
      Beitrag Nr. 63 ()
      Antwort auf Beitrag Nr.: 38.956.226 von MunichStock am 17.02.10 08:32:52keine ahnung... allerdings kamen die letzten bohrnews (450m mit 0,85 g/t au!!!) vor einer woche auch nach börsenschluss bei den cans und gingen dabei völlig unter, vielleicht wars ja auch absicht :laugh:
      kann sein das die größeren adressen jetzt günstig zugreifen. ich denke sowieso das andina das projekt selber nie in produktion bringen wird, früher oder später wird sich kinross andina einverleiben..
      Avatar
      schrieb am 25.02.10 16:13:55
      Beitrag Nr. 64 ()
      weiss irgendeiner, was jetzt schon wieder los ist?
      Avatar
      schrieb am 25.02.10 16:30:57
      Beitrag Nr. 65 ()
      Antwort auf Beitrag Nr.: 39.012.348 von rockafellaa am 25.02.10 16:13:55das interessiert mich auch - finde keine Informationen
      Avatar
      schrieb am 25.02.10 16:36:09
      Beitrag Nr. 66 ()
      Antwort auf Beitrag Nr.: 39.012.348 von rockafellaa am 25.02.10 16:13:55Andina Timing Update for Volcan Gold Project Studies


      5:04 PM ET, February 24, 2010


      TORONTO, ONTARIO, Feb 24, 2010 (MARKETWIRE via COMTEX) -- ANDINA Minerals Inc. (ADM) (the "Company") is providing today an update on the timing of the Conceptual Design Study ("CDS") and Preliminary Economic Assessment ("PEA") currently being conducted on the Volcan Gold Project ("Volcan"). The CDS and PEA, based on a heap leach scenario (the "Heap Leach Base Case"), were targeted for completion in early 2010.

      -- Recent infill drilling suggests that there is potential to define zones of higher grade within the resource-- Further metallurgical testing completed by the Company has indicated that at the crush size the company would likely employ in the Heap Leach Base Case scenario, recoveries for Volcan would range between approximately 57% - 60% rather than the 57% - 77% range indicated by previous metallurgical tests. Prior tests incorporated finer crushing than Andina now believes would likely be employed (refer to November 21, 2007 press release)-- Alternative development scenarios have the potential to generate higher project returns through increased recoveries and optimization of the mining and processing of higher grade material-- Milling and combination heap leaching/milling scenarios are being reviewed, which will evaluate the benefits of higher production revenues against higher capital cost relative to the Heap Leach Base Case scenario-- While copper grades for Volcan are lower than other Maricunga district projects, for the milling type scenarios now being evaluated there may be sufficient copper and gold in pyrite to add a circuit to enhance project economics through the recovery of copper and gold in concentrate
      As a result of these developments, Andina has targeted the second half of 2010 as the anticipated release date for the CDS and PEA, including alternative development scenarios.

      "Given the current and expected strength of gold prices, we believe that it is likely that a milling or combination heap leaching/milling scenario will generate the optimum development alternative for the Volcan Project. As such we are taking the decision to broaden our technical studies rather than fast-track the Heap Leach Base Case Scenario study. While Andina has been primarily focused on a Heap Leach Base Case scenario, it is in the best interest of our shareholders to extend our technical review period to ensure we define the value maximizing scenario for the large Volcan resource", said George Bee, President & CEO. "Volcan continues to be one of the world's largest undeveloped gold projects in a politically stable and mining friendly jurisdiction and we have sufficient cash resources and a strong team in place to optimize the development planning process."

      Conceptual Design Study Initial Metallurgical Results

      Since the release of the last metallurgical test results in May 22, 2008 and November 21, 2007, Andina, utilizing new development planning parameters, has spent considerable time and effort collecting new representative mineral samples, subjecting these new samples to a series of tests, and verifying the results. Although metallurgical results are still under review, the Company considers metallurgical results sufficiently advanced to provide initial conclusions and guidance on gold extraction using heap leach techniques.

      The results of this metallurgical work are consistent with previously released recoveries of approximately 70%. However, these recoveries have only been achievable with crush sizes that were incompatible with other operational parameters of the project, such as leach pad stability, and reasonable capital and sustainable operating costs. For this reason the Heap Leach Base Case recovery rate at the coarser crush size now contemplated, while not optimized, falls short of the recoveries indicated by the 2008 metallurgical test program and the target recovery for the project issued as guidance in the September 2009 resource update.

      Initial Testing

      In 2008, based on test work and an assumed resource cut-off grade, the gold recovery from heap leaching was indicated as ranging from 57% - 77% with increasing recoveries directly correlated with increased grades. Following on from this initial phase of testing, the Andina development team collected samples in early 2009 representing various portions of the mineral resource. An independent consultant was contracted to collect the sample and design the 2009 test program. Approximately 1,250-kg of samples were collected from 10 distinct areas of the resource and arrived at McClelland Laboratories Ltd. ("McClelland") in Reno, Nevada in mid May 2009. A portion of the samples collected were sent to KHD Humboldt Wedag ("KhD") in Cologne, Germany for High Pressure Grind Roll ("HPGR") crushing as a precursor to testing. A comprehensive series of 96-hr bottle roll leach tests were performed on conventionally crushed and HPGR crushed material with crush sizes ranging from 19-mm down to 106 microns. Similar sized material was bottle-roll tested on pre-rinsed material and material that had a lead nitrate additive, beyond the standard reagent doses aimed at pH control and gold extraction. This first series of 128 bottle-roll tests were concluded during August 2009 and was the basis upon, which subsequent column tests were set up and executed, also at McClelland. The Heap Leach Base Case was refined once the initial bottle-roll results had been received. Twenty-one leach column tests were set up testing conventionally crushed material at 9-mm and 6-mm, and HPGR crushed material at 6-mm and 3-mm. Final calculated head grades and full completion of the testing is pending residue assay analysis subsequent to a 120-day column leach cycle. Preliminary results under the conditions tested (6-kg/t cement, 1.5-kg/t lime and 500 ppm NaCN) have been received by the Company.

      Further Testing of Representative Material

      Based on the recent preliminary bottle-roll results and review by metallurgical and process design consultants, it was concluded that the 2007 and 2008 test work program which focused on a crush size of P80 of around 2-mm to 3-mm was not considered feasible for a commercial heap leach operation. The minimum practical crush size for commercial production at Volcan was established at a crush size of P80 of 6-mm. Tests were then aimed at confirming that HPGR crushing improved gold recovery over conventional crushing and establishing an overall recovery parameter for a P80 of 6-mm. Due to the fact that the original 10 samples collected had relatively high gold grades ranging from 0.98-g/t to 1.61-g/t, it was felt these samples did not fully characterize the gold tenor of Volcan, where this grade range represented only fourteen percent (14%) of the contained ounces in the current resource inventory. While the external consultant initially selected higher grade samples to reduce the inherent error in assaying of low grade samples, the Company and its consultants later agreed that these results would not properly reflect the general characteristics of the Volcan mineralization. During July through August 2009 another set of five (5) samples, totalling 1,559-kg was collected, again representing the resource spatially but this time focusing on 0.4-g/t, 0.8-g/t and 0.65-g/t gold grades, and were shipped to McLelland and KhD. A further set of 20 bottle-roll tests were conducted on conventional and HPGR crushed material with size ranges between 2-mm and 12-mm with the emphasis on the 6-mm (P80) crush size for both HPGR and conventional crushed products. Results from bottle-roll tests from the newer samples are now available although no further column test work has been initiated at this time on the lower and mid-range grade resource material.

      As previously stated, results for the Heap Leach Base Case, which incorporates conventional primary, secondary, and then HPGR tertiary crushing, show that for a nominal P80 6-mm leach feed, recoveries of approximately 57% to 60% might be expected. This is based on agglomerating the crushed feed to the leach pad with cement, lime and applying barren leach solution at the agglomerating stage. Due to the need to maintain percolation and solution transmission through the heap and considering the need to stabilize fines in an agglomerated nodule, the feed to the pad is stacked mechanically onto an on-off reusable pad with spent material being deposited in a lined storage facility after rinsing and water recovery. Considerable work remains to be completed on the heap leach scenario to optimize the trade-off of recoveries and other factors such as capital costs for various heap leach configurations.

      Expansion of Processing Alternatives in the Conceptual Design Study

      Alternative process flow sheets are now under consideration in the CDS. Initial desktop evaluations indicate that several alternatives could serve to optimize Volcan's economics by improving recoveries, but also includes conventional heap leach at a coarser crush size to reduce capital investment. Given the strong gold price environment, optimizing recoveries and therefore gold production together with optimizing the mining and processing of potential higher grade material warrants the study of scenarios which probably require additional capital as compared to heap leach alternatives to incorporate milling for all or part of material mined at the Volcan Project.

      Alternatives under consideration are:

      -- Coarser Conventional Crush for Low-Grade and Milling for Higher-Grades - This alternative considers conventional heap leaching for the majority of the ore tonnage but allows a higher-grade portion of the feed to be milled before carbon-in-leach gold extraction in order to enhance gold recoveries. A similar flow sheet is employed at Barrick Gold Corporation's Ruby Hill property in Nevada, USA;-- Coarse Milling With, and Without, Flotation - This alternative seeks to capture as much of the free and encapsulated gold at reasonable grind sizes for whole ore leaching, or recovery of gold and sulphide concentrates for more intensive treatment in a flotation concentrate; and-- Coarser Conventional Crush and Heap Leach - This alternative is a more conventional heap leaching technology, which will deliver lower development capital, but which may not improve gold recoveries. This method has been employed at the nearby Kinross Gold Corporation Maricunga mine and could be evaluated for Volcan on a large scale.
      To evaluate the alternatives above a number of activities need to take place, including:

      -- Completion of the current in-fill drilling program on the Dorado resource which will help identify the different gold grade zones within the resource;-- Resource modelling which would focus on a better interpretation of higher grade zones within the overall resource. This would support selective mining which could serve to reduce dilution seen in the resource model for the Heap Leach Base Case;-- Update mine planning based on each of the alternatives being reviewed;-- Sizing plant and finalizing process flow streams; and-- Estimating capital, operating costs and project economics.
      The finalized CDS will evaluate all of the alternatives above, including optimizing the Heap Leach Base Case, and evaluate final projected gold recoveries, capital and operating costs, and other key parameters. Following release of the comprehensive review of all alternatives in the second half of 2010, the Company would target completion of a prefeasibility study for the leading alternative in the first half of 2011.

      Qualified Person

      Mr. Richard Gowans of Micon International Ltd. is the Qualified Person under National Instrument 43-101 responsible for reviewing technical and scientific information in this press release regarding the CDS and PEA. Mr. Gowans has reviewed the contents of this press release. Certain technical information regarding the Project required to be disclosed under Part 3 of National Instrument 43-101 is contained in the Technical Report on the Volcan Gold Project, Region III, Chile and Updated Mineral Resource Estimate for the Dorado Gold Deposits, dated October 23, 2009, prepared by Reno Pressacco, M.Sc. (A), P.Geo., Richard Gowans, P.Eng. and Sam Shoemaker, B.Sc., MAusIMM, each of Micon, and is available on SEDAR at www.sedar.com. This includes information regarding project area geology, mineralization, rock types and geological controls.

      Andina Minerals Inc.

      Andina's primary focus is mining exploration and development in Chile. The Company's flagship property is the 100%-owned Volcan Gold Project, strategically located in the prolific Maricunga Gold Belt. In September 2009, Andina provided an updated resource estimate for Volcan including measured and indicated mineral resources of 492.5 million tonnes at an average grade of 0.62 g/t Au for 9.8 million ounces of contained gold and inferred mineral resources of 36.8 million tonnes at an average grade of 0.65 g/t Au for 768,000 ounces of gold.

      Forward-Looking Statements

      This release contains forward-looking statements, including predictions, projections and forecasts. Forward-looking statements include, but are not limited to, statements with respect to exploration activities and results (including the timing of results), the timing and success of exploration activities generally, permitting timelines, government regulation of exploration and mining operations, environmental risks, title disputes or claims, limitations on insurance coverage, timing and possible outcomes of any pending litigation and timing and results of future resource estimates or future economic studies, and in particular include statements with respect to the timing of the CDS and PEA, rates of gold recovery, and analysis and assessment of processing scenarios. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "planned", "expects" or "looking forward", "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipate", "does not anticipate", or "belief", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

      Forward-looking statements are based on a number of material factors and assumptions, including, among others, the result of drilling and exploration activities, results of studies, that unexpected geological conditions or formations are not located, that contracted parties provide goods and/or services on the agreed timeframes, that equipment necessary for exploration is available as scheduled and does not incur unforeseen break downs, that no labour shortages or delays are incurred, that plant and equipment function as specified, that no unusual geological or technical problems occur, and that laboratory and other related services are available and perform as contracted.

      Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the interpretation and actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the company's publicly filed documents. Although Andina has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

      Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

      Contacts:Andina Minerals Inc.George M. BeePresident & CEO416 203 3488Andina Minerals Inc.Keith McKayChief Financial Officer416 203 3488www.andinaminerals.com
      SOURCE: ANDINA Minerals Inc.

      http://www.andinaminerals.com
      Copyright 2010 Marketwire, Inc., All rights reserved.
      Avatar
      schrieb am 25.02.10 16:39:57
      Beitrag Nr. 67 ()
      Kam gestern nach Boersenschluss. Man konnte noch mit 1,25 raus bei uns.
      Bin jetzt zu 1,016 rein, finde die Verzoegerung auf die zweite Jahreshaelfte und die Reduzierung von 57 bis 77 auf 57 bis 60 halb so wild. Ausserdem besteht ja Aussicht auf weitere Funde.
      Avatar
      schrieb am 25.02.10 16:43:09
      Beitrag Nr. 68 ()
      Quasi mit dem Redaktionsschluss der heute versendeten Ausgabe schockte Andina Minerals (Kanada: ADM) die Märkte. Deshalb noch dieses Update!

      Anstelle der für das erste Quartal avisierten vorläufigen Machbarkeitsstudien, wurden die Planungen auf das zweite Halbjahr verschoben, weil die metallurgischen Goldgewinnungsraten nur bei 57-60% und damit am unteren Ende der erwarteten 57-77% lagen. Zudem will man jetzt prüfen, ob man neben der geplanten Goldgewinnung im Auslaugungsverfahren nun auch eine herkömmliche Gesteinsmühle in die Produktion einbeziehen soll. Diese erneute Verschiebung bedeutet Unsicherheit und dies bedeutet derzeit Verkaufsdruck. Die Aktie verliert 13% auf 1,49 CAD. Wir halten an unserem Bestand fest. Ein Verkauf bei einer Bewertung von 22 USD je Unze für eine 7 Mio. Unzen Lagerstätte macht bei diesem Kurs kein Sinn, selbst wenn der Aufwärtstrend durch diese News vorerst gebrochen ist.
      Avatar
      schrieb am 25.02.10 17:29:04
      Beitrag Nr. 69 ()
      Da muss aber ein Fonds gekotzt haben; 2 Mio. in Kanada umgesetzte Aktien sprechen schon eine Sprache. Andererseits befinden sich auf der Kaufseite inzwischen doppelt soviele Käufer, als Verkäufer.

      Wer auf der Shortseite steht, sollte langsam ans eindecken denken!

      [urlInfo]http://www.tmx.com/HttpController?GetPage=DelayedMarketByPrice&Market=V&Language=en&SelectedSymbol=ADM[/url]
      Avatar
      schrieb am 26.02.10 15:40:49
      Beitrag Nr. 70 ()
      [urlGestern nachbörslich: ]http://finance.yahoo.com/news/Andina-Exploration-Program-ccn-2479395417.html?x=0&.v=1[/url]

      Andina Exploration Program Outlines a New Mineralized Zone at Ojo de Agua East Drilling 70 Metres at 1.2 g/t Gold
      marketwire

      Press Release Source: ANDINA Minerals Inc. On Thursday February 25, 2010, 5:48 pm EST

      TORONTO, ONTARIO--(Marketwire - Feb. 25, 2010) - ANDINA Minerals Inc. (TSX VENTURE:ADM - News; the "Company") today announced initial drilling and assay results from the strategic exploration program at the Ojo de Agua East ("ODAE") gold target, located at the Company's Volcan Gold Project in Chile. The program builds on the trenching program at Ojo de Agua East (see press release dated December 18, 2009), an area near to both Andina's original Ojo de Agua discoveries and the Dorado zones. The initial reverse circulation drilling has intersected significant gold mineralization with hole 3 intercepting 70 m at a grade of 1.2 g/t Au from a depth of 176 m. (For more details click here to view the map showing the Ojo de Agua East Exploration Results.)

      "Our initial exploration drilling and assaying confirms the potential for the Ojo de Agua East to host zones of significant higher grade mineralization which would be beneficial for ongoing project development," said George Bee, President & CEO. "Based on these positive results, we are continuing to diamond drill in this zone."

      The main purpose of the Company's 2009-2010 strategic exploration program is to identify higher grade mineralization in close proximity to the Dorado deposits. Lying to the west of existing Ojo de Agua discoveries on ground acquired from Barrick Gold Corporation last year, the ODAE target is located 6.5 km to the north east of the Dorado deposits and to the north of likely process facilities contemplated for the Volcan Project. ODAE complements the Dorado zones, which contain measured and indicated resources of 492.5 million tonnes at an average grade of 0.62 g/t Au for 9.8 million ounces of gold and are the focus of development studies by Andina. Andina has already identified an inferred resource of 18.6 million tonnes grading 0.85 grams per tonne (g/t) gold (Au) at a cut-off grade of 0.5 g/t (for 510,000 ounces of gold) located to the west of the Dorado Zone in the Florencia and Andrea zones.

      The Company's decision to test the area utilizing Reverse Circulation ("RC") drilling was based on its positive surface geology and trenching program performed earlier in the season when a strongly gold anomalous 250 m x 600 m zone was encountered. Prior to drilling, the higher grade intervals obtained from the areas which were trench sampled at 5 m intervals were re-sampled at 1 m intervals, which work returned values of 6 g/t and 10 g/t gold. The surface expression of the mineralized trend is limited to the south and to the north west by a cover of younger rocks, such that there is the potential that mineralization extends beyond the currently known limits.

      The initial drilling program consisting of 5 RC holes totalled 1,730 m was designed to target the anomalous gold found over a large surface area clustered around a central largely barren domal intrusive, which may be acting as the central heat source for the mineralization at Ojos de Agua East. Mineralization at Ojos de Agua East is broadly similar to that at the other Volcan targets but the exposures are higher in the hydrothermal system. The mineralization model suggests that the zones of potentially economic mineralization are located at the contacts of the intrusions where intrusion, hydrothermal, and phreatomagmatic breccias appear. This is the so-called "Border Dome Facies", which is often more than 100 m wide before grading into barren or lower grade gold porphyries which surround the dome.

      Drilling Results from Ojo de Agua East

      Hole 1 (RODAE 806) - Drilled into the south east extension of Trench 1, anomaly did not reach the target zone due to high water pressures, which were encountered at a depth of 165 m. However, a 2 m vein interval grading 4.00 g/t Au was intersected at a depth of 126 m, which is indicative of vein environments in a high level epithermal system.

      Hole 2 (RODAE 807) - Located 240 m to the north east of Hole 1, returned 60 m of 0.50 g/t Au from the surface, which reflects the near surface lower grade mineralization, and which is located within the Border Dome Facies.

      Hole 3 (RODAE 812) - This discovery hole was drilled from the same location as RODAE 807, but at a different azimuth. The entire interval drilled (336 m) averaged 0.52 g/t Au with the upper 84 m averaging 0.53 g/t Au and a 70 m interval averaging 1.20 g/t Au, starting at a depth of 176 m.

      Hole 4 (RODAE 814) - Intercepted the essentially barren (500 m averaging 0.07 g/t Au) central sterile porphyry.

      Hole 5 (RODAE 816) intercepted the low grade porphyry (averaging 0.14 g/t Au over the 414 m length of the hole) and missed the fertile Border Dome Facies.

      Holes 2 and 3, in addition to the high grade trenches, have identified a new mineralized zone for Andina in the Volcan District. The target area is up to 100 m wide north west trending Dome Border Facies, which is located at the northern flank of the central ODAE Dome. The core zone within this structure extends for at least 300 m.

      SUMMARY OF EXPLORATION DRILLING AT OJOS DE AGUA EAST - FEBRUARY 2010


      ----------------------------------------------------------------------------
      Total Depth Drilled
      HOLE Number from 0 to (Metres) g/t Au Including
      ----------------------------------------------------------------------------
      RODAE - 806(1) 162 0.15 2m @ 4.00 g/t Au
      RODAE - 807 318 0.18 60m @ 0.50 g/t Au
      RODAE - 812 336 0.52 70m @ 1.20 g/t Au
      RODAE - 814 500 Low Grade
      RODAE - 816 414 0.14
      ----------------------------------------------------------------------------
      (1) Abandoned before reaching target zone


      All assays were performed by Laboratorio Geoanalitica, Coquimbo, Chile.

      Ojo de Agua Area Qualified Person

      The trenching program at the Ojo de Agua East area of the Volcan Gold Project was reviewed and the results approved by Mr. Michael Easdon, Andina's Qualified Person under National Instrument 43-101. Mr. Easdon has been responsible for preparing technical information on the Ojo de Agua area, which is disclosed in the Company's annual information form for the year ended December 31, 2008 (dated April 8, 2009). Mr. Easdon has reviewed the contents of this press release.

      QA/QC Protocols

      Mr. Easdon has confirmed that Andina has utilized appropriate and accepted (per National Instruments 43-101 requirements) Quality Assurance and Quality Control ("QA/QC") protocols for the trench and drill hole sampling and assaying. Grab samples are selected pieces of rock collected to identify or confirm anomalous or potentially economic concentrations of precious metals (Au, Ag), base metals (Cu, Mo, Zn, Pb), as well as path- finder elements commonly associated with epithermal mineralization (As, Sb, Hg, Ba). Chip- channel samples are one or more continuous samples of mineralized or altered rock collected with hammer and chisel over a measured interval and may be taken from areas of outcrop or from trenches. Sample locations are determined at the time of collection with handheld GPS readings. Andina does not intend to use either the chip channel (trenching) or grab samples data in any future resource estimations. The samples that were taken in this program have been collected to confirm previously reported exploration sampling results and to further identify areas of greater interest for more detailed future exploration and drilling.

      All samples are delivered by the Company's personnel to the Geoanalitica sample preparation facility in Copiapo Chile, where they are crushed (chip and grab samples) and all drill hole and surface samples are then shipped by Geoanalitica to their assay facility located in Coquimbo. Geoanalitica analyzes the samples for gold, copper and molybdenum. The gold assays are performed utilizing 30 g fire assay with an Atomic Absorption Spectroscopy ("AAS") or gravimetric finish; the Cu and Mo are assayed for using standard wet analytical techniques. Sample pulp splits are subsequently sent by Geoanalitica to the ALS-Chemex laboratory (also in Coquimbo) for multi-element Inductively Coupled Plasma ("ICP") analysis.

      About Andina Minerals Inc.

      Andina's primary focus is mining, exploration and development in Chile. The Company's flagship property is the 100%-owned Volcan Gold Project, strategically located in the prolific Maricunga Gold Belt. In September 2009, Andina provided an updated resource estimate for Volcan including measured and indicated mineral resources of 492.5 million tonnes at an average grade of 0.62 g/t Au for 9.8 million ounces of contained gold and inferred mineral resources of 36.8 million tonnes at an average grade of 0.65 g/t Au for 768,000 ounces of gold.

      Forward-Looking Statements

      This release contains forward-looking statements, including predictions, projections and forecasts. Forward-looking statements include, but are not limited to, statements with respect to exploration activities and results (including the timing of results), the timing and success of exploration activities generally, permitting timelines, government regulation of exploration and mining operations, environmental risks, title disputes or claims, limitations on insurance coverage, timing and possible outcomes of any pending litigation and timing and results of future resource estimates or future economic studies, and in particular include statements with respect to the timing of the reporting of drilling results at Ojo de Agua East commencing in February 2010. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "planning", "planned", "expects" or "looking forward", "does not expect", "continues", "scheduled", "estimates", "forecasts", "intends", "potential", "anticipate", "does not anticipate", or "belief", or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

      Forward-looking statements are based on a number of material factors and assumptions, including the result of drilling and exploration activities, that unexpected geological conditions or formations are not located, that contracted parties provide goods and/or services on the agreed timeframes, that equipment necessary for exploration is available as scheduled and does not incur unforeseen break downs, that no labour shortages or delays are incurred, that plant and equipment function as specified, that no unusual geological or technical problems occur, and that laboratory and other related services are available and perform as contracted.

      Forward-looking statements involve known and unknown risks, future events, conditions, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, prediction, projection, forecast, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others, the interpretation and actual results of current exploration activities; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the company's publicly filed documents. Although Andina has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

      Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
      Avatar
      schrieb am 26.02.10 15:42:11
      Beitrag Nr. 71 ()
      Avatar
      schrieb am 26.02.10 15:42:32
      Beitrag Nr. 72 ()
      Andina (Kanada: ADM) schloss gestern nach der unerwarteten Verschiebung der vorläufigen Machbarkeitsstudie mit 19,9% im Minus bei 1,45 CAD. Wir warten hier zunächst ab, wie sich die Aktie in den nächsten Tagen verhält.

      Wie schnell es nach einer großen Enttäuschung wieder nach oben gehen kann, zeigte gestern die Aktie von Dorato Resources (Kanada: DRI). Um 25% ging es nach oben, nachdem die Aktie in der letzten Woche eingebrochen war, als das peruanische Minenministerium die Explorationsarbeiten stoppte. Eventuell wissen hier Insider schon mehr und das Verbot wird bald wieder aufgehoben!
      Avatar
      schrieb am 27.02.10 00:14:50
      Beitrag Nr. 73 ()
      Antwort auf Beitrag Nr.: 39.021.222 von MunichStock am 26.02.10 15:40:49wir waren schon früher total unterbewertet und sind es jetzt erst richtig ,es werden immer nur die negativen news gesehen und die positiven ignoriert ,leute wir sind hier mit 18 usdollar pro unze bewertet das ist ein witz nur weil die machbarkeitsstudie um ein paar monate verschoben wird,wenn sie fürs übernächste jahr verschoben würde dann würde ich es ja verstehen,aber hier wird runtergehandelt als wenn das ganze gold gestohlen worden ist
      Avatar
      schrieb am 28.02.10 21:45:49
      Beitrag Nr. 74 ()
      Bin mal gespannt, ob Andina am Montag "Erdbeben-Prügel" bekommt, obwohl sich das Erdbebengebiet südlich von Santiago befindet und die Gebiete von Andina im Norden Chiles liegen
      Avatar
      schrieb am 01.03.10 09:58:17
      Beitrag Nr. 75 ()
      Antwort auf Beitrag Nr.: 39.029.517 von Moritz54 am 28.02.10 21:45:49sind in der letzten zeit genug verprügelt worden
      Avatar
      schrieb am 01.03.10 17:12:10
      Beitrag Nr. 76 ()
      Sehe Boden koennte erreicht sein. Habe vorhin zugekauft.
      Avatar
      schrieb am 01.03.10 17:12:20
      Beitrag Nr. 77 ()
      BID Orders Volume Price Range
      28 166,000 1.230-1.270
      ASK Price Range Volume Orders
      1.280-1.320 28,600 13
      Avatar
      schrieb am 06.03.10 08:39:16
      Beitrag Nr. 78 ()


      Das gefällt mir. Trotz hoher Volumina am 5.03.2010 um kurz vor 20:00 Uhr und ca. 21:15 Uhr konnten die Shorter den Preis nicht mehr weiter nach unten drücken. Es sieht so aus, als ob jetzt wirklich der Boden erreicht ist, von wo aus ADM.V als Schnäppchen angesehen wird und entsprechende Kauforders positioniert sind.

      Werde meinen Bestand am Montag erhöhen. :cool:
      Avatar
      schrieb am 06.03.10 12:25:58
      Beitrag Nr. 79 ()
      Antwort auf Beitrag Nr.: 39.074.866 von MunichStock am 06.03.10 08:39:16Habe gestern zu 0,87 auch noch mal zugekauft...
      Avatar
      schrieb am 08.03.10 16:38:34
      Beitrag Nr. 80 ()
      Antwort auf Beitrag Nr.: 39.075.600 von ooy am 06.03.10 12:25:58Is vllt. ein schuss in den Ofen, aber klappen könnte es ja.
      Was ist der Grund für die Verschiebung der Studie?


      BRIEF-RESEARCH ALERT-Paradigm cuts Yamana Gold, 3 others

      Feb 25 (Reuters) - :

      * Paradigm cuts Terrane Metals to hold from speculative-buy

      * Paradigm cuts Yamana Gold Inc to hold from buy

      * Paradigm cuts Franco Nevada Corp to hold from buy

      * Paradigm cuts Andina Minerals to sell from speculative buy

      * Paradigm cuts Yamana Gold Inc price target to C$13 from C$17

      * Paradigm cuts Franco Nevada Corp price target to C$30 from C$34

      * Paradigm cuts Andina Minerals price target to C$1.50 from C$2.75

      * Paradigm cuts Terrane Metals price target to C$1.35 from C$1.70

      (Bangalore Equities Newsroom; +91 80 4135 5800; within U.S. +1 646 223 8780)

      COPYRIGHT

      Copyright Thomson Reuters 2010. All rights reserved.

      The copying, republication or redistribution of Reuters News Content, including by framing or similar means, is expressly prohibited without the prior written consent of Thomson Reuters.
      Avatar
      schrieb am 08.03.10 16:52:16
      Beitrag Nr. 81 ()
      Paradigm cuts Andina Minerals price target to C$1.50 from C$2.75

      Selbst da waere jetzt ein Potential von 20%
      Avatar
      schrieb am 08.03.10 16:59:59
      Beitrag Nr. 82 ()
      Antwort auf Beitrag Nr.: 39.085.800 von ooy am 08.03.10 16:52:16Ja, das is mir auch aufgefallen.

      Grds. wirkt der Wert auf dem aktuellen Niveau aber ziemlich billig und auf Broker soll man ja nich hören ;)
      Da könnte man genauso gut nen Friseur fragen, ob man ne neue Frisur braucht :laugh:

      Ich muss mich mal noch etwas mit der PR und den sonstigen Facts befassen...
      Avatar
      schrieb am 08.03.10 20:53:08
      Beitrag Nr. 83 ()
      Antwort auf Beitrag Nr.: 39.085.895 von royal_punter am 08.03.10 16:59:59Jetzt wo sie sehen, dass nix mehr nach unten geht, prügeln Sie nochmals ein, um ihre Shorts zu covern und billig einzusammeln. Was mich wundert, ist, dass auf diese diese hinterfotzige Tour noch so viele reinfallen.
      Avatar
      schrieb am 08.03.10 20:59:12
      Beitrag Nr. 84 ()
      Antwort auf Beitrag Nr.: 39.087.706 von MunichStock am 08.03.10 20:53:08:( Mensch, behalt deinen Mut. Ich hab sie auch noch ;)
      Mich würde aber mal interessieren, wie schlecht man die Nachricht überhaupt einordnen muss, weil ein Einbruch von über 40 % ja schon sehr viel ist. Kennt einer die Folgen der Nachricht? oder kennt sich einer genau aus, was es da noch für möglichkeiten gibt, das Gold aus der Erde zu holen?

      Gruß Bronsky
      Avatar
      schrieb am 09.03.10 09:57:46
      Beitrag Nr. 85 ()
      Welche Folgen? Ich sehe nur die Zukunft und die glänzt golden ;)
      Solche Kurse bieten Nachkaufmöglichkeiten für den Mutigen, mein Schnitt ist inzwischen recht gut...einfach liegen lassen, wer es sich leisten kann ;)
      Avatar
      schrieb am 09.03.10 10:26:38
      Beitrag Nr. 86 ()
      Antwort auf Beitrag Nr.: 39.087.753 von bronsky am 08.03.10 20:59:12Ich hab nicht viele, hatte früher mal 40.000 Stück, war Gott sei Dank vor dem großen Einbruch draussen.

      Bin erstmals bei 1,49 USD wieder eingestiegen. Hab mir heute wieder 2000 Stück zu 0,82 EUR gegönnt. Bei 106 Mio. ausstehenden Shares wurden gerade mal höchstens 10 Mio., also nicht mal 10% aller Shares umgesetzt. Von Katastrophe kann keine Rede sein. Glaube eher, dass Broker die Aktie schnell nach unten katapultiert haben. Sollte doch aktuelle Infos im Netz geben, wieviele Aktien short sind.

      Die gestrigen Verkaufsempfehlungen sind eigentlich der Anpfiff zum Wiedereinstieg; hoffentlich mit Short-Squeeze.
      Avatar
      schrieb am 09.03.10 10:39:46
      Beitrag Nr. 87 ()
      Nur mal so zur Info: [urlHier Bid-Size anschaun und dann auf *Click here for the Delayed Market Depth by Price Summary for this symbol.* gehen]http://cxa.marketwatch.com/tsx/en/market/quote.aspx?symbol=adm&x=8&y=15[/url]

      Im Ask praktisch nichts mehr, dafür auf der Bidseite weit über 400.000 Aktien. Wer hier noch große Mengen verkauft, kann nur shorten. Wehe, wenn die BidSize'erer zuschlagen!
      Avatar
      schrieb am 09.03.10 12:34:11
      Beitrag Nr. 88 ()
      Antwort auf Beitrag Nr.: 39.090.846 von MunichStock am 09.03.10 10:26:38Hab gerade auch noch mal gekauft zu 0,816, unter 0,80 greife ich weiter zu...
      Avatar
      schrieb am 09.03.10 15:49:44
      Beitrag Nr. 89 ()
      Spektakuläre Bohrnews von Sorgenkind Andina Minerals (ADM): Unter anderem 130 Meter mit 1,37 g/t.






      Andina's In-Fill Drilling on the Volcan Gold Project Continues to Deliver Excellent Results Including 130 Metres at 1.37 g/t Au


      5:37 PM ET, March 8, 2010


      TORONTO, ONTARIO, Mar 8, 2010 (Marketwire via COMTEX) -- ANDINA Minerals Inc. (ADM) (the "Company") is pleased to report further results from the 2009/2010 In-Fill Drilling Programme on the Company's Volcan Gold Project in Chile. As previously reported, the 2009/2010 Drilling Programme includes 20,960 metres of in-fill drilling and this report follows the first results released on February 10th, 2010 (see February 10, 2010 Press Release).

      "The key drivers to the Volcan project are grade and recovery. We are therefore very pleased and encouraged with the significant intercepts of higher grades seen in the in-fill program. These results together with those previously reported should have a positive impact in a new resource model. At the same time as we are working to enhance the resource model and the grade of the deposit, we continue to work on ways to improve gold recoveries at the Volcan Project. Current metallurgical test work programs are aimed at assessing the benefits of incorporating partial, or full, milling scenarios to the process options," said George Bee, President & CEO.

      Results from the latest batch of 8 drill holes totalling 3,190 metres on the Dorado West area, are reported in the table below.

      ---------------------------------------------------------------------------- TABLE - UPDATED DRILL RESULTS FOR PHASE VI IN-FILL DRILLING TO END OF FEBRUARY 2010 DORADO WEST SECTOR, VOLCAN PROJECT---------------------------------------------------------------------------- Grams/tonneHOLE No. Section From - To Meters (m) Au Including:----------------------------------------------------------------------------ROA - 800 DW - 1400 10 - 166 m 156 m 0.78 34m @ 1.63 g/t Au----------------------------------------------------------------------------DOA - 801 DW - 800 328 - 484 m 156 m 1.05 52m @ 1.96 g/t Au---------------------------------------------------------------------------- 526 - 564 m 38 m 1.21----------------------------------------------------------------------------ROA - 802 DW - 450 0 - 192 m 192 m 0.92 82m @ 1.41 g/t Au----------------------------------------------------------------------------ROA - 803 DW - 750 332 - 392 m 60 m 0.47----------------------------------------------------------------------------ROA - 804 DW - 850 278 - 364 m 86 m 1.22 30m @ 1.59 g/t Au----------------------------------------------------------------------------ROA - 805 DW - 850 80 - 178 m 98 m 1.13 64m @ 1.40 g/t Au----------------------------------------------------------------------------DOA - 808 DW - 950 214 - 464 m 250 m 1.05 130m @ 1.37 g/t Au----------------------------------------------------------------------------DOA - 810 DW - 1000 322 - 450 m 128 m 0.74 48m @ 1.14 g/t Au----------------------------------------------------------------------------
      Of the 3,190 metres drilled, 28% of the meters drilled (880 metres) have a weighted average sample grade of 1.46 g/t Au. The higher than average drill results will support Andina's efforts to better model the Volcan Project's Dorado resource adding further definition and assisting in the preservation of the better grades in the resource. The full effect of the drilling on the resource model will not be known until the resource model has been re-estimated, once all drilling in the 2009/2010 drill season is completed. With the eight holes reported above there are now results for 17-holes totalling 6,795.58 meters.

      The in-fill drilling program started in October 2009 is in support of further defining Andina's 9.8 million ounces of measured and indicated resources reported in the resource statement published in the autumn of 2009 (see Press Release dated September 10, 2009). This most recent drilling will also allow Andina to better estimate the grades in the resource. To date, resource modelling has been accomplished by estimating block model values within a broad mineralized boundary encompassing most of the mineralization. While this method is appropriate for the initially profiled bulk heap leach scenario, and was as detailed as could be expected given the density of the drill data available, Andina believes the approach contributed to smearing gold values, resulting in an estimate that likely overestimates mineral tonnage, reduces mineral grade but models fairly accurately the contained ounces of gold in the deposit. The new in-fill drilling serves to confirm the presence of higher grade zones within the resource and it is expected will allow more accurate modelling of these zones within the overall resource. Furthermore as Andina looks to optimize the development plan for Volcan and investigate alternatives to the initially contemplated heap leach scenario, a new resource model, which better captures the grade seen in drill holes, should offer opportunities to mine and extract the gold more efficiently. The ultimate effect of the new drilling on the resource estimate will not be known until a new resource model is completed in second half of 2010.

      All assays were performed by Laboratorio Geoanalitica, Coquimbo Chile.

      Qualified Person

      Mr. Michael Easdon is the Qualified Person under National Instrument 43-101 responsible for preparing and reviewing technical information on the Volcan Project in the Dorado and Ojo de Agua areas and ongoing field, sampling and analytical procedures in Chile concerning the aforementioned drill results. Mr. Easdon has reviewed the contents of this press release.

      Certain technical information regarding the Volcan Project required to be disclosed under Part 3 of National Instrument 43-101 is contained in the Technical Report on the Volcan Gold Project, Region III, Chile and Updated Mineral Resource Estimate for the Dorado Gold Deposits, dated October 23, 2009, prepared by Reno Pressacco, M.Sc. (A), P.Geo., Richard Gowans, P.Eng. and Sam Shoemaker, B.Sc., MAusIMM, each of Micon, and is available on SEDAR at www.sedar.com. This includes information regarding project area geology, mineralization, rock types and geological controls.

      QA/QC Protocols

      Andina continues to utilize Canadian Institute of Mining, Metallurgy and Petroleum ("CIMM") prescribed Quality Assurance and Quality Control ("QA/QC") protocols for all sampling and assaying of the core and reverse circulation cuttings. The Dorado drill program utilizes extensive QA/QC protocols for assaying and core sample handling that consist of the systematic insertion of blanks, standards and duplicates as well as using a secondary laboratory for regular check assaying. The core boxes are transported to Copiapo where the core is cut with a diamond saw with one-half of the core being placed in sealed bags, which are then taken to the Geoanalitica preparation facility in Copiapo for crushing and from, which the crushed sample is shipped by Geoanalitica to the Geoanalitica assay facility in Coquimbo.

      Geoanalitica analyses the samples for gold, copper and molybdenum. The gold assays are performed utilizing 30 grams fire assay with an Atomic Absorption Spectroscopy ("AAS") or gravimetric finish; the copper ("Cu") and Molybdenum ("Mo") are assayed for using standard wet analytical techniques.
      Avatar
      schrieb am 09.03.10 15:53:49
      Beitrag Nr. 90 ()
      Hab noch 5.000 zu 0,838 bekommen in Stuttgart.
      Avatar
      schrieb am 09.03.10 16:06:11
      Beitrag Nr. 91 ()
      Sind wirklich sensationelle News, und zieht ...

      Avatar
      schrieb am 09.03.10 17:10:13
      Beitrag Nr. 92 ()
      Antwort auf Beitrag Nr.: 39.094.577 von MunichStock am 09.03.10 16:06:11Normalerweise müßte es aufgrund der Shorts der letzten Woche einen Squeeze geben. Vielleicht kommt er ja noch. :D
      Avatar
      schrieb am 09.03.10 22:03:25
      Beitrag Nr. 93 ()

      Diese Aktie wird manipuliert!....................|===================================================================|
      Das sieht man an der Volumenentwicklung ab 17:35 Uhr. Immer mit 100, 200, 300, 400 und 500er - Päckchen druff auf die Mami.
      Avatar
      schrieb am 09.03.10 23:13:05
      Beitrag Nr. 94 ()
      Die können manipulieren soviel sie wollen, mich machen sie nicht nervös.
      Bei diesen Ressourcen und dem Cashbestand pack ich weiterhin alles ein, sofern Budget vorhanden ist.
      Ist nur eine Frage der Zeit, bis wir wieder Freude an Andina haben werden.
      Avatar
      schrieb am 10.03.10 02:33:37
      Beitrag Nr. 95 ()
      Antwort auf Beitrag Nr.: 39.099.536 von Kampfpommes1 am 09.03.10 23:13:05So isses, das beschert und heute nochmals Kaufkurse in Deutschland.
      Avatar
      schrieb am 10.03.10 07:56:45
      Beitrag Nr. 96 ()
      hatte Andine schon früher im Depot und habe wegen der recht geringen Goldgewinnungsquote verkauft ..60% sind einfach zu wenig, da das Deposit eh schon Low-Grade ist und recht hoch im Gebirge liegt.. die kosten für eine Mine wären auch unter normalen umständen schon recht hoch.. man muss nun abwarten..verkaufen macht keinen Sinn mehr.

      Im Negativszenario sitz man auf einem Batzen gold welches über Jahre nicht gefördert wird..die majors schreckt die schlechte Wirtschaftlichkeit wohl eher ab. Es ist wirklich schade.
      Avatar
      schrieb am 11.03.10 08:51:57
      Beitrag Nr. 97 ()
      Antwort auf Beitrag Nr.: 39.100.200 von German2 am 10.03.10 07:56:45In Kanada war gestern bezüglich Andina ein eindeutiger Trendwechsel feststellbar. Die Bidseiten zeigen höhere Volumina an, die Askseiten sind ziemlich leer.

      Avatar
      schrieb am 13.03.10 10:49:58
      Beitrag Nr. 98 ()
      Antwort auf Beitrag Nr.: 39.100.200 von German2 am 10.03.10 07:56:45Kinross´Kosten/Unze in der Maricunga-Mine liegen bei ca. 550 USD, damit kann man leben bzw. muss man leben, nichtsdestotrotz möchte Chile den Goldabbau weiter forcieren, von daher bin ich nicht der Meinung, dass Andina Schwierigkeiten bekommen sollte.
      Zumal die Wasserversorgung bereits erworben wurde und Elektrizität ausreichend zur Verfügung steht, die Straßenanbindung vorhanden ist.

      Die Goldgewinnungsquote in dieser Lage ist sicher nicht die allerbeste, aber sie unterscheidet sich auch nicht großartig zu den anderen dort Produzierenden. Kinross fördert mit einer Quote von 0,57 in der Maricunga-Mine, einige Km entfernt.

      Ich bin sowieso nicht großartig davon überzeugt, dass Andina jemals selbst fördern wird. Hier wird alles für eine Übernahme vorbereitet, nur der Zeitrum bis zu diesem Ziel bleibt offen.
      Avatar
      schrieb am 16.03.10 20:10:03
      Beitrag Nr. 99 ()
      Ungewöhnlich hohe Umsätze, jetzt bereits über 1,15 Mio. in Kanada umgesetzt. Sieht so aus, als ob Shorter versuchen, das Teil weiter unter Beschuss zu nehmen, aber andere, welche recovern müssen, ihre Chance sehen.
      Avatar
      schrieb am 17.03.10 12:18:07
      Beitrag Nr. 100 ()


      1.854.538 Aktien gestern in Kanada gehandelt. Sieht nach alles andere als nach Panikverkäufen aus; schon eher nach Umverteilungen durch große Marktteilnehmer.
      Avatar
      schrieb am 17.03.10 16:47:34
      Beitrag Nr. 101 ()


      Sieht heute nach Shortsqueeze aus!!! :D
      Avatar
      schrieb am 19.03.10 15:50:17
      Beitrag Nr. 102 ()
      Schoener Trade

      09:48 1.310 242,300 0.030
      Avatar
      schrieb am 01.04.10 09:04:04
      Beitrag Nr. 103 ()
      Andina Provides In-Fill Drilling Update on the Volcan Gold Project Including the Best Intercept at the Volcan Project To-Date-ROA 821 with 178 Meters of 1.77 g/t Gold

      TORONTO, ONTARIO--(Marketwire - March 31, 2010) - ANDINA Minerals Inc. (TSX VENTURE:ADM) (the "Company") announces the latest results from its 2009-2010 in-fill drilling programme at the Company's Volcan Gold Project in Chile. As previously reported, the 2009/2010 field season consists of 20,960 metres of in-fill drilling. Results from the latest eighteen (18) drill holes drilled to date totalling 5,401 metres on the Dorado West area of the deposit now have assays, which are reported in Table 1 below.

      "The in-fill drilling results for all the 18 holes presented below appear to exceed previously modeled values. Hole ROA 821, with an 242 meter intersect of 1.43 g/t Au g/t, including 178 meters of 1.77 g/t Au , lies relatively close to the surface and is the best hole drilled to date at Volcan. Even excluding this hole from the results from drill assay values, compared to what we observe in the block model estimate values, results appear to be overall positive in comparison to modeled values. Hole ROA 821 and the other higher grade intercepts support our contention that prior resource modelling does not fully do justice to representing the gold mineralization at Volcan," said George Bee, President & CEO. "With the additional data, we think that the grade distribution will have positive changes, and we will probably be able to define a higher grade core within the mineralized zone, providing a platform for more selective mining and processing to enhance the economics of the Volcan project. Volcan is a large project and it is important that we fully understand its full potential, and have all the elements in place to succeed."

      These new drilling results from the Dorado in-fill program continues to support the fact that there is a very large system of gold mineralization as represented by the resource model published in the National Instrument 43-101 compliant resource last year (see press release dated September 10 2009). Prior resource models took a very broad approach to resource estimation and it is hoped that the current infill drilling program will provide the necessary detail to better characterize the mineral distribution. These results bring the total reported data from this drilling season to 35 holes representing 12,357 meters (see February 10, 2010, and March 8, 2010 Press Release).

      While we believe that the infill drilling program shows values that compare favourably to modelled values and surrounding drill holes and this is very encouraging, it is not to be viewed as conclusive until the resource model is updated. For diagrams illustrating the location of in-fill drilling results, please follow the following link to the Andina website www.andinaminerals.com/find/id/15/7f.

      Table 1. Summary of Significant In-Fill Drilling Results - Phase VI, Volcan Project, March 2010
      Hole Nr. Section From – To (Metres) Metres g/t Au Including
      ROA 811 DW-550 102-238 136 0.51
      DOA 813 DW-1200 0-300 300 0.53 18 m. @ 1.06 g/t Au
      20 m. @ 1.11 g/t Au
      ROA 815 DW-1300 144-172 28 0.42
      ROA 817 DW-1250 0-156 156 0.43
      250-320 70 0.61 +8 m. @ 1.42 g/t Au
      DOA 819 DW-750 0-336 336 0.43
      ROA 820 DW-450 118-268 150 0.49
      ROA 821 DW-1250 102-344 +242 1.43 178 m. @ 1.77 g/t Au
      DOA 822 DW-1050 102-316 214 0.67 38 m. @ 1.16 g/t Au
      434-476 42 1.21 26 m. @ 1.65 g/t Au
      ROA 824 DW-1050 114-212 98 0.75 44 m. @ 1.15 g/t Au
      ROA 825 DW-1100 100-258 158 0.68 52 m. @ 1.00 g/t Au
      ROA 826 DW-800 50-220 170 0.87 56 m. @ 1.39 g/t Au
      ROA 827 DW-1050 0-28 28 0.66
      70-154 84 0.48
      ROA 829 DW-1200 96-190 94 0.62
      ROA 830 DW-1000 64-178 114 0.80 68 m. @ 1.09 g/t Au
      ROA 832 DW-650 6-178 172 0.58
      ROA 833 DW-700 26-188 162 0.49 26 m. @ 1.21 g/t Au
      298-440+ +142 0.52 8 m. @ 1.31 g/t Au
      ROA 834(1) DW-1450 120-140 18 0.41
      ROA 836 DW-1100 2-110 108 0.41

      (1) 2 metres not recovered

      All assays were performed by Laboratorio Geoanalitica, Coquimbo Chile.

      Qualified Person

      Mr. Michael Easdon is the Qualified Person under National Instrument 43-101 responsible for preparing and reviewing technical information on the Volcan Project in the Dorado and Ojo de Agua areas and ongoing field, sampling and analytical procedures in Chile concerning the afore mentioned drill results. Mr. Easdon has reviewed the contents of this press release. Comparisons of the drill results to the block model values were performed by Mr Reno Pressacco of Micon International Ltd, a qualified person under National Instrument 43-101. The block model in question forms the basis of the Dorado resource update released on September 24th 2009 and available on SEDAR at www.sedar.com.

      Certain technical information regarding the Volcan Project required to be disclosed under Part 3 of National Instrument 43-101 is contained in the Technical Report on the Volcan Gold Project, Region III, Chile and Updated Mineral Resource Estimate for the Dorado Gold Deposits, dated October 23, 2009, prepared by Reno Pressacco, M.Sc. (A), P.Geo., Richard Gowans, P.Eng. and Sam Shoemaker, B.Sc., MAusIMM, each of Micon, and is available on SEDAR at www.sedar.com. This includes information regarding project area geology, mineralization, rock types and geological controls.

      QA/QC Protocols

      Andina continues to utilize Canadian Institute of Mining, Metallurgy and Petroleum (CIMM) prescribed QA/QC (quality assurance and quality control) protocols for all sampling and assaying of the core and reverse circulation cuttings. The Dorado drill program utilizes extensive QA/QC protocols for assaying and core sample handling that consist of the systematic insertion of blanks, standards and duplicates as well as using a secondary laboratory for regular check assaying. The core boxes are transported to Copiapo where the core is cut with a diamond saw with one-half of the core being placed in sealed bags, which are then taken to the Geoanalitica preparation facility in Copiapo for crushing and from which the crushed sample is shipped by Geoanalitica to the Geoanalitica assay facility in Coquimbo.

      Geoanalitica analyses the samples for gold, copper and molybdenum. The gold assays are performed utilizing 30g fire assay with an atomic absorption spectroscopy (AAS) or gravimetric finish; the Cu and Mo are assayed for using standard wet analytical techniques.

      About Andina Minerals Inc.

      Andina's primary focus is mining exploration and development in Chile. The Company's flagship property is the 100%-owned Volcan Gold Project, strategically located in the prolific Maricunga Gold Belt. In September 2009, Andina provided an updated resource estimate for Volcan including measured and indicated mineral resources of 492.5 million tonnes at an average grade of 0.62 g/t Au for 9.8 million ounces of contained gold and inferred mineral resources of 36.8 million tonnes at an average grade of 0.65 g/t Au for 768,000 ounces of gold.
      Avatar
      schrieb am 05.04.10 16:36:35
      Beitrag Nr. 104 ()
      :eek:

      ...da kommt musik ins spiel

      ich hoffe, DIE läuft mir nicht davon
      habe noch vor die woche einzusteigen :D

      spekulation einer neuen machbarkeitsstudio wird den kurs treiben
      und ganz im ernst
      der absturz erfolgte ja eher mit erbärmlichen umsatz :p
      Avatar
      schrieb am 07.04.10 20:05:20
      Beitrag Nr. 105 ()
      so langsam könnte es mal hochgehen sonst sind wir hier bald nur noch mit 10 dollar pro unze bewertet wenn der goldpreis so weiter steigt
      Avatar
      schrieb am 08.04.10 19:49:10
      Beitrag Nr. 106 ()
      Antwort auf Beitrag Nr.: 39.290.099 von sharp2008 am 07.04.10 20:05:20Da decken sich bereits einige im stillen Kämmerlein ein;

      nur Geduld, den Gold-Anstieg holen wir beschleunigt irgendwann nach.
      Avatar
      schrieb am 08.04.10 22:01:36
      Beitrag Nr. 107 ()
      Boden eindeutig erreicht - es geht auffi! Kurzfrist-Ziel 2 CAD! :lick::D:cool:

      Steigende Kaufvolumina bei stegenden Kursen beachten! :D


      Avatar
      schrieb am 09.04.10 08:42:10
      Beitrag Nr. 108 ()
      Antwort auf Beitrag Nr.: 39.297.368 von MunichStock am 08.04.10 19:49:10Auffällig die Mini-Orders alle paar Minuten. Hast du ne Ahnung was das bedeutet, bzw. wo die herkommen und wer da event. sammelt? Das gleiche Spiel lief damals auch bei Avion, so drei Tage und dann gings ab.
      Muß aber hier nichts heißen!! Halt nur komisch..:confused:
      Avatar
      schrieb am 09.04.10 09:14:43
      Beitrag Nr. 109 ()
      Antwort auf Beitrag Nr.: 39.299.523 von Golden_Years am 09.04.10 08:42:10Die Miniorders gabs bei Andina aber auch nach unten. Will nicht unbedingt konspirativ denken, aber mir kommt dieser Abverkauf vor einem Monat fast wie eine Einstiegsmöglichkeit für Family & Friends vor. Bei dieser Aktie wird meiner Meinung nach ganz schön manipuliert - jetzt hoffentlich nach oben.

      :D
      Avatar
      schrieb am 09.04.10 09:20:21
      Beitrag Nr. 110 ()
      Antwort auf Beitrag Nr.: 39.299.780 von MunichStock am 09.04.10 09:14:43Klar, gibt immer zwei Richtungen ;)
      Gestern waren es aber Kauforders.
      Bin mal gespannt was da kommt...
      Avatar
      schrieb am 09.04.10 13:42:49
      Beitrag Nr. 111 ()
      Antwort auf Beitrag Nr.: 39.299.826 von Golden_Years am 09.04.10 09:20:21RBC hat eine Empfehlung raus!
      Avatar
      schrieb am 11.04.10 10:56:56
      Beitrag Nr. 112 ()
      sollte man noch einsteigen?
      oder lieber eine korrektur abwarten?
      Avatar
      schrieb am 11.04.10 11:00:45
      Beitrag Nr. 113 ()
      Antwort auf Beitrag Nr.: 39.302.299 von viena am 09.04.10 13:42:49was für eine ist es?
      Avatar
      schrieb am 11.04.10 11:38:03
      Beitrag Nr. 114 ()
      Antwort auf Beitrag Nr.: 39.309.643 von Scheich2000 am 11.04.10 10:56:56Welche Korrektur? :laugh:
      Avatar
      schrieb am 11.04.10 14:17:40
      Beitrag Nr. 115 ()
      Antwort auf Beitrag Nr.: 39.309.779 von Kampfpommes1 am 11.04.10 11:38:03aslo meinst du man sollte rein?
      Avatar
      schrieb am 14.04.10 00:26:57
      Beitrag Nr. 116 ()
      Schöne Bid-Vorlage:

      Wenn die nicht hoch will (hat übrigens auch der Oxford-Club in Ausgabe 9/2009 mit Kurziel 4 CAD empfohlen (lag damals bei 1,25 CAD).

      Avatar
      schrieb am 27.04.10 13:05:13
      Beitrag Nr. 117 ()
      Wow, 180.000 Stueck auf einen Schlag in Stuttgart...
      Avatar
      schrieb am 27.04.10 14:30:43
      Beitrag Nr. 118 ()
      ...und jetzt 500.000 im ASK, was ist da los?
      Avatar
      schrieb am 18.05.10 18:44:36
      Beitrag Nr. 119 ()
      kennt eigentlich jemand die marktkap?
      kan mir sonst noch jemand daten über andina geben?
      machen die schon umsätze?hab´s auch im oxfordbrief gesehen,aber der artikel ist schon zu alt.kann den leider nicht mehr abrufen.
      bauen die schon silber ab?

      grüßle
      Avatar
      schrieb am 09.06.10 01:01:27
      Beitrag Nr. 120 ()
      Antwort auf Beitrag Nr.: 39.541.043 von VFBLER am 18.05.10 18:44:36Schon ins Deutsche übersetzt. Hört sich gut an.

      Andina Reports High Grades von seinem neuen Gold Zone am Ojo de Agua Osten, mit 122 m bei 1,45 g / t Au, einschließlich 32 m bei 3,25 g / t Gold

      04.26 Uhr ET, 8. Juni 2010

      Toronto, Ontario, 8. Juni 2010 (aktiencheck.de / PRNewswire) - ANDINA Minerals Inc. (ADM) (Das "Unternehmen") freut sich, die Ergebnisse von zwei weiteren Bohrlöchern der mineralisierten Zone am Ojos de Agua Osten (ODAE), in der Volcan Project Website rund 6,5 km von der bekannten Dorado Zone bekannt zu geben. Diese Bohrungen folgen auf die jüngste Entdeckung Loch, Loch RODAE 812, die 1,2 g / t Gold über 70m abgefangen innerhalb einer breiteren Zone von 0.52g / t Gold über 336m. (Siehe Pressemitteilung vom 25. Februar 2010). Das Unternehmen ursprünglich geplant zu vier zusätzliche Löcher zu bohren, aber das Programm wurde unterbrochen durch frühe Winterstürme. Die ODAE Zone ist Teil der Mineral-Exploration Zugeständnisse von Barrick Gold Corporation im Jahr 2009 (erworben siehe Pressemitteilung vom 21. Mai 2009). Die Ergebnisse der beiden Bohrlöcher sind wie folgt:


      - Hole RODAE 850D, die 70m von 0.56g / t einschließlich 18m von 1.71g / t zurück
      - Hole RODAE 851, die 122m von 1.45g / t einschließlich 32m auf 3.25g / t zurück




      George Bee, Präsident und CEO von Andina sagte: "Basierend auf dem ursprünglichen Entdeckung Loch und die beiden jüngsten Bohrergebnisse wir glauben, wir haben eine breite Basis abgefangen strukturell kontrollierte mineralisierten Systems bei ODAE mit deutlich überdurchschnittlichen Noten als die wichtigsten Volcan hinterlegen. Dies könnte eine sehr positive Auswirkungen auf die Entwicklungsstrategie und Wirtschaftswissenschaften für Volcan, und könnte die höhere Besoldungsgruppe Ergebnisse Ergänzung aus den jüngsten Bohrungen auf der Haupt-Dorado-Zone (siehe Pressemitteilung vom 7. Juni 2010).

      Der frühe Wintereinbruch zwang uns vorzeitig zu Ende des Bohrprogramms auf ODAE aber wir freuen uns auf eine detaillierte Überprüfung der bisherigen Bohrungen und die Planung für die nächste Saison Explorations-Bohrprogramm. Wir glauben auch, dass der Vulkan-Eigenschaft auf einem sehr großen mineralisierten Systems sitzt und wir glauben, dass wie unser geologisches Team zu bohren und erkunden Sie die Zugeständnisse werden wir auch weiterhin zu einem besseren Verständnis für das Ausmaß der mineralisierten Körper und strukturellen Kontrollen zu gewinnen, was einen besseren weiterhin das Potenzial, finden Sie weitere ODAE mineralisierte Systeme.

      Wir haben unsere meiste Zeit verbracht mit Schwerpunkt auf der Exploration und Entwicklung von Szenarien für unsere Dorado Entdeckungen, die nur etwa 5% unserer Explorations-Konzessionen zu besetzen, so dass dieser jüngste Entdeckung bestätigt unsere Überzeugung, dass Dorado nur der Anfang ist. Ich möchte unsere Geologen Kompliment für ihre harte Arbeit bei der Ermittlung dieser höhergradigen Zonen Volcan Entwicklung ergänzen. "

      Mineralisierten Abschnitte können in Fotografien von Kern auf der Andina-Website eingesehen werden.

      TABELLE 1


      -----------------------------------------------------------------------
      ----
      Hole Nr. Abschnitt Von - an MTS Grs / t Au Einschließlich
      ---------------------------------------------------------------------------
      Nicht größer größer als 18 m
      RODAE-850D Designated 38-167 als 70 0,56 @ 1,71 g / t Au
      ---------------------------------------------------------------------------
      Nicht
      RODAE Designated-851 166 bis 288 122 1,45 32 m@3.25 g / t Au
      ---------------------------------------------------------------------------
      NB. Intervalle repräsentieren down-hole Distanzen und nicht die tatsächlichen Breiten




      Geologie der Ojo de Agua ESTE MINERAL ZONE

      Wie in Tabelle 1, Bohrloch RODAE 851 angegeben abgefangen die Gold-Mineralisierung über einen 122 m-Intervall mit Graden von 1,45 g / t und umfasst 32 m mit 3,25 g / t Au. Bohrloch RODAE 850D abgefangen einem Intervall von 18 m (offen) mit einem Gehalt 1,71 g / t Au (0,68 bis 3,97 g / t Au) in den Boden eines 70 m-Intervall von durchschnittlich 0,56 g / t Au.

      Hole RODAE 851 abgefangen eine konsequente Intervall mit Werten zwischen 3 bis 6 g / t Au. Die höchste Stufe bisher erzielten (12,5 g / t Au über 2 m in dieses Loch) zusammen mit erhaltenen Werte (1 bis 3,5 g / t Au) in die Löcher RODAE 850 + 812, zusätzlich zu den allgemein höheren Klassen aus dem Aushub erhältlich ODAE, sind im Gegensatz zu den Ergebnissen ursprünglich an der Dorado-Zone erhalten. Dies weist auf das Potenzial für die Definition einer deutlich höheren Besoldungsgruppe Ressource Ojo de Agua Osten.

      Epithermale Funktionen sind innerhalb der Zone, die offensichtlich und bestehen aus oberflächennahen dampfbeheizt Veränderung einschließlich kolloidalen Texturen bis hin zu Quarz-Pyrit-Alunit hoher Sulfidierung Veränderung auf tieferen Ebenen. Diese Veränderung Stil Überdrucken Relikt Magnetit-Quarz-Chlorit-Änderung in Bezug auf eine oder mehrere frühere Gold-Porphyr-Events.

      Ein höherwertiges Gold mineralisierte Zone, die entlang des Streichens offen ist, wird als über eine Länge von 400 m und eine Breite von ca. definiert werden. 10 m bis 45 m, und im Durchschnitt ca. 30 m. Diese höhergradigen Kern ist in eine niedrigere Besoldungsgruppe enthalten (+ 0,5 g / t Au) Umschlag von durchschnittlich 110 m in der Breite. Der Bohrer angegebenen Maße Tiefe beträgt 200 m, aber die vertikale Fortsetzung offen bleibt, bis weitere Bohrungen. Die wichtigsten mineralisierten strukturellen Zone Nord-Süd-Trends. Die strukturelle Zone entlang der Gräben an der Oberfläche für weitere 150 m nördlich der Kernzone (ausgegraben worden sind, beziehen sich auf Abbildung 1) zurückverfolgt werden, nach der es unter einen Paläo-Sinter, dass die Mineralisierung hydrothermalen System kann weiterhin für schlägt verschwindet mindestens weitere 1000 m.

      Weitere Gold-Potential am ODAE kann innerhalb von Teilmengen von mineralisierten Strukturen parallel durch weitere Exploration (und für die strukturelle und geochemische Hinweise entdeckt werden, die bereits existieren).

      Die Saison 2010-2011 Exploration beginnend im 4. Quartal 2010 wird auf diese neue Möglichkeit bei ODAE mit Andina den weiteren Zielen konzentrieren.

      Ojo de Agua East Area Qualified Person

      Die Grabungen und Bohrungen Programm an der Ojo de Agua East Bereich des Volcan-Gold-Projekt wurde überprüft und die Ergebnisse von Herrn Michael Easdon, Andina die qualifizierte Person gemäß National Instrument 43-101 genehmigt. Mr. Easdon war verantwortlich für die Vorbereitung der technischen Informationen über die Ojo de Agua Gebiet, das in der Gesellschaft "Annual Information Form für das Geschäftsjahr zum 31. Dezember bekannt gegeben wird 2008 (vom 8. April 2009). Mr. Easdon hat den Inhalt dieser Pressemitteilung überprüft.

      QA / QC-Protokolle

      Mr. Easdon hat bestätigt, dass Andina hat geeignete genutzt und akzeptiert (pro National Instruments Anforderungen von NI 43-101) Qualitätssicherung und Qualitätskontrolle (QA / QC ") Protokolle für den Graben und Bohrloch Probenentnahme und Analyse. Grab Proben Felsstücke gesammelt zu identifizieren oder zu bestätigen oder potenziell anomale wirtschaftliche Konzentrationen von Edelmetallen (Au, Ag), unedle Metalle (Cu, Mo, Zn, Pb) sowie Pathfinder Elemente häufig mit epithermalen Mineralisierung (als assoziierte ausgewählt , Sb, Hg, Ba). Chip-Kanal-Proben sind ein oder mehrere ständige Proben von mineralisiertem Gestein verändert oder mit Hammer und Meißel über ein Intervall gemessen und können aus Bereichen der Ausläufer oder aus Gräben entnommen werden gesammelt. Ausgewählte Standorte sind zum Zeitpunkt der Erhebung mit Handheld-GPS-Messungen bestimmt. Andina nicht beabsichtigt, entweder den Chip-Kanal (Gräben) verwenden oder grab Proben Daten in einer künftigen Ressourcen-Schätzungen. Die Proben, die in dieses Programm aufgenommen wurden gesammelt worden, um zu bestätigen zuvor berichteten Explorations-Ergebnisse der Probenahme und weitere Bereiche ermitteln, von größerem Interesse für die nähere Zukunft Explorations-und Bohrarbeiten.

      Alle Proben werden von der Firma Personal für die Probenvorbereitung Geoanalitica Anlage in Copiapo Chile, wo sie zerkleinert (Chip und greifen Proben) sind und alle Bohrlöcher und Oberflächen-Proben werden dann von Geoanalitica ihre Test-Anlage in Coquimbo befindet geliefert geliefert. Geoanalitica Analysen der Proben auf Gold, Kupfer und Molybdän. Die Gold-Assays durchgeführt werden unter Verwendung 30 g Brandprobe mit einem atomaren Absorptions-Spektroskopie (AAS ") oder gravimetrische, die Cu-und Mo sind für die Verwendung von Standard-nassen analytischen Techniken getestet. Sample Zellstoff-Splits werden anschließend durch Geoanalitica die ALS-Chemex-Labor (auch in Coquimbo) für Multi-Element-Mail mit induktiv gekoppeltem Plasma ("ICP")-Analyse.

      Über Andina Minerals Inc.

      Andina Der primäre Fokus liegt Bergbau, Exploration und Entwicklung in Chile. Das Flaggschiff des Unternehmens Eigenschaft ist die 100%-ige Volcan Gold Project, strategisch im produktiven Goldgürtel Maricunga gelegen. Im September 2009, sofern Andina eine aktualisierte Ressourcenschätzung für Volcan einschließlich gemessen und Bodenschätze 492,5 Millionen Tonnen angegeben bei einem durchschnittlichen Goldgehalt von 0,62 g / t Au für 9.800.000 Unzen an enthaltenem Gold und Inferred Ressourcen von 36,8 Millionen Tonnen bei einem durchschnittlichen Grade von 0,65 g / t Au für 768.000 Unzen Gold.

      Forward-Looking Statements

      Diese Pressemitteilung enthält zukunftsgerichtete Aussagen, einschließlich Prognosen, Projektionen und Prognosen. Zukunftsgerichtete Aussagen beinhalten, sind aber nicht beschränkt auf, Aussagen im Hinblick auf Explorations-Aktivitäten und Ergebnisse (einschließlich des Zeitpunkts der Ergebnisse), das Timing und der Erfolg von Explorationsaktivitäten allgemein, Zeitleisten ermöglichen, staatliche Regulierung von Explorations-und Bergbau-, Umwelt-Risiken , title Streitigkeiten oder Ansprüche, Einschränkungen des Versicherungsschutzes, Timing und mögliche Ergebnisse anhängiger Rechtsstreitigkeiten und Timing und der Ergebnisse künftiger Ressourcenschätzungen oder zukünftige wirtschaftliche Studien, insbesondere beinhalten Aussagen in Bezug auf den Zeitpunkt der Berichterstattung über die Ergebnisse der Bohrungen am Ojo de Agua Osten beginnend im Februar 2010. Oft, aber nicht immer, zukunftsgerichtete Aussagen können durch die Verwendung von Wörtern wie "plant", "planen" identifiziert werden, "geplant", "erwartet" oder "Looking Forward", "erwartet nicht", "weiterhin" , "vorgesehen", "schätzt", "prognostiziert", "beabsichtigt", "potenziell", "antizipieren", "rechnet nicht mit" oder "Glaube", oder beschreibt ein "Ziel", oder Variationen solcher Wörter und Phrasen oder dass bestimmte Aktionen, Ereignisse oder Ergebnisse "vielleicht", "könnte", "würde", "könnte" oder "wird" ergriffen werden, eintreten oder erreicht werden.

      Zukunftsbezogene Aussagen basieren auf einer Reihe von materiellen Faktoren und Annahmen, einschließlich des Ergebnisses der Bohr-und Explorations-Aktivitäten basiert, dass unerwartete geologische Formationen, Bedingungen oder nicht befinden, dass die Parteien liefern Waren und vergebene / oder Dienstleistungen zu den vereinbarten Zeitrahmen, dass Geräte notwendig für die Exploration ist erhältlich als geplant und verursacht keine unvorhergesehenen Pause Downs, dass kein Mangel an Arbeitskräften oder Verzögerungen entstehen, dass Anlagen und Ausrüstung wie angegeben funktionieren, dass keine ungewöhnlichen geologischen oder technischen Probleme auftreten und dass Labor und andere damit zusammenhängende Dienstleistungen verfügbar sind und führen als vertragsgemäß.

      Zukunftsgerichtete Aussagen beinhalten bekannte und unbekannte Risiken, zukünftige Ereignisse, Bedingungen, Ungewissheiten und andere Faktoren, die dazu führen können, Leistungen oder Errungenschaften wesentlich abweichen von den zukünftigen Ergebnissen, Prognose, Projektion, Vorhersage, Leistungen oder Errungenschaften ausgedrückten oder implizierten von den vorausschauenden Aussagen. Solche Faktoren beinhalten unter anderem die Interpretation und die tatsächlichen Ergebnisse von aktuellen Explorationsaktivitäten; Änderungen im Projekt als Hauptparameter plant weiter verfeinert werden, die künftigen Preise von Gold, mögliche Unterschiede in Qualität oder Verwertungsquoten; Ausfall der Ausrüstung oder Prozesse zu bedienen wie erwartet ; das Versagen der Parteien vertraglich zu erfüllen; Arbeitskonflikte und andere Risiken des Bergbaus, Verzögerungen beim Erhalt von behördlichen Zulassungen oder der Finanzierung oder bei der Fertigstellung der Exploration, wie auch jene Faktoren in der Gesellschaft öffentlich hinterlegten Unterlagen offen gelegt werden. Obwohl Andina versucht hat, wichtige Faktoren, dass die tatsächlichen Aktionen, Ereignisse oder Ergebnisse verursachen könnten die zu erheblichen Abweichungen von den in zukunftsgerichteten Aussagen beschrieben werden, kann es andere Faktoren dazu führen, dass Aktionen, Ereignisse oder Ergebnisse nicht wie angenommen, geschätzt oder beabsichtigt . Es kann nicht zugesichert werden, dass zukunftsweisende Aussagen sich als zutreffend erweisen werden, da die tatsächlichen Ergebnisse und zukünftigen Ereignisse könnten wesentlich von den in derartigen Aussagen vorweggenommen werden. Dementsprechend sollte der Leser nicht übermässig auf zukunftsweisende Aussagen.

      Um ein Foto mit dieser Pressemitteilung verbundenen Sie bitte den folgenden Link besuchen:

      http://media3.marketwire.com/docs/mineralization_intercepts_…

      Weder die TSX Venture Exchange noch ihr Regulation Services Provider (wie dieser Begriff in den Richtlinien der TSX Venture Exchange definiert ist) übernimmt die Verantwortung für die Angemessenheit oder Genauigkeit dieser Pressemitteilung.


      Kontakte:
      ANDINA Minerals Inc.
      George M. Bee
      President & CEO
      416 203 3488

      Investor Relations:
      ANDINA Minerals Inc.
      416 203 3488
      www.andinaminerals.com





      QUELLE: ANDINA Minerals Inc.

      http://www.andinaminerals.com



      Copyright 2010 Marketwire, Inc. Alle Rechte vorbehalten.
      Avatar
      schrieb am 17.09.10 15:11:56
      Beitrag Nr. 121 ()
      Andina Reports Improved Grades in the 2010 Resource Update and Provides Progress Update for Volcan Initial Phase I Development Plan
      http://tmx.quotemedia.com/article.php?newsid=34048261&qm_sym…
      Avatar
      schrieb am 21.09.10 18:12:54
      Beitrag Nr. 122 ()
      hier gehts seit monaten die post ab und keinem interessierts
      4 Antworten
      Avatar
      schrieb am 21.09.10 21:52:27
      Beitrag Nr. 123 ()
      Antwort auf Beitrag Nr.: 40.186.825 von colans am 21.09.10 18:12:54wundert mich auch :cool:
      3 Antworten
      Avatar
      schrieb am 21.09.10 22:10:17
      Beitrag Nr. 124 ()
      Antwort auf Beitrag Nr.: 40.188.430 von syrro am 21.09.10 21:52:27wenigsten ein lebenszeichen:-)

      der chart sieht wirklich prächtig aus.
      ich denke der nächste widerstand ist erst bei 2 cad...aber schauen wir mal
      2 Antworten
      Avatar
      schrieb am 22.09.10 12:24:01
      Beitrag Nr. 125 ()
      Antwort auf Beitrag Nr.: 40.188.573 von colans am 21.09.10 22:10:17weiss einer von euch ob rsr schon (gott sei dank) raus ist?
      1 Antwort
      Avatar
      schrieb am 14.10.10 18:49:56
      Beitrag Nr. 126 ()
      Antwort auf Beitrag Nr.: 40.191.427 von colans am 22.09.10 12:24:01 ob rsr schon (gott sei dank) raus ist?

      Die muessten noch drin sein, lese gerade eine Anzeige zur Rohstoffstudie No. 9, dort werden sie noch empfohlen.

      Gruss Looe
      Avatar
      schrieb am 05.05.11 03:38:31
      Beitrag Nr. 127 ()
      Wuerde eigentlich wieder einsteigen wollen, nur die Insiderverkaeufe schrecken mich noch ab, obwohl ja Einer 300.000 Optionen zu 1,35 eingeloest hat...

      Andina Minerals Inc. (ADM) As of May 3rd, 2011
      Filing Date Transaction Date Insider Name Ownership Type Securities Nature of transaction # or value acquired or disposed of Unit Price
      Apr 15/11 Apr 14/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 10 - Disposition in the public market -2,800 $1.490
      Apr 15/11 Apr 14/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 10 - Disposition in the public market -3,000 $1.480
      Apr 15/11 Apr 14/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 10 - Disposition in the public market -4,200 $1.470
      Apr 15/11 Apr 13/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 10 - Disposition in the public market -24,000 $1.500
      Apr 15/11 Apr 12/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 10 - Disposition in the public market -6,000 $1.500
      Apr 15/11 Apr 12/11 Rosselot, Juan Eduardo Direct Ownership Common Shares 51 - Exercise of options 40,000 $1.350
      Apr 15/11 Apr 12/11 Rosselot, Juan Eduardo Direct Ownership Options 51 - Exercise of options -40,000 $1.350
      Apr 13/11 Apr 13/11 Harvey, T. Sean Direct Ownership Common Shares 51 - Exercise of options 300,000 $1.350
      Apr 13/11 Apr 13/11 Harvey, T. Sean Direct Ownership Options 51 - Exercise of options -300,000 $1.350
      Apr 12/11 Apr 12/11 Laing, R. Gregory Direct Ownership Common Shares 10 - Disposition in the public market -60,000 $1.520
      - Amended Filing
      Avatar
      schrieb am 27.03.12 03:31:05
      Beitrag Nr. 128 ()
      Noch jemand investiert hier? Wie stehen die Chancen?
      Avatar
      schrieb am 18.05.12 18:00:35
      Beitrag Nr. 129 ()
      Es tut sich was, haben ja ueber 6 Mio. Unzen, spottbillig...
      5 Antworten
      Avatar
      schrieb am 18.05.12 19:19:58
      Beitrag Nr. 130 ()
      Antwort auf Beitrag Nr.: 43.183.919 von ooy am 18.05.12 18:00:35Hallo lonesome Poster !!!!

      Ich habe auch welche.
      Ziel sollte eine Verdoppelung vom aktuellen Niveau aus sein.

      Siehe die Kurse vor einem Jahr.

      Aber aktuell sind ja alle Minen spottbillig.
      4 Antworten
      Avatar
      schrieb am 18.05.12 20:05:26
      Beitrag Nr. 131 ()
      Antwort auf Beitrag Nr.: 43.184.377 von MIRU am 18.05.12 19:19:58Ja, ich brauche noch 20% zum BreakEven, es sollte aber hoffentlich bald Nachrichten geben, fuers 2. Quartal wurde ja eine Studie angekuendigt...
      3 Antworten
      Avatar
      schrieb am 18.05.12 22:11:07
      Beitrag Nr. 132 ()
      Antwort auf Beitrag Nr.: 43.184.630 von ooy am 18.05.12 20:05:26uiuiui ooy,
      bin noch 30% unter wasser...trotz nachkauf vor zwei tagen.....:eek:
      aber das wird!!! :cool:
      2 Antworten
      Avatar
      schrieb am 19.05.12 11:11:06
      Beitrag Nr. 133 ()
      Antwort auf Beitrag Nr.: 43.185.258 von dr.a am 18.05.12 22:11:07Ja, glaube ich auch, vielleicht kaufe ich auch nochmal nach, wenn wir die 0,35 nochmal sehen...
      1 Antwort
      Avatar
      schrieb am 15.06.12 12:34:45
      Beitrag Nr. 134 ()
      Antwort auf Beitrag Nr.: 43.186.097 von ooy am 19.05.12 11:11:06Wird immer günstiger:


      0,318 €

      -0,93 %
      -0,0030
      Berlin (EUR), 15.06.12 | 11:23
      Avatar
      schrieb am 15.06.12 15:45:12
      Beitrag Nr. 135 ()
      Andina First Quarter 2012 Update



      TORONTO, ONTARIO--(Marketwire - May 29, 2012) -ANDINA Minerals Inc. (TSX VENTURE:ADM) ("Andina" or the "Company") wishes to update the market on progress made during the first quarter of 2012 on the Company's Volcan project.

      "Our environmental permitting and engineering teams have made significant progress advancing their respective studies in 2012," said George Bee, President and CEO. "Our metallurgical work program in support of a feasibility study is complete and final reports are currently being drafted. Preliminary indications suggest that grade recovery curves will be similar to that reported in the 2011 prefeasibility study. The Environmental Impact Assessment ("EIA") is substantially complete and we expect to submit it to the authorities in the second quarter of 2012 after we conclude discussions with both government agencies and local communities. The feasibility study could be delayed as late as the first quarter of 2013, while the Company continues to optimize all aspects of the study, including sourcing of people, products and material which is taking longer than anticipated."

      Volcan Project Update:
      •In January 2012, the Company reviewed and finalized a detailed project description of the Volcan Gold Project ("Volcan") for its EIA and construction permit application, for the initial development plan.

      ◦Extensive metallurgical engineering studies to support a feasibility study for Volcan are now largely complete. These studies were aimed at optimizing reagent consumption and providing an acceptable level of detailed information for any independent engineer reviews.


      ◦Management has included a Sulphidation, Acidification, Recycling, and Thickening circuit into the Volcan project description to reduce operating costs and eliminate risk.


      ◦The project description now includes a combined mill-heap leach production rate of 60,000 tonnes of ore processed per day using the same or similar crushing equipment as identified in the prefeasibility study where total throughput was set at 55,000 tonnes per day.


      ◦Additionally, new processes to mitigate environmental risks associated with tailings have been added to the project description. These measures have been included to give comfort to stakeholders that Andina is proposing all reasonable measures, above and beyond those presented in the prefeasibility study, to save water, protect the environment and eliminate risk associated with the project.



      •During the first quarter of 2012, the Company successfully completed a study linking idiosyncrasies in the Volcan geology and mineralogy to the metallurgical results that have been seen in the metallurgical test work conducted over the past three years.

      ◦The study has significantly advanced our knowledge of the Dorado ore bodies that form the Volcan project. The protocols developed are applicable to the wider geologic setting and give management confidence that Andina can manage a gold deposit in the area with minimal operational risk.


      ◦The Company has now developed a block-model that clearly identifies low pH material, thought to be associated with exotic sulphate salts, therefore further de-risking the planned selective mining and processing practices to be employed at Volcan.


      ◦Having now identified a limited horizon of low pH material at Volcan, the Company believes it can improve heap leach performance by now directing this material to either waste or the proposed mill where it can be effectively processed. The Company anticipates improvements in reagent consumption having developed a protocol to manage low pH material related to sulphate salts.



      •The 2011/2012 Development Program Field Season was successfully completed in April 2012.

      ◦The Company's objective was to gather the remaining essential data for the feasibility study. Information includes: detailed investigation and additional drilling to establish pit-slope angles, condemnation drilling under key project facilities, water well drill and pump test investigations to support the site hydro-geochemical and hydrological models, geotechnical and site foundation investigations.



      •Feasibility Study Status:

      ◦We are currently evaluating the final results of the metallurgical program to confirm the optimal plant flowsheet and to finalize projected recoveries and reagent consumptions.


      ◦The geotechnical investigation has been completed on site for all the proposed site facilities.


      ◦Geotechnical drilling in the mine area to finalize the pit slopes is complete.


      ◦The general site layout has been finalized.


      ◦Preliminary engineering has been completed and general arrangements have been prepared along with the associated material takeoffs for the process plant.


      ◦Requests for quotations have been issued for all major equipment and quotations are in hand for approximately half of the items.


      ◦Contractor bid packages are being sent out to obtain preliminary prices for site construction.


      ◦Preliminary designs for the site infrastructure have been prepared and bid prices are being solicited for construction of these facilities as part of the general contractor bid packages.


      ◦The first draft of Volcan's feasibility study is nearing completion and is expected for initial internal review around mid-year. It is anticipated that there will be several scope differences between the draft feasibility study and the prefeasibility study which was published in February 2011. The concept and scale of mineral processing is expected to be largely the same, employing a spilt leach and milling scenario, however, the intention is to increase the use of the equipment outlined in the prefeasibility study, with the anticipated result of higher throughput in the mill. The Company intends to take a more environmentally robust approach to tailings management and intends to move from thickened tailings envisioned in the prefeasibility study to dry stack tailings and to add a cyanide destruction circuit. These changes would likely be favorable for capital costs by reducing the need for tailings impoundment construction but will be offset due to the need for filtering equipment. The feasibility study is expected to include SART to control copper values in heap leach solutions, which if left unchecked would negatively impact cyanide consumption and therefore operating cost. The differences outlined above and inflation since publication of the prefeasibility study are anticipated to result in several changes to the economic metrics published in the prefeasibility study and as a consequence prior estimates should not be relied upon and should only be considered in the light of noted changes.


      ◦Based on the anticipated changes to the Volcan project description in comparison to the prefeasibility study and the current bearish climate for mining investment, the Company will use the coming months, while environmental permitting is advanced through the evaluation process, to refine and optimize the first draft of the feasibility study, including sourcing of people, products and material, which is taking longer than anticipated. The feasibility study could be delayed as late as the first quarter of 2013.



      •The Company intends to delay its submittal of the EIA for Volcan until the end of the second quarter of 2012 in order to provide the Company additional opportunities to meet with governmental officials and communities prior to submittal.


      •On January 1, 2012, Mr. Robert (Bob) Rose assumed the role of Chief Operating Officer for Andina. Bob is a senior mine development professional who reinforces Andina's internal team and will provide leadership in the preparation of the economic studies and development of Volcan. It should be noted that Bob was the Project Manager for the Volcan Project in his former position with Kappes Cassidy & Associates and the transition has been seamless.


      •In February 2012, Dr. Annick Chouinard assumed the role of Vice President of Exploration for Andina. Annick is a senior geologist having extensive experience with epithermal sulphidation deposits. Annick augments our existing geological team and, with the completion of Volcan's feasibility study, will provide exploration leadership on Andina's under-explored land holdings.


      •As at March 31, 2012 the Company had working capital of $9.8 million and cash-on-hand of $14.3 million.


      •First quarter net loss was $0.4 million, or $0,003 per share.

      Dr. Annick Chouinard, Vice President of Exploration of Andina and a qualified person for the purposes of National Instrument 43-101 of the Canadian Securities Regulators, has reviewed the scientific and technical information contained in this press release.
      Avatar
      schrieb am 15.06.12 15:46:23
      Beitrag Nr. 136 ()
      ◦Based on the anticipated changes to the Volcan project description in comparison to the prefeasibility study and the current bearish climate for mining investment, the Company will use the coming months, while environmental permitting is advanced through the evaluation process, to refine and optimize the first draft of the feasibility study, including sourcing of people, products and material, which is taking longer than anticipated. The feasibility study could be delayed as late as the first quarter of 2013.



      •The Company intends to delay its submittal of the EIA for Volcan until the end of the second quarter of 2012 in order to provide the Company additional opportunities to meet with governmental officials and communities prior to submittal.
      Avatar
      schrieb am 15.06.12 15:47:20
      Beitrag Nr. 137 ()
      Habe mich daher bei 0,375 verabschiedet, hatte gerade darauf gewartet...
      Avatar
      schrieb am 27.09.12 13:36:42
      Beitrag Nr. 138 ()
      trotz verspätung der feasibility study und des länger dauernden genehmigungsverfahrens extrem interessant. für alle bereits investierten ist die verzögerung jedoch eine kathastrophe.

      wobei in peru derzeit die bevölkerung gegen bergbauprojekte sturmläuft. bis vor kurzem konnte die regierung projekte beinahe im schlaf durchwinken. bei newmont, unter anderem, sieht das derzeit wohl anders aus. wobei man dort bereits an lösungen mit den umliegende kommunen arbeitet.

      ob das bei andina ebenfalls wackelig in dieser hinsicht ist, kann ich so grad nicht abschätzen. werde mir mal genauer anschauen wo das projekt liegt.

      cashtechnisch siehts mit rund 8 millionen noch okay aus. ist jetzt die frage in wie fern man die machbarkeitsstudie gezahlt hat oder noch bezahlen muss. administrativ verbrennt man ca. 400.000 cad im monat. da man wohl für explorationen vorerst kein geld aufbringen muss wird die kohle faktisch 1 1/2 bis 2 jahre ausreichen.
      Avatar
      schrieb am 08.11.12 10:25:25
      Beitrag Nr. 139 ()
      08.11.2012 08:25 Uhr | minenportal.de
      Andina Minerals Inc.: Übernahme durch Hochschild Mining Plc geplant
      Andina Minerals Inc. und Hochschild Mining PLC gaben gestern eine bindende Vereinbarung bekannt, wonach Hochschild ein Angebot für den Kauf aller ausstehenden Stammaktien von Andina abgeben wird. Pro Andina-Aktien sollen die Aktionäre 0,80 CAD in bar erhalten.

      Das freundliche Übernahmeangebot soll so schnell wie möglich, aber spätestens bis zum 22. November dieses Jahres beginnen.


      © Redaktion MinenPortal.de




      http://www.goldseiten.de/artikel/154307--Andina-Minerals-Inc…" target="_blank" rel="nofollow ugc noopener">http://www.goldseiten.de/artikel/154307--Andina-Minerals-Inc…
      Avatar
      schrieb am 08.11.12 11:37:20
      Beitrag Nr. 140 ()
      0,59

      +111,83 % :eek::eek:
      +0,312
      Frankfurt (EUR), 08.11.12 | 10:16


      Wie schön, auch mal einen 100-Prozenter im Depot zu haben. :D

      Umgerechnet liegt das Angebot bei 0,63 €. Der Markt will sogar 0,65 € sehen !!!

      Da könnte noch Luft nach oben sein. Immerhin kommt die Aktie von über 1,2 € !!!!!
      Avatar
      schrieb am 08.11.12 12:33:36
      Beitrag Nr. 141 ()
      Darauf habe ich sehr lange gewartet, sehr schoen...
      Avatar
      schrieb am 08.11.12 16:46:44
      Beitrag Nr. 142 ()
      geiles ding :D
      Avatar
      schrieb am 08.11.12 17:40:48
      Beitrag Nr. 143 ()
      6.000.000 oz gold für schlappe 100 millionen cad. :rolleyes:
      Avatar
      schrieb am 08.11.12 17:44:46
      Beitrag Nr. 144 ()
      War wohl ein schlechter Deal. Übernahme ist langfr. immer bitter.
      1 Antwort
      Avatar
      schrieb am 08.11.12 17:59:11
      Beitrag Nr. 145 ()
      Antwort auf Beitrag Nr.: 43.803.015 von ElfenbeinelaufenschnellermitKo am 08.11.12 17:44:46Mir reichts, hat auch ewig gedauert...
      Avatar
      schrieb am 08.11.12 18:50:12
      Beitrag Nr. 146 ()
      naja der übernehmende freut sich vielleicht.
      noch ist ja nich sicher ob das projekt wirtschaftlich genug wäre.
      von daher bin ich froh das man hier fix hohe kurse sieht.
      das größte problem in der region ist das wasser.
      andina, atacama und andere explorer haben das selbe problem.
      in der region ist das wasser extrem knapp.

      werde die kohle die ich durch andina einnehme demnächste in atacama stecken.
      wobei momentan noch bisl teuer. jedoch nur oxid resource! was ein enormer vorteil zu fast allen anderen lagerstätten in der gegend um andina ist.
      Avatar
      schrieb am 13.11.12 16:19:46
      Beitrag Nr. 147 ()
      Kann man mit Nachbesserungen rechnen, oder sollte man alles raushauen zum aktuellen Kurs ???
      1 Antwort
      Avatar
      schrieb am 13.11.12 17:17:37
      Beitrag Nr. 148 ()
      Antwort auf Beitrag Nr.: 43.818.787 von MIRU am 13.11.12 16:19:46Habe Alles rausgehauen...
      Avatar
      schrieb am 13.11.12 18:11:25
      Beitrag Nr. 149 ()
      in den letzten monaten gab es immer mal wieder rückzieher von übernehmenden bei einem bieterverfahren. also lieber den spatz in der hand als die taube auf dem dach.

      und ich glaube auch nicht das hier eine nachbesserung kommen wird.

      ich habe jedenfalls auch alles raus gehauen.


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.
      Doug Casey empfiehlt Andina Minerals 6,62 Millionen Goldunzen