checkAd

    starke, interessante, bombenstarke "Machbarkeitsstudien" - 500 Beiträge pro Seite (Seite 11)

    eröffnet am 12.06.14 14:12:18 von
    neuester Beitrag 31.05.21 14:26:18 von
    Beiträge: 10.349
    ID: 1.195.350
    Aufrufe heute: 2
    Gesamt: 279.116
    Aktive User: 0


     Durchsuchen
    • 1
    • 11
    • 21

    Begriffe und/oder Benutzer

     

    Top-Postings

     Ja Nein
      Avatar
      schrieb am 23.08.18 22:38:11
      Beitrag Nr. 5.001 ()
      Antwort auf Beitrag Nr.: 58.522.149 von Popeye82 am 23.08.18 22:31:26
      Zitat von Popeye82: ÖFFENTLICHE Drohung


      irgendwann gehen Wir uns mal privat treffen, faule Eier kaufen, und dann machen Wir so Eine Art Paintball.


      :laugh::laugh::laugh:
      das könnte lustig werden... da wär ich glatt dabei.
      allerdings nicht in meiner wohnung.
      wäre für neutrales gelände
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 00:53:53
      Beitrag Nr. 5.002 ()
      Antwort auf Beitrag Nr.: 58.522.206 von Boersiback am 23.08.18 22:38:11wobei ich dich da ehrlich gesagt nicht ganz verstehe dass
      du jetzt im sektor bleiben willst.
      also da fand ich die zeiten 2012.15 noch wesentlich fraglicher bzw
      wie weit das runtergeht.

      ventnor oder sowas ist etwas unabhängiger...
      aber so sachen mit den gängigen rohstoffen oder auch den hyperohstoffen
      bei 30 oder 40% kursverfall wie sollen da irgendwelche abhängigen minen
      laufen können ?
      die kann man doch besser nach dem crash einkaufen.
      der crash ist für mich offensichtlich.
      handelskrieg + chart.... die glasklare mischung des großen knalls
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 10:59:33
      Beitrag Nr. 5.003 ()
      Antwort auf Beitrag Nr.: 58.441.387 von Popeye82 am 14.08.18 10:05:55Ivanhoe Mines



      www.mining-journal.com/politics/news/1345223/miners-establis…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 11:13:33
      Beitrag Nr. 5.004 ()
      Antwort auf Beitrag Nr.: 58.427.262 von Popeye82 am 11.08.18 20:00:16Pilbara Minerals



      https://hotcopper.com.au/threads/positive-credit-suisse-comm…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 17:17:44
      Beitrag Nr. 5.005 ()
      Antwort auf Beitrag Nr.: 58.481.176 von Popeye82 am 18.08.18 22:06:29LSC Lithium



      http://dajin.ca/files/press-releases/Aug232018Dajin-LSCProce…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.

      Trading Spotlight

      Anzeige
      InnoCan Pharma
      0,1865EUR 0,00 %
      Multi-Milliarden-Wert in diesem Pennystock?!mehr zur Aktie »
      Avatar
      schrieb am 24.08.18 19:54:28
      Beitrag Nr. 5.006 ()
      Antwort auf Beitrag Nr.: 58.468.483 von Popeye82 am 16.08.18 22:54:50Orezone Gold



      https://www.sedar.com/GetFile.do?lang=EN&docClass=24&issuerN…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 20:34:38
      Beitrag Nr. 5.007 ()
      Antwort auf Beitrag Nr.: 58.520.703 von Popeye82 am 23.08.18 19:56:30Trilogy Metals



      www.mining-journal.com/discovery/news/1345266/trilogy-cuts-s…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 20:52:06
      Beitrag Nr. 5.008 ()
      Antwort auf Beitrag Nr.: 58.468.456 von winni2 am 16.08.18 22:51:20Dear Winni

      Du musst nicht zu Jedem Quark antworten,
      aber wenn Du zu Schreiben1.249 eine Meinung haben solltest, würde Mich SEHR interessieren:
      http://www.wallstreet-online.de/diskussion/1072619-1241-1250…

      VG
      Avatar
      schrieb am 24.08.18 20:59:10
      Beitrag Nr. 5.009 ()
      Antwort auf Beitrag Nr.: 58.364.775 von Popeye82 am 03.08.18 05:49:15Nr. 1 und 2 sind eingesackt. Die alternative Nr. 2 hatte ich glatt vergessen. Mal sehen. Nr. 3 fällt scheinbar noch tiefer (derzeit kein Kauf in Sicht). ;)
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.08.18 22:10:18
      Beitrag Nr. 5.010 ()
      Antwort auf Beitrag Nr.: 58.530.705 von rolleg am 24.08.18 20:59:10Dann lassen Sie uns mal schauen Moby DosenFERTIG zu machen!!!
      Sooooooo lange wie Der uns Ärger im Leben gemacht hat!!!!!
      (Alleine Myne Whiskeyrechnung dürfte(durch DEN) höher als "sonstige Lebensnahrung" liegen:mad::mad::mad: )
      Von der Prothese nicht zu rden.
      (der Spass ist SOMEwhat unangemessen, da ich "eigentlich" ein SEHR Grosser Naturliebhaber sein(OHNE Bäume umarmen. ALLERdings.))
      Avatar
      schrieb am 25.08.18 13:47:59
      Beitrag Nr. 5.011 ()
      Antwort auf Beitrag Nr.: 58.522.779 von Boersiback am 24.08.18 00:53:53wobei ich dich da ehrlich gesagt nicht ganz verstehe dass
      du jetzt im sektor bleiben willst.
      also da fand ich die zeiten 2012.15 noch wesentlich fraglicher bzw
      wie weit das runtergeht.

      ventnor oder sowas ist etwas unabhängiger...
      aber so sachen mit den gängigen rohstoffen oder auch den hyperohstoffen
      bei 30 oder 40% kursverfall wie sollen da irgendwelche abhängigen minen
      laufen können ?
      die kann man doch besser nach dem crash einkaufen.
      der crash ist für mich offensichtlich.
      handelskrieg + chart.... die glasklare mischung des großen knalls
      _________________________________________________





      Naja, ist nicht ganz so einfach.

      Du solltest Dir aber vielleicht öfter auch mal (noch) mehr Gedanken machen Wo(/Wie/Warum...................) Bewertungen bei Rohstoffaktien(Wie Anderen) in Zukunft im Prinzip DAUERhaft, geRECHTFERIGT höher stehen könnten.
      Du hast öfter geschrieben Das "sind ja nur Solche "Temporärzünder" ", o.Ä..
      Das ist sicher auch schon, oft, Was dran.
      Aber Du musst Dir, m.E., noch mehr Gedanken machen Was es für Einen ANDEREN Fall braucht. "Bräuchte", if you want.

      Meine resource Aktien, auch Andere, sind fast durchgehend Solche Typus.
      Wobei könnten erstmal Nichts mit "1.000"% zu tun hat.
      Das ist wichtig zu sehen.
      Das sind natürlich "Gewisse Szenarien", und bei Denen muss man wieder und wieder und wieder gucken.
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.08.18 14:37:50
      Beitrag Nr. 5.012 ()
      Antwort auf Beitrag Nr.: 58.533.501 von Popeye82 am 25.08.18 13:47:59Diese Nachhaltigkeit ist halt schon eher selten...

      mal paar beispiele

      Clean TeQ und Magnis hatte ich recht gut und früh erkannt.
      auch später wieder bzw mal zu früh und mal zu spät geworfen.
      nachhaltig letztlich nix.
      Clean TeQ´s projekt wurde lange zeit überschätzt. war ja eigentlich scanadium und dann hatten sie es auch recht gut vermarktet mit kobalt.
      inzwischen kommen andere gute wie Trilogy und sagen "moment wir auch kobalt" (deren prjekt sowieso viel besser ist als clean teq´s)
      geht in die dosto-richtung... das zeugs wurde für gewöhnlich entsorgt und ist doch recht häufig auch beiprodukt. so hatte clean teq dann auch seinen zauber verloren.
      magnis wiederum... da gitbs halt auch andere. magnis doch etwas big etwas low grades etwas schwierig in produktion zu gehen.

      dagegen dann arizona mines... achja eigentlich hatte ich die ja mal als silberprojekt im depot.
      dann gings richtung zink. absolut nummer 1 von 500 zinkprojekten also zu viel viel geld gekauft worden... verkauft sich wohl doch immer noch gut die richtig guten sachen.
      kann man natürlich sagen ok ich hol mir egal zu welchem preis die besten sachen rein.
      bei gold wärs continental derzeit wenig vergleichbares was noch nicht übernommen wurde.
      irgendwo verstehe ich schon dass man bei continental denken sollte die werden am ende des tages mehr wert sein als heute.

      jetzt haben wir aber halt den ausgangspunkt der bewertungslage:
      Trilogy war mal 90% billiger anno 2015, conti stand bei weniger als der hälfte.
      gute sachen bleiben hoch bewertet.
      also kaum ne chance am markt.... nur wenn gutes zeugs nicht bald gekauft wird,
      könnte das halt insgesamt stimmungsmaessig massiv kippen.
      rohstoffe fallen deutlicher (soviel ist klar)
      also einfach chance-risk in dem sektor ist EXTREMST.

      wie gesagt.. ventnor, edelsteine und rohstoffe weniger im fokus sind etwas aussen vor.

      aber ansonsten:
      2012-2013 ging auch qualität runter... vorrübergehend nur, auch klar. wird auch wieder
      nur vorrübergehend sein. nur hab ich keine lust auf eine depothalbierung from now,
      auch wenns nur vorrübergehend sein mag ;)

      zum einen hast du:
      1. topbuden die nach wie vor hoch bewertet sind
      (Trilogy, Continental z.b.)
      2. interessante explorer wie z.B. Fireweed
      die sind insgesamt eher billig.
      ABER: fällt zink auf 1000-1400 USD pro tonne wovon ich FIX ausgehe, dann sind die mausetot.
      da steht der kurs dann mal bei 0,10 CAD und sie kriegen 0 kapital mehr
      dann kommt mister x und sagt no prob ich kauf den laden für 50% aufschlag zu 0,15 CAD
      das hat dan nnix mehr damit zu tun ob deren deposit mal richtig gut wird oder nicht.
      der hahn wird einfach abgedreht

      von daher SCHACH MATT
      die guten sind keine schnäppchen dürften aber mit dem rohstoffcrash trotzdem vorrübergehend fallen und die aussichtsreichen kriegen 0 kohle mehr und geben auf

      da was zu finden wo richtig perfomance liefert ist heavy. andersrum dagegen gibts haue.
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.08.18 15:30:42
      Beitrag Nr. 5.013 ()
      Antwort auf Beitrag Nr.: 58.533.666 von Boersiback am 25.08.18 14:37:50hab MICH GEIRRT

      die guten sind keine schnäppchen dürften aber mit dem rohstoffcrash trotzdem vorrübergehend fallen und die aussichtsreichen kriegen 0 kohle mehr und geben auf
      ______________________________________________________________________





      Na dann ist ECHT ENDE.
      Sie hatten immer Recht.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.08.18 15:45:04
      Beitrag Nr. 5.014 ()
      Antwort auf Beitrag Nr.: 58.533.915 von Popeye82 am 25.08.18 15:30:42:laugh:

      nur meine erwartung... gegen einen echten sektorcrash ist halt kein kraut gewachsen.
      ich nehme aber gerne in 5 jahren fireweeds projekt wieder ins depot unter anderer flagge nachdem die aufgegeben haben ;) (als beispiel)

      find´s halt relativ easy zu sehen dass rohstofe massiv crashen...
      PS: trilogy bei 0,2 CAD hätt ich schon eingepackt ansonsten hab ich die natürlich auch entsorgt in letzter zeit

      vergleichs halt mal mit stand ende 2015
      und das war ja noch rein gar nix.....
      Avatar
      schrieb am 25.08.18 23:24:39
      Beitrag Nr. 5.015 ()
      Antwort auf Beitrag Nr.: 58.512.942 von Popeye82 am 23.08.18 03:49:07High Grade Metals







      https://finfeed.com/small-caps/juniors/high-grade-metals-ref…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.08.18 14:02:54
      Beitrag Nr. 5.016 ()
      Antwort auf Beitrag Nr.: 58.469.167 von Popeye82 am 17.08.18 03:51:53Prophecy Development


      www.prophecydev.com/prophecy-contracts-newfields-to-advance-…
      http://www.newfields.com/
      http://www.blm.gov/
      https://ndep.nv.gov/
      www.bbb.org/us/ut/salt-lake-city/profile/business-consultant…
      http://www.amecfw.com/




      "Prophecy Contracts NewFields to Advance Permitting/EIS for Gibellini Vanadium Project, Sets Project Timetable

      Vancouver, British Columbia, August 24, 2018 – Prophecy Development Corp. (“Prophecy” or the “Company”) (TSX:PCY, OTCQX:PRPCF, Frankfurt:1P2N) is pleased to announce that it has engaged NewFields Companies, LLC (“NewFields”), an environmental, engineering, and construction management consulting firm to advance permitting and environmental impact statement (the “EIS”) preparation for the Gibellini vanadium project (the “Project”).

      Prophecy’s and NewFields’ teams will work closely with the Bureau of Land Management (the “BLM”), the Nevada Division of Environmental Protection and other federal and state permitting agencies to target the filing of all major permitting applications by the end of 2019. Prophecy anticipates that the Gibellini EIS will not be more than 150 pages (excluding appendices) and the EIS notice of intent (the “NOI”) will be triggered in 2019. Should that occur, the EIS decision for the Project may be rendered in 2020, according to new government direction on such matters.

      Under the engagement, NewFields will provide comprehensive environmental permitting and related engineering services that include:

      - developing with Prophecy, overall permitting roadmap and budget;
      - performing necessary updates to already-filed baseline studies and Management Plan of Operations (the “MPO”);
      - preparation of Water Pollution Control Permit application (the “WPCP”) including detailed design and engineering analysis;
      - preparation of resource report, which is a precursor to trigger the NOI to prepare the Gibellini EIS; and
      - preparation of various federal and state permit applications such as the application for Air Quality Permit, Surface Disturbance/Class II Operation Permit, Explosives Permit, Class III Waiver Landfill Permit, Multi‐Sector General Stormwater Permit, Hazardous Materials Storage Permit, Hazardous Waste Permit, Septic System Permit, Potable Water System Permit, Dam Safety Permit, and Industrial Artificial Pond Permit.


      NewFields completed the Gibellini heap leach pad and waste dump designs (over 40 pages) as part of an overall basic engineering design lead by Scotia International of Nevada, Inc. in 2014. NewFields’ familiarity with the Project should help to expedite permitting efforts at Gibellini.

      Prophecy has systematically advanced the Gibellini Project in the past 12 months, by:

      - securing water for future mining operation (power is readily available);
      - enlisting a technology partner which owns and operates the world’s largest black-shale vanadium mine, with a nearly decade-long commercial vanadium recovery and production experience
      - consolidating a package of approximately 27 sq. km of contiguous mining, exploration and facility land with no known endangered species habitat, or archeological, agricultural, or aboriginal claims;
      - bringing on mining industry veterans who previously worked at Barrick Gold Corporation and Newmont Mining Corporation (“Newmont”);
      - compiling and filing with the BLM, over 1,100 pages of MPO and baseline studies; and
      - engaging Amec Foster Wheeler E&C Services Inc. (“AMEC”) and completing the Preliminary Economic Assessment (the “PEA”) in June 2018, which outlined Gibellini’s annual production profile of 9.65 million pounds of vanadium pentoxide (V2O5) with operating cost of $4.77 per lb V2O5 and an initial capital cost of $116.76 million including a 25% contingency. The most recent trading price of V2O5 according to www.asianmetal.com, as of the date of this press release, is US$18.40/lb.


      The PEA is preliminary in nature, and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. The PEA was prepared under the direction of Kirk Hanson, P.E., Technical Director, Open Pit Mining for AMEC. Mr. Hanson is a “Qualified Person” for the purposes of National Instrument 43-101, and he is independent of Prophecy.

      In July 2018, Prophecy received a 6-page letter from the BLM Mount Lewis Field Office which contains comments with regard to the submitted MPO. Prophecy is working with NewFields to address the BLM’s comments. A preliminary assessment carried out by NewFields and Prophecy indicates that there are no deficiencies identified that are expected to cause delays to Prophecy’s proposed schedule.

      John Lee, the Company’s Executive Chairman, states: “Prophecy has set out a plan to complete the Gibellini permitting and EIS in 2020, and will be issuing updates throughout the next 18 months as each permit application is filed with the relevant agencies.

      Together with the Company’s news release announcing engineering, procurement, construction and management work progress dated August 15, 2018, Prophecy’s objective is to clear all pre-requisites for the Project construction, start the Project construction in 2021, and deliver the first batch of vanadium pentoxide product on site in 2022.

      We believe the Gibellini Project is years ahead of other North American primary vanadium projects in terms of the time to deliver the vanadium product to the market, and we are on target to transform the Gibellini Project to become the first primary vanadium producing mine in the United States.”

      Relevant NewFields experience:
      In 2014-2018, NewFields successfully obtained several WPCP approvals in Nevada including: approvals for Newmont’s Long Canyon gold project with carbon in column processing method, located in Elko; Kinross Gold Corporation’s Bald Mountain gold project with heap leach facility, located in White Pine County; and West Kirkland Mining Inc.’s Three Hills gold and silver project with heap leach facility, located in Esmeralda County.

      About NewFields

      NewFields is headquartered in Atlanta, Georgia, USA with offices in over 10 cities in the United States and has offices in Canada, the UK, Brazil and Mexico. NewFields has over 100 employees dedicated exclusively to supporting the mining industry and its expertise includes environmental and permitting services, construction management and quality assurance services for tailing storage facilities, heap leach facilities, waste rock storage facilities, civil and geotechnical engineering design services, hydrological and hydrogeological engineering and associated mine site infrastructure. NewFields’ staff has provided design and construction services on over 80 heap leach facilities projects with an aggregate lined area of over one billion square feet in over 20 countries and in a variety of climatic conditions ranging from extremely wet and extremely dry to arctic conditions.

      Qualified Person

      The technical content of this news release has been prepared under the supervision of Danniel Oosterman, VP, Exploration. Mr. Oosterman is not independent of the Company in that he is employed as a consultant to the Company and most of his income is derived from the Company. Mr. Oosterman is a Qualified Person as defined in NI 43-101.

      About Prophecy

      Prophecy Development Corp. is a Canadian public company listed on the Toronto Stock Exchange. Prophecy’s main objective is to develop the Gibellini primary vanadium mining project in the Battle Mountain region in northeastern Nevada to production. Further information on Prophecy can be found at www.prophecydev.com.

      PROPHECY DEVELOPMENT CORP.
      ON BEHALF OF THE BOARD

      “JOHN LEE”
      Executive Chairman

      For more information about Prophecy, please contact Investor Relations:

      +1.888.513.6286
      ir@prophecydev.com
      www.prophecydev.com"


      www.prophecydev.com/prophecy-secures-long-term-water-supply-…
      http://water.nv.gov/




      "Prophecy Secures Long Term Water Supply, for Construction and Operation of Gibellini Vanadium Project

      Vancouver, British Columbia, August 20, 2018 – Prophecy Development Corp. (“Prophecy” or the “Company”) (TSX:PCY, OTCQX:PRPCF, Frankfurt:1P2N) is pleased to announce that it has secured water supply for the Gibellini vanadium project’s (the “Project”) construction and operation. The Company has signed a 10-year Water Lease Agreement (the “Agreement”) with the owner of a private ranch, located approximately 14.5 km from the Project. The Agreement can be extended for any number of additional 7-year terms, not to exceed (with the primary term) a total of 99 years.

      Per the terms of the Agreement, the lessor has granted to Prophecy the rights to 805 acre-feet (approximately 262.4 million gallons) of water per year for the Project, at a minimum flow rate of 500 gallons per minute (“gpm”) from its year-round springs surface water stream.

      The water flow rate was measured at the ranch springs in 1965, in 1981, from December 2011 to September 2013, and most recently, in 2017. The water flow rate ranges from 1,000 to 3,900 gpm with an average flow rate of 2,690 gpm, which exceeds the Project’s maximum water operational requirement of 420 gpm based on the process engineering design prepared by Scotia International of Nevada, Inc. as a part of engineering, procurement, construction and management work done in 2014.

      The Gibellini Project has completed water-related baseline studies including the drilling of water-test wells, water source data collection, characterization, flow rate testing and modeling. Due to the fact that the Agreement provides a source of water from surface springs located on a private ranch and baseline studies related to it have been completed, Prophecy expects to significantly expedite the permitting process by eliminating the need to appropriate water rights from the Nevada Division of Water Resources (“DWR”).

      Michael Drozd, Prophecy’s VP, Operations, comments: “The Gibellini project is the only primary vanadium project in the United States with secured, long term water supply for its construction and operation. The water at the ranch has been approved for irrigation use by the DWR, which will require a change to the use by the project’s mine and processing facilities. We expect to file a water usage change application with the DWR by the end of 2018.

      Having already filed Gibellini’s plan of operation and baseline studies in May 2018, we continue to work towards filing the Environmental Impact Statement in 2019 and obtaining full permits in 2020
      .”

      Qualified Person

      The technical contents of this news release have been prepared under the supervision of Danniel Oosterman, VP, Exploration. Mr. Oosterman is not independent of the Company in that he is employed as a consultant to the Company and most of his income is derived from the Company. Mr. Oosterman is a Qualified Person as defined in NI 43-101.

      About Prophecy

      Prophecy Development Corp. is a Canadian public company listed on the Toronto Stock Exchange. Prophecy’s main objective is to develop the Gibellini primary vanadium mining project in the Battle Mountain region in northeastern Nevada to production. Further information on Prophecy can be found at www.prophecydev.com.

      PROPHECY DEVELOPMENT CORP.
      ON BEHALF OF THE BOARD

      “JOHN LEE”
      Executive Chairman

      For more information about Prophecy, please contact Investor Relations:

      +1.888.513.6286
      ir@prophecydev.com
      www.prophecydev.com"
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.08.18 15:45:05
      Beitrag Nr. 5.017 ()
      Antwort auf Beitrag Nr.: 58.380.018 von Popeye82 am 06.08.18 00:57:26Sirius hires ONLY die DÜMMSTEN Bauern







      Sirius Minerals Plc





      https://twitter.com/siriusminerals?lang=de
      39 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.08.18 17:25:24
      Beitrag Nr. 5.018 ()
      Antwort auf Beitrag Nr.: 58.537.448 von Popeye82 am 26.08.18 15:45:05YOU're hired, @Yorkshire





      Avatar
      schrieb am 26.08.18 18:09:38
      Beitrag Nr. 5.019 ()
      Antwort auf Beitrag Nr.: 58.458.931 von Popeye82 am 16.08.18 00:09:47@MCB

      Ich hatte Ihnen bei Greenland ja mal zu Alba/BlueJay über den "GEUS" report geschrieben, right?
      Sie hatten da(nn) Was gefunden, Was aber nicht gemeint war.

      Schauen Sie mal r1,
      DAS DIng war, mit "GEUS" bericht, gemeint!
      Da haben Die "national Geological Surveys(Greenland+Denmark glaube ich)" mal JV gemacht, bisschen photographiert, paar Spaten in den Boden gejagd(usw.usw.usw.),
      und sind wohl zu der CONCLUSIO gekommen dass da MUTmasslich noch 1,2 "Ilmenites" im Boden liegen.
      EVT auch 3.
      Spannend, aber ist so "Winni"Kram.
      Was Deren MaulwurfKollääääägen machen.

      Habe es bis Jetzt nur überflogen,
      aber werde es wohl auch noch Zeile4Zeile durchgehen.
      Was ich, vom (nicht beruflich)Amateurstandpoint, sagen kann ist dass Das, Diese Mineralischen Ablagerungen, @Greenland Beaches(zumindest in Der Region der Thule Base rum), auch Eine ANDERE Art von Mineralisierung(en) sein dürfte.
      Als man es "Aller"meistens hat.
      Würde, als Amateur, nicht sagen dass es Das "Gleiche", aber vielleicht ein bisschen ähnlich wie Diese "Shale" Deposits ist.
      Also in Erster Linie, Meinem Ermessen, nach vor Allem mal Keine "Harte" Mineralisierung, "Einschluss" in Sowas, sondern würde sagen vielleiiicht ein biiiiisschen meeeeeeehr eine Art "Beachpampe, mit Rohstoffen drin".
      Also Zustand "nicht fest, nicht weich, eher(iMo) Irgendwo Dazwischen".

      Das dürfte, (pot) Bergbauseitig, natürlich auch schon bisschen Implikationen haben.





      BlueJay Mining



      www.titanium.gl/documents/company-research/GEUSReport_2017_1…
      Avatar
      schrieb am 26.08.18 19:55:36
      Beitrag Nr. 5.020 ()
      Antwort auf Beitrag Nr.: 58.537.448 von Popeye82 am 26.08.18 15:45:05Sirius Minerals Plc

      www.ii.co.uk/discussion/t/liberum-response-to-alphaville/114…




      " Liberum response to Alphaville
      UK Companies
      Sirius Minerals (lse:sxx)
      Snowman24
      18d
      4

      Sirius Minerals*
      When Alphaville attacks: addressing the bear arguments
      BUY
      Target price 60p | Published price 37p | *Corporate Client of Liberum
      Yesterday FT Alphaville ran a piece amalgamating much of the bear fodder on Sirius here. We think its a worthwhile exercise to address the key points of contention highlighted in the story in order to place some of the project’s risks in context. The two key hurdles for Sirius are still lifting offtake agreements from 5.7mt to c.6.5mt and completion of Stage 2 financing, both of which are pre-requisites to realising our 60p target price
      and our £1.08 NPV. How one thinks about these two risks ultimately drives valuation and suffice to say, we’re more optimistic than the articles author, Dan McCrum.

      Regarding ICL’s view of polyhalite as a premium niche fertilizer
      The article highlighted ICL’s view that polysulphate (POLY4 in Sirius brand name) is a “premium niche fertiliser” which may have potential long-run demand of 3mtpa. There’s no question ICL has always been less optimistic about the ability of POLY4 to be a bulk fertiliser, which is at the very centre of the Sirius investment case. But its worth making a few points to put the ICL view in context:
      • In the early stages of Sirius’ business plan formulation ICL had been dismissive of the marketing potential around polyhalite, which it had access to around 300m below its potash seam. It has since decided to cease mining potash at Boulby in favour of only mining polyhalite, given the superior economics. ICL currently intends to ramp up polyhalite production to 1mpta and it sees long-term demand of 3mtpa. This long-term view ignores that Sirius has binding sales agreements of 5.7mtpta.
      • At a 2017 investor day Sirius’ head of marketing JT Starzecki noted his view that the majority of its offtake customers are not replacing niche fertilizer demand (SOPM, SOP), rather substituting KCl (potassium chloride) units with low-chloride potassium units from polyhalite. The simple reason is low chloride units are scarce, primarily due to two thirds of the market coming from Mannheim production (turning KCl into SOP), which has marginal economics at current prices and is capitally intensive. This ‘pent-up’ demand for low-chloride potassium units points to its potential as a bulk fertilizer, substituting demand for potassium units typically taken by more traditional potash.
      The key difference here is that Sirius sees polyhalite as a bulk fertiliser and its initial offtake agreements imply early customers do also. But if one was to compare the potential market for polyhalite against specialty potassium fertilisers, it would need to be done on a K2O equivalent basis. We highlight the difference between the comparison made in the article, and the same analysis in POLY4 terms.

      If one was to view POLY4 as a bulk commodity, as we do, the addressable market is significantly larger again based on pent up demand for chloride free potassium units and hence some substitution from the MOP market. We show in the attached note potential for a 100mt addressable market (or 5x Sirius’s maximum mine production potential of 20mT) on pages17-21 of our 2016 report.
      Regarding the involvement of the Government’s Infrastructure Projects Authority
      A few points worth addressing in relation to this. The article notes:
      “… the desired guarantee would dwarf previous financial backstops agreed by the Infrastructure and Projects Authority (IPA), which has underwritten only £1.8bn of lending across nine projects.”
      This is indeed true, but also fails to mention that the IPA has £40bn of capacity to use by 2026. It also fails to mention that if Hinkley Point ever gets off the ground, the IPA has approved a guarantee of £2bn, which would be significantly more than any guarantee provided to Sirius.
      On the point of having pre-qualified for investment the article notes:
      “Pre-qualification is an early stage, however, before the application is assessed or put before the IPA’s risk committee. A spokesperson said “hundreds of projects are pre-qualified. That is an administrative stage that begins the process. Most projects that are pre-qualified don’t go on to get approved”, a point the representative subsequently rang back to emphasise.”
      While pre-qualification is very much a preliminary step, it does mean the project notionally fits the criteria for investment – i.e. its fits within the definition of projects that could qualify for the guarantee. Whether or not it actually achieves the guarantee will be a function of approval from the IPA’s risk committee. In our view, if the banking syndicate can get comfortable with lending the money, the likelihood of the IPA following suit it high given the benefits of the project (export led growth, in the north, high paid employment etc.).

      Regarding polyhalite pricing and freight
      The article notes:
      “Sirius expects farmers to pay for each of its composite nutrients - potassium, sulphur, magnesium and calcium.”
      We’re certainly not aware of this. Although the pricing mechanism in existing offtake contracts isn’t public, customers won’t be paying for nutrients they don’t value and in fact, they would be expecting to receive nutrients they do value for free. The polyhalite pricing guidance over the past few years has born little resemblance to the MOP price which the article benchmarks off, but a much closer resemblance to the chloride free potassium (SOP) price - i.e. at $145/t the inference is the customer is not paying for the Magnesium, Sulphur or Calcium. This is a crucial point, as chloride free potassium units in SOP are worth nearly double the potassium units in KCl.
      To deliver our $7.5bn NPV for the project we model $125/t long-run price on the basis of the marginal cost of producing SOP from using the Manheim method – i.e. the price of POLY4 shouldn’t sustainably trade below this level as the implied SOP price would mean Mannheim production would need to close.
      Regarding freight costs, the article notes:
      “The freight cost impact was also laid out. Priced against potassium, Fertecon estimated a competitive price for polyhalite going to Brazil in 2013 would have been $72/t. Going to China, the implied price would have been just $47/t.” and quoting CRU analyst Humphry Knight “The risk is that you get customers who only want one or two nutrients, then you’re basically shipping around a lot of stuff you don’t want.”
      As noted above, this analysis ignores the price basis on which existing binding agreements have been struck which appears to ascribe value to the chloride-free nature of the product. Regarding shipping around unwanted material, its worth noting for context that the largest bulk commodity market, iron ore, currently trades benchmark product at $62/t. Clearly the impact of incremental shipping charges on a product valued at $145/t FOB is considerably less.
      Regarding existing offtake agreements
      The article referred to the Archer Daniels Midlands agreement as a “promotional slight of hand in the way the contract was described in an earlier announcement.”
      The inference here seems to be that Sirius had misled investors by implying that the agreement was for 1.5mt of offtake from day one. We find this line of argument somewhat perplexing given offtake agreements for any mining operation need to be scaled with a delay to the production ramp up to allow for headroom in case production misses expectation. It would also be odd for a single offtaker on a project of this magnitude to be consuming all of the first year of production. Having covered the stock since the initial ADM deal was signed this is the first time we’ve heard this point raised as a concern, although it is true that the original announcement did not specifically mention that the headline number referred to peak sales. Sirius noted this was due to confidentiality and more granularity was given in other agreements where permitted by the customer.
      On the company’s Chinese offtakes, the article draws attention to the two changes to agreements in China since 2016.
      The TCT/peony offtake have been the source of a fair amount of investor scrutiny regarding credit quality, in particular after the CEO mentioned to a Reuters journalist that he did not think the agreement was binding, but later retorted. We think the latest agreement, which replaced this agreements has likely improved credit quality, but there are obvious challenges in doing due diligence on private Chinese companies. Sirius, however, notes it has done significant due diligence, including third party due diligence, on these counterparties, including their distribution networks. It is worth noting that the Yantai offtake for 800ktpa is linked to one of the big agricultural means of production organisations, responsible for getting fertiliser products into farms in the north of the country.

      …and a few other points worth addressing
      “Fraser’s answer to that question was to say, in a variety of ways, that Sirius will be better at selling it than ICL has been, and that its rival’s “chipped rock” is somehow inferior to the granules to come.”
      The implication here seems to be that it is a contentious point that Sirius’ proposed granules delivered superior performance to the “chipped rock” that Boulby is currently selling. Sirius has commissioned studies undertaken by independent bodies such as NRM Labratories, the University of Aberdeen and the University of Limerick that have confirmed granules have a superior nutrient release profile (40 hours vs. 180 hours), better spreading characteristics (lower coefficient of variation), better handling and storing properties and make higher amounts of nutrients available in the soil - all of which improve yield.
      On the depth of the mine:
      “to do so it must first finance and build the UK’s deepest ever mine”
      There are of course challenges related to both shaft construction and tunnel boring , but certainly not any that have been surmountable for decades. The shafts at Boulby mine reach down to 1100m (vs. Sirius at 1500m) and were constructed in the late 1960’s/early 70’s. Learnings from the
      geology encountered at Boulby have been useful in the planning and design of Sirius’ own shafts. Of course on a global scale 1.5km isn’t close to the deepest mine and there are many examples of successful operations at greater depths.
      “By comparison, the UK will be on its own if it backs Sirius. Should demand for the fertiliser prove insubstantial, the rock will stay in the ground, along with the money poured into it”
      This is a risk that equity funders have taken, but the risk taken by the banks and the UK government will be considerably lower. If sufficient offtake agreements of a quality that satisfies the lenders and the IPA can’t be obtained, neither will lend the project money and UK taxpayer won’t be on the hook."
      37 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.08.18 04:01:09
      Beitrag Nr. 5.021 ()
      Antwort auf Beitrag Nr.: 58.473.325 von Popeye82 am 17.08.18 14:27:25Ventnor Resources













      http://www.wallstreet-online.de/nachricht/10813365-rohstoffk…




      "Experten WARNEN VOR BAUVERZÖGERUNGEN, WEGEN ROHSTOFFKNAPPHEIT

      Nachrichtenagentur: Redaktion dts | 22.08.2018, 07:08 | 534 | 0 | 2 Foto: Baustelle, über dts Nachrichtenagentur Berlin (dts Nachrichtenagentur) - Wegen des anhaltenden Baubooms in Deutschland haben Experten vor einer Knappheit von Bausand, Kies und Naturstein gewarnt, die zu Verzögerungen von Bauprojekten führen könnte. Grund dafür sind lange Genehmigungsverfahren für die Erweiterung oder Eröffnung neuer Förderwerke, berichtet die "Rheinische Post" (Mittwochsausgabe). "Angesichts der ambitionierten Ziele der Bundesregierung etwa beim Wohnungsbau oder bei den geplanten Milliardenausgaben für den Straßen und Brückenbau wird es zwangsläufig zu regionalen Engpässen bei der Rohstoffversorgung kommen", sagte Susanne Funk, Geschäftsführerin des Bundesverbandes Mineralische Rohstoffe, der Zeitung.

      Anzeige Logistik: Online-Handel verleiht Flügel Weltweit werden zunehmend mehr Waren transportiert: Neue Ideen, neue Konzepte und neue Player treiben die Logistikbranche an. Wenn Briefträger verfolgt werden, ist das in der Regel kein Grund zur Freude. Aber im hessischen Bad Hersfeld gingen im vergangenen Jahr keine bissigen Vierbeiner bei Fuß, sondern vierrädrige Postbots. Mehr erfahren powered by finative Von solchen Verzögerungen könnten die Bauprojekte der Bahn im Oberrheintal oder die vielen Autobahnbaustellen in NRW betroffen sein, fügte die Expertin hinzu. Es gibt ihren Angaben zufolge noch etwa 3.000 Werke, die Sand, Kies und Naturstein zum Beispiel für die Herstellung von Beton, Asphalt und Bahnschotter abbauen. Diese Anzahl der Werke sei trotz der wieder steigenden Nachfrage rückläufig, weil die Genehmigungsverfahren für die Rohstoffgewinnung viel zu lange dauerten. "Derzeit müssen die Betreiber solcher Werke mit einer Verfahrensdauer von bis zu zwölf Jahren rechnen, um die Gewinnungsstätten zu erweitern oder neue zu erschließen", sagte Funk. Sie rief die Politik in Bund, Ländern und Kommunen dazu auf, gegenzusteuern. "Die Politik muss das auf allen Ebenen angehen und die Bürokratie abbauen", sagte die Geschäftsführerin des Verbandes. Auch die Bundesanstalt für Geowissenschaften und Rohstoffe sieht Probleme: "Ein weiteres Risiko für die Versorgung mit Baurohstoffen besteht in der konkurrierenden Flächennutzung", sagte Volker Steinbach, Vizepräsident der Behörde. "So sind beispielsweise in Siedlungs- und Infrastrukturgebieten sowie in Wasser-, Naturschutz- und Landschaftsschutzgebieten diese Rohstoffe nicht gewinnbar." In Baden-Württemberg seien bereits 85 Prozent der nutzbaren Fläche verplant. "Für Kies- oder Sandgruben ist dann kaum Platz", sagte Steinbach."
      36 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.08.18 04:55:03
      Beitrag Nr. 5.022 ()
      Antwort auf Beitrag Nr.: 58.093.765 von Popeye82 am 29.06.18 03:17:49Australian Potash



      www.australianpotash.com.au/site/PDF/1616_0/PilotPondBrinePr…
      www.australianpotash.com.au/site/PDF/1620_0/ManagementUpdate


      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.08.18 05:36:03
      Beitrag Nr. 5.023 ()
      24 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 18:13:58
      Beitrag Nr. 5.024 ()
      Antwort auf Beitrag Nr.: 58.458.211 von Popeye82 am 15.08.18 21:58:11Aurania Resources



      www.b-tv.com/aurania-resources-ceo-clip-90sec/
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 18:25:21
      Beitrag Nr. 5.025 ()
      Antwort auf Beitrag Nr.: 58.553.501 von Popeye82 am 28.08.18 18:13:58Wieso darfst Du schon wieder posten ? :laugh:
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 18:54:29
      Beitrag Nr. 5.026 ()
      popeye darf doch immer posten...
      war er gesperrt ?
      wegen dem chartgott, weil er nicht brav war ?
      Avatar
      schrieb am 28.08.18 18:59:13
      Beitrag Nr. 5.027 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 19:12:02
      Beitrag Nr. 5.028 ()
      Antwort auf Beitrag Nr.: 58.483.728 von Popeye82 am 19.08.18 17:11:55Global Geoscience













      www.globalgeo.com.au/files/announcement/files/180828-success…
      47 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 19:13:49
      Beitrag Nr. 5.029 ()
      Antwort auf Beitrag Nr.: 58.553.570 von Reiners am 28.08.18 18:25:21Werter Dr. Roiners

      Zuviel der Ehre dass Sie sich in Diese niederen Gefilde daniederlassen.
      Es wurde mit den Kerkermeistern ein AGREEment erzielt,
      Welches allerdings auf, gegenseitig, wohl nicht VOLLständig grenzenlosem Vertrauen basiert.
      WESwegen Das Letzte Kapitel mglw noch nicht gesprochen ist.

      Meaning: 1n Dauerrauswurf, @SOME point, dürfte Nach wie Vor in Der Verlosungstrommel drin sein.
      Für Anderes ist, mutmasslich, Mein Schädel zu DICK.
      Avatar
      schrieb am 28.08.18 19:27:14
      Beitrag Nr. 5.030 ()
      Antwort auf Beitrag Nr.: 58.481.605 von Popeye82 am 19.08.18 01:46:30NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Exploration, Nickel/Kobalt/Scandium, in Brasilien. In Einer der Resourcereichsten Provinzen, Die es gibt. ww. Neben noch Anderen Resource Aktivitäten, Brasilien.
      Fokus ist hier Itapitanga.
      Das Projekt hat ein paar Interessante "Features".
      In 1. Linie wohl: Relativ hochgradig, kulmuliert, die Abschnitte("drills") gehen in Grossen Teilen nahe von der Oberfläche, oder Direkt davon weg.
      Und das Projekt liegt im Einzugsgebiet Einer gigantischen Mine, Eine der Größten die es Dieser Art gibt.
      Ggf. "Salobo" und "Jacaré" mal nachschlagen.
      Neben bisschen Anderem.
      Ausgegebenes Bohrziel: 35,000,000‐45,000,000ts @0,80-1,10% nickel, 0,07-0,12% cobalt und 18-30g/t scandium. Könnte mutmasslich, over time, noch Mehr werden.
      Link3 ausführlicher.

      Kann man mal GUCKEN Was bei Erstresource und Feasibility rauskommt.
      _________________________________________________________________





      Wie angedeutet, Das Exploration "Target" wird nach Beendigung der Bohrrunde wohl nochmal aufgestockt werden.
      Bohr/Geologieseitig ganz interessant Was Sie da schreiben.


      Centarus Metals



      www.centaurus.com.au/uploads/files/announcements/2018/CTM_26…
      383 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 20:30:20
      Beitrag Nr. 5.031 ()
      Antwort auf Beitrag Nr.: 58.363.656 von Popeye82 am 02.08.18 21:58:23ZincX Resources



      http://zincxresources.com/news/index.php?content_id=325
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 21:32:31
      Beitrag Nr. 5.032 ()
      Antwort auf Beitrag Nr.: 58.486.944 von Popeye82 am 20.08.18 10:28:04Ironbark Zinc
















      https://gallery.mailchimp.com/c108dbc2422b014650e30c936/file…
      https://naalakkersuisut.gl/en
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 21:44:33
      Beitrag Nr. 5.033 ()
      Antwort auf Beitrag Nr.: 58.439.863 von Popeye82 am 14.08.18 03:26:02Sovereign Metals





      www.investi.com.au/api/announcements/svm/ab92a8c0-28c.pdf
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 21:59:33
      Beitrag Nr. 5.034 ()
      Antwort auf Beitrag Nr.: 58.505.823 von Popeye82 am 22.08.18 10:44:12TNG



      http://clients2.weblink.com.au/news/pdf_1%5C02014977.pdf
      46 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 22:13:23
      Beitrag Nr. 5.035 ()
      Antwort auf Beitrag Nr.: 58.539.278 von Popeye82 am 27.08.18 05:36:03remains committed to concluding a Native Title Agreement in collaboration with Traditional Owners by mid Q4 2018







      Erwerb noch vorstellbar, auf kürzere Sicht jedoch nicht absehbar.


      Sheffield Resources













      www.sheffieldresources.com.au/irm/PDF/3060_0/FavourableNativ…
      http://www.nntt.gov.au/searchRegApps/NativeTitleClaims/Pages…
      http://www.dmirs.wa.gov.au/
      www.nntt.gov.au
      http://www.fedcourt.gov.au/
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 22:53:39
      Beitrag Nr. 5.036 ()
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.08.18 23:56:58
      Beitrag Nr. 5.037 ()
      Antwort auf Beitrag Nr.: 58.414.872 von Popeye82 am 09.08.18 21:41:30Erin Ventures



      www.erinventures.com/media/nws_d.php?id=198
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 01:24:32
      Beitrag Nr. 5.038 ()
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 01:37:20
      Beitrag Nr. 5.039 ()
      Antwort auf Beitrag Nr.: 58.505.148 von Popeye82 am 22.08.18 09:47:32standOUT project, globally







      Xanadu Mines


      www.proactiveinvestors.com/companies/news/203736/xanadu-mine…

      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 02:42:42
      Beitrag Nr. 5.040 ()
      Antwort auf Beitrag Nr.: 58.512.969 von Popeye82 am 23.08.18 04:54:11Geopacific Resources



      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 02:56:02
      Beitrag Nr. 5.041 ()
      Antwort auf Beitrag Nr.: 58.439.362 von Popeye82 am 13.08.18 22:42:48sollte sehr, sehr spannend werden.



      Tando Resources













      www.tandoresources.com.au/sites/default/files/asx-announceme…
      http://www.resbank.co.za/

      https://smallcaps.com.au/tando-resources-final-hurdle-comple…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 03:49:31
      Beitrag Nr. 5.042 ()
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 04:01:16
      Beitrag Nr. 5.043 ()
      Antwort auf Beitrag Nr.: 58.438.981 von Popeye82 am 13.08.18 21:32:38Hill End Gold



      www.resourcesrisingstars.com.au/sites/default/files/Independ…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 05:33:30
      Beitrag Nr. 5.044 ()
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 05:45:25
      Beitrag Nr. 5.045 ()
      Antwort auf Beitrag Nr.: 58.492.629 von Popeye82 am 20.08.18 22:14:09Rift Valley Resources





      http://riftvalleyresources.com.au/wp-content/uploads/2018/08…
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 05:57:41
      Beitrag Nr. 5.046 ()
      Antwort auf Beitrag Nr.: 58.556.333 von Popeye82 am 29.08.18 01:24:32Pilbara Minerals

      https://stockhead.com.au/resources/aussie-miners-need-muscle…




      "Aussie miners need muscle, if they want to cash in on battery metals boom

      Resources

      1 hour ago | Angela East

      Australia needs a strong mining sector if it’s going to be able to take advantage of the growing demand for renewable technologies and battery storage, according to West Australian mining minister Bill Johnston.

      “There’s no doubt that there’s very few more exciting developments in the world than the move towards electric vehicles,” the minister told delegates at the three-day Africa Down Under conference in Perth, WA.

      “Of course, we can’t have this new exciting renewable energy future with battery storage and other technologies without a strong mining industry.

      “The world can only gain access to these new technologies because of the resources that we are taking out of the ground in each of the regions that we represent.”

      Europe already has 1 million electric vehicles on its roads – beating the US, according to a recent report by The Guardian.

      Europe sold 195,000 plug-in cars in the first half of this year, 42 per cent higher than for the same period of 2017, a report by Swedish industry consulting group EV-Volumes found.

      There are about 3 million electric cars in the world right now — but if “policy ambitions continue to rise to meet climate goals”, that number could hit 220 million by 2030 — including 130 million electric and 90 million hybrids, the International Energy Agency says.

      This is driving substantial demand for battery metals like lithium, cobalt, manganese and nickel.

      Subscribe to our daily newsletter
      Bookmark this link for small cap news
      Join our small cap Facebook group
      Follow us on Facebook or Twitter

      West Australia has been pushing to become a battery metals hub.

      The State government released a comprehensive report backing the establishment of a “Lithium Valley”, with locations like Kwinana (south of Perth) favoured.

      The lithium-rich Pilbara has also been flagged as a possible contender for a processing hub.

      WA is one of the world’s largest lithium producers. The State has five operating lithium mines, two under construction and one undergoing planning approvals.

      The Greenbushes mine in the State’s southwest is the world’s largest and highest-grade source of lithium-bearing spodumene ore, contributing 40 per cent of the world’s current lithium supplies.

      WA has also attracted investment from several majors looking to process lithium-bearing minerals into lithium hydroxide and lithium carbonate.

      Chinese-backed Tianqi Lithium is spending more than $700 million on building a two-stage lithium processing plant in Kwinana.

      US-based chemical company Albermarle and Chile’s SQM are also close to making investment decisions about downstream processing in WA.

      Renewable energy is also a huge opportunity for WA, according to Mr Johnston.

      “Here in Western Australia, we’re very excited about the opportunities for solar panels and microgrids to be deployed into remote communities in Western Australia, some of them thousands of kilometres from here in Perth,” he said."
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 08:22:20
      Beitrag Nr. 5.047 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 09:40:03
      Beitrag Nr. 5.048 ()
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 10:54:39
      Beitrag Nr. 5.049 ()
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 11:10:10
      Beitrag Nr. 5.050 ()
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 15:07:58
      Beitrag Nr. 5.051 ()
      Antwort auf Beitrag Nr.: 58.539.242 von Popeye82 am 27.08.18 04:01:09Ventnor Resources



      https://hotcopper.com.au/threads/large-cost-advantage-over-m…
      www.portsnorth.com.au/cape-flattery/
      35 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 16:10:23
      Beitrag Nr. 5.052 ()
      A1H42B - hab zwar isin und WKN, aber Ventnor
      ist über meinen Broker nicht handelbar, weil unbekannt.
      (Bin aber auch happy mit Base Resources & Diatreme)
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 16:42:33
      Beitrag Nr. 5.053 ()
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 18:02:32
      Beitrag Nr. 5.054 ()
      Antwort auf Beitrag Nr.: 58.561.793 von MONSIEURCB am 29.08.18 16:10:23
      Zitat von MONSIEURCB: A1H42B - hab zwar isin und WKN, aber Ventnor
      ist über meinen Broker nicht handelbar, weil unbekannt.
      (Bin aber auch happy mit Base Resources & Diatreme)


      dann bist du nicht bei comdirect ;)
      Avatar
      schrieb am 29.08.18 18:24:36
      Beitrag Nr. 5.055 ()
      Antwort auf Beitrag Nr.: 58.336.422 von Popeye82 am 30.07.18 20:53:58Armadale Capital Plc

      https://polaris.brighterir.com/public/armadale_capital/news/…




      "Progress Update: Mahenge Liandu Graphite Project Feasibility Study

      Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce significant progress on the 2018 field work programme underway at its Mahenge Liandu Graphite Project in Tanzania (‘Mahenge Liandu’ or the ‘Project’) ahead of an anticipated decision to mine in early 2019.

      Overview

      - Diamond drilling programme completed with eight holes for a total of 489m
      - All holes intersecting wide intervals of high grade mineralisation from surface with up to 67m thickness
      - Drilling focused on the proposed initial mining area and the results of the drilling will be incorporated into the mine planning
      - Diamond core to be used to validate the reverse circulation (‘RC’) drilling and to provide core samples to allow for representative concentrate samples for marketing to prospective off-take partners
      - 10km2 topographic survey completed covering the area of the proposed mining lease
      - Field work for Environmental and Social baseline surveys now completed with environmental impact assessment (EIA) and relocation action plan (RAP) and valuation survey expected to be submitted in late September
      - RC drill programme expected to be completed by mid-September, following delays due to a rig breakdown
      - RC drilling targeting the upgrade of the current JORC Resource of 51.1Mt at 9.3% Total Graphitic Carbon (‘TGC’) to Probable and Proven Reserves


      Diamond Drilling Results

      The diamond drilling programme has now been completed with eight holes for a total of 489m drilled. All holes intersected mineralisation from surface over wide thicknesses averaging 55m and up to 67m. Excellent core recovery was achieved and the mineralisation correlates well to the results of the RC drilling programme conducted in 2017. The cores will be used to produce representative graphite concentrates to advance the product marketing as well as to refine the process flowsheet.

      Hole ID Easting Northing Azi/dip Depth Min from Min to Min thickness
      LDDD0001 251658 9035187 325/-60 65.3 0 58 58
      LDDD0002 251816 9035236 325/-60 65.4 0 52 52
      LDDD0003 251746 9035387 325/-60 65.6 0 65.6 65.6
      LDDD0004 251836 9035442 325/-60 63.5 0 48 48
      LDDD0005 251793 9035423 325/-60 59.7 0 54 54
      LDDD0006 251787 9035317 325/-60 70.0 0 67 67
      LDDD0007 251851 9035283 325/-60 50.0 0 48 48
      LDDD0008 251868 9035372 325/-60 50.0 0 45 45

      Table 1 Diamond drilling summary

      Nick Johansen, Director of Armadale said, “I am pleased to report that all aspects of our development work at Mahenge Liandu are progressing encouragingly and we continue to look forward to making a decision to mine early on in the new year.

      “These latest diamond drill results, which highlighted high grade mineralisation in every hole, over wide intervals from surface with up to 67m thickness, are particularly pleasing and further reinforce our understanding of the geology of the Mahenge Liandu Project. The area drilled covers our proposed initial mining area and the results of the drilling will be incorporated into our mine planning over the coming months.

      “Drilling continues on site, however the bulk of our activities are now focussed on the completion of the EIA, relocation plan and valuation survey – all critical components of our development plan as we target first production within 12-18 months.

      “I look forward to reporting the completion of our RC programme and delivery of our relocation plan and ancillary surveys in the coming weeks.”

      The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

      **ENDS**

      For further information, please visit the Company’s website www.armadalecapitalplc.com, follow Armadale on Twitter @ArmadaleCapital or contact:

      Enquiries:
      Armadale Capital Plc

      Tim Jones, Company Secretary
      +44 20 7236 1177
      Nomad and broker: finnCap Ltd

      Christopher Raggett / Simon Hicks
      +44 20 7220 0500
      Joint Broker: SVS Securities

      Tom Curran / Ben Tadd
      +44 20 3700 0093
      Press Relations: St Brides Partners Ltd

      Susie Geliher / Charlotte Page
      +44 20 7236 1177

      Notes

      Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

      The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 51.1Mt @ 9.3% TGC. Marking the project one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

      Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments. "
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 19:40:26
      Beitrag Nr. 5.056 ()
      Antwort auf Beitrag Nr.: 58.336.944 von Popeye82 am 30.07.18 22:01:15South Star Mining



      https://southstarmining.com/wp-content/uploads/2018/08/South…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.08.18 21:34:29
      Beitrag Nr. 5.057 ()
      Antwort auf Beitrag Nr.: 57.686.046 von Popeye82 am 03.05.18 14:07:00Alphamin Resources

      www.alphaminresources.com/alphamin-resources-corp-provides-p…
      www.alphaminresources.com/wp-content/uploads/2018/08/ALPHA_M…

      www.alphaminresources.com/alphamin-resources-corp-closes-c19…
      www.alphaminresources.com/alphamin-completes-drawdown-of-us2…
      www.alphaminresources.com/equity-financing-of-us15-million-t…




      "ALPHAMIN RESOURCES CORP. PROVIDES PROJECT UPDATE, RELEASES INTERIM RESULTS

      NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR PUBLICATION, RELEASE OR DISSEMINATION, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART, IN THE UNITED STATES, AUSTRALIA, JAPAN, OR ANY OTHER JURISDICTION IN WHICH IT WOULD BE UNLAWFUL TO DO SO. ANY FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF THE SECURITIES LAWS OF SUCH JURISDICTIONS.

      ALPHAMIN RESOURCES CORP. PROVIDES PROJECT UPDATE, RELEASES INTERIM RESULTS

      MAURITIUS – August 29, 2018 – Alphamin Resources Corp. (AFM: TSXV, “Alphamin” or the “Company”) is pleased to announce an update on progress at its Bisie Tin Project.

      Construction of the Company’s 80.75% owned Bisie Tin Project is currently on schedule and 75% complete. Commissioning of the process plant is scheduled for Q1 2019. Equity financing raised to date together with the US$80m credit facility is currently projected to take the Company through to commercial production.


      Key project highlights include;

      Safety
      Over 1 million-man hours worked by over 600 employees with no lost time injuries reported.

      Mine construction
      Progressing ahead of schedule with 1709 development meters complete out of a total of 2,700.

      Process plant
      Construction ahead of schedule with 256 tons of steel erected with majority of kit required now on site.

      Infrastructure
      Construction of the Company’s 36Km access road to site and airstrip is now complete with project deliveries getting through to site without difficulty.

      Logistics and procurement
      73% of project loads have been delivered to the mine site. Procurement is 90% complete.

      Social and community
      Social development investments targeting over 1500 households for livelihoods and community infrastructure projects continue. Site security and community relations have been strengthened further by the peaceful and voluntary migration of the remaining 500 artisanal miners from Alphamin’s concession in late 2017 and early 2018.


      The recent Ebola outbreak in the North Kivu province is being monitored closely and strict protocols have been put in place to reduce the risk of transmission at Bisie. The outbreak is located some 1,200km from Bisie by road. To date there has been no impact on the Company’s operations.

      The Company has also filed its interim financial statements for the three and six months ended June 30, 2018 and Management Discussion and Analysis – quarterly highlights, which are available on SEDAR.com.

      Further information, videos and photographs of the Project’s progress are available on the Alphamin Resources Corp. website at www.alphaminresources.com

      Click here to download the unaudited condensed consolidated interim financial statements (expressed in US dollars) for the three and six months ended June 30, 2018 and 2017.
      Click here to download management’s discussion and analysis quarterly highlights (expressed in US dollars) for the three and six months ended June 30, 2018.

      FOR MORE INFORMATION, PLEASE CONTACT:

      Boris Kamstra
      Chief Executive Officer
      Alphamin Resources Corp.
      Tel: +230 269 4166
      E-mail: boris.kamstra@alphaminresources.com

      Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this News Release.

      ISSUED ON BEHALF OF THE BOARD OF DIRECTORS OF ALPHAMIN RESOURCES CORP. BY:
      Boris Kamstra, Chief Executive Officer
      Tel: +230 269 4166
      Grand Baie, Mauritius"





      - Alphamin Resources Corp.
      Am 29.08.2018 veröffentlicht
      Alphamin is on track to deliver on the commitment to develop the first large commercial tin mine in the eastern Democratic Republic of Congo that will produce responsible, developmental, conflict-free tin concentrate, while promoting community development, safety, health and environmentally sound practices. The first production at Alphamin Bisie Tin Mine is expected in 2019 and the mine will reach steady state production towards the end of 2019. The project is already bringing substantial benefit to local communities and holds promise of attractive returns for investors for many years to come. -
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 00:36:24
      Beitrag Nr. 5.058 ()
      Antwort auf Beitrag Nr.: 58.565.378 von Popeye82 am 29.08.18 21:34:29Alphamin Resources



      www.alphaminresources.com/wp-content/uploads/2018/06/Resourc…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 09:26:14
      Beitrag Nr. 5.059 ()
      Antwort auf Beitrag Nr.: 58.530.705 von rolleg am 24.08.18 20:59:10
      Zitat von rolleg: Nr. 1 und 2 sind eingesackt. Die alternative Nr. 2 hatte ich glatt vergessen. Mal sehen. Nr. 3 fällt scheinbar noch tiefer (derzeit kein Kauf in Sicht). ;)


      wie betrachten sie denn ABR bisher so? spricht jetzt grundsätzlich nur die aussicht auf einen günstigeren kurs gegen ein aktuelles invest oder sind da noch fragezeichen offen die sie geklärt haben wollen?
      mich interessieren vor allem die injection und recovery wells tests. auch ist die frage offen ob man sich mit dem nachbarn elementis gut versteht der die liegenschaft letztlich an den vorbesitzer optioniert hatte der dann von ABR aufgekauft wurde. ich halte den vertraglich festgesetzten produktionsbeginn in 2021 für sehr ambitioniert. falls man bis dato nicht in produktion ist hat elementis wohl das recht vom vertrag zurückzutreten ohne weiteres gemache. bis 2021 kann der vertrag jedoch nicht ohne weiteres gelöst werden. nach produktionsbeginn ebenfalls nur falls man da keinen wirtschaftlichen betrieb erzielt. macht die sache nochmal nen stück weit spannender. hier wird es enorm wichtig sein sich einen gescheiten anlagenbauer ins boot zu holen. keine zeit während des ramp ups da noch an der anlage herumzubasteln.

      termination just in case if they fail to reach a stable production without earnings greater than the royalty payment.

      cancellation by elementis if they fail to comply with the lease agreement or couldnt pay the minimum payments.




      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 11:34:26
      Beitrag Nr. 5.060 ()
      Antwort auf Beitrag Nr.: 58.481.677 von Popeye82 am 19.08.18 04:27:32Galena Mining



      https://gallery.mailchimp.com/ff61321dee50f7e7a1a9d9db8/file…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 15:21:14
      Beitrag Nr. 5.061 ()
      Antwort auf Beitrag Nr.: 58.396.002 von Popeye82 am 08.08.18 00:39:54on @the VERGE of, finally, being able to develop ONE of the last (known) undeveloped world-class nickel laterite deposits(in the world)







      Rating, als Nickelinteressierter: Sollte man im Auge behalten.


      Axiom Mining



      www.axiommining.com.au/irm/showdownloaddoc.aspx?AnnounceGuid…
      http://adaptation-undp.org/partners/ministry-mines-energy-an…
      www.un.org/development/desa/indigenouspeoples/
      www.un.org/development/desa/indigenouspeoples/publications/2…
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 15:28:28
      Beitrag Nr. 5.062 ()
      Antwort auf Beitrag Nr.: 58.572.329 von Popeye82 am 30.08.18 15:21:14wissen tun sie es bestimmt auch nicht auf anhieb, aber haben die ihre probleme mit den liegenschaften in den griff gekriegt? die hatten doch mal ne studie angefertigt welche nen teil einer liegenschaft beinhaltete die zu diesem zeitpunkt nicht im besitz von axiom war. resultat war, dass die dann die studie revidieren mussten.
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 15:34:17
      Beitrag Nr. 5.063 ()
      Antwort auf Beitrag Nr.: 58.561.793 von MONSIEURCB am 29.08.18 16:10:23Bi Happy


      Scheint gut zu laufen?
      Avatar
      schrieb am 30.08.18 15:46:22
      Beitrag Nr. 5.064 ()
      Mal so gesagt. Allgemein.
      "Paar Neue" hätte ich Hier noch.

      Gab auch Die Letzten Wochen(/Monate) Vereinzelte Feasibilities Wo der EIndruck besteht:
      Naja, "vielleicht eher grenzwertig".
      MAYbe: Ja. Reicht es. MAYbe not.
      Eines Dieser Projekte war "Minera Alamos".
      (Panoro Minerals, Coro Mining u.A., @What the Geier-knows, hatten meine auch Was vermeldet)
      Die m.E.n. schon ein paar sehr, sehr Gute Ansätze haben.
      Aber Kurzes Minenleben.

      Meistens schwieriger mit Den Dingern.
      Das "auf"zudröseln.
      Was sich gegenseitig miteinander bedingt, ausgleicht. Oder nicht. Usw.


      Whatever, Eine Dieser(BB kennt Die Kiste) Firmen kommt Hier wahrscheinlich in Kürze, vielleicht heut noch, rein.
      Wo früher schon drauf hingewiesen, Das Projekt soll man m.M. 1 Auge drauf halten.
      Die haben grad Vorhin Feasibility released.

      Die wird voraussichtlich kontinuierlich (weiter)begleitet.
      Bin da nicht sicher, aber Eindruck: Ab(mit) DER Feasibility vielleicht eher noch nicht Der Grosse Wurf,
      aber mit(ab) Der "Nächsten"("updated" Feasibility) könnte Es vielleicht interessant(er) werden.
      Da dürften, nämlich, noch Eine ganze, ganze Ecke CHANGES in der Verlosungstrommel -MAY possible- drin sein.
      Avatar
      schrieb am 30.08.18 17:04:03
      Beitrag Nr. 5.065 ()
      Antwort auf Beitrag Nr.: 58.556.453 von Popeye82 am 29.08.18 05:33:30Pioneer Resources













      www.pioresources.com.au/downloads/asx/pio2018083001.pdf
      http://www.cabotcorp.com/
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 18:21:30
      Beitrag Nr. 5.066 ()
      Antwort auf Beitrag Nr.: 58.560.980 von Popeye82 am 29.08.18 15:07:58Interessierte Gut lesen.
      Bin soweit erstmal zufrieden.
      Initialresource erwartet September.





      Ventnor Resources













      www.asx.com.au/asxpdf/20180830/pdf/43xvk774tfxsvv.pdf
      http://www.csaglobal.com/
      http://www.ore.com.au/
      http://www.nagrom.com.au/metallurgical-services
      34 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 18:33:52
      Beitrag Nr. 5.067 ()
      Antwort auf Beitrag Nr.: 58.555.169 von Popeye82 am 28.08.18 21:32:31CLEANEST zinc mine(in the world)







      Ironbark Zinc/BlueJay Mining(/Greenland Minerals+Energy)













      https://gallery.mailchimp.com/c108dbc2422b014650e30c936/file…
      http://www.fednav.com/en/nunavik
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 18:46:08
      Beitrag Nr. 5.068 ()
      Antwort auf Beitrag Nr.: 58.468.804 von winni2 am 16.08.18 23:56:19Du bist LIEB


      Winni

      Hast Meinung zu Ventnor?
      Wenn Du willst, zu Der Kiste auch:
      www.azargametals.com/news/2018/azarga-metals-announces-posit…
      Avatar
      schrieb am 30.08.18 20:42:09
      Beitrag Nr. 5.069 ()
      Antwort auf Beitrag Nr.: 58.469.164 von Popeye82 am 17.08.18 03:39:42Lithium Americas













      www.ktvn.com/story/38989830/nevada-mine-could-produce-25-per…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 20:42:37
      Beitrag Nr. 5.070 ()
      Antwort auf Beitrag Nr.: 58.568.159 von sir_krisowaritschko am 30.08.18 09:26:14Hi Sir,

      danke - sehr gute Hintergrundinfos! Ist in meiner Watchlist seit Aufnahme schon 25% rot...
      Hatte Ihren letzen Beitrag (also den davor) gelesen und da kamen dann tatsächlich ein paar Fragezeichen auf. Da ich keine Zeit hatte, mich näher damit zu beschäftigen, hab ich das auch erst mal gelassen und stattdessen die alternative Nr. 2 genommen (und noch paar andere Sachen - ist nicht weiter wichtig).
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 20:55:14
      Beitrag Nr. 5.071 ()
      Antwort auf Beitrag Nr.: 58.574.309 von Popeye82 am 30.08.18 18:21:30Ventnor Resources



      www.rdmag.com/article/2018/08/coated-sand-could-clean-storm-…
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 21:24:02
      Beitrag Nr. 5.072 ()
      Antwort auf Beitrag Nr.: 58.575.827 von rolleg am 30.08.18 20:42:37sehr gerne! ich tu was ich kann. bei den aussies im board kommt da nicht ganz so viel außer, dass die einen hoffen dass der kurs steigt und die anderen erwarten die 0,1aud. denke popeye kann das eventuell bestätigen? hatte jedenfalls den eindruck, dass da wenig feedback/rückantwort auf seine beitrage kamen.

      an und für sich ist das alles bei ABR schon recht interessant. allein die infrastruktur (highway, strom und wasser) überzeugt mich sehr. mir stellt sich nur die frage ob sie mit ihrem alternativ ISR-verfahren gut fahren. ich kenne das eben nur von excelsior und dachte eben das wäre standart. ich bin mir nicht sicher ob die kommenden tests das verfahren supporten. naja man will offensichtlich die capex drücken. muss man drauf spekulieren, dass sie mit der methode "injektion und recovery im selbigen loch" gut fahren. hatte mir mal welche zu 0,19aud zugelegt. bisl früh im nachklang. war mir im 0,25aud bereich recht sicher dass man die 0,2aud nochmal unterschreitet. kann mir gut und gerne auch noch die 0,1aud vorstellen. aber wer weiß das schon.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 21:38:08
      Beitrag Nr. 5.073 ()
      Antwort auf Beitrag Nr.: 58.576.337 von sir_krisowaritschko am 30.08.18 21:24:02Ja das Zahlenwerk gefällt schon (MC ist schon sehr niedrig...)
      http://americanpacificborate.com/wp-content/uploads/ABRToInc…
      Ob sie tatsächlich noch mal au 0,1 Aud zurückkommen? Dann wäre ich glatt versucht ;)
      Avatar
      schrieb am 30.08.18 21:52:43
      Beitrag Nr. 5.074 ()
      Antwort auf Beitrag Nr.: 58.575.989 von Popeye82 am 30.08.18 20:55:14ist das die Waldfee mit nem Holla ?
      Avatar
      schrieb am 30.08.18 22:01:38
      Beitrag Nr. 5.075 ()
      Antwort auf Beitrag Nr.: 58.530.579 von Popeye82 am 24.08.18 20:34:38Trilogy Metals



      www.northernminer.com/subscribe-login/?id=1003798984
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 22:13:38
      Beitrag Nr. 5.076 ()
      Antwort auf Beitrag Nr.: 58.568.159 von sir_krisowaritschko am 30.08.18 09:26:14Guter Punkt.
      Auch mit Ihröm Injection Well(s).
      Zur Aufklärung Derer ich aber, aus Dem Stand, Nichts beitragen kann.
      Avatar
      schrieb am 30.08.18 22:23:39
      Beitrag Nr. 5.077 ()
      Antwort auf Beitrag Nr.: 58.576.787 von Popeye82 am 30.08.18 22:01:38My dear Mr. Popeye,

      verraten Sie mir bitte, welchen Browser Sie verwenden. Ich weiß (noch) nicht warum Ihre Beiträge von Firefox sehr oft als unsicher bezeichnet werden - Zitat: "Diese Verbindung ist nicht sicher" :confused:
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 22:29:17
      Beitrag Nr. 5.078 ()
      einfach das s wegmachen

      https -> http
      Avatar
      schrieb am 30.08.18 22:30:43
      Beitrag Nr. 5.079 ()
      deurch das https erwartet der browser ein sicherheitsprotokoll.. wenn die jeweilige seite keins hat kommt die meldung
      warum die links mit dem https kommen bei popeye oft weiss ich nicht egal
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 22:41:16
      Beitrag Nr. 5.080 ()
      Antwort auf Beitrag Nr.: 58.577.072 von Boersiback am 30.08.18 22:30:43Börsi, schon klar. Ich wollte nur wissen, warum das so ist... (weder bei Edge, IE noch Firefox der Fall. Chrome und Safari oder Opera nutze ich nicht - wobei Opera eigentlich was wäre...) ;)
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 22:58:37
      Beitrag Nr. 5.081 ()
      Antwort auf Beitrag Nr.: 58.434.541 von Popeye82 am 13.08.18 13:23:43von der Endproduktspezifikation besser als Ventnor.
      also Die werden, wenn die ein Produzent werden, wohl Einen Einiges Höheren Preis nehmen können.

      von den Operations/Ablagerungen, Das finde ich nicht ganz uninteressant, ist Das würde ich sagen auch ein "bisschen wie Das Bauxite Zeug".
      also, heisst(u.A.) dass Das(meist?) in eher "lockeren Aufschüttungen"/Ablagerungen/Sedimenten(??)/Einschlüssen liegt, oft liegt da "Kaum Was"(Erdzeug) drüber usw.



      Diatreme Resources



      www.diatreme.com.au/media/1246/aug_16_2018_drx_asx_bulk-samp…
      http://www.ihcrobbins.com/about/
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 23:10:35
      Beitrag Nr. 5.082 ()
      Antwort auf Beitrag Nr.: 58.575.827 von rolleg am 30.08.18 20:42:371 Projekt habe ich für Sie noch.
      Könnte Ihnen gefallen.
      Mache Die scharf.
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.08.18 23:22:35
      Beitrag Nr. 5.083 ()
      Antwort auf Beitrag Nr.: 58.577.360 von Popeye82 am 30.08.18 23:10:35Nur raus damit... ;)
      Avatar
      schrieb am 30.08.18 23:23:10
      Beitrag Nr. 5.084 ()
      Antwort auf Beitrag Nr.: 58.577.360 von Popeye82 am 30.08.18 23:10:35Pisa: I can't EVEN read








      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 00:25:12
      Beitrag Nr. 5.086 ()
      Antwort auf Beitrag Nr.: 58.577.429 von Popeye82 am 30.08.18 23:23:10Didn´t you know I´m:

      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 01:20:49
      Beitrag Nr. 5.087 ()
      Antwort auf Beitrag Nr.: 58.469.086 von Popeye82 am 17.08.18 01:52:35Global Atomic













      www.globalatomiccorp.com/wp-content/uploads/2018/08/GLO-28-A…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 01:33:40
      Beitrag Nr. 5.088 ()
      Antwort auf Beitrag Nr.: 58.512.915 von Popeye82 am 23.08.18 02:53:52Piedmont Lithium



      https://gallery.mailchimp.com/3c4aa62f5be7d2078cdc62469/file…
      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 03:20:24
      Beitrag Nr. 5.090 ()
      Antwort auf Beitrag Nr.: 58.002.504 von Popeye82 am 17.06.18 05:46:13Aquila Resources


      - Pre-tax NPV at a 6% discount rate of $259M and IRR of 32.0% at base case metal prices of $1,300/oz gold, $1.20/lb zinc, $20/oz silver, $3.00/lb copper and $1.00/lb lead.
      - After-tax NPV at a 6% discount rate of $208M and IRR of 28.2% with a 2.2 year payback.
      - Open pit Proven and Probable Mineral Reserves of 11.65M tonnes.
      - A project life of seven years with total payable gold production of 468,000 oz (or an average of 67,000 oz per year) and 135,000 oz in Year 1. Total payable gold equivalent production of 1.1 million oz.
      - Total payable zinc production of 512M lbs (or an average of 73M lbs per year). Total payable zinc equivalent production of 1.2B lbs.
      - Initial project capital costs estimated at $294M with a 24-month construction period.
      - Sustaining capital costs of $110.6M.
      - Gross C1 cash costs1 of $499/oz gold equivalent or $0.46/lb zinc equivalent and net C1 cash costs of -$590/oz gold or -$1.73/lb zinc.
      - Gross AISC2 of $677/oz gold equivalent or $0.62/lb zinc equivalent and net AISC of -$171/oz gold or -$1.34/lb zinc.
      - The Company has also identified a number of opportunities to further enhance the overall economics of the Project including the future addition of an underground expansion.

      https://aquilaresources.com/release/?id=122557
      http://www.lycopodium.com.au/
      https://aquilaresources.com/release/?id=122558
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 03:41:25
      Beitrag Nr. 5.091 ()
      Antwort auf Beitrag Nr.: 58.554.062 von Popeye82 am 28.08.18 19:27:14ONE of the highest-grade zinc projects, in the world







      NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Kurz: War mal Eine Mine, Zink+Beiprodukte, sehr, sehr Highgrade. Aber klein.


      Kann man mal GUCKEN was bei Der Feasibility rauskommt.





      Superior Lake Resources



      https://superiorlake.com.au/sup/wp-content/uploads/austocks/…
      www.proactiveinvestors.co.uk/companies/news/200025/superior-…

      https://superiorlake.com.au/sup/wp-content/uploads/austocks/…

      https://superiorlake.com.au/sup/wp-content/uploads/austocks/…

      https://superiorlake.com.au/sup/wp-content/uploads/austocks/…

      https://superiorlake.com.au/sup/pick-lake-winston-lake-zinc-…
      https://vimeo.com/270590346
      https://vimeo.com/270587512

      http://firstmover.com.au/coverage/superior-lake-resources/

      https://superiorlake.com.au/sup/








      356 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 05:37:52
      Beitrag Nr. 5.092 ()
      Antwort auf Beitrag Nr.: 58.577.930 von Popeye82 am 31.08.18 03:41:25Superior Lake Resources



      www.nextminingboom.com/sups-zinc-grades-rank-among-worlds-be…
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 06:54:51
      Beitrag Nr. 5.093 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 07:07:09
      Beitrag Nr. 5.094 ()
      Antwort auf Beitrag Nr.: 58.155.641 von Popeye82 am 06.07.18 16:32:35Nouveau Monde Mining



      http://nouveaumonde.ca/nouveau-monde-graphite-and-the-munici…
      http://www.saintmicheldessaints.com/
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 12:30:39
      Beitrag Nr. 5.095 ()
      Antwort auf Beitrag Nr.: 51.936.108 von Popeye82 am 09.03.16 08:03:18das "Offshore" Szenario könnte evt. was sein,
      das Andere ist hässlich

      ein westaustralisches Vanadium/Titan/Eisen Projekt

      Audalia Resources - Medcalf Project Pre-Feasibility Study Results - Mar 9, 2016

      + The Medcalf Project is a 'multi-product deposit with a long mine life coupled with a low risk +low cost mining operation'.

      + The Base Case scenario for the Medcalf Project has a "sound" pre-tax NPV8% of A$186m, 13.1% IRR and a 5.4 year payback using conservative key assumptions.

      + The Offshore Base Case scenario, which contemplates locating the hydrometallurgical plant overseas, has an attractive pre-tax NPV8% of A$843m, 38.1% IRR +a 2.6 year payback (using Base Case inputs +making assumptions for savings in capital +operating costs).

      + The PFS has identified a number of options available to the Company to improve the economic outcomes of the Medcalf Project, +reduce the environmental impact of the operations, which will be investigated as part of the Definitive Feasibility Study(DFS).

      + A number of priority actions have been recommended as a forward ork plan, including interim metallurgical testwork, environmental approvals +permitting, infill drilling +exploration, which will be pursued leading into the DFS.



      Variable - Base Case - Offshore Base Case

      Saleable products V2O5, TiO2, Fe2O3 - V2O5, TiO2, Fe2O3
      Capital cost A$780,000,000 - A$499,000,000
      Operating cost(/t ore) A$190,28/t - A$158,46/t
      Operating costs(LoM) A$3,461,000,000 - A$2,884,000,000
      Revenue(LoM) A$5,379,000,000 - A$5,379,000,000
      Cashflow(LoM) A$671,000,000 - $A1,553,000,000
      IRR 13,1% - 38,1%
      NPV(inclusive of royalties, pre-tax) A$186,000,000 - A$843,000,000
      "Simple Payback" 5,4years - 2,6years


      Key assumptions

      Life of Mine(LoM) 12,5years(ramping down in Year 13)
      Annualised mining production 1,500,000t/a(beneficiation feed)
      Product grade V2O5 98,5% TiO2 95,0%
      Average feed grade V2O5 0,56% TiO2 10,2%
      Overall recovery V2O5 70,3% TiO2 62,4%
      Product prices V2O5 US$15,000/t TiO2 US$2,200/t By-product prices Fe2O3 US$40/t 1FeSO4.7H2O US$40/t2
      Average strip ratio(waste / ore tonne) 0,6
      Product produced(tonnes pa, avg) V2O5 5,750 TiO2 Pigment 98,000
      Total concentrates produced(LoM) V2O5 71,900t TiO2 1,164,000t
      Exchange rate A$:US$(LoM) 0,75
      Discount rate 8% ...
      www.asx.com.au/asxpdf/20160309/pdf/435pll23nvvbd1.pdf
      www.audalia.com.au/projects/medcalf/
      www.audalia.com.au/files/AudaliaResources-Presentation-June-…




      __________________________________________________________________





      Audalia Resources



      www.asx.com.au/asxpdf/20180831/pdf/43xyj0by3mc66n.pdf

      www.audalia.com.au/projects/medcalf/
      Avatar
      schrieb am 31.08.18 13:18:49
      Beitrag Nr. 5.096 ()
      Antwort auf Beitrag Nr.: 51.800.800 von Boersiback am 21.02.16 21:26:58die gefällt mir eigentlich immer besser.
      marktkap 15 mios CAD... die könnten auch 250 mios CAD wert sein am markt und wären attraktiv ;)
      ........................................ ich glaub bei plateau geh ich früher oder später das risiko ein und kaufe mal irgendwann in diesem jahr...
      ________________________________________________________________________





      Schaue gerade in "Älteren" Gefilden nochmal rum.
      Tja, sehense,
      so falsch haben Se nicht gelegen. So far.

      Meine Aussage war sogar, weit, drastischer(und zu Dieser stehe ich nach wie Vor):

      Wenn Sie es schaffen in Produktion zu kommen, und der Uranmarkt sich wieder "signifikant erholt" dann halte ich PROBLEMLOS Eine 9stellige Bewertung für machbar.
      Und Das heisst nicht dass Vorne Eine "1" stehen muss.
      Allerdings: Das ist, auch, Nach(inkl.) CAPEX.
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 16:42:39
      Beitrag Nr. 5.097 ()
      Antwort auf Beitrag Nr.: 58.574.402 von Popeye82 am 30.08.18 18:33:52Ironbark Zinc





      https://thewest.com.au/business/public-companies/ironbark-ti…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 20:01:34
      Beitrag Nr. 5.098 ()
      Antwort auf Beitrag Nr.: 58.458.931 von Popeye82 am 16.08.18 00:09:47BlueJay Mining













      www.titanium.gl/documents/research-reports/STRONG-BUY-Target…
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 20:41:29
      Beitrag Nr. 5.099 ()
      Antwort auf Beitrag Nr.: 58.582.325 von Popeye82 am 31.08.18 13:18:49
      Zitat von Popeye82: die gefällt mir eigentlich immer besser.
      marktkap 15 mios CAD... die könnten auch 250 mios CAD wert sein am markt und wären attraktiv ;)
      ........................................ ich glaub bei plateau geh ich früher oder später das risiko ein und kaufe mal irgendwann in diesem jahr...
      ________________________________________________________________________





      Schaue gerade in "Älteren" Gefilden nochmal rum.
      Tja, sehense,
      so falsch haben Se nicht gelegen. So far.

      Meine Aussage war sogar, weit, drastischer(und zu Dieser stehe ich nach wie Vor):

      Wenn Sie es schaffen in Produktion zu kommen, und der Uranmarkt sich wieder "signifikant erholt" dann halte ich PROBLEMLOS Eine 9stellige Bewertung für machbar.
      Und Das heisst nicht dass Vorne Eine "1" stehen muss.
      Allerdings: Das ist, auch, Nach(inkl.) CAPEX.


      kann ich mir schon auch vorstellen...
      bin aktuell draussen (noch)

      was mich etwas von der "trading-seite" aus gestört hat war der lithiumhype auf plateau, obwohl lithiumwerte eigentlich nicht hypen.
      zumidnest hatte ich es so interpretiert

      ziel wäre in der schwachen phase zu 0,9 und 0,6 (CAD) wieder reinzukommen.
      wobei da problem natürlich besteht das sie einem wegläuft... anderer haken ist halt die sache mit uranpermits in peru.

      (von der qualität her vergleichbares zu dem preis kenne ich im sektor nicht annhähernd)
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 21:34:52
      Beitrag Nr. 5.100 ()
      Antwort auf Beitrag Nr.: 58.423.272 von Popeye82 am 10.08.18 20:15:22SRG Graphite



      http://srggraphite.com/pdf/GraphiteandNickelUncertaintyCloud…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 31.08.18 21:50:34
      Beitrag Nr. 5.101 ()
      Antwort auf Beitrag Nr.: 58.586.969 von Boersiback am 31.08.18 20:41:29zu 1,20 CAD doch für 3.000 € mal wieder welche genommen :rolleyes:

      hab ja einiges cash und so bleibts mal auch
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 01:18:15
      Beitrag Nr. 5.102 ()
      Antwort auf Beitrag Nr.: 58.587.461 von Boersiback am 31.08.18 21:50:34GUTE werte sollte man weitgehend DURCHhalten


      Lieber Boersiback

      Ich will Jetzt gar Keine Kauf/Verkauf/Handlungsempfehlung geben. Nix Dergleichen.
      Das soll auch nicht die Angebershow sein.
      Aber mal rein konzeptuell gesprochen.
      Ich weiss Jetzt gar nicht genau wie man es ausdrücken soll. Ich versuche es mal.
      Das ist ein Punkt den ich mit Dir schon lange mal auf die Couch kriegen wollte.

      Du tradest ja immer super.
      Für Mich sieht Das aber schon DEUTLICHES STück Anders noch aus.
      Also Diese Hier Genannten Zahlen sind rein konzeptuell. Und durch zig Andere Kombinationen austauschbar.

      Angenommen Du kaufst eine Aktie. Bei 1$.
      Die geht auf 5. Alles supi.
      Jetzt fängt Sie aber an zu "bröckeln".
      4,50, 4,00, 3,50, 3,00, 2,50, 2,00.................................................................
      Du hast Die Schnauze voll
      (siehst vielleicht auch ein bisschen Die Felle wegschwimmen).
      Reissleine. Raus. Bei 2.

      Fundamental läuft die Story aber EIGENTLICH gut.
      Die Firma macht weiter Ihre Schritte. Ist auf dem Weg.
      Irgendwann dreht Das Sentiment wieder.
      Der "Markt" ist nicht mehr permanent depressivparanoid. Alles wieder bisschen freundlicher.
      Deine (Ex)Firma entwickelt sich weiter.
      Der Kurs fängt wieder an Ein bisschen anzuziehen. Und noch ein bisschen mehr, und noch ein bisschen mehr.
      Nach laaaaaaaaaaaaaaanger Zeit, mit Viiiiiiiiiiiiiiiiiiiielen Auf und Abs landet die Aktie bei 10. $.

      Weil Dich Das irgendwie angek

      hat, warst Du von "7 auf 10" (nochmal) Dabei.
      Ein Anderer, aber, hat Diese Aktie zur Gleichen Zeit wie Du erworben. Aber NIE verkauft.

      Kassensturz, jetzt gucken Wir mal.
      Was hast Du gemacht? Eingesackt?
      Was Er?
      Der Einfachheithalber wird Eine Ausgangssumme von 1.000$ angenommen. Gebühren, Weitere Abzüge usw. Nichts Dergleichen.


      Boersiback:
      von 1 auf 2 = 2.000$
      von 7 auf 10 = Nochmal 856 Plus.
      =, Summe: 2.856$.

      Der Andere Typ:
      von 1 auf 10 = 10.000$.
      =, Summe: 10.000$.

      See SOMEthing?


      Es geht Jetzt nicht Darum Dicke Hose zu machen. Oder Was auch immer.
      Aber Was ich Dir SEHR, SEHR sagen will:
      Wenn ich Eine Aktie kaufen, ist vielleicht sehr gut "gelaufen", und dann steht Eine "Schwäche"phase an. Fällt, fällt noch mehr, Verselbstständigt sich vielleicht auch.
      Wenn ich denke dass Das Potenzial deutlich über Die Hochs hinaus(d.h. man muss sich dann aber auch an Seiner Eigenen Meinung(Beurteilung) messen:) ) ist,
      dann überlege ich Mir mindestens DREI, FÜNF, ZEHN, oder Mehr, Mal ob Man Diese Aktie wirklich verkauft.

      Wenn man mal Einen "Ordentlichen Xbagger" hat;
      Du darfst glauben dass Mir Das nicht vollumfänglich unbekannt ist;
      (aktuell 4 >5bagger(aber noch ne Menge im "Ofen":). Dafür gibt es auch Verluste. Aber nicht Viele. Aber die Gesamtrechnung ist ein ziemlich, ziemlich Geiles DIng.)
      und Die Aktie macht Intraday 2%. Aber Du machst 10%. DAS sind Feiertage.

      Die Sache ist dass man sich dann nicht (mehr einfach) Alles "Chart"brainwashen kann. Sondern dann HÄNGT man, auch, an Seiner Einschätzung.
      Kann auch schiefgehen. Und Das tut es auch mal.
      Das ist zum Beispiel Warum ich bei Celsius eine GANZ, GANZ Andere Meinung habe. Und Die nicht verkauft hab.


      Ich will nicht sagen
      - Wie "mans machen soll".
      - Nicht die "Welt" erklären.
      - Nicht 1stein "nacheifern".
      - Nix. Derart.

      Aber(und Das gern auch in PRAKTISCHEN Dimensionen mal Mehr durchgehen) verstehst Du den PUNKT?????
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 02:03:26
      Beitrag Nr. 5.103 ()
      Antwort auf Beitrag Nr.: 58.588.304 von Popeye82 am 01.09.18 01:18:15die sache bzw das problem ist halt auch folgendes:

      1. weiss man im grunde oft nicht wirklich welcher wert nun sehr gut ist.
      bsp Celsius... es ist anzunehmen dass es ein relativ solides deposit sein müsste aufgrund der bisherign daten.
      (ich hatte bei 0,20 AUD die hälfte verkauft weil mir die bewertung recht hoch schien. in dem fall wars auch bislang recht perfekt gewesen. den rest hab ich noch.)
      man muss natürlich immer auch die marktkap der liegenschaft entgegenhalten und grob einplanen was erwarte ich von dem ding (irr, npv, cashflows, capex usw usw)
      das hatte ich bei Clean TeQ die ganze zeit im kopf z.B. dass die bewertung schon recht heftig war. deswegen auch 0 prb mich da bei 1 AUD zu trennen. nicht perfekt getimed. es tat aber nicht weh, weil ich sie als zu teuer empfand und das immer noch 500% für mich waren
      ich brauche vor allem im kopf was ist das für mich wert und von zeit zu zeit muss man das anpassen.
      bei vielen geschichten ist das schwierig... (HGM, FWZ usw)... gut man kann was ansetzen aber man hat letztlich keinen echten plan was am ende des tages dabei rauskommt.
      das macht natürlich unsicher. da hat man bei xy poduzent oder "normalaktie" eine klarere vorstellung.

      2. marktrisiko
      manchmal wird ein kompletter sektor einfach umbewertet.
      bsp 2000... da gabs schon auch werte mit kgv 15 die nicht zu teuer erschienen.
      es folgte aber eine umbewertung nach unten und das dauert dann 5-10 jahre bis der alte bewertungsstand erreicht wurde.
      hast du jetzt ein problem mit rohstoffen... also dass gold auf 600 geht und kupfer auf 2000 wegen einer weltwirtschaftsdepression dann nutzt alles nix, weil man jede bewertung zu den einzelwerten nach unten anpassen muss

      ob das bei rohstoffen passiert weiss ich nicht... letztlich nicht unmöglich in diesen zeiten aktuell.
      aber dann kansnt du im grunde dein gehirn leermachen und alles neu bewerten. nämlich viel tiefer (ausser ein explorer drillt grad 200 meter mit 10% Cu)
      meistens ist das allerdings in hypephasen so.. der minensektor insgesamt ist viell. aktuell "vernünftig" bewertet aber sicherlich nach wie vor nicht gerade ein highlight wie 2008 oder 2011.

      meine befürchtung ist halt so eine sektorumbewertung, weil ich das 2000, 2008, 2011-2015 sehr oft miterlebt habe und kein weiteres mal reinplumpsen will und ich es für denkbar halte

      was verkäufe angeht, ist es schooooooooon bei mir so dass ich nach oben eher verkaufe als nach unten. ich hab aber meinen "geldgesamtstand" und wenn der zu schnell zu heftig fällt kanns passieren dass ich etwas panisch werde, ansonsten nutze ich ja schon meistens einen tiefgang zum kauf/nachkauf. was dann oft ein vorteil ist wenn man eine aktie länger hat und kennt und WEISS da war nix aber chartspielchen und eine delle die behoben werden wird. so machts einkaufen dann meistens auch schon spaß.
      problem ist dann eher eben diese depotstandschmerzgrenze... grund war bei mir da einfach dass ich nur noch knapp über 300K stand und mmir mal schwor dass ich wenns brennt diese 300k als limit geldstand halten möchte.
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 04:12:17
      Beitrag Nr. 5.104 ()
      Antwort auf Beitrag Nr.: 58.575.989 von Popeye82 am 30.08.18 20:55:14Ventnor Resources













      www.proactiveinvestors.com.au/companies/news/203836/ventnor-…
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 06:43:42
      Beitrag Nr. 5.105 ()
      Antwort auf Beitrag Nr.: 58.490.151 von Popeye82 am 20.08.18 17:01:51ONE of the world’s largest (undeveloped) (high-grade) lithium deposit(in the world)







      Birimian


      https://investorinsight.com.au/home/birimian-present-at-afri…



      www.mining.com/birimian-eyes-2020-production-199m-mali-lithi…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 06:57:30
      Beitrag Nr. 5.106 ()
      Antwort auf Beitrag Nr.: 58.490.151 von Popeye82 am 20.08.18 17:01:51Balls THERE?



      ___________________________________________________________





      Meine Empfehlung für Sie ist:
      Shorten, mindestens 3 Jahre.
      Und frühestens bei 3(A)c veräussern.
      Das ist Das richMAKER Rezept.
      Exklusiv für Sie.
      Avatar
      schrieb am 01.09.18 10:44:25
      Beitrag Nr. 5.107 ()
      Antwort auf Beitrag Nr.: 58.588.481 von Popeye82 am 01.09.18 06:43:42das ist der einzige reine lithiumwert den ich mir vorstellen könnte

      der (zwischen)hype ist da ja auch vorbei von daher wieder interessant
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 20:16:19
      Beitrag Nr. 5.108 ()
      Antwort auf Beitrag Nr.: 58.555.835 von Popeye82 am 28.08.18 22:53:39Desert Lion Energy

      http://desertlionenergy.com/news-and-media/news-releases/201…
      http://desertlionenergy.com/news-and-media/news-releases/201…



      "Desert Lion Energy Initiates Strategic Review

      Canada NewsWire

      TORONTO, Aug. 31, 2018

      TORONTO, Aug. 31, 2018 /CNW/ - Namibian lithium developer and emerging lithium concentrate producer Desert Lion Energy Inc. (TSXV: DLI) (OTCQB: DSLEF) ("Desert Lion" or the "Company") today announced that it has ceased all operations in Namibia in light of the continued decline in lithium carbonate pricing. The Board is currently re-assessing the previously announced 3-stage execution plan and is evaluating all available options to find a sustainable path to the continued development of its Namibian Lithium Project.

      The Company has also commenced negotiations with its offtake partner, Jiangxi Jinhui Lithium Co. Limited, to amend the pricing metrics under its offtake agreement in light of the current lithium carbonate pricing environment.

      As previously disclosed, the Company intends to announce its Maiden Resource Estimate and Preliminary Economic Assessment prior to the end of Q3 2018.

      About Desert Lion Energy

      Desert Lion Energy is an emerging lithium development company focused on building Namibia's first large-scale lithium mine to be located approximately 210 km from the nation's capital of Windhoek and 220 km from the Port of Walvis Bay. The Company's Rubicon and Helikon mines are located within a 301 km2 prospective land package, with known lithium bearing pegmatitic mineralization and the Company is currently in Phase 1 of its production plan, producing and exporting lithium concentrate from stockpiled material. The project site is accessible year-round by road and has access to power, water, rail, port, airport and communication infrastructure."
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 20:43:29
      Beitrag Nr. 5.109 ()
      Antwort auf Beitrag Nr.: 58.572.395 von sir_krisowaritschko am 30.08.18 15:28:28wissen tun sie es bestimmt auch nicht auf anhieb, aber haben die ihre probleme mit den liegenschaften in den griff gekriegt? die hatten doch mal ne studie angefertigt welche nen teil einer liegenschaft beinhaltete die zu diesem zeitpunkt nicht im besitz von axiom war. resultat war, dass die dann die studie revidieren mussten.
      ____________________________________________________________________________





      Ich bin Mir eigentlich recht sicher dass Diese (Rechts)Unklarheiten final beigelegt wurden,
      habe Jetzt aber nicht die "Meldung" Dazu zur Hand.
      Die müsste man ggf. nochmal aus dem wwwÄther rausfischen.
      No promises, aber vielleicht schau ich mal danach.
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.09.18 20:54:43
      Beitrag Nr. 5.110 ()
      Antwort auf Beitrag Nr.: 58.577.684 von rolleg am 31.08.18 00:25:121nes muss ich DOCH nochmal fragen


      Didn´t you know I´m:


      _________________________________________________________________________





      Entschuldigen Sie, aber in Zeiten Der Cancer-like Ausbreitenden Fake NEWs Welten,
      ist man doch um Die Aufdeckung der WAHRheit immer SEHR, SEHR, SEHR Speziell nochmal bemüht.
      Sooooo.

      Bedeutet Dies Sie sind TriSexuell(ich hoffe doch Nix animalisches)?
      Oder: Ich(Sie) "bin 3 Atome"?



      Mehr Optionen gippts nicht. SOweit ich Das sehe.
      Wenn ich in Bio aufgepasst habe sind Sie aber Vielmehr als 3 Atome.
      Weswegen ich "gewisse Befürchtungen" habe.
      Avatar
      schrieb am 01.09.18 23:15:47
      Beitrag Nr. 5.111 ()
      Antwort auf Beitrag Nr.: 58.592.258 von Popeye82 am 01.09.18 20:43:29
      Zitat von Popeye82: wissen tun sie es bestimmt auch nicht auf anhieb, aber haben die ihre probleme mit den liegenschaften in den griff gekriegt? die hatten doch mal ne studie angefertigt welche nen teil einer liegenschaft beinhaltete die zu diesem zeitpunkt nicht im besitz von axiom war. resultat war, dass die dann die studie revidieren mussten.
      ____________________________________________________________________________


      Ich bin Mir eigentlich recht sicher dass Diese (Rechts)Unklarheiten final beigelegt wurden,
      habe Jetzt aber nicht die "Meldung" Dazu zur Hand.
      Die müsste man ggf. nochmal aus dem wwwÄther rausfischen.
      No promises, aber vielleicht schau ich mal danach.


      Hmm... so richtig Safe scheint das offenbar aber noch nicht zu sein.
      Axiom hat sich in erster Linie mit den Landbesitzern zu einigen. Nichts leichter als das.
      Dann gibt's die Genehmigung vom Ministerium.

      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 01:23:50
      Beitrag Nr. 5.112 ()
      Antwort auf Beitrag Nr.: 58.592.705 von sir_krisowaritschko am 01.09.18 23:15:47Tag

      Thanks.
      Ich kann da aus Dem Stand Nichts Genaues, Belastbares sagen,
      aber mal 2,3 Punkte:

      - "Eigentlich recht sicher" ist Jetzt vermutlich falsch. Aber in Der Beabsichtigten Aussage glaube ich trotzdem richtig gewesen.

      zum Eingestellten:
      - 1) Können Sie mal sagen wie Das mit dem Pdf Inhalten/(inkl)Graphiken einstellen geht?
      Ich verzweifel da jedesmal dran. Kriege Das; Warum auch immer; nie hin.
      (Sonst wären Hier Einige Sachen schon "noch optisch Spannender gewesen".
      - 2) LOI "Granted" steht ja für Tennement "D" und "Kolosori".
      Die resource liegt aber auf San Jorge???
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 09:06:13
      Beitrag Nr. 5.113 ()
      Antwort auf Beitrag Nr.: 58.593.005 von Popeye82 am 02.09.18 01:23:50weiß jetzt nicht, welchen pdf-Reader du nutzt. Bei Foxit-Reader gibt es in der Menüleiste/Toolbar ein kleines Kamerasymbol, neben dem "Schnappschuss" steht. Das klickst du an, anschließend markierst du den gewünschten Bereich (Text und/oder Graphik) des pdf-files. Es erscheint automatisch der Hinweis "der ausgewählte Bereich wurde in die Zwischenablage kopiert". Danach öffnest du ein Bildbearbeitungsprogramm, z.B. Paint, ist auf Windowsrechnern vorinstalliert, klickst auf "Einfügen" und speicherst das als JEPG-Bild auf deiner Festplatte. Dieses kannst du anschließend auf WO hochladen (siehe linke Seite neben dem Textfeld, wo Smilies, Formatierungen usw ausgewählt werden können.
      Avatar
      schrieb am 02.09.18 12:04:57
      Beitrag Nr. 5.114 ()
      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 12:31:22
      Beitrag Nr. 5.115 ()
      Antwort auf Beitrag Nr.: 58.592.705 von sir_krisowaritschko am 01.09.18 23:15:47Sorry pop, ich bin da nicht im Detail drin. Hatte nur nochmal den Grund der aufzuhebenden pfs nachgelesen und da war die Rede von kolosori. Dachte dann da würde sich der Kreis mit der aktuellen Meldung schließen.
      Avatar
      schrieb am 02.09.18 18:58:34
      Beitrag Nr. 5.116 ()
      Antwort auf Beitrag Nr.: 58.575.824 von Popeye82 am 30.08.18 20:42:09Lithium Americas



      https://seekingalpha.com/article/4203443-energy-metals-exper…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 20:51:18
      Beitrag Nr. 5.117 ()
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 21:14:36
      Beitrag Nr. 5.118 ()
      Antwort auf Beitrag Nr.: 58.562.204 von Popeye82 am 29.08.18 16:42:33Niocorp Developments



      www.mining-technology.com/features/critical-minerals-scarcit…
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 21:52:54
      Beitrag Nr. 5.119 ()
      Antwort auf Beitrag Nr.: 58.556.459 von Popeye82 am 29.08.18 05:45:25Rift Valley Resources



      www.mining-technology.com/comment/rare-earths-chinese-domina…
      30 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 22:48:23
      Beitrag Nr. 5.120 ()
      Antwort auf Beitrag Nr.: 57.516.476 von Popeye82 am 11.04.18 12:43:13Myanmar Metals



      https://hotcopper.com.au/threads/next-opportunity-for-a-bump…

      www.mining-technology.com/news/myanmar-permits-local-foreign…
      www.mmtimes.com/news/foreign-investment-permitted-mining-sec…
      https://gettingthedealthrough.com/area/22/jurisdiction/132/m…
      www.investingmyanmar.com/single-post/2018/04/17/Myanmar-Mine…
      www.investingmyanmar.com/single-post/2018/04/17/Myanmar-Mine…
      www.investingmyanmar.com/single-post/Introducingmyanmar
      www.investingmyanmar.com/single-post/myanmar-business-climat…

      www.investingmyanmar.com/single-post/myanmar-as-a-FDI-destin…




      "Myanmar permits local and foreign investment in mining
      By JP Casey
      Share

      Myanmar’s Ministry of Natural Resources and Environmental Conservation (MONREC) has announced that local and foreign investment in mining operations in the country will be permitted, following an assessment of the industry’s environmental impacts.

      Mining was suspended in 2016 due to concerns over the environmental damage caused by the industry and legal confusion. Inconsistencies were found between rules directed at mining unions and those operating at a state-wide level on the matter of permissible distance of mining operations from water sources. The confusion grew around the 2012 Environmental Conservation Law, which has since been altered in line with the 2018 Myanmar Mining Rule.



      “We have since inspected up to 519 mining sites and made many reforms. We believe the mining sector is now ready to contribute to our nation’s development,” said U Khin Latt Kyi, director general of MONREC’s mining department. “The mining sector is now open to local and foreign investors after two years.”

      The ministry will now allow foreign companies to invest in large-scale sites covering over 500,000 acres, as well as medium-scale operations of up to 247.1 acres. MONREC will also permit investment in small-scale precious metal sites of up to four acres, other mineral sites of up to ten acres, and raw industrial material and precious stone sites of up to 20 acres.

      The Mining Rule, which came into force in February this year but has since been updated, also gives stage and regional governments authority to oversee small-scale mining blocks. It requires investors to seek permission from the Union Minister’s Office to work with large- and medium-scale projects, or from the Department of Mines for smaller operations.

      Australian mining company PanAust has already received permission to conduct feasibility studies in Myanmar’s Wuntho region, and several foreign companies from Australian, China and Japan are seeking similar permits.

      “However, we can’t give permission for foreign investments directly,” said U Khin Lat Kyi. “We have to submit these applications to the government, which will grant permission. Wuntho has been contracted for the first time. I think at least six or seven investments will come to exist in the next three or four months.”

      Mining in Myanmar has struggled recently, with thousands of miners facing unemployment following a dispute between the National Prosperity Company and the national government after it emerged the former was not able to produce enough gold to pay to the latter as part of a mining licence granted in 2011. "
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.09.18 23:04:17
      Beitrag Nr. 5.121 ()
      Antwort auf Beitrag Nr.: 58.597.518 von Popeye82 am 02.09.18 22:48:23wer an resources(Entwicklung) in Myanmar interessiert ist ruhig mal angucken.





      Myanmar Metals



      http://charltonsmyanmar.com/wp-content/uploads/2013/10/CHARL…

      www.myanmar-responsiblebusiness.org/pdf/SWIA/Mining/Appendix…

      http://www.researchgate.net/profile/Myo_Myanmar/publication/…
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 00:15:36
      Beitrag Nr. 5.122 ()
      Antwort auf Beitrag Nr.: 58.555.415 von Popeye82 am 28.08.18 21:59:33TNG



      https://hotcopper.com.au/threads/ann-tng-strengthens-mine-de…
      45 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 01:46:35
      Beitrag Nr. 5.123 ()
      Antwort auf Beitrag Nr.: 58.019.557 von Popeye82 am 19.06.18 17:13:01Lindian Resources



      https://stockhead.com.au/resources/these-africa-focused-asx-…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 02:02:14
      Beitrag Nr. 5.124 ()
      Antwort auf Beitrag Nr.: 58.597.356 von Popeye82 am 02.09.18 21:52:54Rift Valley Resources



      https://stockhead.com.au/special-report/a-new-us-law-has-giv…
      www.proactiveinvestors.com.au/companies/news/203646/rift-val…

      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 03:16:51
      Beitrag Nr. 5.125 ()
      Antwort auf Beitrag Nr.: 58.597.869 von Popeye82 am 03.09.18 01:46:35Lindian Resources



      www.asx.com.au/asxpdf/20180806/pdf/43x3wn98tp6bvs.pdf

      www.asx.com.au/asxpdf/20180731/pdf/43wywfvdfp81yd.pdf
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 03:31:05
      Beitrag Nr. 5.126 ()
      Antwort auf Beitrag Nr.: 58.576.997 von rolleg am 30.08.18 22:23:39My dear Mr. Popeye,

      verraten Sie mir bitte, welchen Browser Sie verwenden. Ich weiß (noch) nicht warum Ihre Beiträge von Firefox sehr oft als unsicher bezeichnet werden - Zitat: "Diese Verbindung ist nicht sicher" :confused:
      _______________________________________________________________________





      Herr Rolleg

      Keine Ahnung.
      User "Boersiback" teilte Mir einmal mit: Das " "s" ist Zuviel". Seitdem mache ich es(bei Link(s) 1stellen) IMMER weg. Wenn man da(nn) (auf Die Eingestellten Links) draufklickt ist es aber manchmal IMMERnoch(WIEDER) da.:confused::confused::confused::mad::keks:

      Keine Ahnung, Dafür kann ich Nix.
      Ansonsten halte ich Mich EXAKT an Dr. Sommers Beratung(sstunde), und sollte freizusprechen sein.
      Darüberhinaus, abseits der "S", poste ich nur ganz Normale Links.
      Keine Ahnung ob Das Irgendeine Aufklärung bringt, aber Mehr weiss ich Dazu eigentlich nicht.
      Avatar
      schrieb am 03.09.18 03:34:16
      Beitrag Nr. 5.127 ()
      Antwort auf Beitrag Nr.: 58.577.156 von rolleg am 30.08.18 22:41:16Börsi, schon klar. Ich wollte nur wissen, warum das so ist... (weder bei Edge, IE noch Firefox der Fall
      _________________________________________________________________________





      Achso, ich nutze Firefox.
      0 Plan.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 05:12:48
      Beitrag Nr. 5.128 ()
      Antwort auf Beitrag Nr.: 58.556.384 von Popeye82 am 29.08.18 02:56:02Tando Resources













      www.tandoresources.com.au/sites/default/files/asx-announceme…
      14 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 13:18:39
      Beitrag Nr. 5.129 ()
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 14:01:52
      Beitrag Nr. 5.130 ()
      Antwort auf Beitrag Nr.: 58.597.980 von Popeye82 am 03.09.18 05:12:48Tando Resources



      https://stockhead.com.au/special-report/tando-resources-expe…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 15:07:17
      Beitrag Nr. 5.131 ()
      Antwort auf Beitrag Nr.: 58.221.360 von Popeye82 am 16.07.18 09:48:40Highfield Resources

















      www.geoalcali.com/en/news/project-news/highfield-resources-t…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 17:40:15
      Beitrag Nr. 5.132 ()
      Antwort auf Beitrag Nr.: 58.491.777 von Popeye82 am 20.08.18 20:14:31SolGold

      www.juniorstockreview.com/2018/06/13/ecuador-renaissance-min…




      "Ecuador – A Renaissance in Mining Investment Attractiveness??????????????????????????????????????????????????????????????????

      Lately, I’ve spent a lot of time debating the criteria I use and the level of risk I’m willing to take with regards to jurisdiction. I find the topic of jurisdictional risk very interesting because, although, there’s a quantifiable aspect to jurisdiction, I believe many of the general opinions regarding jurisdictional risk are based on qualitative observations or anecdotal themes that are proliferated through the mainstream media.

      A good example is Russia. Many jump to the conclusion that it’s a VERY risky country and, therefore, not a place to invest. I don’t necessarily disagree; most of the propaganda about Russia, today, is ‘negative.’

      Let’s, however, take a look at one of the criteria listed by the Fraser Institute in its examination of jurisdictional risk; political stability. Relative to its peers, Russia scored low, which too many translate into ‘stay away.’ While political stability is a complex factor, I was taken aback when a friend, whose company does business in Russia, said he finds this scoring comical; “does anyone really think there’s going to be some serious political upheaval while Putin is in charge?” Given the complexity of evaluating political stability, his answer isn’t complete, but it still reveals the contrast in views – those who have experience in these ‘risky’ jurisdictions, and those who rely solely on narrative to form their opinions.

      Last year, one of the mining industry’s best, Rick Rule, gave me some sage advice regarding jurisdictional risk;

      “My own experience is that most investors equate political risk to their emotion rather than to reality, and you tend to react more strongly to political risk that you haven’t experienced or don’t understand. My own belief is that money that is stolen from me by white people in English, according to the rule of law, is just as gone as money that is extorted from me in some third world kleptocracy.

      My experience, further, by doing business internationally, and this is going to sound like a generality, which it is, but it is also true, countries that can’t get any worse don’t, and countries that can’t get any better don’t, either. This plays out over time, not immediately, but the truth is, the countries that have rewarded me the best are countries that have been coming off low bottoms. An example would be Chile, with a superb exploration endowment coming off, first, the idiocy of socialism under Allende, and then, the murderous regime of Pinochet. The response of the geology in Chile to stability and the sort of social sense that they had had enough of rightist and leftist autocracy was spectacularly good for me. I made money in hard places like Russia, Sudan, Congo. The truth is that most of the great, easy to find, tier one deposits that exist in countries that have been able to be explored efficiently in the last 40 years have been made. The big tier 1 discoveries that have yet to be made are going to be made in places where there have been problems with access or problems with cost of capital. Places like the Tethyan metalagentic belt, running through Turkey, Pakistan, Kazakhstan, Afghanistan, Uzbekistan, Kyrgyzstan, Mongolia, those types of places. The easy deposits in safe places have mostly been found.” ~ A Conversation with Rick Rule, CEO of Sprott US Holdings

      With this in mind, and through my process of due diligence, I believe Ecuador is a country which is coming off a bottom in terms of mining investment attractiveness. I’m a buyer of what I believe are the highest quality junior mining companies exploring and developing projects in Ecuador, and believe that money invested now, near the bottom, gives the investor a great risk to reward opportunity.


      Ecuador

      Capital City – Quito
      Population – 16.529 million
      Currency – U.S. Dollar
      2017 GDP – $70.955 billion USD
      2017 Unemployment Rate – 4.34%
      Main Industries – Petroleum (more than 40% of exports), food processing, textiles, wood products and chemicals
      Main Export Partners – United States, Chile, Peru, Colombia, Japan and Russia

      *All Figures taken from IMF website


      Ecuador’s economy is the 8th largest in South America and is driven by the oil industry, where petroleum makes up almost half of the country’s exports. The agriculture sector is a distant second with a little more than 10% of exports.

      NOTE: Ecuador is the largest banana producer and exporter in the world.

      Ecuador’s oil production began in the early 1970s and is clearly the main driver of the economy. In the years before oil production, Ecuador was a country whose people identified with an agrarian social philosophy, meaning they valued rural society as superior to urban society. With the influx of cash into the country, this has slowly started to change and, in my opinion, is a key point in understanding the Ecuadorian culture.

      Social Unrest – Taxes and the Environment

      Looking into Ecuador’s past, it’s evident that its people are not afraid to protest, especially when it comes to the environment or a number of social issues. Ultimately, moving forward, the government will have to choose how they deal with future protests but, either way, social unrest surrounding a potential mine site could have a major impact on the success of the project.

      Environment

      If I were to pick the most likely point of contention regarding mining’s future in Ecuador, it would be related to the environment. Ecuador is near the top of the world list of biodiversity hotspots in terms of vertebrate species, endemic vertebrates and plants. Specifically, the Intag region, named for the river that runs through it, spans two of the world’s 34 most biologically important areas.

      This biodiversity is highly coveted by many who live within Ecuador and many of the environmental NGOs around the world. Doing a quick search of environmental organizations with propaganda referencing Ecuador reveals a long list of interested parties including, The Ecologist and Fund My Planet.

      While there is the potential for turmoil regarding the environment, I think that the probability of there being issues can be reduced if handled correctly by the mining companies. By ‘handled correctly,’ I think it’s really important to educate and support the local communities in the region with which you’re developing or exploring. Educate on the benefits of mining and how the company intends to protect the environment in which it’s working.

      Additionally, an X-Factor in this type of relationship are ties with Ecuadorian companies that have operated within the country for many years. I think the companies that leverage their relationships within Ecuador are miles ahead of those who try to navigate the culture and government from the ground floor.

      There’s one such relationship which I think has a ton of potential to bring shareholders value through their expertise and recognition within the local communities. Adventus Zinc Corporation and Salazar Resources (SRL:TSXV) have this type of agreement, and I had the opportunity to ask Sam Leung, Adventus’ VP Corporate Development, about it.


      Adventus Zinc Corp

      Adventus Zinc Corp. (ADZN:TSXV)

      MCAP – $45.5 million (at the time of writing)


      Brian: In your opinion, why was it important to have a partner, such as Salazar, in Ecuador?

      Sam: Local know-how is often invaluable, particularly in the mining sector and developing jurisdictions such as Ecuador. Many foreign companies and corporate personnel often fail to recognize what they do not know about a project jurisdiction and its normal business and community practices, so a trusted local partner can add significant value with operational experience and local networks. For Adventus’ Curipamba Project and the Ecuador country-wide alliance, a strong partnership has been formed with Fredy Salazar and his local Salazar Resources team, who are pioneers in Ecuadorean mineral exploration with over 30 years in their home country. The Salazar team work closely with Adventus to help expedite and complete tasks in country with minimal complications, and share important business insights from domestic developments.

      Brian: What do you see as the biggest risk for mining investment in Ecuador?

      Sam: We perceive community relations and integration to be the biggest risk not just for mining investment in Ecuador but most other developing countries. Each project has different stakeholders and dynamics, so investors need to be aware of management teams’ capabilities and limits in addressing social needs in project development. For the Curipamba Project, the Salazar team are well-respected members of the project communities, while Adventus brings additional resources and international best-practices to address social needs.

      Left-Leaning Socialism

      The political philosophy which I’m most apprehensive about, especially from an economic standpoint, is left-leaning socialism. Throughout history, political structures rooted within these frameworks have been bad for business.

      I believe, however, that given the obvious PUSH toward reducing taxes and attracting mining investment dollars, at least in the short-term, the risk associated with this form of political philosophy is reduced, but never too far away.

      For me, when a political philosophy is so ingrained in the culture of a country, it’s only a matter of time before the cycle shifts and once again reflects the country’s history during Correa’s rein. I’m very optimistic that the next few years will remain positive for mining investment, but will remain open-minded about the subtleties that may be indicating a reversion back to the mean!

      The Last 10 Years

      A major turning point in Ecuador’s history, in terms of how it relates to mining, occurred in November 2006 with the election of Rafael Correa as President. Interestingly, Correa’s 10 years as President was unusual given the fact that there had been 7 different Presidents in the previous decade.

      Correa’s appeal to the Ecuadorian people appears to have been rooted within socialist or left-leaning political philosophy, which saw a major portion of tax dollars diverted into social causes, such as healthcare, education and agricultural subsidies. Additionally, and more to the point of this article, Correa focused his attention on extracting more cash from the mining business.

      In April of 2008, Correa’s government adopted a new mining mandate which restricted companies to holding a maximum of three concessions and instilled a 180-day suspension of activities for almost all mining concessions in Ecuador while a new mining law was put together. This controversial move did not go over well with investors, and most of the mining companies which held property in Ecuador, as they saw their share prices fall in response to the news.

      Months after, still under the guise of the new mining mandate, Aurelian Resources sold their multi-million gold ounce deposit, Fruta del Norte, to Kinross Gold Corporation for $1.2 billion. I believe this deal single-handedly marked the height of ‘doom,’ so-to-speak, of the hard-rock mining industry within Ecuador. Over the coming years, Kinross participated in negotiations with the government over terms to develop Fruta del Norte into a mine but, ultimately, couldn’t come to an agreement.

      As cited in many articles relating to the negotiations, the Ecuadorian Government insisted on a 70% windfall profits tax, which, in essence, would limit the profitability of the mine in a rising gold price environment. Ultimately, this led to negotiations falling apart in 2013. Within a year, Kinross formally stepped away from Fruta del Norte with its sale to Lundin gold for $240 million – a whopping 80% loss!

      As I stated, I believe this marked the low point for hard-rock mining in Ecuador; outside of nationalizing Fruta del Norte, selling it for a fraction of the purchase price because of negotiations with the government had a major effect on how the mining industry viewed investment within Ecuador’s borders.

      The failure of these negotiations is clearly visible in the popular Fraser Institute Rankings, as Ecuador’s score for mining investment attractiveness fell to a low of 38.1, ranking it 80th out of the 122 countries that were covered by the 2013 report. In the years since, Ecuador has slowly improved its ranking with a score of 45.9 in 2014, 45.36 in 2015, 50.38 in 2016, and 52.09 in 2017. While this is a marginal improvement year over year, the score is headed in the right direction, and one which, I believe, will improve again in 2018.

      2018

      Why do I believe that Ecuador’s mining investment attractiveness score is going to continue to improve in 2018? Great question and one that needs to be explained in further detail, as Ecuador’s past needs to be kept in perspective when making prognostications.

      Goal of Attracting $4.6 Billion Investment Dollars, Over the Next 4 Years (2021)

      In May 2017, Lenin Moreno replaced Correa as President of Ecuador. While much of what I have read describes Moreno as having a socialist or leftist political philosophy that’s very similar to Correa’s, Moreno has publicly stated a desire to attract close to $5 billion for Ecuador’s mining sector. This is a lofty goal because, in my opinion, they will have to make great strides with regards to changing their image in the mining sector in order to accomplish this.

      At this year’s PDAC, Ecuador may have made a crucial step in improving their image, as they were the headline country sponsor for the event and had a large booth at the show. While advertising is great and a step in the right direction, if they don’t take action to improve the country’s mining investment attractiveness, it may be all for not.

      Even before this advertising PUSH, however, Ecuador has shown that it’s poised to change. The biggest change, in my mind, comes with hiring Wood Mackenzie as a consultant to assist in changing Ecuador’s mining tax regime, making it competitive with the rest of the world.

      Here’s a list of some of the positive fiscal and financial reforms made over the last few years:

      Value Added Tax (VAT) Recovery – Starting in 2018, VAT will be recoverable for mineral exports
      Windfall Tax – A bill has been expedite to remove the windfall tax, and should be approved in the next 30 days.
      Sovereign Adjustment
      Currency Transaction Tax – exemption on tax relating to currency outflows
      Accelerated Depreciation – Investors’ choice of 5-10 years (locked in fiscal stability contract)
      Fiscal Burden – For example, the fiscal burden on a large scale copper project has dropped from 30% to 23% with the changes to the tax regime

      NOTE: Review Wood Mackenzie “Ecuador Tax Regime”

      Brian: Of the positive fiscal and financial reforms made by the Ecuadorian government to date, which do you feel will be the most effective in changing perception of the mining community?

      Sam: We believe the significant reduction in the Windfall Tax terms over the past few years has been integral to changing the investment perception. Due to the negative connotations, we also believe the government of Ecuador could go further and remove the Windfall Tax outright, but that remains to be seen. Please refer to our corporate presentation on the Adventus website for more details on the Windfall Tax.

      Brian: In your opinion, is there anything else that needs to occur to change the perception of the mining and investment communities?

      Sam: With regards to exploration investment jurisdictions globally, Ecuador has been arguably the hottest over the past 12 months and this momentum continues. Longer term, we believe a significant milestone for Ecuador will be the completion and successful commercial operation of the first large mines which are currently in construction. Once these foreign companies demonstrate returns on their investments, many more deep-pocketed investors will be drawn into Ecuador.

      Cash Flow Back Into Ecuador

      As Ecuador’s actions align with the statements they’ve made about bringing mining investment dollars to the country, cash has begun to flow back into the country’s hard-rock mining sector. Arguably the best example of this comes from Lundin Gold and their push toward the development of Fruta del Norte.
      Fruta del Norte

      On January 14th, 2016, Lundin Gold announced that they had completed the negotiation of the definitive form of the Exploitation Agreement for the Fruta del Norte Project with the Government of Ecuador. The completion of this Agreement is a huge milestone given the controversy associated with its history. For those interested in reviewing the details of the Agreement, please follow the link to the news release.

      The completion of the Agreement was very important, but most important is Lundin’s ability to take the Agreement and put it into action via financing for the development of the Fruta del Norte Project. On March 26, 2018, Lundin Gold took a major step forward by announcing that they would be closing their $400 million USD equity private placement. In my opinion, while the risk to reward ratio is very much in favour of Lundin Gold, considering the upfront capital cost versus upside potential related to expected gold production, the raising of this amount of cash for a gold project located in Ecuador speaks volumes about how the market is changing its view of the country, and Lundin’s level of influence within the industry.

      Collaboration – Chile and Ecuador

      On March 10th, 2018 Codelco, the world’s largest copper miner, announced that Chile’s Minister of Mining, Aurora Williams, and her counterpart in Ecuador, Rebecca Illescas, signed a joint declaration that strengthens the agreements of the Codelco-Enami EP alliance, and expedites the execution of the Llurimagua bi-national copper project, located in northeast Ecuador.

      To date, there has been $34 million USD spent on the Llurimagua Project. It’s expected that the total will be upwards of $50 million USD by the end of the advanced exploration phase. The signing of the agreement and the money being spent by Codelco on the Llurimagua Project is another example of the changing tides in Ecuador.

      Cascabel

      One of the hottest stories in the junior mining sector in 2017 was about Sol Gold, which is developing Cascabel, its porphyry copper-gold deposit, located in the Imbabura province in the northwest region of Ecuador.

      Cascabel is a great example of the mineral potential that exists within Ecuador. Clearly, investors are attracted to Sol Gold with their high-grade copper over wide intervals, such as that which was found in Cascabel Hole 12 and produced an interval of 1560 meters at 0.93% CuEq, or Hole 9, which produced an interval of 1197.4 meters at 1.16% CuEq.

      Are mining investors avoiding Ecuador? Glancing at Sol Gold’s stock chart, I think the answer is no. With Ecuador’s push toward change in its hard-rock mining policy, and what looks to be world-class mineral potential, investors are clearly interested in the risk to reward potential.

      Ecuador’s Potential

      In my opinion, the top reason for investing in junior mining companies that are exploring or developing projects in Ecuador is the mineral potential that exists within its under explored borders. Also, more with regards to the projects that are in development, Ecuador produces 90% of its internal energy requirements via hydro electric dams, giving Ecuador some of the cheapest electricity in the world.
      Mineral Potential

      Ecuador is located on the northwest coast of South America and is host to the northern portion of the Andes Mountain chain. The Andes are famous for their mineral endowment, as a couple of South America’s most prolific mining countries, Chile and Peru, have produced some of the richest deposits in the world.

      In a presentation entitled, Geological and Mining Potential in Ecuador, John Efrain Bolanos cites,

      “the spatial-time distribution of the Cu porphyries and related epithermal mineralizations of the Peru metallogenic belts are very similar to those ones in Ecuador.”

      Source: John Efrain Bolanos Presentation – Geological and Mining Potential of Ecuador

      From Bolanos’ presentation, Ecuador can be broken down into 6 geo-structural domains, which showcase Ecuador’s geological potential:

      The Fore Arc Basin of the Coast

      Cretaceous to Cenozoic basin underlain by aloctonous basaltic ocean crust

      Western Cordilera

      Formed by an accretionary prism mainly of ocean crust composition, continental crust and accreted Late Mesozoic to Cenozoic ocean terrains

      Interandean Graven

      Formed by thick and large Oligocene to Miocene volcano-sedimentary sequences

      Real of Central Cordilera

      Formed by several litho-tectonic divisions of Andean bearing and separated by regional faults. Guamote division, Alao division, Loja division, Salado division and Zamora division

      Eastern Subandean Zone

      Formed by forearc belt of the basement covered by volcano-sedimentary sequences

      Back Arc Basin of Iquitos

      Comprises of Oriente or Amazonian basin mainly formed by sedimentary and volcano-sedimentary sequences

      Given Ecuador’s favourable geography, similarities to a couple of the world’s most prolific mining countries and lack of modern exploration activity, Ecuador may be one of the world’s last frontiers for potential world-class deposit discoveries.

      Brian: Was Ecuador’s mineral potential a factor, first, in choosing the Curipamba Project, and second, in expanding upon the exploration and development deal with Salazar?

      Sam: In our global hunt for zinc-related projects in 2017, the quality of the Curipamba Project with respect to its high grade El Domo deposit and the additional exploration potential over its 22,000 hectare area stood out when compared with other known projects and operations globally. During our due diligence process, we also recognized the scale of potential discoveries within under-explored Ecuador and how a well-aligned partnership with Salazar would provide us with first-mover advantages during Ecuador’s adolescence as a mining jurisdiction. Ecuador’s mineral potential, located between Peru and Colombia, is at the heart of the investment thesis.

      Concluding Remarks

      It’s my contention that Ecuador is in the midst of a renaissance toward perceived mining investment attractiveness. While there’s a conscious effort being made by the Ecuadorian government to attract investment from the global mining industry, I believe investors and mining companies are rightly skeptical about placing their money in a place where so much destruction to capital has occurred in the past.

      In my opinion, the risks that pose the largest threat to investment dollars still exist and will not cease to exist at any point in the future. I believe the Ecuadorian people have a culture which is rooted in left-leaning socialism. Currently, the pendulum, while still hanging under the socialist umbrella, has pushed further right and will remain there for the next few years, but will revert back to the mean at some point in the future – to that I think it’s inevitable.

      Additionally, given the biodiversity of Ecuador and the global push toward environmental diligence, mining within Ecuador’s borders will always ‘walk the line’ between being accepted and being protested. Companies that do not make an effort to explain how they will protect the environment and the other benefits of mining to the communities will not be successful.

      While the risk associated with investing in Ecuador is very real, I believe there’s tremendous opportunity in Ecuador right now. This is based on the following:

      Current President, Lenin Moreno, has stated that it’s his goal to attract close to $5 billion in mining investment dollars over the course of his 4 years as President. Lundin Gold’s $400 million financing for the development of Fruta del Norte speaks to the market beginning to turn in favour of investment within Ecuador.
      Adventus Zinc, Lundin Gold, Codelco, BHP and Sol Gold are all examples of companies that have started putting investment dollars to work within Ecuador. It’s my opinion that smart money begins to flow into the smart contrarian markets first.
      Wood Mackenzie’s influence in Ecuador’s mining taxes is a major step toward becoming a world-class destination for mining exploration and development. Reductions in VAT and the company’s fiscal burden, along with the proposed elimination of the windfall tax, are all integral steps in attracting further investment dollars.
      Immense mineral potential – Much of Ecuador has not been explored with modern exploration techniques. Given Ecuador’s geographical location, I believe it’s safe to say that Ecuador may be one of the world’s last remaining jurisdictions with tier 1 deposit type discovery upside potential.


      I’m investing my money in Ecuador and believe it’s just a matter of time before the market recognizes the changes that have been made and will follow suit.

      Don’t want to miss a new investment idea, interview or financial product review? Become a Junior Stock Review VIP now – it’s FREEEEEEEEEEEEEEEEEEEEEEEEE!

      Until next time,

      Brian Leni P.Eng

      Founder – Junior Stock Review

      Disclaimer: The following is not an investment recommendation, it is an investment idea. I am not a certified investment professional, nor do I know you and your individual investment needs. Please perform your own due diligence to decide whether this is a company and sector that is best suited for your personal investment criteria. I do own shares in Adventus Zinc Corporation. Junior Stock Review and/or Brian Leni has NO business relationship with Adventus Zinc or any other company mentioned within this article."
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 19:16:36
      Beitrag Nr. 5.133 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.09.18 21:41:24
      Beitrag Nr. 5.134 ()
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 01:10:38
      Beitrag Nr. 5.135 ()
      Antwort auf Beitrag Nr.: 58.496.103 von Popeye82 am 21.08.18 11:06:21Canyon Resources



      www.asx.com.au/asxpdf/20180821/pdf/43xj15wjync1j7.pdf
      36 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 12:13:02
      Beitrag Nr. 5.136 ()
      Antwort auf Beitrag Nr.: 58.606.188 von Popeye82 am 04.09.18 01:10:38sehr, sehr ordentlich.





      Canyon Resources


      - JORC (2012) compliant resource of 550,000,000tonnes @an average grade of 45,5% total Al2O3 +total 2,06% SiO2, comprising:
      1) Indicated 88,000,000ts averaging 41,8% Al2O3 +1.3% SiO2
      2) Inferred 466,000,000ts averaging 46,2% Al2O3 +2.2% SiO2
      3) Mineral Resource upgrade from JORC 2004 to JORC 2012 completed by SRK Consulting(Australasia).

      - Potential to significantly increase resource tonnage, with only 40% of available bauxite plateaux previously tested.
      - Potential to target very high-grade bauxite zones on new plateaux +within the existing resources.
      - The Minim Martap bauxite is suitable for processing in low temperature refineries











      www.asx.com.au/asxpdf/20180904/pdf/43y0s16mvf4w4z.pdf
      35 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 13:08:31
      Beitrag Nr. 5.137 ()
      Antwort auf Beitrag Nr.: 58.420.374 von Popeye82 am 10.08.18 14:31:16Peel Mining



      www.asx.com.au/asxpdf/20180904/pdf/43y12qdt7jr5ht.pdf
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 13:54:23
      Beitrag Nr. 5.138 ()
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 15:10:33
      Beitrag Nr. 5.139 ()
      Antwort auf Beitrag Nr.: 58.577.852 von Popeye82 am 31.08.18 01:33:40Piedmont Lithium













      https://gallery.mailchimp.com/693e9b35073e903cff5eb9b88/file…
      https://mrl.ies.ncsu.edu/
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 15:22:21
      Beitrag Nr. 5.140 ()
      Antwort auf Beitrag Nr.: 58.577.276 von Popeye82 am 30.08.18 22:58:37Diatreme Resources



      www.asx.com.au/asxpdf/20180904/pdf/43y17j7jh51qt0.pdf
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 17:07:33
      Beitrag Nr. 5.141 ()
      Antwort auf Beitrag Nr.: 58.439.971 von Popeye82 am 14.08.18 06:53:29Emmerson Plc













      www.alignresearch.co.uk/wp-content/uploads/2018/09/Emmerson_…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 18:16:00
      Beitrag Nr. 5.142 ()
      Antwort auf Beitrag Nr.: 58.610.313 von Popeye82 am 04.09.18 13:54:23Savannah Resources Plc




      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 18:28:04
      Beitrag Nr. 5.143 ()
      Antwort auf Beitrag Nr.: 58.584.803 von Popeye82 am 31.08.18 16:42:39Ironbark Zinc





      www.miningcapital.com/companies/stocktube/10309/ironbark-zin…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 19:47:41
      Beitrag Nr. 5.144 ()
      Antwort auf Beitrag Nr.: 58.577.930 von Popeye82 am 31.08.18 03:41:25NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Lithium/Tantal, kein grosses Deposit, mittelklein, ungefähr "Dimension Sayona/Savannah" würde ich mal sagen. Hard Rock, High grade, Ausweitungspotenztiale, wohl Infrastruktur rich, Minenlizenz granted, voraussichtlich "conventional" Processing, Westaustralien.

      Kann man mal GUCKEN Was bei der Feasibility rauskommt.







      Liontown Resources




      [/url]



      [/url]




      www.ltresources.com.au/sites/default/files/asx-announcements…

      www.ltresources.com.au/sites/default/files/broker_research_f…

      www.ltresources.com.au/sites/default/files/asx-announcements…

      www.ltresources.com.au/kathleen-valley-project

      www.ltresources.com.au


















      342 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 20:41:32
      Beitrag Nr. 5.145 ()
      Antwort auf Beitrag Nr.: 58.597.935 von Popeye82 am 03.09.18 03:34:16
      Zitat von Popeye82: Achso, ich nutze Firefox.
      0 Plan.


      Kurz recherchiert - liegt nicht an Dir. Liegt wohl eher daran, dass die entsprechenden Websites nicht mehr dem neuen Standard entsprechen, die Firefox etc. haben wollen. Kann man im Browser (z.B. Firefox) umgehen, werde das aber lassen und stattdessen in der Adresse das s bei https\ einfach weglassen. ;)
      Avatar
      schrieb am 04.09.18 20:52:29
      Beitrag Nr. 5.146 ()
      Antwort auf Beitrag Nr.: 58.428.429 von Popeye82 am 12.08.18 09:00:49Plateau Energy Metals




      44 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 21:48:45
      Beitrag Nr. 5.147 ()
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 22:01:56
      Beitrag Nr. 5.148 ()
      Antwort auf Beitrag Nr.: 58.511.550 von Popeye82 am 22.08.18 21:12:46Bundesentwicklungsminister Gerd Müller, quote: Zimbabwe "kann NICHT mehr als Bananen":mad::mad::mad:





      Tharisa/Prospect Resources



      http://www.wallstreet-online.de/nachricht/10826855-minister-…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 23:37:26
      Beitrag Nr. 5.149 ()
      Antwort auf Beitrag Nr.: 58.512.807 von Popeye82 am 23.08.18 00:51:04MOD Resources



      www.modresources.com.au/sites/default/files/asx-announcement…
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 23:49:21
      Beitrag Nr. 5.150 ()
      Antwort auf Beitrag Nr.: 58.238.436 von Popeye82 am 18.07.18 00:28:33Dome Gold Mines



      http://clients2.weblink.com.au/news/pdf_2%5C02004619.pdf
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 04.09.18 23:55:29
      Beitrag Nr. 5.151 ()
      Antwort auf Beitrag Nr.: 58.616.832 von Popeye82 am 04.09.18 23:49:21The resource you are looking for might have been removed, had its name changed, or is temporarily unavailable.
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 01:04:13
      Beitrag Nr. 5.152 ()
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 01:17:08
      Beitrag Nr. 5.153 ()
      Antwort auf Beitrag Nr.: 58.497.897 von Popeye82 am 21.08.18 14:32:14Mkango Resources



      www.proactiveinvestors.co.uk/companies/news/202387/mkango-re…
      www.mkango.ca/s/news.asp?ReportID=834700
      http://www.sedar.com/GetFile.do?lang=EN&docClass=7&issuerNo=…





      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 02:25:13
      Beitrag Nr. 5.154 ()
      Antwort auf Beitrag Nr.: 58.493.718 von Popeye82 am 21.08.18 07:23:04AVZ Minerals



      https://static1.squarespace.com/static/5934d2ae6b8f5beeb5ba2…
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 03:55:16
      Beitrag Nr. 5.155 ()
      Antwort auf Beitrag Nr.: 58.556.375 von Popeye82 am 29.08.18 02:42:42Geopacific Resources



      www.asx.com.au/asxpdf/20180905/pdf/43y21z4d2pvczm.pdf
      14 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 04:07:17
      Beitrag Nr. 5.156 ()
      Antwort auf Beitrag Nr.: 58.553.924 von Popeye82 am 28.08.18 19:12:02the CEO CAN speak(MUSS wohl studiert haben, MBA)







      Global Geoscience



















      46 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 05:46:42
      Beitrag Nr. 5.157 ()
      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 15:35:39
      Beitrag Nr. 5.158 ()
      Antwort auf Beitrag Nr.: 58.553.501 von Popeye82 am 28.08.18 18:13:58Aurania Resources







      www.aurania.com/aurania-resources-provides-quarterly-update-…
      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 05.09.18 15:55:00
      Beitrag Nr. 5.159 ()
      Antwort auf Beitrag Nr.: 58.616.844 von Boersiback am 04.09.18 23:55:29Nehmen Sie Den ---->Hier<----.
      www.asx.com.au/asxpdf/20180731/pdf/43wyd5f15n819g.pdf



      Ich hab Die NEUE (resources)Apple für Sie gefunden!
      www.goldenminerals.com/pdfs/GLDN_InvestorKit/Press-Release-S…
      Aktivieren Sie Ihre Hypothek!!!
      Avatar
      schrieb am 06.09.18 10:04:51
      Beitrag Nr. 5.160 ()
      Antwort auf Beitrag Nr.: 58.617.294 von Popeye82 am 05.09.18 05:46:42Neo Lithium



      www.neolithium.ca/news/press-releases-and-news/press-release…
      24 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 10:26:06
      Beitrag Nr. 5.161 ()
      Heftig heute bei Sirius.
      Einerseits die Finanzierungsfrage, andererseits ob man die Mengen wirklich am Markt absetzen kann.
      https://ftalphaville.ft.com/2018/08/07/1533614400000/Sirius-…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 10:46:31
      Beitrag Nr. 5.162 ()
      Antwort auf Beitrag Nr.: 58.611.189 von Popeye82 am 04.09.18 15:10:33Piedmont Lithium
















      https://gallery.mailchimp.com/693e9b35073e903cff5eb9b88/file…
      27 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 12:00:56
      Beitrag Nr. 5.163 ()
      Antwort auf Beitrag Nr.: 58.613.406 von Popeye82 am 04.09.18 18:16:00Savannah Resources Plc



      http://www.rns-pdf.londonstockexchange.com/rns/9069Z_1-2018-…
      Avatar
      schrieb am 06.09.18 12:41:10
      Beitrag Nr. 5.164 ()
      Antwort auf Beitrag Nr.: 58.629.519 von Milian16 am 06.09.18 10:26:06Dazu komme ich noch.
      Hast Du EIne Meinung dazu?
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 14:02:31
      Beitrag Nr. 5.165 ()
      Antwort auf Beitrag Nr.: 58.630.821 von Popeye82 am 06.09.18 12:41:10Ich wünschte ich hätte eine, muss ich aber leider verneinen, bin nicht so ein Quatscherzähler ohne fundiertes Hintergrundwissen.
      Hab gerade Dein link im Siriusthread gesehen, die Kosten steigen also, daher der Kursrutsch.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 15:31:02
      Beitrag Nr. 5.166 ()
      Antwort auf Beitrag Nr.: 58.629.519 von Milian16 am 06.09.18 10:26:06
      Zitat von Milian16: Heftig heute bei Sirius.
      Einerseits die Finanzierungsfrage, andererseits ob man die Mengen wirklich am Markt absetzen kann.
      https://ftalphaville.ft.com/2018/08/07/1533614400000/Sirius-…


      ach du scheiße, ich dachte gestern schon das wären gute kurse und nu das`!!! :eek:


      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 15:35:30
      Beitrag Nr. 5.167 ()
      Antwort auf Beitrag Nr.: 58.630.821 von Popeye82 am 06.09.18 12:41:10zumindest ist das jetzt ne fixed capex per EPC contract.
      capex steigt um ca. 13% von 3,67 mrd auf 4,17mrd USD.
      bin nich dazu gekommen mich im detail mit sirius außeinander zu setzen.
      hätte erwartet, dass die schon ein EPC abgeschlossen haben.
      Avatar
      schrieb am 06.09.18 16:13:12
      Beitrag Nr. 5.168 ()
      Antwort auf Beitrag Nr.: 58.617.009 von Popeye82 am 05.09.18 01:04:13Continental Gold



      www.continentalgold.com/en/continental-gold-reports-security…
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 16:28:39
      Beitrag Nr. 5.169 ()
      Antwort auf Beitrag Nr.: 58.494.573 von Popeye82 am 21.08.18 08:45:14Zinc One Resources


      - Significant new intercepts include:
      1) MGC18012 – 31.8 metres of 28.2% zinc, from 18.0 metres drill depth
      True vertical thickness of 22.5 metres from true vertical depth of 12.7 metres
      2) MGC18008 – 15.0 metres of 28.9% zinc, from surface
      True vertical thickness of 15.0 metres
      3) MGC18023 – 18.0 metres of 26.2% zinc, from 13.5 metres drill depth
      True vertical thickness of 12.7 metres from true vertical depth of 9.5 metres

      3) Mineralization at Mina Grande Centro includes zinc oxides, carbonates and silicates hosted by soils, highly-weathered carbonates, and fine- to coarse-grained dolomites, most of which are brecciated.
      www.zincone.com/news/2018/zinc-one-reports-drill-results-fro…
      www.proactiveinvestors.co.uk/companies/news/204355/zinc-one-…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 16:51:08
      Beitrag Nr. 5.170 ()
      Antwort auf Beitrag Nr.: 58.632.321 von sir_krisowaritschko am 06.09.18 15:31:02Was denken Sie denn(eeeeeher(Nix Verbindliches)):

      Sind Das JETZT Gute Kurse??
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 18:17:00
      Beitrag Nr. 5.171 ()
      Antwort auf Beitrag Nr.: 58.603.011 von Popeye82 am 03.09.18 17:40:15SolGold













      www.mining.com/worlds-biggest-miner-speeds-hunt-copper-asset…

      http://ir.q4europe.com/Tools/newsArticleHTML.aspx?solutionID…

      www.bhp.com


      "World’s biggest miner speeds hunt for copper assets, buys stake in SolGold
      Cecilia Jamasmie | a day ago |



      The Cascabel copper-gold project, 180 km north of the capital Quito, may become one of the largest copper-gold porphyry systems ever discovered. (Image: Alpala camp. Screenshot from SolGold corporate video 2017.)

      World’s largest miner BHP (ASX, NYSE:BHP) (LON:BLT) has bought a 6.1% stake in Ecuador-focused explorer SolGold (LON:SOLG) (TSX:SOLG) for $35 million, increasing this way its exposure to copper as the Cascabel project is believed to have the potential to become one of the largest copper-gold assets ever discovered.

      The Melbourne, Australia-based giant has acquired 103.1 million shares in SolGold from Guyana Goldfields (TSX:GUY), at 26.592 pence per share. The figure represents 20% premium to the 20 day volume-weighted average price of 22.16 pence per share, it said.

      The deal sets the stage for a potential showdown with Australian gold miner Newcrest Mining (ASX:NCM), the top shareholder in SolGold, which is Cascabel's majority owner and operator, with a 14.54 % stake.

      Two years ago, the Canadian junior rejected an offer from BHP to buy a 10% intertest in the company, which paved the way for Newcrest’s acquisition.
      "The Cascabel project is located in the northern portion of the Andean copper belt in Ecuador, renowned for hosting almost half the world’s copper known reserves"

      BHP, already the world's second-biggest listed copper miner, has raised its annual exploration spending in the last two years with the purpose of finding new copper and oil deposits. The mining giant is committed to make of those two commodities the pillars of its future growth.

      “Consistent with our positive long-term outlook, copper is a key exploration focus for BHP as we seek to replenish our resource base and grow this important business,” BHP’s chief executive Andrew Mackenzie said in the statement.

      Miners are scrambling to acquire copper reserves amid forecasts that supply of the metal significantly outstrip supply from 2020, due to increasing demand for power generation and electric vehicles (there’s 300kg of copper in an electric bus and nine tonnes per windfarm megawatt).

      The Cascabel copper-gold project, in northern Ecuador, is one of the very few new ones expected to come online in the near future. According to Colin Hamilton, director of commodities research at BMO Capital Markets, the current copper pipeline is the lowest seen this century, both in terms of number and capacity.

      “After delivery of Cobre Panama (with the main ramp early next year) we are left with a gap until we see the next batch of 200ktpa-plus projects in 2022-23. This is when the likes of Kamoa, Oyu Tolgoi Phase 2, and QB2 are likely to offer meaningful supply growth,” Hamilton said in April.

      Prices for copper, however, have dropped almost 20% in London so far this year, due to a combination of factors, including a strengthening dollar, mounting trade disputes and emerging market turmoil.

      “Highly prospective” location

      Ecuador has gained ground as a mining investment destination in the past two years thanks to a revised regulatory framework and a major investor engagement campaign that has already attracted around 420 applications for concessions in less than a year.

      Mackenzie himself said the investment allowed BHP to tap into a “highly prospective” mining destination, partly given its relatively untapped reserves.

      In March, another big miner, Anglo American (LON:AAL), landed in the South American country. Through a deal with Canadian gold junior Lumina Gold (TSX-V:LUM) (OTC:LUMAF), the company plans to develop two copper and gold concessions there.

      Currently, the nation’s emerging mining sector employs 3,700 people, but the government estimates the figure will rise to about 16,000 in the 2017-2020 period.

      SolGold's shares shot up on the news, jumping 20% in London to at 26.32p at 8:35am local time, while they were trading more than 17% higher in Toronto to 41 Canadian cents at 9:30am ET."
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 18:33:43
      Beitrag Nr. 5.172 ()
      Antwort auf Beitrag Nr.: 58.614.531 von Popeye82 am 04.09.18 19:47:41DIRTYtv





      NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.


      Von Denen gibt es noch ein "paar".
      4-10 dürften Das ungefähr sein, nach aktuellem Stand so.

      Hatte zu Denen schon 1,2 Schreiben in Briten Boards gemacht.
      Im Prinzip dürfte Das so eine "Art early Birimian Sideplay" sein.
      Lithium, Mali, nicht sehr gross, high Grade, Viel oberflächennahes Material, Einiges "out"cropping.
      Und wenn Sie mit Ihren Indizierungen Recht haben, dürfte Die Ganze Geschichte für Einen "Ziemlichen Schnapps" zu bauen sein. Die Erste Phase, jedenfalls.

      Kann man mal GUCKEN Wies weitergeht.


      Kodal Minerals


      - Maiden Mineral Resource of 17.3Mt at 1.20% Li2O in the Inferred category.
      - The Maiden Mineral Resource is made up of Kodal's three most advanced prospects:
      1) Sogola-Baoule: 10.4Mt at 1.18% Li2O;
      2) Ngoualana: 4.7Mt at 1.34% Li2O;
      3) Boumou: 2.2Mt at 1.01% Li2O
      (Mineral Resource reported using a 0.5% Li2O lower cut-off, no top cut-off and is based on the wireframe interpretation of mineralised pegmatites)

      - Preliminary open pit optimisations have been undertaken to identify key areas for further drill testing and definition of the pegmatite hosted mineralisation.
      - Mineralisation captured within these conceptual open pits totals 13.2Mt at 1.2% Li2O. This is not an Ore Reserve estimate, however it highlights areas where the optimised shells are resource constrained and these areas will be the focus for future drilling campaigns.
      - Separately from the Mineral Resource and optimisation study, Kodal has commissioned a Processing Review by independent engineering consultants, Wave International, based on the ongoing metallurgical testwork for the Bougouni mineralisation. This is considered an order of magnitude study.
      - This review indicates a capital cost of AUD$14M for a 1Mtpa dense media separation plant component. A full plant will require a crushing circuit and additional materials handling components.
      - The processing review further indicates a potential production cost of US$400 per tonne of spodumene concentrate which compares to a current market selling price of between US$800 and US$900 per tonne.
      - Exploration and definition drilling for resource expansion and continued testing of new target areas is underway.

      http://www.rns-pdf.londonstockexchange.com/rns/8121Z_1-2018-…
      www.csaglobal.com

      https://kodalminerals.com/project/bougouni-lithium-project/o…

      https://kodalminerals.com/wp-content/uploads/2018/07/Kodal-P…

      https://kodalminerals.com/i
















      306 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 19:22:19
      Beitrag Nr. 5.173 ()


      Procurement and capital estimate update

      § Design and build contract signed with STRABAG for the remaining mineral transport system drives
      § Materials handling facility EPC contract signed with Jacobs UK Limited
      § Finalising procurement and the associated risk allocations expected to result in stage 2 funding requirement increasing by US$400 - 600m
      § Company to review the most cost effective and efficient sources of capital to fund the additional capital requirement

      ...http://otp.investis.com/clients/uk/sirius_minerals/rns/regul…




      Shares in Sirius Minerals were temporarily suspended after falling more than 27% in early trading on Thursday but several brokers remained optimistic about the company's prospects as it looks to develop a polyhalite mine under the North Yorkshire moors.

      The FTSE 250 firm revealed on Thursday that higher than expected costs of the contracts to develop the mine's mineral transport system would lead to the project's stage two capital requirement estimate increasing $570m to almost $4.2bn, meaning the Stage 2 funding requirement is now expected to be $400-600m higher at $3.4-3.6bn and come in the first quarter of next year rather than the end of this year.

      Broker Peel Hunt noted that the majority of the increase is the MTS contract which has blown out 70% from the initial estimate of $858m to $1,461m.

      "Investor's concerns from this point should focus around the issue that there is still some major procurement ahead. Management has guided that it expects the remaining items will be in line with previous estimates, but after today's news this will be viewed with scepticism and an equity issue is listed as a potential route to cover the budget shortfall."

      However, part of the increased cost of the MTS contract was a "significantly improved" commercial risk allocation which transfers construction and delivery risk to contractor Strabag, who now take on construction risk provided ground conditions sit within an agreed geotechnical baseline.

      On a call with analysts, Sirius chief executive Chris Fraser said “we'll be looking to strategic partners” and mentioned the possibility of “bringing in a partner with a bigger balance sheet”.

      Depending on the ultimate financing solution agreed, Liberum, one of several house brokers, said its conservative pricing and cost profile led to a new base-case scenario involving a further $400m of equity being raised, via either a strategic, equity or convertible at 30p, which reduces its NPV per share estimate from £1.08 to between £0.75 and £1.00, and reduces its diluted NPV/share estimate to 84p.

      Liberum cut its target price to 50p from 60p based on 0.6x ratio of price to net present value, but keeping it 'buy' rating with the shares trading at a major discount to its NPV range.

      House broker Shore Capital noted that Sirius now only plans to achieve 13Mtpa by 2026 and 20Mtpa in 2029 rather than 2025 and 2028 respectively expected due to the expectation that senior debt facility terms will restrict the use of operational cashflows in funding said capacity expansions.

      But analyst Yuen Low was, on balance, "quite encouraged" by the update, saying if the Brazil/European offtakes come through they "could see shorts & doubters roasted, we believe".
      https://uk.webfg.com/news/broker-recommendations-/sirius-min…
      Avatar
      schrieb am 06.09.18 19:54:12
      Beitrag Nr. 5.174 ()
      Antwort auf Beitrag Nr.: 58.507.677 von Popeye82 am 22.08.18 13:52:29Celsius Resources



      http://clients3.weblink.com.au/pdf/CLA/02019088.pdf
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 19:57:27
      Beitrag Nr. 5.175 ()
      Antwort auf Beitrag Nr.: 58.525.020 von Popeye82 am 24.08.18 10:59:33CITIC Metal’s C$723 million strategic equity investment in Ivanhoe Mines to close September 19, 2018
      https://www.ivanhoemines.com/news/2018/citic-metal-c-723-mil…
      Avatar
      schrieb am 06.09.18 20:06:50
      Beitrag Nr. 5.176 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 20:28:35
      Beitrag Nr. 5.177 ()
      Cypress Development Announces Positive Preliminary Economic Assessment (PEA) for Clayton Valley Lithium Project, Nevada
      https://www.cypressdevelopmentcorp.com/news/2018/cypress-dev…
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 21:15:38
      Beitrag Nr. 5.178 ()
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 21:27:53
      Beitrag Nr. 5.179 ()
      Antwort auf Beitrag Nr.: 58.493.136 von Popeye82 am 20.08.18 23:50:44Salazar Resources



      www.salazarresources.com/news/2018/september6/
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 21:42:00
      Beitrag Nr. 5.180 ()
      Antwort auf Beitrag Nr.: 58.635.894 von rolleg am 06.09.18 20:28:35Sind Eine von den "4-10".
      Aber ein bisschen ordentlicher(Einstellung der Basisrahmendaten) kriegen Wir Das schon noch hin.;);)


      Ansonsten: Deine Kragenweite, Was Du Hier einstellst, ist aber Soweit; für Mein Befinden, erstmal TOTAL PASSEND!:)
      Also, Dazu: Absolut Daumen hoch! Ist "schick".

      Ich sagte ja mal: Wird denke ich noch "Stück besser" werden.
      Und laaangfristig wird sichs denke ich lohnen.
      (GGG+FYI kommen Hier, bspw., wahrscheinlich auch noch. Neben paar Anderen.)


      Rolleg

      Dass Du bei Sirius jetzt so Einen Schlechten "Start" erwischt hast tut Mir leid.
      Wirklich.
      Aber Das Ende Der Geschichte ist noch NICHT erzählt.
      Schreibe Dazu noch ein bisschen Etwas.
      Mein Fazit bis Jetzt: Ich werde Sirius nach dem AKTUELL Verfügbaren Informationen NICHT verkaufen.
      Will aber auch erst noch ein bisschen Die Britenboards sichten.
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 22:07:53
      Beitrag Nr. 5.181 ()
      Antwort auf Beitrag Nr.: 58.636.644 von Popeye82 am 06.09.18 21:42:00My dear Mr. Popeye,

      machen Sie sich mal keine Gedanken. Es war ja meine Entscheidung. Das Ding ist ja noch nicht "gelutscht" ;)

      Nach Arizona geht auch bald Nevsun aus dem Depot. Bei Prairie Mining wird es auch grad spannend - könnte der nächste Kandidtat sein, der sich dann positiv aus dem Depot verabschiedet (und mit dreien hatte ich ähnliche Kurskapriolen...) ;)
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 22:53:04
      Beitrag Nr. 5.182 ()
      Antwort auf Beitrag Nr.: 58.586.699 von Popeye82 am 31.08.18 20:01:34BlueJay Mining



      www.titanium.gl/announcements/appointment-of-general-manager…
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 06.09.18 23:10:01
      Beitrag Nr. 5.183 ()
      Antwort auf Beitrag Nr.: 58.612.635 von Popeye82 am 04.09.18 17:07:33Emmerson Plc

      http://www.rns-pdf.londonstockexchange.com/rns/9021Z_1-2018-…




      "Seismic Interpretation, +Operations Update

      Emmerson Plc, the Moroccan focused potash development company, is pleased to announce it has completed the interpretation of the data obtained from the recently completed seismic survey at its 100% owned Khemisset Potash Project in Northern Morocco ("Khemisset" or "the Project"). The interpretation indicates that no major faulting exists in the area of the survey, which is likely to be a significant positive for underground mining.

      The Company is also pleased to provide an update on ongoing operations at Khemisset as a part of its Scoping Study which is[b] targeted for delivery in Q1 2019[/b]. These activities include mine access design and costs and infrastructure studies and Emmerson is targeting to release updates with regards to these work streams in the coming months.

      To view the press release with the illustrative maps and diagrams please use the following link: http://www.rns-pdf.londonstockexchange.com/rns/9021Z_1-2018-…


      Highlights

      - Interpretation of recently completed seismic study indicates the area of the Khemisset Project is likely to be free of major faulting which would impact underground mining operations, which is considered a major positive

      - Strong progress has been made on Khemisset Scoping Study components with updates on the following ahead of delivery of the full Scoping Study in Q1 2019:

      1) Mine access (decline) design and costs
      2) Road design to connect mine site to existing major motorway
      3) Electrical connection design to either main power line or local substation
      4) Gas (onsite LNG or pipeline to site) infrastructure design and costs
      5) Port facilities study


      Hayden Locke, CEO of Emmerson, commented:

      "We continue to be pleased by developments which confirm our view that the Khemisset ore body will likely be amenable to simple, conventional, underground mining methods. The indication of limited faulting will positively impact the overall mine design, resulting in lowered overall mining costs per tonne of ore and lower general design risk. Coupling this with the excellent infrastructure proximal to our project strengthens our belief that Khemisset has the potential to be a low capital cost, high margin mine which can deliver outstanding returns regardless of the potash price.

      "In addition, we continue to progress all of the major workstreams vital to our ongoing Scoping Study including capital cost estimates for various technical components and connections to infrastructure surrounding the Project. Each of these sections will be released ahead of the complete study and will allow us to talk, with real numbers, about the potential of Khemisset to be a low capital cost potash project. We expect this news flow to commence in the coming weeks and months ahead of the delivery of the final Scoping Study by the end of Q1 2019."

      Interpretation of Seismic Data

      Emmerson recently completed a seismic survey at Khemisset (refer RNS, 10 July 2018 - "Completion of Seismic Survey at Khemisset Potash Project") which included 60km of seismic lines shot across the Project, focused primarily in the north east of the basin (refer Figure 1). The interpretation of this seismic data, which was undertaken by Velseis Integrated Seismic Technologies in cooperation with the Company, is now complete and indicates that there is limited faulting across the project area. The general interpretation of the data is that the basin is a well-defined NE-SW half graben structure that plunges towards the NE.

      The Seismic Survey was carried out using Mini-SOSIE technique and successfully mapped the Triassic-Liassic saline sequence that comprises the potash seam in the targeted exploration area. This seismic method was selected because it is considered especially suitable for geological interpretation in areas where the sedimentary cover above the Triassic-Liassic evaporitic sequences is reduced, such as this portion of the Khemisset basin.

      Seismic line 4 (refer Figure 2), which traverses almost the entire axis of the basin, is considered the most representative section of the basin. The interpretation of this seismic line which is approximately 11km in length, shows only minor indications of disruption or faulting, which is almost entirely concentrated towards the south eastern margin of the basin. The margin of the basin is also clearly shown at PU016, which the Company interprets as being an extension of the Air Orma fault, which is a control on mineralisation in the south east.

      The interpretation also showed clear identification of three main seismic reflectors including the top of the basalt (represented by the light blue horizontal line in Figure 2) which constitutes the exploration guide for the potash bed which occurs close below the basalt. These marker horizons allow future drilling and mine planning to occur with significantly more confidence. The three main seismic reflectors have been defined as: Reflector A (marker clays/salt in the Upper Salt Unit); Reflector BST (top of basalt) and Reflector LCU (top of Lower Clay Unit). The Potash target occurs between BST and LCU reflectors, just below an extensive basalt flow bed. The basement structure has been also outlined in some of the seismic lines showing the existence of differential subsidence sectors (mainly extensive faulting, although importantly this appears to be pre-deposition of potash) at the initial stages of the Triassic-Liassic deposition providing a well-defined NE-SW basin structure.

      The extensive continuity of reflectors A and BST, that mainly show slight folding/flexure in the basin indicates the absence of major faulting affecting the potash seam. After completion of the seismic interpretation, Emmerson is working in a depositional model for Khemisset to define target areas with thickening of the potash bearing horizon linked to basement NE-SW tectonic structures that suggest relative differential subsidence during the potash event sedimentation. Emmerson will be developing an exploration model for the recently presented NE exploration target based on the aforementioned potash genetic model and the NE-SW tectonic trend.


      Operations Update

      As work on the Scoping Study for Khemisset advances ahead of delivery in Q1 2019, the Company has made good progress on many of the technical studies, including capital cost estimates, which will comprise the study itself. A number of these individual workstreams are nearing completion at which point the Company will make standalone announcements on each item. Emmerson expects those items to be released to the market as per the timings in the table below:

      Workstream


      Announcement
      Timing

      1. Decline Costs and Design


      Mid September

      2. Road construction to connect plant site to main motorway infrastructure


      Early October

      3. Electrical infrastructure connection to either main power line or local substation


      Late October

      4. Gas (onsite LNG or pipeline to site) infrastructure


      November

      5. Port facilities


      November



      **ENDS**

      For further information, PLEASE the visit, @@@@@@@ ------> www.emmersonplc.com, follow us on Twitter (@emmerson_plc), ooooooooooooooooooooooooooooooooooor contact:

      Hayden Locke
      Emmerson Plc
      Tel: ------> +44 (0) 207 236 1177

      Edward McDermott
      James Biddle
      Roland Cornish
      Beaumont Cornish Limited
      Financial Adviser
      Tel: ------> +44 (0) 207 628 3396

      Jeremy King
      Optiva Securities Limited
      Broker
      Tel: ------> +44 (0) 3137 1904

      Lottie Wadham
      Susie Geliher
      St Brides Partners Ltd
      Financial PR/IR
      Tel: ------> +44 (0) 20 7236 1177


      NOTES, to Editors

      Emmerson's primary focus is on developing the Khemisset Potash Project located in Northern Morocco. The project has a large JORC Resource Estimate (2012) of 311.4Mt @ 10.2% K2O and significant exploration potential with an accelerated development pathway targeting a low capex, high margin mine. Khemisset is perfectly located to capitalise on the expected growth of African fertiliser consumption whilst also being located on the doorstep of European markets. This unique positioning means the project will receive a premium netback price compared to existing potash producers. The need to feed the world's rapidly increasing population is driving demand for potash and Emmerson is well placed to benefit from the opportunities this presents.

      The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014.

      This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

      END"
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 00:29:03
      Beitrag Nr. 5.184 ()
      Antwort auf Beitrag Nr.: 58.511.301 von Popeye82 am 22.08.18 20:41:48Core Exploration



      https://wcsecure.weblink.com.au/pdf/CXO/02019117.pdf

      https://wcsecure.weblink.com.au/pdf/CXO/02019556.pdf
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 00:40:51
      Beitrag Nr. 5.185 ()
      Antwort auf Beitrag Nr.: 58.636.959 von rolleg am 06.09.18 22:07:53Re: DIESES Leben ist EINES Der Schwersten




      Nach Arizona geht auch bald Nevsun aus dem Depot. Bei Prairie Mining wird es auch grad spannend - könnte der nächste Kandidtat sein, der sich dann positiv aus dem Depot verabschiedet (und mit dreien hatte ich ähnliche Kurskapriolen...) ;)
      ___________________________________________________________________________





      Doofe Frage nur:

      Meinen Sie mit Dreien, oder mit DEN Dreien??

      Also kann soweit nur bestätigen: Mit -letztendlich- "Winnern" hat man "zwischen"durch meistens auch Kapriolen.
      Das sieht im Nachhinein meistens Viel, Viel schöner+einfacher aus. Als es war.
      Wenn es Einer wird.
      Mit Sirius lag ich zum Beispiel bis Letzte Woche "ungefähr 100"% Vorne.
      Jetzt nur noch "ungefähr 50"%.

      Ich nenne Es öfter Meine "Weine". Finde Das passt sehr, sehr gut.
      Aber auch bei Meinen Allermeisten Anderen Werten Die final im Plus, tlw sehr hoch, abgestossen wurden, oder aktuell liegen,
      sah Das rückwirkend Meistens VIEL, VIEL einfacher aus. Als es war.

      Von den Anderen, 98%, Losern möchte ich jetzt NICHT sprechen.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 00:57:38
      Beitrag Nr. 5.186 ()
      Antwort auf Beitrag Nr.: 58.637.799 von Popeye82 am 07.09.18 00:40:51Waren schon genau die drei gemeint, die ich gennant hatte. Und das war mit etlichen anderen Übernahmekanditen auch genau so (ok, bei ein paar anderen, war ich nie im roten Bereich - soll vorkommen). Hat aber mit Sirius nicht unbedingt etwas gemein...
      Avatar
      schrieb am 07.09.18 01:37:51
      Beitrag Nr. 5.187 ()
      Antwort auf Beitrag Nr.: 58.468.831 von Popeye82 am 17.08.18 00:05:57Nickel Interessierte MAL DURCHHÖREN.
      Amur ist ein Sulphate Deposit.
      Eines Der ganz Wenigen, Signifikanten, in Development.





      Amur Minerals






      - Proactive Investors Stocktube
      Am 06.09.2018 veröffentlicht
      Thomas Hohne-Sparborth, senior economic analyst at Roskill, discusses with Proactive Investors the outlook for nickel sulphate.

      Nickel sulphate is the key material used to produce precursor materials for lithium-ion batteries.

      Hohne-Sparborth suspects forecasts that nickel sulphate demand will increase five fold over the next decade are conservative and says the big question is not so much whether the demand is there but whether there will be enough raw materials to meet that demand. -
      www.proactiveinvestors.co.uk/companies/stocktube/10378/deman…

      https://amurminerals.com/frequently-asked-questions/
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 01:49:23
      Beitrag Nr. 5.188 ()
      Antwort auf Beitrag Nr.: 58.424.850 von Popeye82 am 11.08.18 04:02:59Bluestone Resources



      www.bluestoneresources.ca/news/index.php?content_id=95
      http://www.jdsmining.ca/
      https://geologicalmapping.com/
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 08:44:54
      Beitrag Nr. 5.189 ()
      Antwort auf Beitrag Nr.: 58.633.293 von Popeye82 am 06.09.18 16:51:08
      Zitat von Popeye82: Was denken Sie denn(eeeeeher(Nix Verbindliches)):

      Sind Das JETZT Gute Kurse??


      sorry ich muss gestehen ich bin noch nicht fest im thema drin und somit weiß ich jetzt nich so recht ob die capexerhöhung das projekt an sich ins wanken bringen könnte oder das jetzt einfach mal für den kurs ne südliche dehle mit sich bringt die dann in den nächsten monaten abgearbeitet werden muss. können sie dazu was sagen? also zu dem wanken?
      Avatar
      schrieb am 07.09.18 11:21:49
      Beitrag Nr. 5.190 ()
      Antwort auf Beitrag Nr.: 58.189.274 von Popeye82 am 11.07.18 17:48:12TriStar Gold














      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 11:34:10
      Beitrag Nr. 5.191 ()
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 12:58:11
      Beitrag Nr. 5.192 ()
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 15:06:16
      Beitrag Nr. 5.193 ()
      Antwort auf Beitrag Nr.: 58.512.609 von Popeye82 am 22.08.18 23:40:37Black Rock Mining













      www.blackrockmining.com.au/wp-content/uploads/2018/09/050918…
      http://www.nemc.or.tz/
      www.blackrockmining.com.au/wp-content/uploads/2018/08/230818…


      - Proactive Investors Stocktube
      Am 03.09.2018 veröffentlicht
      Black Rock Mining Ltd (ASX:BKT) chief executive officer John de Vries updates Proactive Investors about the graphite company’s development of its Mahenge Graphite Project in Tanzania.

      Mahenge is one of the largest JORC-compliant flake graphite resources globally, with 211.9 million tonnes at 7.8% total graphitic carbon for 16.6 million tonnes of contained graphite.

      Black Rock’s pre-feasibility study for the project considers a three-stage construction schedule to deliver up to 250,000 tonnes per annum of 98.5% graphite concentrate for 31 years.

      “The PFS delivered a $905 million NPV10 (net present value at a 10% discount), after tax, after government free-carried, on top of a $90 million-dollar investment,” de Vries says.

      He continues, “that is a 10-1 NPV to capital ratio which is just simply unheard of in a lot of modern projects.” -
      www.miningcapital.com/companies/stocktube/10317/black-rock-m…
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 07.09.18 16:08:50
      Beitrag Nr. 5.194 ()
      Antwort auf Beitrag Nr.: 58.634.538 von Popeye82 am 06.09.18 18:33:43Kogi könnte Hier auch noch Thema werden.
      Kenne den Laden schon seit Jahren bisschen.







      Kodal Minerals/SolGold/Amur Minerals(Kogi Iron)




      - Proactive Investors Stocktube
      Am 07.09.2018 veröffentlicht
      Mining Capital's Alastair Ford discusses Amur Minerals Corporation (LON:AMC) and the updated lithium resource put out this week by Kodal Minerals PLC (LON:KOD).

      Ford also talks through the big plans by Kogi Iron Ltd (ASX:KFE) to become Nigeria’s first domestically-sourced producing steel company as well as moves this week by global miner BHP Billiton to acquire a 6.1 percent stake in SolGold (LON:SOLG) -
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 13:39:23
      Beitrag Nr. 5.195 ()
      Antwort auf Beitrag Nr.: 58.556.420 von Popeye82 am 29.08.18 04:01:16(POSITIVE)Drogenrazzia bei HEG







      Hill End Gold



























      https://smallcaps.com.au/high-purity-alumina-stocks-asx-ulti…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 14:09:43
      Beitrag Nr. 5.196 ()
      Antwort auf Beitrag Nr.: 58.535.622 von Popeye82 am 25.08.18 23:24:39High Grade Metals



      www.taurachsoft.at/erzweg/schellgaden/grubenfahrt_stueblbau.…
      www.mindat.org/loc-56900.html
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 16:21:08
      Beitrag Nr. 5.197 ()
      Antwort auf Beitrag Nr.: 58.616.844 von Boersiback am 04.09.18 23:55:29Boersiback

      Hast Du zu High Grade Metals schon Die Letzte Meldung gelesen?

      Nicht Die Hier "drin",
      sondern Die Letzte Pressemeldung.
      Avatar
      schrieb am 08.09.18 18:51:21
      Beitrag Nr. 5.198 ()
      Antwort auf Beitrag Nr.: 58.649.940 von Popeye82 am 08.09.18 14:09:43High Grade Metals



      www.asx.com.au/asxpdf/20180903/pdf/43xzmvsy0166p7.pdf
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 20:34:57
      Beitrag Nr. 5.199 ()
      Antwort auf Beitrag Nr.: 57.819.011 von Popeye82 am 23.05.18 22:30:14Euro Sun Mining



      www.stockhouse.com/companies/bullboard?symbol=t.esm&postid=2…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 21:59:14
      Beitrag Nr. 5.200 ()
      Antwort auf Beitrag Nr.: 58.596.510 von Popeye82 am 02.09.18 18:58:34Lithium Americas



      http://libull.com/NR-2018-06-09-Lithium.pdf
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 22:11:29
      Beitrag Nr. 5.201 ()
      Antwort auf Beitrag Nr.: 58.425.141 von Popeye82 am 11.08.18 08:19:54Victoria Gold















      https://twitter.com/victoriagold?lang=de
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 08.09.18 23:38:20
      Beitrag Nr. 5.202 ()
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 02:28:23
      Beitrag Nr. 5.203 ()
      Antwort auf Beitrag Nr.: 58.522.032 von Popeye82 am 23.08.18 22:16:42Danakali













      https://hotcopper.com.au/threads/news-dnk-danakali-banks-on-…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 14:25:04
      Beitrag Nr. 5.204 ()
      Antwort auf Beitrag Nr.: 58.650.933 von Popeye82 am 08.09.18 18:51:21Interessierte: mal DURCHhören.





      High Grade Metals



      https://player.vimeo.com/video/273233328
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 17:18:50
      Beitrag Nr. 5.205 ()
      Antwort auf Beitrag Nr.: 58.635.894 von rolleg am 06.09.18 20:28:35Wollte Das(Die) eigentlich so oder so nochmal in EInem "bisschen Umfangreicherem" Schreiben einleiten,
      aber erstmal mit Den Rahmendaten zumindest.

      Rating: Es GIBT Schlechtere!:mad::mad::mad::mad::mad:


      Mal gucken Was Die drauf haben.





      Cypress Development


      - Net present value of $1.45 billion at 8% discount rate and 32.7% internal rate of return on after-tax cash flow.
      - Lithium carbonate price of $13,000 per tonne based on Benchmark Research market study.
      - Average annual production rate of 24,042 tonnes of lithium carbonate over 40-year life.
      - Capital cost estimate of $482 million, pre-production and operating cost estimate averaging $3,983 per tonne of lithium carbonate.
      - Updated Resources from May 1, 2018 estimate:
      1) Indicated Resource of 831 million tonnes at 867 ppm Li, or 3.835 million tonnes lithium carbonate equivalent (LCE).
      2) Inferred Resource of 1.12 billion tonnes at 860 ppm Li, or 5.126 million tonnes LCE.

      - Internal rate of return(IRR): 32.7%
      - Net present value (NPV-8%):$1.45 billion
      - Cumulative cash flow, undiscounted: $6.171 billion
      - Payback period: 2,7 years
      - Operating rate: 15,000 tpd, for 40 years
      - Capital cost estimate: $482 million, over 2 years
      - Net lithium recovery: 81,5%
      - Base case price for lithium carbonate: $13,000/tonne
      - Average production lithium carbonate: 24,042 tonnes
      - Operating cost for lithium carbonate: $3,983/tonne

      Sensitivity of Base Case to Lithium Price
      Price for lithium carbonate- NPV-8%($ Million) - IRR

      - $4,800/tonne - break-even — 0
      - $8,000/tonne (-38%) 433 16.4
      - $10,500/tonne (-19%) 947 25.0
      - $13,000/tonne – base-case 1,454 32.7
      - $15,500/tonne (+19%) 1,960 40.0
      - $18,000/tonne (+38%) 2,467 46.8


      www.cypressdevelopmentcorp.com/news/2018/cypress-development…
      http://www.global-resource-eng.com/
      http://www.extractivemetallurgy.com/index.html

      www.cypressdevelopmentcorp.com/projects/nevada/glory-lithium…

      www.cypressdevelopmentcorp.com/site/assets/files/3567/cyp_pp…
      26 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 18:15:06
      Beitrag Nr. 5.206 ()
      Antwort auf Beitrag Nr.: 58.655.211 von Popeye82 am 09.09.18 17:18:50Cypress Development
























      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 18:44:18
      Beitrag Nr. 5.207 ()
      Antwort auf Beitrag Nr.: 58.655.424 von Popeye82 am 09.09.18 18:15:06Cypress Development





      www.streetwisereports.com/article/2018/07/11/after-blockbust…
      24 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 20:17:28
      Beitrag Nr. 5.208 ()
      Antwort auf Beitrag Nr.: 58.615.311 von Popeye82 am 04.09.18 20:52:29Plateau Energy Metals














      43 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 20:48:47
      Beitrag Nr. 5.209 ()
      Antwort auf Beitrag Nr.: 58.656.006 von Popeye82 am 09.09.18 20:17:28Plateau Energy Metals













      http://www.sedar.com/GetFile.do?lang=EN&docClass=24&issuerNo…



      42 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 22:01:01
      Beitrag Nr. 5.210 ()
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 23:10:55
      Beitrag Nr. 5.211 ()
      Antwort auf Beitrag Nr.: 58.634.538 von Popeye82 am 06.09.18 18:33:43NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Botswana, sehr Grosse Landholdings, ziemlich, ziemlich Highgrade.
      Ich denke Das KÖNNTE mal ein ziemlich Geiles Deposit(s) werden.
      CEO "Duarne Parnham".
      Im Hauptprospect steht jetzt langsam mal Eine Erste Resource an.
      Die werden aber schon noch ein Weilchen brauchen.
      Das Pilot Ding interessiert Mich nicht, WENN nur richtig.


      Giyani Metals













      www.stockhouse.com/news/press-releases/2016/10/27/giyani-acq…
      www.stockhouse.com/news/press-releases/2016/11/17/giyani-acq…

      http://giyanimetals.com/#projects

      http://giyanimetals.com/#Investors

      www.stockhouse.com/companies/news?symbol=v.wdg

      http://giyanimetals.com/






























      291 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 09.09.18 23:50:12
      Beitrag Nr. 5.212 ()
      Antwort auf Beitrag Nr.: 58.588.415 von Popeye82 am 01.09.18 04:12:17POTENTTIAL World Class Project







      Ventnor Resources





      www.mnn.com/earth-matters/wilderness-resources/stories/world…

      www.proactiveinvestors.com.au/companies/news/202909/ventnor-…

      https://globenewswire.com/news-release/2018/04/17/1480261/0/…

      30 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 01:10:14
      Beitrag Nr. 5.213 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 02:31:55
      Beitrag Nr. 5.214 ()
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 02:47:09
      Beitrag Nr. 5.215 ()
      Antwort auf Beitrag Nr.: 58.657.146 von Popeye82 am 10.09.18 01:10:14Explaurum



      www.explaurum.com//irm/showdownloaddoc.aspx?AnnounceGuid=5cf…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 04:02:56
      Beitrag Nr. 5.217 ()
      Antwort auf Beitrag Nr.: 58.597.878 von Popeye82 am 03.09.18 02:02:14Rift Valley Resources
















      http://riftvalleyresources.com.au/wp-content/uploads/2018/09…
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 05:52:16
      Beitrag Nr. 5.218 ()
      Avatar
      schrieb am 10.09.18 05:53:09
      Beitrag Nr. 5.219 ()
      Avatar
      schrieb am 10.09.18 05:56:00
      Beitrag Nr. 5.220 ()
      Avatar
      schrieb am 10.09.18 06:09:49
      Beitrag Nr. 5.221 ()
      Avatar
      schrieb am 10.09.18 09:40:52
      Beitrag Nr. 5.222 ()
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 11:55:21
      Beitrag Nr. 5.223 ()
      Antwort auf Beitrag Nr.: 58.629.711 von Popeye82 am 06.09.18 10:46:31Western Europe’s LARGEST (spodumene) Lithium (Mineral) Resource, shaping up to be Europe’s MOST strategically (significant) mineral discovery, in recent years







      Savannah Resources Plc













      www.savannahresources.com/cms/wp-content/uploads/2018/09/Por…
      http://paynegeo.com.au/paul-payne/
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 18:19:55
      Beitrag Nr. 5.224 ()
      Antwort auf Beitrag Nr.: 58.509.084 von Popeye82 am 22.08.18 16:32:37Millennial Lithium



      http://millenniallithium.com/2018/09/10/exploration-drilling…
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 18:32:05
      Beitrag Nr. 5.225 ()
      Antwort auf Beitrag Nr.: 58.659.621 von Popeye82 am 10.09.18 11:55:21Savannah Resources Plc





      www.proactiveinvestors.co.uk/companies/stocktube/10415/savan…
      www.mining-journal.com/resource-definition/news/1346329/sava…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 19:50:11
      Beitrag Nr. 5.226 ()
      Antwort auf Beitrag Nr.: 58.569.872 von Popeye82 am 30.08.18 11:34:26Galena Mining



      www.asx.com.au/asxpdf/20180910/pdf/43y5vgn47tzn14.pdf
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 20:02:13
      Beitrag Nr. 5.227 ()
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 21:58:24
      Beitrag Nr. 5.228 ()
      Antwort auf Beitrag Nr.: 58.554.062 von Popeye82 am 28.08.18 19:27:14Centarus Metals



      www.centaurus.com.au/uploads/files/announcements/2018/CTM_10…
      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 22:12:04
      Beitrag Nr. 5.229 ()
      Antwort auf Beitrag Nr.: 58.346.829 von Popeye82 am 01.08.18 07:51:42Pacific Rim Cobalt


      www.proactiveinvestors.co.uk/companies/news/204563/pacific-r…





      "Pacific Rim Cobalt in the hunt for energy metals, with one prized Indonesian asset; Ranjeet Sundher, CEO of Pacific Rim Cobalt is creating a carpe diem moment for the mining company by developing a cobalt and nickel asset in Indonesia



      For now, the supremacy of cobalt, a scarce metal in the growing electric car market is unassailable

      Energy storage is a technology crucial to our future, and for good reason. Affordable storage is “the missing link” between intermittent renewable power, such as solar and wind, and 24/7 reliability, according to McKinsey and Company.

      Ranjeet Sundher, Chief Executive Officer of Pacific Rim Cobalt (CNSX:BOLT; OTCMKTS:PCRCF), which is developing a cobalt asset in Indonesia, says a major form of energy storage includes lithium-ion batteries, and one of the metals they rely on heavily is cobalt.

      “Global demand for renewable power is fueling a massive shift from traditional energy supply chain economics, and the most widely used power source for portable applications is cobalt-reliant lithium-ion batteries,” said Sundher.

      “Pacific Rim leverages the global shift to renewable energy and the electric vehicle revolution by capitalizing on two elements: cobalt and nickel. Cobalt and nickel are both essential to lithium-ion batteries.”

      The mining industry veteran says lithium-ion batteries containing cobalt can be used to smooth the flow of power. They can be integrated into electricity systems so that if a main source of power fails, it provides a backup, improving reliability.

      Despite Tesla Chief Executive Elon Musk tweeting in July that he wants cobalt out of his next-generation batteries, cutting the base metal can create safety and performance issues. For now, the supremacy of cobalt in the growing electric car market is unassailable.

      “Cobalt is necessary for any lithium-ion battery with a high energy density. Essentially, any high-performance battery requires cobalt. As most of these batteries are for vehicles and phones, performance is a necessity. Therefore, you cannot get rid of cobalt,” said Sundher.

      Sundher, who previously founded Indogold Exploration, a Jakarta-based mining service firm, is creating a carpe diem moment for Pacific Rim Cobalt by developing a cobalt and nickel asset in Indonesia. The Cyclops Cobalt-Nickel Project, recently renamed for its proximity to the Cyclops mountain range, is situated on the north coast of Papua Province. The project covers 5,000 hectares with nine prospects, five of them drill-tested with known cobalt-nickel mineralization.

      Nearly 66% of the world’s cobalt comes from the Democratic Republic of the Congo, a country torn by a long-running civil war. This turmoil means that mining cobalt is often dangerous and subject to supply disruptions that can result in spiraling prices. Some companies call the cobalt mined in the Congo the “blood diamond of batteries” owing to harsh mining conditions and use of child labour.

      In contrast, Pacific Rim Cobalt’s Cyclops Project has excellent logistics and infrastructure. Located 15 kilometres from the Sentani Airport, the project's tidewater location offers strategic access to China, the largest battery metals market in the world.

      “We have a solid growth story in the right place,” said Sundher. “We are developing our flagship cobalt asset in Indonesia. We were fortunate to pick an asset that already had a tremendous amount of work done on it – making it much easier to leverage. There have been over 850 drill holes done on our property, which allows us to talk to potential offtake partners much earlier than we normally would.”
      The Canadian company has a production permit, environmental permit and sealed road access 12 months of the year to the project. “This means we can work on development without any seasonal delays,” said Sundher. “We are currently beginning to drill 150 holes totaling 5,000 metres on our Cyclops Project and aim to make our historic estimate of 37 million metric tons at 0.11% cobalt compliant.”

      The goal of the program is to establish a maiden compliant resource on the project as well as to identify target locations for extraction of mini bulk samples required for metallurgical and process testing.

      With a historic estimate of 37 million metric tons grading 0.11% cobalt and 1.31% nickel at a 0.8% nickel cut-off grade, Cyclops contains significant cobalt and nickel mineralization as well as excellent infrastructure for year-round development activities.

      Sundher makes clear that China is a focus of the company’s strategy for eventual supply. “A key factor and strength of our development going forward is our proximity to China. Indonesia faces China. China is a big investor into Indonesia and they are a big consumer of cobalt,” said Sundher.

      Indeed, China’s fast-growing battery industry accounts for 80% of cobalt usage. Beijing is locking down supply chains and gobbling up as much cobalt as it can.

      Pacific Rim Cobalt has signed a preliminary offtake agreement with Beijing Easpring Material Technology Co. to purchase nickel sulphate and cobalt sulphate from the Cyclops project for five years from the start of commercial production.

      “This is a major milestone for us. Beijing Easpring supplies five of the world’s top six battery manufacturers. They are incredibly sophisticated and dedicated to the electric revolution. Our business model is China-facing,” said Sundher.

      It’s no secret that global battery makers have been searching for ways to reduce cobalt in their batteries to cut costs. Next year, China’s largest lithium-ion battery maker, Contemporary Amperex Technology Ltd., plans to begin producing next-generation nickel-rich batteries, called NCM 811, which are cheaper to make and have longer lifespans.

      Pacific Rim Cobalt is positioned to roll with these changes in battery composition, though, as it has both cobalt and nickel in its arsenal.

      “The NCM 811 chemistry does reduce the amount of cobalt, but it replaces it with nickel. We are a cobalt and nickel company, so the switch does not affect us as much as other companies,” said Sundher.

      “Our preliminary offtake partner, Beijing Easpring, is one of the leaders of 811 chemistry, and it is not anticipated to be the leading battery chemistry for a number of years,” said Sundher.

      “It’s Day 1 in our company and I firmly believe that any investor who is interested in cobalt and understands the cobalt supply chain should have a close look at what we are doing.”"
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 23:22:36
      Beitrag Nr. 5.230 ()
      Antwort auf Beitrag Nr.: 58.656.564 von Popeye82 am 09.09.18 22:01:01Cypress Development



      www.mining-journal.com/resource-definition/news/1346285/neva…
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 10.09.18 23:34:51
      Beitrag Nr. 5.231 ()
      Antwort auf Beitrag Nr.: 58.637.883 von Popeye82 am 07.09.18 01:37:51Amur Minerals


      www.proactiveinvestors.co.uk/companies/news/204404/nickel-fr…




      "Nickel from Amur’s Kun-Manie project destined for China and electric vehicle batteries; Amur Minerals is sitting on one of the world's largest undeveloped nickel sulphide deposits
      Nickel from Amur’s Kun-Manie project destined for China and electric vehicle batteries




      pdf icon
      Download Amur Minerals Corporation
      Capital Network report here
      INVESTMENT OVERVIEW: AMC The Big Picture
      Nickel is used extensively in electric vehicle batteries

      How many tonnes of rock does it take to make a battery?

      The answer to that will vary from deposit to deposit, and from commodity to commodity, but the question nevertheless is an intriguing one, and may yet come to be a new informal metric for the measurement of a project’s viability.
      READ: Amur Minerals cements its focus on Asia as end to 2018 drilling nears

      Take Amur Minerals Corporation (LON:AMC) for instance, which has nickel at the Kun-Manie deposit in the Far East of Russia. A typical Tesla battery will contain around 50 kilograms of nickel, so with Amur’s average grade of 0.8% and projected recoveries of 80%, it’ll be about eight ore tonnes.

      So far so good, but what does it really mean? Well, one way of looking at it is to compare Amur’s grades with other companies, like for example Royal Nickel (TSE:RNX). The Royal Nickel Dumont project ranks, like Kun-Manie, among the largest undeveloped nickel sulphide deposits in the world.

      But there is a crucial difference. Grades at Dumont run at around 0.26% and projected recoveries are set to be around 42%. When you plug in those numbers to the Tesla calculation it turns out that Royal Nickel will need to mine around 40 tonnes of ore to match the battery productivity of Amur’s eight tonnes.

      Because Dumont is so large there will be economies of scale and it still looks set to generate an internal rate of return of just 15.2% after tax on the US$2bn project. But it’s an intriguing comparison nonetheless, and goes a long way towards demonstrating the relative attractiveness of some mines over others.

      Haulage capacity

      To put it in simple terms, to transport the ore required to manufacture each electric vehicle battery, Royal Nickel is going to need around 5 times more pit haulage capacity than Amur. That’s a lot of trucks when you consider Amur itself will need about 10 to 15 Cat 785D trucks.

      When in production, Dumont is likely to be the fifth biggest nickel sulphide project in the world, behind Voisey’s Bay, Sudbury, the Chinese operations run by Jinchuan, and of course the mines of the industry behemoth Norilsk (MCX:GMKN). It would be interesting to run the same set of numbers across the Norilsk portfolio, given that Norilsk and Amur both operate in Russia in relatively remote locations.

      The key difference, of course, is that Norilsk is an established and long-standing player, while Amur has yet to make it into production.

      Decent progress

      But progress towards that end continues at a good strong pace, according to chief executive Robin Young.

      “We are starting to put together our strategy for next year,” he says.

      “What we want to do is benchmark the project, to set out where we stand in relation to the economics, and to work out what we can do to get to first production as soon as possible.”

      The results of an imminent pre-feasibility study are likely to be “substantial and quite positive,” according to Young.

      They will show a project with a mine plan, a mining schedule, a mill design, a plan to transport concentrate to the local railhead, and a logistics agreement to get concentrate to the smelter.

      “That’s the fastest way to production,” says Young, “and it’s suitable and acceptable to the banks.”

      Russia and China

      Almost equally crucial is that it’s acceptable to the Russian government too. Amur now seasoned in the ways of operating in Russia and tends to see itself as having an “Asian-centric” focus these days.

      The product will likely go south, across the border into China, while almost all the operational functions will be Russian.

      “The Russians and Chinese are comfortable with us,” says Young. “We’ve been there so long.”

      For the Russians, the benefits are simple enough: the economic stimulus that such a large project will create, including jobs and secondary employment.

      “The Russian government is quite keen to get projects like ours up and running,” says Young. Incentives around taxes and royalties provide the company with plenty of motivation to get up and running, and what’s more, because they only run for a limited time, to get the maximum amount of metal out of the ground as soon as possible.

      But it’s the Chinese connection that in the end could prove crucial. At some point soon Young is going to have to go into the market for significant sums of debt and equity finance to get Kun-Manie built, always assuming that a buyer doesn’t step in, that is.

      When he does, Western banks will certainly have a role to play, but so too will the Chinese. And it’ll be towards China that Amur looks to for potential offtake agreements and joint venture partners.

      “I would anticipate that someone will step up, although I can’t really say when that will be,” says Young.

      Flexibility

      “We’re flexible. All our plans and designs work on the basis that we’ll go it alone, but we know that as more and more information becomes available there’ll be more focus on what we have.”

      September is likely to be a big month for Amur, with the upcoming pre-feasibility study, and it’s a good bet that the company will be on the receiving end of a lot of attention from the market. Young is all set to initiate a new marketing drive, and it will be interesting to see what kind of traction the shares are able to get."











      - Proactive Investors Stocktube
      Am 21.08.2018 veröffentlicht
      Robin Young, chief executive of Amur Minerals Corporation (LON:AMC), updates Proactive's Andrew Scott on the 2018 drill programme at their wholly-owned Kun-Manie nickel-copper sulphide project in the Far East of Russia.

      Young says the programme's more than 80% complete and they've experienced no downtime with the rigs.

      He adds metallurgical sample collection is also advancing and he's anticipating successful completion of this year's drill objectives by mid-September. -
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 00:49:03
      Beitrag Nr. 5.232 ()
      Antwort auf Beitrag Nr.: 58.597.749 von Popeye82 am 03.09.18 00:15:36TNG




      https://stockhead.com.au/columnists/tim-treadgold-why-vanadi…
      44 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 01:02:37
      Beitrag Nr. 5.233 ()
      Antwort auf Beitrag Nr.: 58.617.093 von Popeye82 am 05.09.18 02:25:13world’s LARGEST (hardrock) lithium deposit







      AVZ Minerals



      https://stockhead.com.au/special-report/not-all-lithium-is-c…

      " Not all lithium is created equal: why AVZ’s Congo project stands out

      Resources

      Special Report

      Special report: AVZ’s majority owned “Manono” lithium, tin and tantalum project in the Democratic Republic of Congo is the world’s largest hardrock lithium deposit.

      It’s also the second-highest grade discovered — with the lowest impurities as reported by official JORC compliant mining industry standards.

      The brownfield site was discovered in 1910 and mined until 1982 for tin.

      Fast-forward to August 2018 and AVZ has just reported a maiden mineral resource of 260 million tonnes of lithium graded at 1.63 per cent and 229,000 tonnes of tin. The resources will probably get bigger, given only half the total strike length at the Roche Dure prospect at Manono.

      Only one of six massive pegmatites on the Manono-Kitotolo permits has been included so far.

      What’s even more promising is AVZ has yet to go through the valuation uplift of JORC completion, scoping study, finance, mine development and cashflow production that many of its peers have received.

      Does size maaaaatter?????????????????????

      Yes it does. However it isn’t just about the size of the deposit; it’s the quality.

      Some lithium commentators such as Benchmark Minerals have begun highlighting pricing as well as quality differences as critical in meeting new battery raw material specification requirements.

      There are few lithium projects globally that have low impurities of mica or iron-oxide that can meet the quality requirements for the next generation of batteries.

      The two highest grade in the world — as well as the largest hard-rock projects — are Greenbushes in Western Australia and AVZ’s Manono.

      The Greenbushes pit is now more than 500m deep whereas AVZ is at surface — and has tin as a by-product credit.

      Manono was highlighted by Deutsche Bank in the first major investment bank report on lithium (figure 172) in May 2016, prior to AVZ acquiring or completing a JORC compliant resource.

      While AVZ has the largest lithium and tin JORC compliant resource, this is expected to expand as the company has a 1 billion tonne-plus exploration target.



      AVZ consultant Airguide, which regularly works alongside Chinese battery majors, believes “the market does not fully understand the specifications or requirements for raw materials required by the battery sector”.

      That’s also reflected in recent comments by lithium majors. “Battery requirements are becoming more stringent and there is a definitive move towards higher energy density batteries,” Albemarle spokeswoman Hailey Cobb said.

      This begs the question: what lithium impurities are okay for batteries, and what impurities may make the raw material unusable?

      “[Battery makers such as] EVE and other companies are telling us that they can no longer use lithium that is derived from high mica sources, as they can’t produce a lithium concentrate suitable for the next generation of batteries,” Airguide says.

      Mica is a mineral name given to a group of minerals that are physically and chemically similar. Lepidolite is a member of the mica group of minerals and is the most abundant lithium-bearing mineral.

      The table below, taken from a Deutsche Bank 2016 report, illustrates the significant differences in conversions to lithium carbonate or lithium hydroxide based on sources with high mica (lepidolite) compared to spodumene.



      The importance of the above table is it is not just about comparing lithium companies on operating cost to produce lithium concentrate.

      What also matters is understanding the impurities, as this can have a significant impact on how many tonnes of concentrate are required to make one tonne of lithium carbonate or hydroxide.

      AVZ’s spodumene from Manono has no mica issues as was reflected in AVZ’s metallurgical report[3].

      AVZ’s recent metallurgy test work produced a 5.8 to 6.3 per cent concentrate, without any type of beneficiation processing or optimisation. Thats all very positive for AVZ.

      This was also historically independently verified in a Belgian Government study of the Manono project, which produced a 6.82 per cent lithium concentrate.

      Older lithium batteries are running lower energy density requirements, which means they can use lithium sources with higher impurities.

      However, impurities in the next generation of batteries results in battery failure or underperformance.

      This is a key reason battery manufacturers need a high purity source of lithium.

      “Right now, when everyone is doing their lithium supply analysis they are making the mistake of saying that all lithium is equal in its ability to supply the battery sector; and it absolutely is not,” according to AirGuide.

      “It is more than just a matter of better pricing for high grade concentrate”.

      Even if you did not believe this, the conversion table of quality spodumene to lithium carbonate or lithium hydroxide is clearly compelling.

      “In our opinion, what we are hearing is over the next one or two years those companies that produce concentrate with lower mica will command a higher premium compared to the operations that have a high level of mica in their raw material.”



      This special report is brought to you by AVZ Minerals.

      This advice has been prepared without taking into account your objectives, financial situation or needs. You should, therefore, consider the appropriateness of the advice, in light of your own objectives, financial situation or needs, before acting on the advice.

      If this advice relates to the acquisition, or possible acquisition, of a particular financial product, the recipient should obtain a disclosure document, a Product Disclosure Statement or an offer document (PDS) relating to the product and consider the PDS before making any decision about whether to acquire the product."
      Avatar
      schrieb am 11.09.18 03:05:23
      Beitrag Nr. 5.234 ()
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 03:51:10
      Beitrag Nr. 5.235 ()
      Antwort auf Beitrag Nr.: 58.439.899 von Popeye82 am 14.08.18 04:59:19New Century Resources













      https://wcsecure.weblink.com.au/pdf/NCZ/02021084.pdf
      www.msq.qld.gov.au/Shipping/Port-procedures/Port-procedures-…

      https://wcsecure.weblink.com.au/pdf/NCZ/02018003.pdf

      https://wcsecure.weblink.com.au/pdf/NCZ/02017952.pdf
      http://www.nab.com.au/



      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 13:37:16
      Beitrag Nr. 5.236 ()
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 15:20:17
      Beitrag Nr. 5.237 ()
      Antwort auf Beitrag Nr.: 58.663.836 von Popeye82 am 10.09.18 20:02:13
      Zitat von Popeye82: Bluestone Resources













      www.bluestoneresources.ca/news/index.php?content_id=96
      www.bloomberg.com/research/stocks/private/snapshot.asp?privc…
      Avatar
      schrieb am 11.09.18 15:23:45
      Beitrag Nr. 5.238 ()
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 15:40:31
      Beitrag Nr. 5.239 ()
      Antwort auf Beitrag Nr.: 58.641.780 von Popeye82 am 07.09.18 12:58:11SolGold/MOD Resources/Atalaya/Asiamet Resources













      www.modresources.com.au/sites/default/files/research_reports…
      Avatar
      schrieb am 11.09.18 17:42:05
      Beitrag Nr. 5.240 ()
      Antwort auf Beitrag Nr.: 58.617.018 von Popeye82 am 05.09.18 01:17:08Mkango Resources



      www.mkango.ca/s/news.asp?ReportID=835518
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 17:55:19
      Beitrag Nr. 5.241 ()
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 19:55:41
      Beitrag Nr. 5.242 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 20:07:58
      Beitrag Nr. 5.243 ()
      Antwort auf Beitrag Nr.: 58.656.885 von Popeye82 am 09.09.18 23:10:55today a bit of EDUCATION







      NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      EIn FrauenEXPLORER, im Weissen .
      Der wirds WOHL NICHT MEHR LANGE MACHEN.





      FYI Resources





      www.fyiresources.com.au

      www.fyiresources.com.au/investors/asx-announcements
      275 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 11.09.18 23:15:52
      Beitrag Nr. 5.244 ()
      Antwort auf Beitrag Nr.: 58.616.067 von Popeye82 am 04.09.18 22:01:56Zimbabwe kann NICHT mehr als Bananen
      _________________________________







      Tharisa













      www.mining.com/web/zimbabwe-will-accelerate-debt-plan-financ…
      http://www.zim.gov.zw/
      http://www.zimtreasury.gov.zw/
      http://www.worldbank.org/
      http://www.afdb.org/en/
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 01:01:15
      Beitrag Nr. 5.245 ()
      Antwort auf Beitrag Nr.: 58.635.516 von Popeye82 am 06.09.18 19:54:12Celsius Resources



      https://stockhead.com.au/resources/we-need-double-the-cobalt…
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 01:13:03
      Beitrag Nr. 5.246 ()
      43 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 02:49:11
      Beitrag Nr. 5.247 ()
      Antwort auf Beitrag Nr.: 58.345.575 von Popeye82 am 31.07.18 22:08:57Jangada Mines Plc



















      https://stockhead.com.au/resources/people-arent-recycling-je…
      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 04:26:46
      Beitrag Nr. 5.248 ()
      Antwort auf Beitrag Nr.: 58.539.266 von Popeye82 am 27.08.18 04:55:03Australian Potash

















      www.australianpotash.com.au/site/showdownloaddoc.aspx?Announ…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 19:16:38
      Beitrag Nr. 5.249 ()
      Antwort auf Beitrag Nr.: 58.637.379 von Popeye82 am 06.09.18 22:53:04BlueJay Mining





      www.titanium.gl/documents/in-the-news/Dundas-update-12-09-18…
      www.facebook.com/pages/Geolab-Greenland/903187133223929
      http://met-solvelabs.com/
      30 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 19:31:25
      Beitrag Nr. 5.250 ()
      Antwort auf Beitrag Nr.: 58.554.581 von Popeye82 am 28.08.18 20:30:20ZincX Resources



      http://zincxresources.com/news/index.php?content_id=326
      http://acmelab.com/
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 20:36:05
      Beitrag Nr. 5.251 ()
      Antwort auf Beitrag Nr.: 58.675.968 von Popeye82 am 12.09.18 01:13:03TNG




      www.tngltd.com.au/investor_centre/media_articles.phtml
      42 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 23:02:12
      Beitrag Nr. 5.252 ()
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 12.09.18 23:46:09
      Beitrag Nr. 5.253 ()
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 01:02:14
      Beitrag Nr. 5.254 ()
      Antwort auf Beitrag Nr.: 58.665.711 von Popeye82 am 10.09.18 23:22:36Cypress Development





      - Ellis Martin
      Am 10.09.2018 veröffentlicht
      In this segment of The Ellis Martin Report, Donald Mosher, VP of Corporate Development for Cypress Development Corp discusses the recent positive preliminary Economic Assessment (PEA) for the company's Clayton Valley Lithium Project in Nevada, USA. Listen and hear why this particular project may be much more economic than the lithium brine projects in the region and elsewhere around the globe. -
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 02:28:39
      Beitrag Nr. 5.255 ()
      Antwort auf Beitrag Nr.: 58.629.711 von Popeye82 am 06.09.18 10:46:31Piedmont Lithium



      - Integrated project to produce 22,700 tonnes per year of lithium hydroxide
      - Initial 13-year mine life with 2 years of spodumene concentrate sales and 11 years of integrated operations
      - Staged development to minimise up-front capital requirements and equity dilution
      - Stage 1 initial capex of US$109mm for the Mine/Concentrator and by-product circuits (excluding contingency)
      - Stage 2 capex for Chemical Plant funded largely by internal cash flow
      - Estimated 1st quartile spodumene concentrate costs of US$193/t and lithium hydroxide costs of US$3,112/t, both net of by-product credits and inclusive of royalties
      - Conventional technology selection in all project aspects
      - Steady-state annual EBITDA of US$225-245mm and after-tax cash flow of US$180-190mm
      - Estimated NPV8% of US$888mm and after-tax IRR of 46% with ~2-year payback
      - Potential mine and project life extension provide the opportunity for further economic upside














      https://gallery.mailchimp.com/693e9b35073e903cff5eb9b88/file…
      http://www.csaglobal.com/
      https://mrl.ies.ncsu.edu/
      http://www.hazenresearch.com/
      http://www.primero.com.au/
      http://www.hdrinc.com/locations/US/North%20Carolina/Charlott…
      http://www.jahlaw.com/
      https://twitter.com/globallithium?lang=de
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 02:40:38
      Beitrag Nr. 5.256 ()
      Antwort auf Beitrag Nr.: 58.632.321 von sir_krisowaritschko am 06.09.18 15:31:02Heftig heute bei Sirius.
      Einerseits die Finanzierungsfrage, andererseits ob man die Mengen wirklich am Markt absetzen kann.
      https://ftalphaville.ft.com/2018/08/07/1533614400000/Sirius-…
      __________________________________________________________________________


      ach du scheiße, ich dachte gestern schon das wären gute kurse und nu das`!!! :eek:



      __________________________________________________________





      Naja, sehen Sie:
      Ich masse Mir Keine "absolute" Wertung an,
      aber ich habe(gleich von Anfang an) Das Gefühl dass Diese Meldung weit, weit heisser gegessen wurde. Als gekocht.
      Ist ja schon fast wieder auf (0,)30 hoch.

      Ich würde Hier(abgesehen dass Es Direktbeteiligte in Deutschland eh kaum geben dürfte) die Kirche ERSTMAL EIN BISSCHEN IM DORF LASSEN.
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 03:54:09
      Beitrag Nr. 5.257 ()
      Antwort auf Beitrag Nr.: 58.686.723 von Popeye82 am 13.09.18 01:02:14Cypress Development


      summary of types of clay and similar projects




      https://seekingalpha.com/article/4205681-look-lithium-clay-p…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 04:18:10
      Beitrag Nr. 5.258 ()
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 06:09:36
      Beitrag Nr. 5.259 ()
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 07:14:43
      Beitrag Nr. 5.260 ()
      Antwort auf Beitrag Nr.: 58.556.342 von Popeye82 am 29.08.18 01:37:20Xanadu Mines



      www.xanadumines.com//irm/showdownloaddoc.aspx?AnnounceGuid=0…
      14 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 09:08:09
      Beitrag Nr. 5.261 ()
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 09:19:45
      Beitrag Nr. 5.262 ()
      Antwort auf Beitrag Nr.: 58.663.836 von Popeye82 am 10.09.18 20:02:13Bluestone Resources


      http://www.wallstreet-online.de/nachricht/10857327-wirtschaf…

      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 11:08:28
      Beitrag Nr. 5.263 ()
      Antwort auf Beitrag Nr.: 58.588.481 von Popeye82 am 01.09.18 06:43:42Birimian



      http://birimian.com/pdfs/30June2018HalfYearFinancialReport13…
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 12:39:51
      Beitrag Nr. 5.264 ()
      Antwort auf Beitrag Nr.: 58.563.323 von Popeye82 am 29.08.18 18:24:36Armadale Capital Plc



      www.voxmarkets.co.uk/articles/erris-resources-armadale-capit…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 13:23:06
      Beitrag Nr. 5.265 ()
      Antwort auf Beitrag Nr.: 58.665.777 von Popeye82 am 10.09.18 23:34:51Amur Minerals



      www.voxmarkets.co.uk/articles/sp-angel-s-morning-view-norils…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 15:23:50
      Beitrag Nr. 5.266 ()
      Antwort auf Beitrag Nr.: 58.622.406 von Popeye82 am 05.09.18 15:35:39Aurania Resources





      www.aurania.com/aurania-confirms-extension-to-most-advanced-…
      24 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 16:55:26
      Beitrag Nr. 5.267 ()
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 23:07:58
      Beitrag Nr. 5.268 ()
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 13.09.18 23:19:18
      Beitrag Nr. 5.269 ()
      Nusantara???

      0.5 g/t Au cut-off
      +
      Indonesien

      =

      sorry - JUNK !

      ;--)))

      (aber mach ruhig weiter so ... kriegst
      irgendwann mal "royalty" in Form
      von Andechser Dunklem Doppelbock..)
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 00:33:21
      Beitrag Nr. 5.270 ()
      Antwort auf Beitrag Nr.: 58.696.017 von MONSIEURCB am 13.09.18 23:19:18aber mach ruhig weiter so ... kriegst
      irgendwann mal "royalty" in Form
      von Andechser Dunklem Doppelbock..
      _________________________





      Also Sie müssen Hier jetzt Einen massiven Qualitätsverlust diagnostizieren?
      Das ist doch Das GUTE: Das ist doch SCHON TOTAL AM BODEN.


      Ansonsten habe ich aber Das Gefühl dass Ihr Gefühl auch immer ein bisschen, bisschen noch besser wird.
      Ist aber nur ein Gefühl!
      Avatar
      schrieb am 14.09.18 00:43:53
      Beitrag Nr. 5.271 ()
      trust your feelings ....

      ;-)
      Avatar
      schrieb am 14.09.18 12:57:24
      Beitrag Nr. 5.272 ()
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 20:28:40
      Beitrag Nr. 5.273 ()
      Antwort auf Beitrag Nr.: 58.686.762 von Popeye82 am 13.09.18 02:40:38Sirius Minerals Plc- Royalty financing investment update
      http://otp.investis.com/clients/uk/sirius_minerals/rns/regul…

      Australia’s richest woman comes to Sirius Minerals’ rescue with US$250mln injection
      http://www.proactiveinvestors.com.au/companies/news/204957/a…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 21:11:27
      Beitrag Nr. 5.274 ()
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 21:27:03
      Beitrag Nr. 5.275 ()
      Antwort auf Beitrag Nr.: 58.704.258 von rolleg am 14.09.18 20:28:40Danke Rolli.
      Ich werde Das(Hier) noch "nach"arbeiten.

      Die Olle Tante hat übrigens auch "SOLG umzingelt".

      In "Manchen" Ländern; Meinem Eindruck nach; fängt "an Was zu gehen".
      Ecuador würde ich definitiv auf Diese Liste setzen. Muss man denke ich "bisschen weitergucken". Meine These war ja dass sich Das erstmal Vorrangig im "earlier" Prospecting Bereich abspielen wird. Das wird, m.E., schon "paar" Jahre brauchen. Bis man da, evt., über Grösserflächig vielleicht Produktionsrelevantes sprechen kann. Aber da haben sich Einige schon "fett Konzessionen" eingepackt. Und ich mutmasse Das dürfte erst der Start sein.
      Aber auch Einige Andere. Nordische Länder scheinen Mir tendenziell ein Revival zu erleben. Die Myanmar Kiste wird denke ich noch interessant. Die hatten dbzgl gerade Eine, m.E., ganz, ganz Wichtige Meldung. Kolumbien scheinen auch immer mehr zu "staken". Teile Asiens(Thailand und Vietnam glaube ich zum Beispiel??). Auch paar Osteuropäische Ecken wird Die Förderung künftig m.E. nicht weniger werden. Neben wahrscheinlich noch Dem "Ein oder Anderem" Land. Und in (teils Zentral)Europa scheint es ja auch Einige Ländern zu geben Die, in Dem Zusammenhang, wieder mehr aufs Gas drücken. Bei Spanien habe ich zum Beispiel sehr stark den Eindruck.

      Also mit der "Next(vor Allem: LAST:D:D:D) Frontier" Kiste wäre ich immer eher vorsichtig. Das, ganz speziell last, ist m.E. weitestgehend Promo BS.
      Aber so auf "geographischer" Ebene passiert da m.E. schon noch Eine Menge.
      Und da dürfte es, m.M., schon auch Einige Länder geben Die, Fördervolumenseitig, Ihre Hochzeiten noch nicht gesehen haben.
      Avatar
      schrieb am 14.09.18 22:39:46
      Beitrag Nr. 5.276 ()
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 23:08:48
      Beitrag Nr. 5.277 ()
      Antwort auf Beitrag Nr.: 58.616.844 von Boersiback am 04.09.18 23:55:29Heute MA ANDERS


      Passen Sie auf, Wir spielen Heute mal SQUASH.
      Ich hau Ihnen 1nen Ball rüber,
      und WENN Sie Den zurückhauen kommt von Mir auch noch Mindestens Einer.

      Sonst Nix.


      Accccccccccccccccccccccccccccccccccccccccccccccchtung(373mph):

      Wie sehen Sie denn Jetzt ungefähr mal Die Lage bei HGM??
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 23:16:26
      Beitrag Nr. 5.278 ()
      Antwort auf Beitrag Nr.: 58.705.359 von Popeye82 am 14.09.18 23:08:48HGM (london kürzel highland gold) hat gute Zahlen geliefert und zahlt eine dividende von über 7% dieses jahr zudem wurden schulden abgebaut und eine neue produzierende mine dazugekauft.
      insofern alles ok.

      :D

      ....muss zugeben bei dem speed dachte ich mir lieber mal wegducken :laugh:
      aber elegant ausgewichen oder ?

      reicht das für mehr ???
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 23:21:11
      Beitrag Nr. 5.279 ()
      Antwort auf Beitrag Nr.: 58.705.359 von Popeye82 am 14.09.18 23:08:48ok so wird das nix....

      verzögerungen. ein bohrgerät kaputt.
      2 neue eingetroffen usw
      schellgaden und leogang...

      alles für mich sekundär--- am ende zählt das jeweilige bohrergebnis.
      da kann ich nciht viel zu sagen derzeut
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 14.09.18 23:48:28
      Beitrag Nr. 5.280 ()
      Antwort auf Beitrag Nr.: 58.705.407 von Boersiback am 14.09.18 23:16:26HGM (london kürzel highland gold) hat gute Zahlen geliefert und zahlt eine dividende von über 7% dieses jahr zudem wurden schulden abgebaut und eine neue produzierende mine dazugekauft.
      _______________________________________________________________________





      Na sehen Sie ------>KAUF!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
      Ich muss allerdings Steve nochmal anmailen. Wie Die Das hingekriegt haben.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 00:00:25
      Beitrag Nr. 5.281 ()
      Antwort auf Beitrag Nr.: 58.705.536 von Popeye82 am 14.09.18 23:48:28es ist SEHR schön so Seelenverwandte zu haben.
      Avatar
      schrieb am 15.09.18 02:10:27
      Beitrag Nr. 5.282 ()
      Antwort auf Beitrag Nr.: 58.705.449 von Boersiback am 14.09.18 23:21:11ich will Sie NOCHMAL VERWIRREN
      Untertitel: Sie können Ihre Meinung(Analysefähigkeiten) VERSCHROTTEN, WIR HABEN DIE GLEICHE(ca.)


      alles für mich sekundär--- am ende zählt das jeweilige bohrergebnis.
      _____________________________________________________





      Also da liegen Wir jetzt schon "ziemlich auf Einer Länge".
      Ist m.M. Eine Gute Einschätzung von Dir.


      Ich zeichne Dir mal Mein "Kurz"Bild:

      Als Erstes sollte man sich Meiner Meinung mal die GRUNDfesten Der Firma, Spekulation klarmachen.
      Also Das ist ein Explorer, frühes Stadium. 2 sehr, sehr Massive Ziele.
      Ob Das Hier mal ein "Producer" wird lässt sich, genauer, noch absolut überhaupt nicht sagen.
      Meine Hoffung ist dass Sie mit MINDESTENS Einem der 2 (Haupt)Projekte schaffen Produzent zu werden.
      Also, Was ist/wird wichtig?
      Meiner Meinung ERSTMAL hauptsächlich Die Bohrungen. Sowie noch ein "paar Andere early" Arbeiten. Da muss man sehen Was passiert.

      Da wurde m.E., aber, auch
      A) Die Letzte Meldung, "Verzögerungen", Vielvielzu Negativ vom "Markt" bewertet.
      Dass Die jetzt nochmal "abverkauft" wurde ist in Meinen Augen im Prinzip Blödsinn.
      Im Prinzip wird Die Planung voraussichtlich ja so stattfinden wie gedacht, "nur" Etwas später.
      Die Aussies sind aber auch ein Ungeduldiges Volk, am Aktienmarkt zumindest, Daher wundert es Mich auch nicht sehr.
      B) Was für Mich auch GANZ, GANZ, GANZ wichtig ist, ist WIE man sich "Solche" Spekulationen "strukturiert".
      Der Grundlegende Punkt ist Jetzt mal: Es gibt einfach Viele, Viel Fragen. Und Viele Antworten, noch, nicht. Was für Solche Stadien im Prinzip total normal ist.
      Also muss man sich überlegen WIE man Damit umgeht.

      M.E. gibt Es Einige, Wenige Möglichkeiten:
      1) Du kannst sagen: Ist Nix für Mich. Alles klar, weg. Der Dreck.
      2) Du kannst sagen: Ist JETZT Nix für Mich.
      Auch OK. Dann solltest Du Dir aber rechtzeitig überlegen Wie der Andere Fall aussieht.
      Also WANN Da Ding Was für Dich würde.
      3) Ja. Ist Was für Mich.
      Dann kommts ein bisschen drauf an.
      Ich denke dann sollte man sich vor Allem:
      - Einen Überblick verschaffen.
      - Eine Eigene Wertung vornehmen.
      - Eine ERWARTUNGSHALTUNG schaffen.
      - Und Die auch im Prinzip einigermassen permanent aktualisieren.
      OB Das "Case" noch "steht".

      Das ist mal, auf Eine einfache Art gesagt, ungefähr Meine Methode.
      Wenn man sich zu Sowas entscheidet.

      Also Mein Rezept ist, bei "Solchen" Spekulationen im Prinzip; sehr, sehr einfach ausgedrückt:

      Absicht grundsätzlich ist spekulativ, langfristig.
      Das heisst aber nicht unbedingt dass Die Ehen gehen bis Beide zu Asche zerfallen.
      Und SoLANGE ich nicht Die "Rote" Ampel sehe, erkennen kann(d.h. soLANGE Der "Case", Diese Grundannahmen, aufrecht erhalten bleiben scheinen), verkaufe ich Das Ding, im Regelfall, auch nicht.

      Das ist Das Grundrezept.

      Das hat aber natürlich, auch, Risiken
      A) Kannn es sein dass man (Irgend)Was nicht erkennt/sieht/versteht. Also dass Der "Case"/die Grundannahmen NICHT mehr "aufrecht" stehen. Und man "blickts" nicht.
      B) Auf Diese Art kann man auch "Verlierer" "erwischen". Und Das wird auch vorkommen.
      Ist aber, absolut überhaupt nicht, entscheidend.
      Entscheidend, auf Diesem Weg, ist Was auf der GEGENseite steht.
      Man kann sich schon "Hin und wieder mal Einen Verlierer leisten".
      WENN Der Rest stimmt.
      C) Ich würde zum Beispiel auch NIE sagen: Die "werden 100% Produzent".
      Nööö. Warum? Weiss ich ja gar nicht.
      Und Das bezieht sich nicht nur auf Die (Produzenten)Sache. Sondern auch auf Viele Andere.

      Sondern Das, Solche Situationen, ist eben Vielmehr Eine "Stadium stage"-Spekulation.
      Also wenn HGM, Firmen Solcher ART, den Ritt "durch" schaffen, dann haben Diese in Meinen Augen richtig, richtig, richtig viel Potenzial.
      (auch Bezug auf Den "Korab" Kommentar)

      Aber Das lässt sich eben "einfach nicht so leicht Alles beantworten". Muss man Stück für Stück gucken.
      Grossartig Andere Möglichkeiten gibt Es da glaube ich auch gar nicht??
      D) Du bist dann natürlich an Deine EIGENE(N) Fundamentale Einschätzung geBUNDEN.

      Und Das ist gar nicht so leicht. Da muss man "oft mit sich Selber in Den Ring steigen":) . Sehr, sehr oft.
      Wenn Du noch Eigene Pimpotenziale Suchst: Da kannst in Meinen Augen noch sehr, sehr Viel machen.

      Also, Das ist jetzt mal ein kurzer Abriss Wie es bei Mir ungefähr funktioniert. Kurzrezept.
      Dass Die Praxis viel, viel komplexer ist brauchen Wir nicht drüber reden. Ist selbstverständlich.
      Vermutlich gibts noch ein paar Andere Methoden, aber ich würde mal sagen Vielviel mehr (Brauchbare)Methoden gibt Es zu Solchen Situationen/Firmen gar nicht.

      Aber Soviel mal zu Meiner "Ungefähren Rangehart". In Solchen Fällen.
      Ca. Klärchen??


      Ich mache Solche Posts aber nur noch wenn ich Bock habe.
      Wenn Mir Diskussionen zu langweilig, stupid werden, habe ich auch grundsätzlich Interessante Optionen.
      Avatar
      schrieb am 15.09.18 02:40:27
      Beitrag Nr. 5.283 ()
      Antwort auf Beitrag Nr.: 58.705.449 von Boersiback am 14.09.18 23:21:11Und zu HGM noch.

      Also ich sags Ihnen mal offen:
      Mir ist Das eigentlich überhaupt nicht lieb. Der Typ hat in Meinen Augen "schon paar Schmierenfinger". Aber Wie Es aussieht stehen Sie auch auf der "Sprott List".
      Also mit "Dem muss man schon aufpassen ins Bett zu springen". Ich dachte früher, @the BEGINNINGS, mal Das ist Der Gesalbte Heiland. "Dosto" sieht Den glaube ich eher als Eine Art Seinen "kanadischen Pollinger".
      Dass Er Damit nicht so falsch liegt hab ich Erst später verstanden:
      www.epstatistics.com/watchlists/sprott.php
      https://ceo.ca/HGM.AX
      Avatar
      schrieb am 15.09.18 03:11:24
      Beitrag Nr. 5.284 ()
      Antwort auf Beitrag Nr.: 58.676.043 von Popeye82 am 12.09.18 02:49:11beWARE ALL Platinum Companies





      Jangada Mines Plc





      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 04:24:12
      Beitrag Nr. 5.285 ()
      Antwort auf Beitrag Nr.: 58.389.615 von Popeye82 am 07.08.18 10:56:52Franz von Assisi(, quote): "Short ALL Copper companies"







      Excelsior Mining



      www.excelsiormining.com/news/news-2018/excelsior-mining-welc…
      www.excelsiormining.com/news/news-2018/excelsior-mining-appo…
      https://seekingalpha.com/article/4200717-excelsior-mining-wo…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 04:39:34
      Beitrag Nr. 5.286 ()
      Antwort auf Beitrag Nr.: 58.609.881 von Popeye82 am 04.09.18 13:08:31Peel Mining



      www.proactiveinvestors.com.au/companies/news/204891/peel-min…
      Avatar
      schrieb am 15.09.18 17:29:55
      Beitrag Nr. 5.287 ()
      Antwort auf Beitrag Nr.: 58.557.551 von Popeye82 am 29.08.18 09:40:03Cardinal Resources



      www.proactiveinvestors.com.au/companies/news/204888/cardinal…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 20:05:22
      Beitrag Nr. 5.288 ()
      Antwort auf Beitrag Nr.: 58.597.563 von Popeye82 am 02.09.18 23:04:17ONCE ONE of the largest AND richest lead+silver mines, in the world







      Im Zink(+ByProduct)Entwicklerbereich sollte man m.E. auf Dem Zettel haben.


      Myanmar Metals













      www.mining-journal.com/base-metals/news/1346698/myanmar-meta…
      https://assets.ctfassets.net/hnlfgsjzg6je/4xiKop5ZYQEKOgaUcG…
      http://www.csaglobal.com/




      "Myanmar Metals scopes China zinc venture; Scoping work has shown Myanmar Metals will likely need to find in the order of US$200 million, to develop the China pit, @its Bawdwin zinc project in Myanmar, with the aim being to kick off production in the second half of 2021




      Cashflow from the 13-year China mine will be used to fund further openpit and underground mining at Bawdwin, with Myanmar making the point that it will fund "life-of-mine infrastructure while consuming only 26% of the current indicated and inferred mineral resources".

      China will yield 1 million tonnes of zinc concentrate grading 52% zinc, as well as 1.6Mt of concentrate grading 63% lead, 2% copper and 1,554 grams per tonne silver.

      More than 80Mt will be mined, of which 21Mt will be ore.

      Processing will be at a rate of 1.8Mt per annum.

      Total operating costs per tonne processed are estimated at $84/t.

      Myanmar aims to complete prefeasibility and full feasibility studies by the end of next year.

      The company didn't disclose revenue, operating earnings, NPV, IRR, payback period and other financial metrics, saying it was taking "a conservative approach, in consideration of the scoping study" nature of the assessment undertaken.

      In terms of funding, Myanmar pointed out it has previously received a non-binding letter of financial support from Perilya, its cornerstone investor, for up to $150 million for future construction.

      Perilya holds about 20% of Myanmar, with famed Australian-based prospector Mark Creasy having a 12% stake.

      Shares in Myanmar (ASX: MYL) were up 1.5% to A6.9c in morning trade, capitalising the company at $86 million.

      Myanmar started the current quarter with $16.6 million cash, with about $35 million raised earlier this year when new shares were issued at 6c each."
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 22:20:47
      Beitrag Nr. 5.289 ()
      Antwort auf Beitrag Nr.: 58.577.831 von Popeye82 am 31.08.18 01:20:49Global Atomic



      http://axino.de/index.php/global-atomic-corp/1916-global-ato…
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 22:33:39
      Beitrag Nr. 5.290 ()
      Antwort auf Beitrag Nr.: 58.662.912 von Popeye82 am 10.09.18 18:19:55KEEPS on Giving





      Millennial Lithium





      www.caesarsreport.com/blog/millennial-lithium-pastos-grandes…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 15.09.18 23:47:44
      Beitrag Nr. 5.291 ()
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 12:22:55
      Beitrag Nr. 5.292 ()
      Antwort auf Beitrag Nr.: 58.674.018 von Popeye82 am 11.09.18 20:07:58FYI Resources







      http://rohstoffbrief.com/2018/09/14/chinas-automarkt-volkswa…
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 14:08:37
      Beitrag Nr. 5.293 ()
      Antwort auf Beitrag Nr.: 58.709.679 von Popeye82 am 15.09.18 23:47:44Celsius Resources





      - The Economist
      Am 13.09.2018 veröffentlicht
      More people were killed in a recent civil war in the Democratic Republic of Congo than in conflicts in Vietnam, Syria, Iraq and Korea combined. The African country may be sliding back in to war, but one man is hoping a message of peace can overcome violence. WARNING: this film contains distressing images.

      Click here to subscribe to The Economist on YouTube: https://econ.st/2xvTKdy

      It's one of the deadliest countries on the planet - wracked for decades by civil war, rape, murder, and genocide. Now the Democratic Republic of Congo is in the midst of another crisis and potentially another civil war.

      But one group of young people is taking a stand - not with weapons but with a message of peace. Fred Bauma risks his life every day campaigning for peace in the DRC, a country that has little concept of peace.

      Between 1998 and 2003 a brutal civil war tore the country apart, killing up to five million people. That's more than were killed in Syria, Iraq, Vietnam, and Korea combined.

      Sitting on vast mineral wealth and situated at the heart of the continent, the DRC could be the crossroads of Africa - if it were peaceful and functional. But the country remains extremely undeveloped. Only one in seven earned more than $1.25 a day. Life expectancy is just 60 years.

      The dictator President Joseph Kabila is standing down after almost 20 years and the battle for who succeeds him is underway. The election due to be held in December will undoubtedly be an unfair fight and could push the country back to Civil War. The favourites to replace Mr. Kabila could be as bad for the country as the current dictator.

      Emmanuel Ramazani Shadary is from the same party as Mr Kabila and is seen as a potential puppet for the president. His likely opponent is Jean-Pierre Bemba, a warlord, former vice president and rebel leader who served 10 years in prison in The Hague for war crimes - a sentence that was recently overturned. Neither candidate is likely to bring peace to the country. Mr. Bauma is a member of Lucha, a youth group that does not engage in politics but protests against the government's failure to provide services. In the face of mounting violence, Lucha's peaceful protests provide an alternative to the bloodshed that has plagued the country for decades.

      Fred's fear is real. One of his colleagues Luc Nkulula was burnt alive in a house fire that was allegedly started by government forces.

      If Congo could find stability then the whole of Africa would benefit however it is unlikely that a presidential election will bring about real change. It is a risky moment for this fragile country. There's a real chance that the country could fall back into civil war and millions more could die.

      Daily Watch: mind-stretching short films throughout the working week.

      For more from Economist Films visit: http://films.economist.com/
      Check out The Economist’s full video catalogue: http://econ.st/20IehQk
      Like The Economist on Facebook: https://www.facebook.com/TheEconomist/
      Follow The Economist on Twitter: https://twitter.com/theeconomist
      Follow us on Instagram: https://www.instagram.com/theeconomist/
      Follow us on Medium: https://medium.com/@the_economist -
      Avatar
      schrieb am 16.09.18 14:23:48
      Beitrag Nr. 5.294 ()
      Antwort auf Beitrag Nr.: 58.691.784 von Popeye82 am 13.09.18 15:23:50Aurania Resources



      http://www.wallstreet-online.de/nachricht/10862892-wirtschaf…
      www.commodity-tv.net/c/search_adv/?v=298509
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 16:53:46
      Beitrag Nr. 5.295 ()
      Antwort auf Beitrag Nr.: 58.652.349 von Popeye82 am 09.09.18 02:28:23Danakali
















      www.proactiveinvestors.com.au/companies/news/204787/danakali…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 20:23:53
      Beitrag Nr. 5.296 ()
      Antwort auf Beitrag Nr.: 58.629.261 von Popeye82 am 06.09.18 10:04:51Neo Lithium



      www.streetwisereports.com/article/2018/09/11/single-well-pro…




      "Single Well Production Rate Accounts for 20% of Argentina Lithium Project Target
      Research Report

      Source: Streetwise Reports (9/11/18)

      A Canaccord Genuity report provided a progress update on the advancement work underway by this asset's owner.
      red black lithium

      In a Sept. 6 research note, Canaccord Genuity analyst Eric Zaunscherb reported that Neo Lithium Corp. (NLC:TSX.V) finished a hydrological model, an initial production well and an environmental baseline study, all part of the feasibility study work on its Tres Quebradas project in Argentina.

      Zaunscherb reviewed each of the three developments. As for the hydrological model, it showed that the planned mineral extraction methods would have zero to minimal environment impact for several decades on the Tres Quebradas and Laguna Verde lakes just south of the project. To arrive at this conclusion, data from two drilling seasons and from 11 long-duration pumping tests across the salar were incorporated into the model. It will serve as the foundation of a reserve estimate.

      "The completion of the hydrological model is an important step in progressing the production model and assessing any of the project's potential environmental impacts," Zaunscherb noted.

      Regarding the initial well, its production rate, using a high-grade cutoff, is equal to about 20% of the total production needs of the project, meaning it would likely require few wells. The 12-inch-wide, steel filter well that descended 100 meters yielded 90 liters of high-grade lithium brine. The grade cutoff was 800 milligrams per liter lithium whereas the cutoff for the Measured and Indicated resource was 614 milligrams per liter. Further, these results were consistent with those of the hydrological model.

      Zaunscherb wrote that Neo Lithium will keep building production wells in the northern, high-grade zone to "define production capacity, test the aquifer and carry on production level pump tests."

      With respect to the environmental baseline study, it will be forwarded to the provincial authorities. Of note, the study found that no significant nesting grounds are located within the proposed mining and operations area. In other related news, Neo Lithium's environmental exploration and development permit has been renewed for two years.

      The company has sufficient cash, $49 million, to take it through the feasibility stage. To get it from feasibility through development, it is currently considering the various financing options "with the goal of securing a joint venture partner by year-end," Zaunscherb explained.

      He reiterated Canaccord Genuity's Speculative Buy rating and CA$2 per share target price on Neo Lithium, whose current stock price is around CA$1.04 per share."
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 22:01:23
      Beitrag Nr. 5.297 ()
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 16.09.18 23:37:54
      Beitrag Nr. 5.298 ()
      Antwort auf Beitrag Nr.: 58.686.822 von Popeye82 am 13.09.18 04:18:10Cypress Development













      http://aheadoftheherd.com/Newsletter/2018/Cypress-Developmen…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 01:09:08
      Beitrag Nr. 5.299 ()
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 02:44:26
      Beitrag Nr. 5.300 ()
      Antwort auf Beitrag Nr.: 58.556.474 von Popeye82 am 29.08.18 05:57:41Pilbara Minerals













      www.pilbaraminerals.com.au/site/showdownloaddoc.aspx?Announc…
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 05:14:16
      Beitrag Nr. 5.301 ()
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 13:40:14
      Beitrag Nr. 5.302 ()
      Antwort auf Beitrag Nr.: 58.714.417 von Popeye82 am 17.09.18 02:44:26Pilbara Minerals




      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 14:45:21
      Beitrag Nr. 5.303 ()
      Antwort auf Beitrag Nr.: 54.857.308 von Popeye82 am 03.05.17 18:17:38Um es mal so zu sagen:
      Sehr, sehr dolle siehts Mir nicht aus.
      Nach Den Zahlen.

      Ein paar richtig, richtig Gute Ansätze nach m.E.,
      aber für Mein Befinden Minenleben JUST to short.
      Viele(die Meisten?) Daten sind für Mein Bemessen schon richtig gut,
      aber 8 Jahre Minenleben ist einfach shice.
      Mit 20(++) Jahren wäre Das m.E. ein GANZ, GANZ Anderes Ding.
      Und würde ichs vmtl. auch kaufen.

      Falls Dr. Krisowaritschko noch DInge anzumerken hat..................................





      Amarillo Gold


      - After tax internal rate of return (IRR) of 51% at US$1,300/oz gold (Au)
      - After tax net present value (NPV5%) of US$244 million at US$1,300/oz Au and a USD/BRL exchange rate of 3.60 (US$198M at US$1,200/oz)
      - After tax project payback of 2.6 years at US$1,300/oz Au
      - Average annual gold production 144,000 oz over first 4 years
      - Average life of mine (LOM) production 123,000 oz per year over 8 years, and total production of 985,000 ounces after 91% recovery
      - LOM cash operating cost of US$545/oz Au, and all-in sustaining cost (AISC*) of US$655/oz Au
      - Upfront capital expenditure of US$123M
      - Updated Proven and Probable Reserves of 1,087,000 oz – 23.8 million tonnes (Mt) @ 1.42 g/t Au
      1) Proven 513,000 oz – 9.6 Mt @ 1.65 g/t Au, and
      2) Probable 574,000 oz -14.2 Mt @ 1.26 g/t Au

      Note: *
      AISC: Total cash operating cost + Royalties + Transportation & Refining + Sustaining Capital + Closure + Corporate G&A

      www.amarillogold.com/news/amarillo-updates-pre-feasibility-s…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 15:07:17
      Beitrag Nr. 5.304 ()
      Antwort auf Beitrag Nr.: 58.718.665 von Popeye82 am 17.09.18 14:45:21naja aktuell bohren se bisl auf mara rosa rum.
      ziel ist dort die resourcen und reserven hoch zu bekommen, logo.
      minenleben soll in die 10+ jahre liga kommen. wird sich zeigen, ob se das schaffen.

      großes landpackage um mara rosa und lavras do sul könnten langfristig weiteres potential in sich birgen.
      besonders interessant könnte sein, wenn sie die mine auf mara rosa mal zum laufen bekommen haben, das back-in-agreement mit iamgold und rio tinto für lavra do sul sein. momentan jedoch alles träumerei.

      das ganze gemache um die bude interessiert nur aktuell in dem umfeld keine sau. dosto meinte auch das der mutchler für so manchen brasilianer ein rotes tuch ist. derzeit scheint er shorttechnisch aber nix geplant zu haben.

      https://www.amarillogold.com/W0p23B/wp-content/uploads/2018/…
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 15:56:57
      Beitrag Nr. 5.305 ()
      Antwort auf Beitrag Nr.: 58.718.101 von Popeye82 am 17.09.18 13:40:14Pilbara Minerals













      www.pilbaraminerals.com.au/site/PDF/2235_0/PilgangooraReserv…
      https://amcconsultants.com/
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 16:21:28
      Beitrag Nr. 5.306 ()
      Antwort auf Beitrag Nr.: 58.640.760 von Popeye82 am 07.09.18 11:21:49TriStar Gold













      www.tristargold.com/index.php/news/news/2018/204-




      "35% Increase in Resources at Castelo de Sonhos, as Preliminary Economic Assessment Begins

      SCOTTSDALE, Ariz., Sept. 17, 2018 (GLOBE NEWSWIRE) -- On behalf of TriStar Gold Inc. (TSG-TSX.V) (the “Company” or “TriStar”), GE21 Consultoria Mineral Ltda (“GE21”) of Belo Horizonte, Brazil, has begun the Preliminary Economic Assessment (“PEA”) for the Castelo de Sonhos gold project in southern Pará State, Brazil. The first phase of this work, updating the mineral resources, is complete. With the increase in resources being materially significant, Bernardo Horta de C Viana of GE21 is the independent Qualified Person (“QP”) for this new resource estimate. Key highlights include:

      Mineral Resources (above a 0.3 g/t cut-off) of:

      Indicated: 17.7 million tonnes at 1.2 g/t, containing
      0.7 million ounces (“Moz”) of gold
      Inferred: 39.8 million tonnes at 1.0 g/t, containing
      1.3 Moz of gold

      - Esperança East, where drilling has confirmed strong similarities to Esperança South, contributes Inferred Resources of 11.8 Mt @ 0.9 g/t with 0.4 Moz of gold, making it already larger than Esperança Center despite having only 28 initial drill holes.
      - Most of Esperança East remains to be tested by future drilling, as do promising targets with surficial mineralization at Esperança West, the New Discovery Zone and the Upper Conglomerate Zone.


      “This year’s strong drilling results in Esperança East have been very encouraging,” says Nick Appleyard, TriStar’s President and CEO, “especially in that they clearly show the existence of the same two high-grade reefs seen earlier in Esperança South. We have now seen over 600% growth in mineral resources over the last 2 years. This new, larger mineral resource will be used in the PEA now underway to give us the first look at the project’s potential economic viability before the end of the year.”

      Table 1. Mineral resource estimate1 for the Castelo de Sonhos gold project (with an effective date of September 17, 2018) above a reporting cutoff 2 of 0.3 g/t Au.
      Region Classification Tonnage (Mt) Grade (g/t Au) Metal Content3(Moz Au)

      Esperança South Indicated 11.8 1.4 0.5
      Inferred 21.7 1.2 0.8
      Esperança East Indicated -- -- --
      Inferred 11.8 0.9 0.4
      Esperança Center Indicated 5.9 0.9 0.2
      Inferred 6.3 0.7 0.1
      Project Total Indicated 17.7 1.2 0.7
      Inferred 39.8 1.0 1.3


      1Numbers have been rounded to reflect the precision of Inferred and Indicated mineral resource estimates.

      2The reporting cutoff corresponds to the marginal cutoff for an open pit with operating cost (processing + G&A) of $US 10/t, metallurgical recovery of 98% and a gold price of $US 1,200/oz. These are mineral resources and not reserves and as such do not have demonstrated economic viability.

      3The metal content estimates reflect gold in situ, and do not include factors such as external dilution, mining losses and process recovery losses.

      4TriStar is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing or political factors that might materially affect these mineral resource estimates.

      5TriStar intends to file an independent NI 43-101 Technical report within 45 days in support of this new mineral resource estimate.

      Resource estimation

      The resource was constrained by a mineralized envelope that corresponds to the conglomeratic band of the paleo-placer, honouring its outcrop location and surface measurements of its bedding orientations, and extending into the upper and basal arenites where drilling has confirmed that these contact arenites contain remobilized gold. The mineralized envelope was divided into five domains, each a layer that follows stratigraphy of the original depositional environment. Two of these domains are higher-grade reefs, approximately 10-20m thick that contain 40-45% of the gold metal content in only 10-15% of the total thickness of the conglomeratic band. The other three domains lie above the upper reef, below the lower reef and between the two reefs. Modeling of the 3D geometry of the reefs was constrained by drill hole assays, by logged lithologies, by paleo-current direction measurements from field mapping, and by optical televiewer images.

      All drill hole assays were capped at 10 g/t. Where multiple assays were available for a sample interval, Leachwell assays were used, if available, then metallic screen assays, and then fire assays if neither metallic screen results nor Leachwell results were available. This prioritization reflects the Company’s conclusions on the accuracy and precision of data from the three different analytical procedures.

      Grades were interpolated into 5x5x2m blocks using inverse-distance-cubed (ID3) interpolation of grades from nearby drill hole assays. The search strategy, guided by variogram analysis, uses a flattened ellipse, with long ranges in the bedding direction and a short range perpendicular to bedding. In the reef domains, ranges were 150m (parallel to bedding) and 15m (perpendicular); in the non-reef domains, ranges were 100m and 10m.

      Directions of maximum and minimum continuity needed for grade interpolation were locally customized, using the wireframes of the domain boundaries to establish local bedding directions.

      As with previous resource models, this new resource estimate was checked against the grade-tonnage distribution predicted by a global change of support procedure, assuming 5x5x2m selective mining units. The grade, tonnage and metal content predicted by this global procedure are all within 10% of the values reported from the ID3 block model, which has the advantage of providing local detail that enables checking of the modeling of the reefs which guide continuity directions.

      Resource classification

      The mineral resources in Table 1 are constrained by open pit shells developed by the independent QP to meet the requirement that resources have “reasonable prospects for eventual economic extraction”. Within the pit shell material above a cut-off grade of 0.3 g/t was classified as Indicated in blocks for which grade estimation was able to use data from at least three separate drill holes in three quadrants, and for which the average distance to the nearby data was less than half the variogram range; these criteria are almost always met only in the areas where the drill holes are more closely spaced than 50m. All other blocks with grade estimates were classified as Inferred resources; since the search ellipse was aligned with the variogram ranges, Inferred blocks must have at least one sample within the range of the variogram. This usually occurs in areas where hole spacing is 100m. These block by block classification codes were then spatially smoothed to avoid inconsistent classification of isolated blocks.

      QUALIFIED Person

      Bernardo Horta de C Viana (MAIG #3709), Director of GE21, is the Qualified Person for the mineral resource estimates presented in this press release, has approved its publication.

      TriStar Gold Retains Investor Relations Firm

      TriStar has retained Transcend Capital Inc. ("Transcend") to develop and implement an investor relations program for the Company for a period of 12 months for an aggregate fee of C$60,000 plus applicable taxes. Transcend and its directors, officers and employees own 400,000 common shares and 200,000 warrants of the Company.

      About TriStar:

      TriStar Gold is an exploration and development company focused on precious metals properties in the Americas that have potential to become significant producing mines. The Company’s current flagship property is Castelo de Sonhos in Pará State, Brazil. The Company’s shares are listed on the TSX Venture Exchange under the symbol TSG. Further information is available at www.tristargold.com.

      For further information, PLEASE contact:


      TriStar Gold Inc.
      Nick Appleyard
      President and CEO
      480-794-1244
      info@tristargold.com"
      Avatar
      schrieb am 17.09.18 16:26:20
      Beitrag Nr. 5.307 ()
      Antwort auf Beitrag Nr.: 58.636.959 von rolleg am 06.09.18 22:07:53 Nach Arizona geht auch bald Nevsun aus dem Depot. Bei Prairie Mining wird es auch grad spannend - könnte der nächste Kandidtat sein, der sich dann positiv aus dem Depot verabschiedet (und mit dreien hatte ich ähnliche Kurskapriolen...) ;)
      ________________________________________________________________________________





      Zu Ihrer Prairie.
      Habe da auch spekuliert, nach der "Usukrut" Meldung aber verkauft. Mit Verlust.

      Weiss nicht wie weit Sie da jetzt ge"drillt" sind,
      aber wenn Sies noch nicht getan haben würde ich 1mal die Ereignisse Der Letzten (5-10?) Tage nachvollziehen.
      Da haben die Ereignisse ja ziemlich geknallt.
      Wenn man Dies über den "Wallstreet: Online" Faden "täte" sind ge"fühlt" wahrscheinlich ~2.000 Seiten nur.
      Avatar
      schrieb am 17.09.18 16:38:15
      Beitrag Nr. 5.308 ()
      Den Ein oder Anderen Namen gäbe Es Hier noch.
      Wahrscheinlich nach+nach immer mal wieder.
      VLC hat Heute Eine Erst "PEA" gemeldet.
      Darf schon Mehr werden, aber teils sehr Gute Ansätze, lässt sich vielleicht drauf aufbauen würd ich sagen.
      Avatar
      schrieb am 17.09.18 18:06:55
      Beitrag Nr. 5.309 ()
      Antwort auf Beitrag Nr.: 58.718.860 von sir_krisowaritschko am 17.09.18 15:07:17Ich will da Keine
      Klug

      sprüche
      abladen,
      aber Was ich Ihnen sagen kann ist dass Mir die "Earner zu Burner"-Jahre, Das Verhältnis(unter Inkludierung "CAPEX"), im Prinzip sehr, sehr, sehr wichtig ist.
      Also in Ihrem "Rule book for Mining Anleger", ich würd Mir Das schon EHER Oben Irgendwo hinschreiben.
      Das ist auch Ein(von Vielen) Aspekt Der Mich bei Sirius sehr, sehr anspricht,
      und EIn Grund Warum ich es Jetzt auch mal mit CYP probiere.

      VG
      Avatar
      schrieb am 17.09.18 19:01:01
      Beitrag Nr. 5.310 ()
      Antwort auf Beitrag Nr.: 58.614.531 von Popeye82 am 04.09.18 19:47:41Liontown Resources


      www.ltresources.com.au/sites/default/files/asx-announcements…

      34 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 20:48:58
      Beitrag Nr. 5.311 ()
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 21:17:57
      Beitrag Nr. 5.312 ()
      Antwort auf Beitrag Nr.: 58.704.258 von rolleg am 14.09.18 20:28:40Sirius Minerals Plc

      Major Supply Agreement and Downstream Investment in South America

      - Sirius signs its largest POLY4 supply agreement for up to 2.5 Mtpa
      - Long-term supply agreement with Cibra, Brazil's sixth largest fertilizer distributor group
      - Acquisition of 30 per cent. equity stake in Cibra in return for 95 million ordinary shares in Sirius
      - Sirius aggregate peak contracted take-or-pay sales volume increased to 8.2 Mtpa
      http://otp.investis.com/clients/uk/sirius_minerals/rns/regul…
      Avatar
      schrieb am 17.09.18 22:03:12
      Beitrag Nr. 5.313 ()
      Antwort auf Beitrag Nr.: 58.556.414 von Popeye82 am 29.08.18 03:49:31Centrex Metals



      www.asx.com.au/asxpdf/20180906/pdf/43y3synlkls799.pdf
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 17.09.18 23:12:12
      Beitrag Nr. 5.314 ()
      Antwort auf Beitrag Nr.: 58.601.463 von Popeye82 am 03.09.18 14:01:52Tando Resources













      www.tandoresources.com.au/sites/default/files/asx-announceme…
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 00:54:04
      Beitrag Nr. 5.315 ()
      Antwort auf Beitrag Nr.: 58.657.203 von Popeye82 am 10.09.18 02:47:09Explaurum



      www.explaurum.com//irm/showdownloaddoc.aspx?AnnounceGuid=22b…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 02:29:32
      Beitrag Nr. 5.316 ()
      Antwort auf Beitrag Nr.: 58.686.759 von Popeye82 am 13.09.18 02:28:39Piedmont Lithium



      https://gallery.mailchimp.com/693e9b35073e903cff5eb9b88/file…
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 04:32:17
      Beitrag Nr. 5.317 ()
      Antwort auf Beitrag Nr.: 58.380.105 von Popeye82 am 06.08.18 03:20:40Orion Minerals NL



      www.asx.com.au/asxpdf/20180918/pdf/43yf6f6rcf1q5y.pdf
      www.asx.com.au/asxpdf/20180910/pdf/43y5zrj3yy6ww5.pdf
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 05:34:10
      Beitrag Nr. 5.318 ()
      Antwort auf Beitrag Nr.: 58.709.679 von Popeye82 am 15.09.18 23:47:44Celsius Resources



      https://stockhead.com.au/resources/there-are-now-45-battery-…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 07:35:35
      Beitrag Nr. 5.319 ()
      Antwort auf Beitrag Nr.: 58.617.093 von Popeye82 am 05.09.18 02:25:13AVZ Minerals



      https://stockhead.com.au/resources/ivanhoe-investment-shows-…
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 08:55:15
      Beitrag Nr. 5.320 ()
      Antwort auf Beitrag Nr.: 58.714.342 von Popeye82 am 17.09.18 01:09:08Strandline Resources













      www.strandline.com.au/irm/showdownloaddoc.aspx?AnnounceGuid=…
      http://www.azurecapital.com.au/
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 10:30:50
      Beitrag Nr. 5.321 ()
      Antwort auf Beitrag Nr.: 58.604.016 von Popeye82 am 03.09.18 19:16:36NQ Minerals













      www.proactiveinvestors.com.au/companies/news/205098/nq-miner…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 11:09:03
      Beitrag Nr. 5.322 ()
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 18.09.18 11:16:02
      Beitrag Nr. 5.323 ()
      ...ah, mein diatreme-Schnucki - MERCI für die Infos!

      (aber es wäre schön, bei ALLEN Links aus dem "https" ein "http" zu machen .... ;-)
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 05:37:23
      Beitrag Nr. 5.324 ()
      Antwort auf Beitrag Nr.: 58.658.466 von Popeye82 am 10.09.18 09:40:52Sheffield Resources



      www.sheffieldresources.com.au/irm/showdownloaddoc.aspx?Annou…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 06:03:33
      Beitrag Nr. 5.325 ()
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 06:45:47
      Beitrag Nr. 5.326 ()
      Antwort auf Beitrag Nr.: 58.714.507 von Popeye82 am 17.09.18 05:14:16New Century Resources













      https://wcsecure.weblink.com.au/pdf/NCZ/02023856.pdf
      www.portsnorth.com.au/karumba/
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 07:08:49
      Beitrag Nr. 5.327 ()
      Antwort auf Beitrag Nr.: 58.572.329 von Popeye82 am 30.08.18 15:21:14Axiom Mining


      Kurze "Seiten"notiz.

      Die Bude Hier scheint in Der Nähe Land zu grabben.
      In Die Kaufland Tüte zu packen.
      Hab duuuuunkel in Erinnerung dass Die lange Zeit an Einem Kupfer/Gold porphyry Deposit gearbeitet haben, in Südamerika. Ziemlich gross Das Ding, aber Die scheinen Damit nicht so entscheidend weitergekommen zu sein. Keine Ahnung, aber vermutlich auch wg Grades(Equi).

      Dass Was Die sich Jetzt greifen scheint ein "bisschen in Der Nähe", zu Axiom, DSO Laterite Target, aber scheinbar erstmal klein, vermutlich High Grades, nahe zur Küste, wohl Gute Anbindung, aber auch "potenziell fast von Der Oberfläche weg"(Target wohl potenziell 12m Overburden/Dreck drüber) etc.

      EIne kurzfristige Relevanz hat Das Teil vmtl. nicht, aber vielleicht bekommt Es Hier noch Eine.
      Kommt auf Meine könnte für "Hier vielleicht noch Was werden"-Liste.


      Metminco





      www.metminco.com.au/site/PDF/2671_1/ACQUISITIONOFDSONICKELLA…

      www.metminco.com.au/site/PDF/2673_1/PRESENTATIONDSONICKELLAT…
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 07:21:08
      Beitrag Nr. 5.328 ()
      Antwort auf Beitrag Nr.: 58.733.560 von Popeye82 am 19.09.18 07:08:49Wenn man Hier reinguckt scheinen Die Vorowner, Inco/BHP/Sumitomo, Die Projekte in Kombi besessen zu haben.
      Welche Jetzt, EInzeln aufgeteilt, an Die 2 Firmen gehen/gingen.
      Keine Ahnung, aber Die, Zusammen, an Eine Partei zu vergeben wäre vielleicht besser gewesen.
      Keine Garantie, aber scheint Mir so auszusehen.
      www.smm.co.jp/solomon/news/pdf/20140409_Volume1.pdf
      www.smm.co.jp/solomon/news/pdf/20140409_Volume4_Section1.pdf


      Eine Korrektur:
      12m "Over"burden scheint Quatsch.
      Expected Tiefe ist 12m. Und wenn Die Mächtigkeit/Dicke expected 5-7m sind, wäre Das Overburden Zeug 5-7m. Also pot. Strip Ratio müsste, Demzufolge, 1 bis 1,4.
      Avatar
      schrieb am 19.09.18 07:33:32
      Beitrag Nr. 5.329 ()
      Antwort auf Beitrag Nr.: 58.723.831 von Popeye82 am 18.09.18 07:35:35AVZ Minerals



      https://static1.squarespace.com/static/5934d2ae6b8f5beeb5ba2…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 08:31:02
      Beitrag Nr. 5.330 ()
      Antwort auf Beitrag Nr.: 58.617.189 von Popeye82 am 05.09.18 03:55:16Geopacific Resources


      www.asx.com.au/asxpdf/20180919/pdf/43yg2ywf6xjv0c.pdf
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 09:09:11
      Beitrag Nr. 5.331 ()
      Antwort auf Beitrag Nr.: 58.637.508 von Popeye82 am 06.09.18 23:10:01Das ist m.E. jetzt erstmal Eine wirklich "Grosse" Meldung für die Firma.
      (Bildchen siehe "RNS" Link)





      Emmerson Plc


      - Mining horizon proposed to be accessed by twin declines constructed using underground mining machinery, which will later be used in mining production
      - Direct capital cost estimate of mine access component approximately US$35m including 30% contingency, with potential to save upfront capital by using contract miners to complete works
      - Estimated capital cost saving of over 95%, or over US$1bn, relative to average Canadian potash mine development1
      - This cost would place the Khemisset Potash Project in the lowest 10% for mine access cost for potash developments globally
      - Design and estimate completed by independent engineering group, Golder Associates ("Golder"), according to AusIMM guidelines for capital cost estimates
      - Enhances Management's strong belief in potential for Khemisset to be a low capital cost potash mine development
      - The preliminary design and cost estimates for the mine access is the first Scoping Study deliverable for the Khemisset Potash Project, which is set to be delivered in Q1 2019











      www.rns-pdf.londonstockexchange.com/rns/0356B_1-2018-9-17.pd…
      http://www.golder.com/

      http://publications.gov.sk.ca/documents/310/93667-PotashRequ…




      "Decline Design and Cost Estimates Indicates Potential for Very Low Capital Cost Access to Mineralisation

      Emmerson Plc, the Moroccan focused potash development company, is pleased to announce that it has completed the preliminary design and cost estimates for the mine access component of the Scoping Study, which is being completed for its 100% owned Khemisset Potash Project, located in northern Morocco ("Khemisset" or "the Project"). To view the press release with the illustrative maps and diagrams please use the following link:

      http://www.rns-pdf.londonstockexchange.com/rns/0356B_1-2018-…


      Highlights

      - Mining horizon proposed to be accessed by twin declines constructed using underground mining machinery, which will later be used in mining production
      - Direct capital cost estimate of mine access component approximately US$35m including 30% contingency, with potential to save upfront capital by using contract miners to complete works
      - Estimated capital cost saving of over 95%, or over US$1bn, relative to average Canadian potash mine development1
      - This cost would place the Khemisset Potash Project in the lowest 10% for mine access cost for potash developments globally
      - Design and estimate completed by independent engineering group, Golder Associates ("Golder"), according to AusIMM guidelines for capital cost estimates
      - Enhances Management's strong belief in potential for Khemisset to be a low capital cost potash mine development
      - The preliminary design and cost estimates for the mine access is the first Scoping Study deliverable for the Khemisset Potash Project, which is set to be delivered in Q1 2019


      Hayden Locke, CEO of Emmerson, commented:

      "In the development of a potash mine the first capital investment item on which significant cost savings can be made is the method by which the underground mining horizon is accessed from the surface facilities. For most potash projects, globally, this is an extremely technically challenging and expensive investment. The work completed by our independent engineer, Golder Associates, indicates that the mining horizon at Khemisset can be accessed via a simple decline, which involves significantly lower cost and technical risk.

      "The implications of these findings are important. It is estimated that the cost of accessing the mining horizon in a typical Canadian potash mine is over US$1.1bn1. The estimated cost for Khemisset, at US$35m including a 30% contingency, would represent a comparative capital cost saving of over 95% and is due to both the relatively shallow nature of the ore body as well as the lack of evidence of any aquifer units. The work on the preliminary decline design and cost estimates enhances our belief that Khemisset has the potential to be a very low capital cost potash development.

      "We will continue to keep the market informed of the progress of our engineering works and we will release key components of the Scoping Study (as outlined in our 6 September 2018 RNS), which we are confident of delivering to the market by early Q1 2019."

      Comparison to Peers

      The Scoping Study decline design and costing for the Khemisset Project, completed by independent engineers Golder, indicates that the capital cost requirement to reach mineralisation should be far lower than the majority of potash development projects globally. A comparison to other development stage potash projects is shown in Figure 1 below.

      Summary Overview

      Golder, which was appointed by the Company to manage the delivery of its Scoping Study, has completed basic design and cost estimates for decline access at Khemisset. Designs and estimates have been prepared in line with Scoping Study guidelines provided by the Australasian Institute of Mining and Metallurgy ("AusIMM").

      The proposed access to the main potash seam will be achieved via twin declines which will be constructed using continuous miners ("CMs"), machines which will eventually be responsible for mine production. The declines have been designed to access the primary horizon in the higher-grade eastern edge of the deposit, at a depth of approximately 610m below surface. The decline position and orientation has been selected to access the highest-grade part of the deposit at the shallowest depth while also allowing the plant site to be located as close as possible to the existing local infrastructure (roads, power, water). The initial portal location can be seen in Figure 2 below.

      Geology and Stratigraphy

      The decline will be driven through four key lithologies: Quaternary and Mio-Pliocene sediments (~30m thick); minor clay formation (~30m thick); primary massive salt horizon (~520m thick); and an overlying basalt unit (~60m thick).

      Decline Design

      The decline design has been sub-divided into four key zones based on the lithologies above, with specific geotechnical support requirements and advanced rates provided for each zone. One decline will be used for production of ore and air intake to the mine, while the other will be used for services, personnel movement and as ventilation exhaust from the mine.

      Excavation of both declines will be undertaken concurrently with a proposed cross-sectional area of approximately 28m2, which will allow sufficient airflow to ventilate the underground mine when in full operation
      . The current proposed decline design comprises
      :

      - A portal constructed at the surface with the excavations supported with shotcrete, mesh and soil nailing as required. A buried steel or concrete liner will protect the entrance to the portal;

      - Zone 1: through the soft soil/rock will be lined with shotcrete and mesh, with excavation carried out using conventional tunnelling techniques;

      - Zone 2: through the salt horizon, will be supported with patterned bolts;

      - Zone 3: through the basalt will excavated by drill and blast methods and supported with patterned bolts and mesh. Minimal water inflows are expected within the basalt strata; and

      - Zone 4: will be driven laterally with the CMs and supported in a similar manner to Zone 2


      The declines will be driven at a gradient of around 1:7 with a length of approximately 4,700m and will reach the potash horizon at a depth of approximately 600m below surface. A long section of the lithologies crossed by decline access is shown in Figure 3 below.

      Schedule and Cost Estimation

      The total programme duration of the decline construction activities is anticipated to be approximately 17 months at a direct capital cost of approximately US$35 million including a 30% contingency. Cost estimation for the decline development and construction has been conducted in line with Scoping Study levels of accuracy of approximately ±30-50%.

      A summary of the cost breakdown is presented in Table 1 below:


      Item


      US$ millions

      Direct Costs


      $26.7

      Portal Construction


      $0.4

      Zone 1 Development


      $5.4

      Zone 2 Development


      $9.5

      Zone 3 Development


      $2.5

      Zone 4 Development


      $0.2

      Power


      $3.1

      Equipment purchase (vent fans, connection conveyor)


      $3.0

      Equipment Mobilisation / Demobilisation


      $2.6

      Contingency (30%)


      $8.0

      Total Direct Costs including Contingency


      $34.7

      Table 1: Summary of Direct Costs for Decline Development

      A number of machines, including the continuous miners, roof bolters, decline conveyors, power infrastructure and associated machinery, will be used in the construction of the decline. The cost to purchase these items will be included as part of the capital cost estimates for the underground mine.

      An overview of capital equipment purchased for the decline construction, and its relevant cost centre for the upcoming Scoping Study, is outlined in Table 2 below.

      Equipment Used in Decline Construction


      Number


      Cost US$'000s
      (Excluding Contingency)


      Cost Centre for Capital Cost Estimates

      Continuous Miner


      2


      $9,362.76


      Underground Mining

      Feeder Breaker


      1


      $653.50


      Underground Mining

      Roofbolter


      2


      $1,914.77


      Underground Mining

      Scoop


      1


      $627.19


      Underground Mining

      Force Duct Fan, 45kW


      2


      $77.83


      Decline construction

      Exhaust Fan, 45kW


      2


      $77.83


      Decline construction

      Exhaust Duct Fan, 75kW


      2


      $97.85


      Decline construction

      Connection Conveyor


      1


      $2,779.70


      Decline construction

      Auxiliary Mining Equipment


      1


      $1,530.26


      Underground Mining

      Table 2: Summary of Capital Equipment Used in Decline Construction

      **ENDS**

      For further information, PLEASE visit ------> www.emmersonplc.com , follow us on Twitter (@emmerson_plc), ooooooor contact:


      Hayden Locke
      Emmerson Plc
      Tel: ------> +44 (0) 207 236 1177

      Edward McDermott
      James Biddle
      Roland Cornish

      Beaumont Cornish Limited
      Financial Adviser
      Tel: ------> +44 (0) 207 628 3396

      Jeremy King
      Optiva Securities Limited
      Broker
      Tel: ------> +44 (0) 3137 1904

      Lottie Wadham
      Gaby Jenner
      St Brides Partners Ltd
      Financial PR/IR
      Tel: ------> +44 (0) 20 7236 1177

      Notes, to Editors

      Emmerson's primary focus is on developing the Khemisset Potash Project located in Northern Morocco. The project has a large JORC Resource Estimate (2012) of 311.4Mt @ 10.2% K2O and significant exploration potential with an accelerated development pathway targeting a low capex, high margin mine. Khemisset is perfectly located to capitalise on the expected growth of African fertiliser consumption whilst also being located on the doorstep of European markets. This unique positioning means the project will receive a premium netback price compared to existing potash producers. The need to feed the world's rapidly increasing population is driving demand for potash and Emmerson is well placed to benefit from the opportunities this presents. "
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 09:26:21
      Beitrag Nr. 5.332 ()
      Antwort auf Beitrag Nr.: 58.375.968 von Popeye82 am 04.08.18 20:45:30Tinka Resources

















      www.tinkaresources.com/news/tinka-reports-additional-step-ou…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 09:41:24
      Beitrag Nr. 5.333 ()
      Antwort auf Beitrag Nr.: 58.725.922 von MONSIEURCB am 18.09.18 11:16:02(aber es wäre schön, bei ALLEN Links aus dem "https" ein "http" zu machen .... ;-)
      ______________________________________________________________





      Senator MCB

      Ich möchte Sie HÖCHSTfreundlich daRAUF aufMERK(!!!)sam machen, dass ich; wie(Mehrfach), schon, angemerkt; Diese 's'es fast IMMER wexxxxxtrahiere, Sie JEEEEEdoch TROTZdem (wieder)erscheinen.

      So, doN'T shoot the postman!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!


      GOT it??
      Avatar
      schrieb am 19.09.18 11:10:06
      Beitrag Nr. 5.334 ()
      Antwort auf Beitrag Nr.: 58.722.409 von Popeye82 am 17.09.18 22:03:12Centrex Metals













      www.asx.com.au/asxpdf/20180918/pdf/43yf7f8bhkkwnx.pdf
      http://www.cdeglobal.com/de
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 11:22:45
      Beitrag Nr. 5.335 ()
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 12:31:02
      Beitrag Nr. 5.336 ()
      "Senator MCB"?

      Find ich gut.

      Bei DEM Ton bleiben wir!

      ;-)))
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 12:36:51
      Beitrag Nr. 5.337 ()
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 13:25:14
      Beitrag Nr. 5.338 ()
      Antwort auf Beitrag Nr.: 58.637.784 von Popeye82 am 07.09.18 00:29:03Core Exploration



      www.proactiveinvestors.com.au/companies/news/205182/core-exp…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 13:42:54
      Beitrag Nr. 5.339 ()
      Antwort auf Beitrag Nr.: 58.704.591 von Popeye82 am 14.09.18 21:11:27einiges haben Wir noch.
      mein Tagespensum ist noch nicht durch, not @ALL.





      Argosys Minerals Minerals













      www.asx.com.au/asxpdf/20180919/pdf/43yfsmwty5rxvy.pdf
      http://www.mauriciomacri.com.ar/
      www.proactiveinvestors.com.au/companies/news/205173/argosy-m…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 13:54:41
      Beitrag Nr. 5.340 ()
      Antwort auf Beitrag Nr.: 58.636.482 von Popeye82 am 06.09.18 21:27:53Salazar Resources


      - CURI-290 intersected 10,93metres of 1,72% copper, 4,09 g/t gold, 7,49% zinc, 89,2 g/t silver+0,67% lead, for 8,62% CuEq;
      - CURI-292 intersected 27,47metres of 3,03% copper, 6,26 g/t gold, 1,79% zinc, 35,0 g/t silver+0,04% lead, for 8,33% CuEq; including 15,39metres of 5,21% copper, 10,39 g/t gold, 3,17% zinc, 55,8 g/t silver+0,07% lead, for 14,07% CuEq; and
      - CURI-295 intersected 1,38metres of 4,49% copper, 6,75 g/t gold, 44,23% zinc, 262,0 g/t silver+1,95% lead, for 30,09% CuEq.

      www.adventuszinc.com/news/122511
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 15:25:25
      Beitrag Nr. 5.341 ()
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 15:28:20
      Beitrag Nr. 5.342 ()
      Antwort auf Beitrag Nr.: 58.736.968 von MONSIEURCB am 19.09.18 12:31:02MC Caesar

      Ordern Sie auch manchmal Technologiefirmen im Menü?
      Ich hätte dann MAYbe Etwas für Sie.
      For @looki, looooooooooooooooooooooooooooooooooooooooooooki.
      Ich würde Ihnen @dann Eine Mail weiterleiten, Die ich Vorhin Einem kanadischen Freund @verschickte.
      Avatar
      schrieb am 19.09.18 15:33:06
      Beitrag Nr. 5.343 ()
      Ei nun, werter Imperator - bin akut zugange bei

      - AMD
      - BidEnergy
      - Afterpay Touch
      - Adslot
      - BrainChip

      .. und allzeit offen für Inspirationen, die sich lohnen ... ;-)
      Avatar
      schrieb am 19.09.18 15:40:02
      Beitrag Nr. 5.344 ()
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 15:52:36
      Beitrag Nr. 5.345 ()
      Antwort auf Beitrag Nr.: 58.528.926 von Popeye82 am 24.08.18 17:17:44LSC Lithium


      - Constant pump rate over 7-days from well SP-2017-10W at 82m3/h
      - Measured drawdown is constant and full recharge within 3h after completion of pumping
      - Consistent grade with average 750mg/l Li and minimum of 736mg/l Li
      - Hydrogeological modelling shows that a production well in this area can consistently yield 130m3/h
      - Results confirm a second high-grade depocenter in the South-West of the salar, providing the basis for a resource update and expansion @Pozuelos





      www.lsclithium.com/news-and-media/news-releases/press-releas…
      www.facebook.com/pages/Conhidro-SRL/949052328538684
      http://www.alsglobal.com/
      http://www.sgs.ca/en/mining
      www.lsclithium.com/news-and-media/news-releases/press-releas…
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 17:20:49
      Beitrag Nr. 5.346 ()
      Antwort auf Beitrag Nr.: 58.651.818 von Popeye82 am 08.09.18 22:11:29Victoria Gold















      www.vitgoldcorp.com/news/2018/victoria-gold-eagle-constructi…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 17:35:52
      Beitrag Nr. 5.347 ()
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 17:50:22
      Beitrag Nr. 5.348 ()
      Victoria, mein EX(!!)-Favorit:

      "The Eagle and Olive deposits, include Proven and Probable Reserves of 2.7 million ounces of gold from 123 million tonnes of ore with a grade of 0.67 grams of gold per tonne, as outlined in a National Instrument 43-101 feasibility study. The NI 43-101 Mineral Resource for the Eagle and Olive deposits has been estimated to host 191 million tonnes averaging 0.65 grams of gold per tonne, containing 4.0 million ounces of gold in the "Measured and Indicated" category, inclusive of Proven and Probable Reserves, and a further 24 million tonnes averaging 0.61 grams of gold per tonne, containing 0.5 million ounces of gold in the "Inferred" category.

      Masse statt Klasse - is halt am UNTERSTEN Wirtschaftlichkeitsbereich ... leider ...
      Avatar
      schrieb am 19.09.18 18:20:14
      Beitrag Nr. 5.349 ()
      Antwort auf Beitrag Nr.: 58.597.074 von Popeye82 am 02.09.18 20:51:18Cornerstone Metals



      www.cornerstonemetals.ca/index.php/news/2018/440-cornerstone…
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 19:33:59
      Beitrag Nr. 5.350 ()
      Antwort auf Beitrag Nr.: 58.346.361 von Popeye82 am 01.08.18 02:15:49Wealth Minerals







      https://wealthminerals.com/news/wealth-initiates-new-geophys…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 19:52:53
      Beitrag Nr. 5.351 ()
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 21:01:01
      Beitrag Nr. 5.352 ()
      Antwort auf Beitrag Nr.: 58.685.136 von Popeye82 am 12.09.18 20:36:05TNG



      www.stockhouse.com/news/newswire/2018/09/13/vanadium-uranium…
      41 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 21:13:23
      Beitrag Nr. 5.353 ()
      Antwort auf Beitrag Nr.: 58.635.663 von Popeye82 am 06.09.18 20:06:50Ivanhoe Mines



      www.ivanhoemines.com/news/2018/yufeng-miles-sun-and-tadeu-ca…



      www.ivanhoemines.com/news/2018/strategic-equity-investment-o…



      www.china.com



      "Strategic equity investment of C$723 million
      in Ivanhoe Mines by China-based CITIC Metal
      has been completed

      Zijin Mining also has exercised its anti-dilution rights,
      raising additional C$78 million for Ivanhoe

      Ivanhoe’s current cash position is approximately
      C$855 million

      CITIC Metal and Zijin Mining each purchased
      their Ivanhoe Mines shares at C$3.68 per share

      BEIJING, CHINA – Robert Friedland, Executive Co-Chairman of Ivanhoe Mines (TSX: IVN; OTCQX: IVPAF), and Lars-Eric Johansson, Chief Executive Officer, today announced the completion of a major strategic equity investment totalling C$723 million (approximately US$556 million) in Ivanhoe Mines by CITIC Metal Africa Investments Limited (CITIC Metal Africa), a direct subsidiary of CITIC Metal Co., Ltd. (CITIC Metal), one of China’s leading international resources companies.

      The investment, initiated three months ago by CITIC Metal, is an integral part of Ivanhoe’s long-term strategic cooperation and investment agreement with CITIC Metal.

      Ivanhoe Mines has issued 196,602,037 common shares to CITIC Metal Africa through a private placement at a price of C$3.68 per share.

      CITIC Metal Africa now has become Ivanhoe Mines’ largest single shareholder through its acquired ownership of approximately 19.5% of the company’s issued and outstanding common shares. Mr. Friedland has the second-largest Ivanhoe shareholding, with an ownership stake of approximately 17%.

      As part of the private-placement agreement, CITIC Metal Africa and Mr. Friedland have signed reciprocal standstill agreements that prevent either of them from increasing their individual ownerships in Ivanhoe Mines to more than 19.9% until January 8, 2022.

      The investment has generated gross proceeds for Ivanhoe Mines of C$723 million (approximately US$556 million). Approximately C$131 million of the C$723 million owing from the strategic equity investment was used to repay an interim loan of US$100 million that Ivanhoe Mines received on August 9, 2018, from CITIC Metal’s corporate parent, CITIC Metal Group Limited. This resulted in a net cash payment to Ivanhoe today of C$592 million (approximately US$455 million). The full repayment of the interim loan eliminates the limited-recourse guarantee and share pledge previously provided by Mr. Friedland to secure Ivanhoe Mines’ obligation under the loan facility.

      “For more than 15 years, we have been mutually building the foundation for a long-lasting and trust-based relationship with CITIC,” said Mr. Friedland. “We first formed a strategic alliance with CITIC in 2003 and since then have worked together to deepen our understandings of each other’s values, strategic priorities, and operating and financial capabilities.

      “After a period of extensive due diligence and multiple site visits, we are delighted to welcome CITIC Metal Africa as our new, largest shareholder. CITIC’s leaders have reviewed hundreds of mining projects around the world, helping them to fully appreciate the world-scale significance of our three tier-one projects, and the opportunities and challenges that lie ahead as we move forward with our ongoing mine developments and exploration programs.

      “We are confident that the CITIC Metal Group has the experience, financial resources – and a shared commitment to our objectives – to greatly assist us as we advance our projects to production, creating value for Ivanhoe’s stakeholders in the Democratic Republic of Congo and South Africa, and our international shareholders.”

      Yufeng “Miles” Sun, President of CITIC Metal Group Limited, commented: “For several years, CITIC Metal has been focused on investing in high-quality mining assets with strategic, global partners. We are very pleased to have partnered with Ivanhoe Mines as Ivanhoe’s three world-class assets are among the very best in the mining industry and Mr. Friedland is a respected, long-standing friend of CITIC’s.

      “CITIC Metal’s strategic investment in Ivanhoe reflects our strong belief that the long-term prospects for the mining industry are extremely positive, especially given the projected robust future demand for key metals, such as copper, for renewable energy infrastructure and electric vehicles.

      “We recognize the professional competence of the Ivanhoe Mines team, and we share their profound understanding and embracing of diverse cultures, which are indispensable factors in successful construction and operation of large-scale mining assets in Africa. We are confident that by working closely with the Ivanhoe Mines team and other existing shareholders and stakeholders, Ivanhoe’s three tier-one projects can be successfully brought into production on schedule,” Mr. Sun added.

      CITIC Metal’s Strategic Investment in Ivanhoe Mines Closing Ceremony


      Zijin exercises anti-dilution rights at C$3.68 per share
      to raise additional C$78 million for Ivanhoe

      Ivanhoe’s joint-venture partner at the Kamoa-Kakula Project, Zijin Mining Group Co., Ltd., has exercised its anti-dilution rights, generating additional proceeds for Ivanhoe of C$78 million (approximately US$60 million). The exercise by Zijin of its anti-dilution rights also was at a price of C$3.68 per share. This has resulted in Zijin retaining a 9.7% ownership stake in Ivanhoe Mines – its level of ownership prior to the completion of CITIC Metal Africa’s strategic investment.

      With receipt of the combined proceeds of more than C$800 million from CITIC Metal Africa and Zijin, and the repayment of the interim loan, Ivanhoe now has cash and cash equivalents of approximately C$855 million (US$657 million) – and no significant debt.

      Ivanhoe intends to use the funds to continue advancing its development and exploration activities at the Kamoa-Kakula, Platreef and Kipushi projects on their current, accelerated timetables.

      “With today’s closing of the private-placement financings with CITIC and Zijin, we have enhanced our strategic cooperation partnership with two of China’s leading mining companies,” said Mr. Friedland.

      “Both partners share our expectation that future markets for metals will be influenced by steadily increasing urbanization and demands for cleaner air and water, which require strategic metals, such as nickel, zinc, platinum-group metals and, especially, copper.

      “Ivanhoe Mines now is in the extremely advantageous position of having current cash resources of approximately US$657 million. We are confident in our capacity to successfully finance all three of our mine-development projects to production,” Mr. Friedland added.

      Mr. So Hon Chun, the controlling shareholder of Crystal River Global Limited, the holder of the 1% interest in the holding company for the Kamoa-Kakula Project with Zijin, previously assisted in connection with Zijin’s initial investment in Ivanhoe Mines. Mr. So has a long-standing relationship with the Ivanhoe group of companies and continues to assist Ivanhoe in the Democratic Republic of Congo.

      Yufeng “Miles” Sun and Tadeu Carneiro join expanded Ivanhoe Board

      Pursuant to the terms of the private-placement agreement with CITIC Metal Africa, Ivanhoe Mines has accepted CITIC Metal’s nomination of Mr. Sun and Tadeu Carneiro to the Ivanhoe Mines Board of Directors. The two new appointments expand the Board to 11 members.

      Mr. Sun, President of CITIC Metal Group, has been appointed Non-Executive Co-Chairman of Ivanhoe Mines. Mr. Carneiro, former Chief Executive Officer of Brazil-based Companhia Brasileira de Metalurgia e Mineração (CBMM), the world's largest producer of niobium metal and its basic alloys, has been appointed as a non-executive director.

      Advisors

      Ivanhoe Mines’ financial advisors are BMO Capital Markets and Citi. Legal counsel for the company is Stikeman Elliott LLP. CITIC Metal is advised by RBC Capital Markets, as financial advisor, Ernst & Young (China), as tax advisor, RPM Global and BGRIMM Technology Group, as technical advisors and CITIC Securities, as PRC strategic advisor. Legal counsel for CITIC Metal is Baker McKenzie. Counsel for Zijin is Fasken Martineau DuMoulin LLP.

      About CITIC Metal and CITIC Limited

      CITIC Metal Africa Investments and CITIC Metal are affiliates of CITIC Limited. As CITIC Limited’s arm in the business of resources and energy, CITIC Metal specializes in the importation and distribution of copper, zinc, platinum-group metals, niobium products, iron ore, coal and non-ferrous metals; trading of steel products; and investments in metals and mining projects. CITIC Metal’s major mining investments include a 15% ownership in the Las Bambas copper project in Peru and leading a Chinese consortium in acquiring a 15% ownership in the Brazil-based niobium producer CBMM. CITIC Metal Africa is an Investment holding company incorporated in Hong Kong, with its 100% equity interests directly held by CITIC Metal.

      CITIC Limited (SEHK:267) is China's largest conglomerate, with total assets of more than US$900 billion. Among its diverse global businesses, CITIC Limited focuses primarily on financial services, resources and energy, manufacturing, engineering contracting and real estate. CITIC Limited enjoys leading market positions in sectors well matched to China’s economy. CITIC’s rich history, diverse platform and strong corporate culture across all businesses ensure that CITIC Limited is unrivalled in capturing opportunities arising in China.

      CITIC Limited is listed on the Stock Exchange of Hong Kong, where it is a constituent of the Hang Seng Index. CITIC Group Corporation, a Chinese state-owned enterprise, owns 58% of CITIC Limited.

      About Ivanhoe Mines

      Ivanhoe Mines is a Canadian mining company focused on advancing its three principal projects in Southern Africa: the development of new mines at the Kamoa-Kakula copper discovery in the Democratic Republic of Congo (DRC) and the Platreef platinum-palladium-nickel-copper-gold discovery in South Africa; and the extensive redevelopment and upgrading of the historic Kipushi zinc-copper-germanium-lead mine, also in the DRC.

      Information contacts

      Investors
      Bill Trenaman +1.604.331.9834

      Media
      North America: Bob Williamson +1.604.512.4856
      South Africa: Jeremy Michaels +27.82.772.1122"
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 23:01:18
      Beitrag Nr. 5.354 ()
      Antwort auf Beitrag Nr.: 58.088.230 von Popeye82 am 28.06.18 14:36:06Deep South Resources



      www.deepsouthresources.com/investors/news-releases/deep-sout…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 19.09.18 23:15:28
      Beitrag Nr. 5.355 ()
      Antwort auf Beitrag Nr.: 58.733.362 von Popeye82 am 19.09.18 05:37:23Development Interessierte mit Sheffield MAL BESCHÄFTIGEN.
      Ein Potenzielles PremiumpremiumProjekt.





      Sheffield Resources













      www.sheffieldresources.com.au/irm/PDF/3070_0/NAIFApproves95m…
      http://www.naif.gov.au/
      http://www.transport.wa.gov.au/imarine/port-of-derby.asp
      http://www.wa.gov.au/government
      http://www.azurecap.com/
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 20.09.18 01:45:32
      Beitrag Nr. 5.356 ()
      Antwort auf Beitrag Nr.: 58.725.388 von Popeye82 am 18.09.18 10:30:50NQ Minerals



      www.nqminerals.com/interim-results-for-the-six-months-ended-…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 11:32:32
      Beitrag Nr. 5.357 ()
      Antwort auf Beitrag Nr.: 58.337.997 von Popeye82 am 31.07.18 02:24:55Heron Resources



      www.heronresources.com.au/downloads/asx/2018/hrr2018092101.p…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 12:16:23
      Beitrag Nr. 5.358 ()
      Antwort auf Beitrag Nr.: 58.469.020 von Popeye82 am 17.08.18 01:27:51Harte Gold













      www.hartegold.com/wp-content/uploads/2018/09/Permitting-and-…
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 13:59:07
      Beitrag Nr. 5.359 ()
      Antwort auf Beitrag Nr.: 58.344.492 von Popeye82 am 31.07.18 19:04:46FireWeed Zinc



      www.fireweedzinc.com/news-media/news/release/index.php?conte…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 14:17:52
      Beitrag Nr. 5.360 ()
      Antwort auf Beitrag Nr.: 58.664.973 von Popeye82 am 10.09.18 21:58:24ticks EVERY box(for THEM) as a world‐class exploration opportunity







      Centaurus Metals



      www.centaurus.com.au/uploads/files/announcements/2018/CTM_21…

      www.centaurus.com.au/uploads/files/announcements/2018/Half%2…
      http://www.mma.gov.br/
      http://www.icmbio.gov.br/portal/
      http://www.mme.gov.br/
      24 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 15:26:34
      Beitrag Nr. 5.361 ()
      Antwort auf Beitrag Nr.: 58.739.374 von Popeye82 am 19.09.18 15:52:36ONE of the most attractive resource portfolios, amongst, advanced stage (global) Lithium (brine) developments







      LSC Lithium













      https://s21.q4cdn.com/429708605/files/doc_downloads/LSC09201…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 15:39:10
      Beitrag Nr. 5.362 ()
      Antwort auf Beitrag Nr.: 58.572.329 von Popeye82 am 30.08.18 15:21:14ONE of the largest nickel (laterite) deposits in the Pacific, 1st ore shipment expected Q1 2019







      as said, bin mit Der Richtung Hier SEHR, SEHR zufrieden.
      langsam mehren sich Die (Voraussichtlichen) Produzenten Hier.
      and it' JUST a Start.


      Axiom Mining













      www.axiom-mining.com/irm/PDF/3060_0/MiningLeaseGrantedforIsa…
      www.adaptation-undp.org/partners/ministry-mines-energy-and-r…
      www.parliament.gov.sb/index.php?q=node/517

      www.axiom-mining.com/irm/PDF/3037_0/QuarterlyActivitiesRepor…
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 17:23:24
      Beitrag Nr. 5.363 ()
      Antwort auf Beitrag Nr.: 58.740.598 von Popeye82 am 19.09.18 17:35:52Euro Sun Mining













      www.gowebcasting.com/events/precious-metals-summit-conferenc…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 17:39:54
      Beitrag Nr. 5.364 ()
      Antwort auf Beitrag Nr.: 58.418.559 von Popeye82 am 10.08.18 11:18:58bringing PNG’s FIRST cement, +quicklime, project into reality













      Mayur Resources


























      www.investi.com.au/api/announcements/mrl/9d5325f0-e34.pdf

      https://mayurresources.com/limestone-quicklime/
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 20:18:17
      Beitrag Nr. 5.365 ()
      Antwort auf Beitrag Nr.: 58.632.849 von Popeye82 am 06.09.18 16:13:12Continental Gold

      www.continentalgold.com/en/continental-gold-reports-incident…

      www.continentalgold.com/en/continental-gold-reports-security…




      "Continental Gold Reports Incident at its Berlin Project, Colombia

      Toronto, Sept. 20, 2018 /CNW/ – Continental Gold Inc. (TSX:CNL; OTCQX:CGOOF) ("Continental" or the "Company") announces that the Company has learned that a residence, in which exploration geologists and contractors were staying, was criminally attacked in the middle of the night. This tragedy took place in the village of Ochalí in the municipality of Yaramul, Antioquia, which is located within the boundaries of the Company’s Berlin project. This is unrelated to the Buriticá project as it is located over eight hours away by road. Details at this point are unclear as to the severity of the attack but the worst is feared. Initial indications are that the attack was carried out by a dissident group of ex-FARC members. The Company is fully cooperating with authorities and is working with the families affected.

      About Continental Gold Inc.
      Continental Gold is the leading large-scale gold mining company in Colombia and is presently developing it’s 100% owned Buriticá project in Antioquia. Buriticá is one of the largest and highest-grade gold projects in the world and is being advanced utilizing best practices for mine construction, environmental care and community inclusion. Led by an international management team with a successful record of discovering, financing and developing large high-grade gold deposits in Latin America, the Buriticá project is on schedule with first gold pour anticipated during the first half of 2020."
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 20:34:01
      Beitrag Nr. 5.366 ()
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 20:45:52
      Beitrag Nr. 5.367 ()
      Antwort auf Beitrag Nr.: 58.631.565 von Milian16 am 06.09.18 14:02:31bin nicht so ein Quatscherzähler ohne fundiertes Hintergrundwissen
      ____________________________________________________________





      Avatar
      schrieb am 21.09.18 22:07:38
      Beitrag Nr. 5.368 ()
      Antwort auf Beitrag Nr.: 58.601.970 von Popeye82 am 03.09.18 15:07:17Highfield Resources



      www.highfieldresources.com.au/wp-content/uploads/sites/2/201…
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 22:23:42
      Beitrag Nr. 5.369 ()
      Antwort auf Beitrag Nr.: 58.690.194 von Popeye82 am 13.09.18 12:39:51Armadale Capital Plc

      https://polaris.brighterir.com/public/armadale_capital/news/…
      http://www.enviromineinc.com/

      https://polaris.brighterir.com/public/armadale_capital/news/…





      "Appointment of Marketing Consultant, to Negotiate Product Offtake from Mahenge Liandu Graphite Project

      Armadale, the AIM quoted investment company focused on natural resource projects in Africa, is pleased to announce significant progress on the 2018 field work programme underway at its Mahenge Liandu Graphite Project in Tanzania (‘Mahenge Liandu’ or the ‘Project’). With the feasibility study now well advanced and test work underpinning the strong commercial applications of the Project’s graphite concentrate, Armadale has appointed an experienced Beijing-based marketing consultant to pursue offtake agreements ahead of an anticipated decision to mine in early 2019.

      Overview

      - Highly experienced Beijing-based marketing consultant appointed to manage offtake agreements and marketing activities in China
      1) Significant commercial experience – previously General Manager of the Mineral Resources Division of AVIC International Steel Trade Ltd, one of the largest trading companies in China in the iron, coal and manganese sector importing into the Chinese market
      - Metallurgical test work indicates that exceptional purity can be achieved alongside excellent flake size distribution, making the product highly amenable to a range of commercial applications
      1) Results from a simple conventional flowsheet produced grades well above the standard 95% purity for most size fractions
      2) Downstream test work on concentrates showed excellent expandability particularly of the larger size fractions
      3) Test work to further enhance the purity of the graphite concentrate showed that acid treatment readily upgrades the concentrate further to above the 99.95% purity required for the rapidly expanding Lithium-ion battery market
      - Feasibility Study now well advanced with targeted publication in Q4 2018:
      1) Reverse Circulation (‘RC’) drilling programme completed with 18 holes for 951m completed
      2) High-grade coarse flake graphite mineralisation from surface identified in 17 of 18 holes
      3) Widths of up to 98m intersected from surface with average thicknesses of 43m
      4) The RC programme is designed to upgrade the current JORC Resource of 51.1Mt at 9.3% Total Graphitic Carbon (‘TGC’) in order to declare a Maiden Reserve that will underpin a long-life low-cost mining operation
      - Work on environmental and social baseline surveys are nearing completion with the environmental impact assessment (EIA), relocation action plan (RAP) and valuation survey expected to be submitted in October 2018


      Appointment of Marketing Consultant

      Armadale has now commenced graphite marketing activities in China with the appointment of Jenny Lee as a consultant to the company. She will be based in Beijing to manage offtake discussions in-country, which will be co-ordinated alongside test-work from the recently completed diamond drilling and metallurgical programmes.

      Jenny is the current Managing Director of Jialin International Trading, Hong Kong and is highly experienced in obtaining offtake agreements and managing ongoing sales arrangements in China. Prior to her current role she served as Divisional Manager of the Mineral Resources Division of AVIC International Steel Trade Ltd, one of the largest trading companies in China in the iron, coal and manganese sector importing into the Chinese market.

      Metallurgical Test Work

      Test work completed on graphite from Mahenge Liandu indicates that exceptional purity can be achieved alongside excellent flake size distribution. The results from a simple conventional flowsheet produced grades well above the standard 95% purity for most size fractions.

      Flake Size Weight % TGC %
      > 500 µm 3.6 97.7
      > 300 µm 20.9 97.8
      > 180 µm 23.6 97.8
      > 150 µm 18.4 98.0
      > 106 µm 13.3 98.2
      > 75 µm 7.9 97.6
      < 75 µm 3.6 95.2

      Table 1 Flake size distribution and grade of Mahenge Liandu Graphite

      Downstream test work on concentrates from the Project also showed excellent expandability, particularly of the larger size fractions. These results suggest Armadale will be able to target a rapidly growing high value potential market; expandability over 200cm3/g is required in many potential applications, with expandability over 400cm3/g considered excellent for most applications.

      Flake Size 800 Degrees C 1000 Degrees C
      > 500 µm 440 cm3/g 480cm3/g
      > 300 µm 370 cm3/g 420cm3/g
      > 180 µm 300 cm3/g 380cm3/g
      > 106 µm 210cm3/g 230cm3/g
      > 75 µm 165cm3/g 170cm3/g
      < 75 µm 99.65 115cm3/g

      Table 2 Expandability of Mahenge Liandu Graphite at various flake sizes

      Test work conducted to further enhance the purity of the graphite concentrate showed that acid treatment readily upgrades the concentrate further to above the 99.95% purity required for the rapidly expanding Lithium-ion battery market. This market is focused on the medium sized flake sizes from 106 µm to 300 µm sizes where Mahenge Liandu achieved purity up to 99.99%.

      Flake Size Purity
      > 500 µm 99.93
      > 300 µm 99.99
      > 180 µm 99.98
      > 106 µm 99.96
      > 75 µm 99.94
      < 75 µm 99.65

      Table 3 Purity achieved via acid treatment of Mahenge Liandu Graphite Concentrate

      RC Drilling Results

      Ongoing RC drilling results continue to confirm wide graphite mineralisation from surface with a total of 16 holes for 770m completed. Widths of up to 77m from surface have been intersected. The drilling is targeting high grade near surface mineralisation and 15 of the 16 holes have intersected coarse flake graphite mineralisation from surface. A majority of the holes intersected areas of very high grade mineralisation.

      HoleID Easting Northing Azi/Dip MaxDepth MinFrom MinTo MinThickness
      LDRC0050 251818 9035117 325/-60 52.00 0.00 44.00 44.00
      LDRC0051 251783 9035216 325/-60 67.00 0.00 55.00 55.00
      LDRC0052 251744 9035287 325/-60 79.00 0.00 77.00 77.00
      LDRC0053 251717 9935358 325/-60 64.00 0.00 60.00 60.00
      LDRC0054 251683 9035432 325/-60 46.00 0.00 40.00 40.00
      LDRC0055 251851 9035548 325/-60 44.00 0.00 40.00 40.00
      LDRC0056 251882 9035482 325/-60 37.00 0.00 31.00 31.00
      LDRC0057 251918 9035402 325/-60 22.00 0.00 - No intercept
      LDRC0058 251946 9035342 325/-60 46.00 0.00 35.00 35.00
      LDRC0059 251978 9035267 325/-60 68.00 0.00 62.00 62.00
      LDRC0060 252012 9035190 325/-60 56.00 0.00 43.00 43.00
      LDRC0061 251929 9035120 325/-60 34.00 0.00 24.00 24.00
      LDRC0062 251848 9035036 325/-60 65.00 0.00 58.00 58.00
      LDRC0063 251511 9035343 325/-60 40.00 0.00 20.00 20.00
      LDRC0064 251531 9035283 325/-60 16.00 0.00 4.00 4.00
      LDRC0065 251563 9035204 325/-60 34.00 0.00 21.00 21.00
      LDRC0064 251358 9035177 325/-60 102 0 98 98
      LDRC0065 251329 9035250 325/-60 79 0 79 76

      Table 4 RC drilling summary

      Permitting

      The Environmental and Social impact studies “ESIA” in the field have now been completed. A final report for the work is in progress by specialist consultant Enviromine. After completion of the report, it will be submitted to National Environmental Management Committee for validation and initiation of environmental permit approval.

      Furthermore, Armadale contracted Property Matrix Limited to conduct a valuation study covering the 10km2 area of the proposed mining permit application. Their team is onsite conducting those studies and the result will be incorporated into a valuation report. The report will then be submitted to the Government Chief Valuer for approval.

      Both the ESIA and Valuation team have been working closely with government authorities and the surrounding communities to ensure compliance with applicable regulations.

      Nick Johansen, Director of Armadale said, “Mahenge Liandu continues to exceed all internal expectations – with wide intervals of high-grade, and exceptionally high-grade, mineralisation identified from surface, we are confident that we will be able to demonstrate a long-life, low-cost mining operation in early 2019 when we make a decision to mine. In tandem with our operational advances, it is critical that we develop a marketing function capable of attracting long-term and well-priced offtake agreements for our future product, and today’s appointment of our first Beijing-based marketing consultant is central to this objective. Jenny’s extensive operational experience in China and proven success in managing commercial sales negotiations makes her ideally suited to represent Armadale in this prospective market.

      “Looking at our commercial potential, our scoping study released earlier this year sets the scene for what our project might look like and be capable of – including delivering average production of 49,000tpa of graphite products during a 32-year life of mine at a low operating cost of US$408/t. With these parameters, Mahenge Liandu would deliver a pre-tax IRR of 122% and NPV of US$349m with a low development capex of US$35m, highlighting the significant value accretion potential of this project for investors. We have also consistently demonstrated the high quality of our graphite products, as indicated from recent metallurgical test work, with a high-grade coarse flake product with exceptional purity being produced from relatively simple processing methods. With this in mind we are confident that our new marketing consultant will be able to command attractive pricing arrangements for our premium quality graphite product.

      “We look forward to moving through the final phases of our development process and remain focussed on being in a position to make a decision to mine, and begin the construction phase, in 2019.”

      The information communicated in this announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) No. 596/2014.

      **ENDS**

      For further information, PLEASE visit the Company’s website, @@@@@@@ ------> www.armadalecapitalplc.com , follow Armadale on Twitter @ArmadaleCapital, ooooooor contact:


      Enquiries:
      Armadale Capital Plc
      Tim Jones, Company Secretary
      ------> +44 20 7236 1177

      Nomad and broker: finnCap Ltd
      Christopher Raggett / Simon Hicks
      ------> +44 20 7220 0500
      Joint Broker: SVS Securities

      Tom Curran / Ben Tadd
      ------> +44 20 3700 0093
      Press Relations: St Brides Partners Ltd

      Susie Geliher / Charlotte Page
      ------> +44 20 7236 1177

      Notes


      Armadale Capital Plc is focused on investing in and developing a portfolio of investments, targeting the natural resources and/or infrastructure sectors in Africa. The Company, led by a team with operational experience and a strong track record in Africa, has a strategy of identifying high growth businesses where it can take an active role in their advancement.

      The Company owns the Mahenge Liandu graphite project in south-east Tanzania, which is now its main focus. The Project is located in a highly prospective region with a high-grade JORC compliant inferred mineral resource estimate of 51.1Mt @ 9.3% TGC. Marking the project one of the largest high-grade resources in Tanzania, and work to date has demonstrated Mahenge Liandu’s potential as a commercially viable deposit with significant tonnage, high-grade coarse flake and near surface mineralisation (implying a low strip ratio) contained within one contiguous ore body.

      Other assets Armadale has an interest in include the Mpokoto Gold project in the Democratic Republic of Congo and a portfolio of quoted investments. "
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 23:28:45
      Beitrag Nr. 5.370 ()
      Antwort auf Beitrag Nr.: 58.657.185 von Popeye82 am 10.09.18 02:31:55Lithium Americas



      www.libull.com/NR-2018-9-21.pdf
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 23:40:37
      Beitrag Nr. 5.371 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 21.09.18 23:54:18
      Beitrag Nr. 5.372 ()
      Antwort auf Beitrag Nr.: 58.714.114 von Popeye82 am 16.09.18 23:37:54Cypress Development



      http://statesidereport.com/wp-content/uploads/2018/09/Cypres…

      www.howestreet.com/2018/09/07/robust-pea-reported-for-lithiu…

      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 22.09.18 01:17:15
      Beitrag Nr. 5.373 ()
      Antwort auf Beitrag Nr.: 58.656.201 von Popeye82 am 09.09.18 20:48:47Plateau Energy Metals




      www.stockhouse.com/news/press-releases/2018/09/20/plateau-ex…













      www.reuters.com/article/peru-vizcarra-mining/peru-president-…


      "Peru president expects lithium, uranium mining laws passed in 6 months
      Mitra Taj

      3 Min Read

      PUCALLPA, Peru, Aug 10 (Reuters) - Peruvian President Martin Vizcarra told Reuters his government will likely pass laws within six months needed to tap a new lithium and uranium deposit, removing a major hurdle for Canadian miner Plateau Energy Metals’ proposed $800 million mine.

      Plateau said last month it had found 2.5 million tonnes of high-grade lithium resources and 124 million pounds of uranium resources at its Falchani deposit in southern Peru, and was looking for a partner in what it said could become the world’s biggest lithium mine
      .

      But the company identified a lack of regulations on mining radioactive materials in Peru as an obstacle. The lithium at Falchani, a hard-rock deposit, can only be mined by also extracting uranium.

      Vizcarra said his energy and mines minister was already working on a legal framework for mining uranium and lithium.

      “It has to be soon. I calculate within the next six months,” Vizcarra said in an interview on Thursday in the Amazonian town of Pucallpa where he also discussed his proposed referendum on anti-graft measures.

      Vizcarra said that with the right “mechanisms,” the project could be a key driver of development in the highland region of Puno, where the project is located at an altitude of more than 14,700 feet. “If we manage to do this, that wealth will mainly benefit Puno,” he said.

      Lithium is largely concentrated in the so-called lithium triangle between Bolivia, Chile and Argentina. But if Plateau can confirm the size of its discovery in reserves, it might attract companies such as China’s Tianqi Lithium Corp or U.S.-based Albemarle Corp, to Peru.

      Vizcarra, a former governor of a small copper region, took office four months ago after his predecessor, Pedro Pablo Kuczynski, a former Wall Street banker, resigned to avoid impeachment in a graft scandal.

      Vizcarra said he did not think that Newmont Mining Corp’s Conga gold project or Southern Copper Corp’s proposed Tia Maria copper mine - both stalled by farmers’ protests - were socially viable yet. “They need to be analyzed,” he said.

      Vizcarra called a proposed railway for transporting mineral concentrates from Peru’s southern mining belt, where MMG Ltd operates the Las Bambas copper operation and Strike Resources wants to build an iron-ore mine, a “good project.”

      Vizcarra said he would study the project, which was proposed under Kuczynski, next year but believed it would work using a mix of private and public financing. (Reporting by Mitra Taj Editing by James Dalgleish)"
      41 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 22.09.18 02:02:50
      Beitrag Nr. 5.374 ()
      Avatar
      schrieb am 22.09.18 03:50:14
      Beitrag Nr. 5.375 ()
      Antwort auf Beitrag Nr.: 58.657.005 von Popeye82 am 09.09.18 23:50:12POTENTIAL World Class Project(s)







      Ventnor Resources
















      https://clients3.weblink.com.au/pdf/VRX/02024455.pdf
      http://www.nagrom.com.au/metallurgical-services
      http://www.csaglobal.com/
      http://www.cdeglobal.com/
      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 23.09.18 14:33:52
      Beitrag Nr. 5.376 ()
      34 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 23.09.18 15:59:36
      Beitrag Nr. 5.377 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 23.09.18 20:13:41
      Beitrag Nr. 5.378 ()
      Antwort auf Beitrag Nr.: 58.530.330 von Popeye82 am 24.08.18 19:54:28Orezone Gold



      www.caesarsreport.com/blog/orezone-gold-continues-to-advance…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 23.09.18 22:55:05
      Beitrag Nr. 5.379 ()
      Antwort auf Beitrag Nr.: 58.605.300 von Popeye82 am 03.09.18 21:41:24Metro Mining



      www.metromining.com.au/media/33117/20180921-metro-ships-one-…
      www.marinetraffic.com/en/ais/details/ships/shipid:5313165/mm…
      www.proactiveinvestors.com.au/companies/news/205390/metro-mi…

      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 23.09.18 23:48:38
      Beitrag Nr. 5.380 ()
      Antwort auf Beitrag Nr.: 58.686.525 von Popeye82 am 12.09.18 23:46:09Technology Metals Australia



      https://stockhead.com.au/resources/vanadiums-price-is-at-13-…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 00:57:10
      Beitrag Nr. 5.381 ()
      Antwort auf Beitrag Nr.: 58.346.358 von Popeye82 am 01.08.18 02:02:15Tawana Resources NL



      https://canaccordgenuity.bluematrix.com/sellside/EmailDocVie…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 02:36:03
      Beitrag Nr. 5.382 ()
      Antwort auf Beitrag Nr.: 58.723.420 von Popeye82 am 18.09.18 04:32:17Orion Minerals NL



      www.asx.com.au/asxpdf/20180924/pdf/43yl4bzdr1wls5.pdf
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 06:42:06
      Beitrag Nr. 5.383 ()
      40 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 08:18:01
      Beitrag Nr. 5.384 ()
      Antwort auf Beitrag Nr.: 58.641.780 von Popeye82 am 07.09.18 12:58:11SolGold











      http://angrygeologist.blogspot.com/2018/09/cascabel-after-me…
      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 20:36:44
      Beitrag Nr. 5.385 ()
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 22:10:43
      Beitrag Nr. 5.386 ()
      Antwort auf Beitrag Nr.: 58.740.430 von Popeye82 am 19.09.18 17:20:49Victoria Gold













      www.vitgoldcorp.com/news/2018/victoria-gold-receives-c-87.2-…
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 24.09.18 22:22:28
      Beitrag Nr. 5.387 ()
      Antwort auf Beitrag Nr.: 58.722.922 von Popeye82 am 17.09.18 23:12:12Tando Resources



      www.tandoresources.com.au/sites/default/files/asx-announceme…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 00:56:06
      Beitrag Nr. 5.388 ()
      Antwort auf Beitrag Nr.: 58.709.364 von Popeye82 am 15.09.18 22:33:39Millennial Lithium



      http://millenniallithium.com/2018/09/24/millennial-strengthe…

      14 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 01:08:34
      Beitrag Nr. 5.389 ()
      Antwort auf Beitrag Nr.: 58.558.493 von Popeye82 am 29.08.18 11:10:10Asiamet Resources



      www.proactiveinvestors.co.uk/companies/news/205453/arden-pra…
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 01:20:17
      Beitrag Nr. 5.390 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 02:26:58
      Beitrag Nr. 5.391 ()
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 03:21:11
      Beitrag Nr. 5.392 ()
      Antwort auf Beitrag Nr.: 58.759.951 von Popeye82 am 21.09.18 11:32:32Heron Resources













      www.heronresources.com.au/downloads/asx/2018/hrr2018092501.p…
      https://pybar.com.au/
      http://sedgman.com/
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 04:30:29
      Beitrag Nr. 5.393 ()
      Avatar
      schrieb am 25.09.18 04:31:02
      Beitrag Nr. 5.394 ()
      Avatar
      schrieb am 25.09.18 04:54:26
      Beitrag Nr. 5.395 ()
      Antwort auf Beitrag Nr.: 58.777.919 von Popeye82 am 24.09.18 06:42:06TNG













      www.tngltd.com.au/investor_centre/media_articles.phtml
      39 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 06:23:46
      Beitrag Nr. 5.396 ()
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 16:13:21
      Beitrag Nr. 5.397 ()
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 17:15:44
      Beitrag Nr. 5.398 ()
      Antwort auf Beitrag Nr.: 58.713.622 von Popeye82 am 16.09.18 22:01:23D'Arianne Phosphate













      www.arianne-inc.com/en/pressroom/press-releases/arianne-phos…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 17:42:03
      Beitrag Nr. 5.399 ()
      Antwort auf Beitrag Nr.: 58.723.468 von Popeye82 am 18.09.18 05:34:10Celsius Resources



      http://clients3.weblink.com.au/pdf/CLA/02026148.pdf
      http://www.mme.gov.na/
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 19:24:15
      Beitrag Nr. 5.400 ()
      Antwort auf Beitrag Nr.: 58.484.223 von Popeye82 am 19.08.18 19:32:41Pure Gold Mining



      http://puregoldmining.ca/news/pure-gold-test-mining-delivers…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 22:50:27
      Beitrag Nr. 5.401 ()
      Antwort auf Beitrag Nr.: 57.666.930 von Popeye82 am 01.05.18 08:00:35POTENTIALLY transformational development, for the future of uranium mining, in the Athabasca Basin







      muss man für Künftigen Uranabbau denke ich auf der Rechnung haben.
      Opex/"AISC" m.E. brutal, brutal stark.
      wenn Das DIng zum laufen kommen sollte, dürfte m.E. wahrscheinlich Eine DER Addressen werden.


      Denison Mines


      - Mine life: 10 years(6.0 million lbs U3O8 per year on average)
      - Probable reserves(1): 59.7 million lbs U3O8 (141,000 tonnes at 19.1% U3O8)
      - Average cash operating costs: $4.33 (US$3.33) per lb U3O8
      - Initial capital costs: $322.5 million
      - Base case pre-tax IRR(2): 43.3%
      - Base case pre-tax NPV8%(2): $930.4 million
      - Base case price assumption: UxC spot price(3) (from ~US$29 to US$45/lb U3O8)
      - Operating profit margin(4): 89.0%:eek::eek::eek: at US$29/lb:eek::eek::eek::eek::eek: U3O8
      - All-in cost(5): $11.57:eek::eek::eek: (US$8.90) per lb U3O8











      www.stockhouse.com/news/press-releases/2018/09/24/denison-re…
      www.denisonmines.com/news/2018/denison-discovers-uranium-min…
      www.denisonmines.com/news/2018/denison-to-increase-its-inter…

      www.denisonmines.com/news/2018/denison-reports-results-from-…
      www.denisonmines.com/news/2018/denison-announces-summer-dril…
      www.denisonmines.com/news/2018/denison-announces-summer-2018…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 25.09.18 22:55:39
      Beitrag Nr. 5.402 ()
      Antwort auf Beitrag Nr.: 58.798.412 von Popeye82 am 25.09.18 22:50:27ja, hatte mich auch überrascht... hatte ja denison mal lange im depot und mir seit gestern überlegt zu kaufen

      (nette bestätigung von dir ;) )
      Avatar
      schrieb am 26.09.18 01:10:21
      Beitrag Nr. 5.403 ()
      Antwort auf Beitrag Nr.: 58.577.981 von Popeye82 am 31.08.18 05:37:52ONE of the highest-grade zinc projects (in the world)
      __________________________________________







      legen nochmal ganze Ecke nach, potenziell x2-3.


      Superior Lake Resources













      www.asx.com.au/asxpdf/20180926/pdf/43yn0w52ly0pkl.pdf

      https://superiorlake.com.au/sup/wp-content/uploads/austocks/…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 02:11:34
      Beitrag Nr. 5.404 ()
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 02:28:26
      Beitrag Nr. 5.405 ()
      19 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 03:17:53
      Beitrag Nr. 5.406 ()
      Antwort auf Beitrag Nr.: 58.788.296 von Popeye82 am 25.09.18 04:54:26CENTRAL project for the TiO(2) (pigment) industry







      sehr Gute Meldung.


      TNG













      www.tngltd.com.au/images/tngltd---eiribeesok.pdf
      https://ti-cons.com/TC2/index.php/en/
      38 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 03:29:44
      Beitrag Nr. 5.407 ()
      Antwort auf Beitrag Nr.: 58.768.135 von Popeye82 am 22.09.18 03:50:14Ventnor Resources



      www.proactiveinvestors.com.au/companies/news/205690/ventnor-…
      www.linkedin.com/company/australian-silica
      www.asx.com.au/asxpdf/20180925/pdf/43ymnzhy08gyy3.pdf





      naaaaa Boersiback,
      Happy, so far??
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 04:30:59
      Beitrag Nr. 5.408 ()
      36 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 05:01:20
      Beitrag Nr. 5.409 ()
      wird nicht unter "Bumsbude" geführt.
      weil Die Hier schon waren.
      finde "nur" den Bezug nicht mehr.

      WARNING: NPV 191Mio BIS A$2,37 Milliarden.:laugh: Da hat der Taschenrechner wohl geklemmt.:laugh::laugh::laugh:





      Australian Vanadium


      - An initial vanadium production scenario has been developed for the Gabanintha Vanadium Project, as part of the ongoing Pre-Feasibility Study PFS). This base case demonstrates robust project fundamentals, competitive product costs and financials, with further optimisation potential.

      - Opportunities exist to further reduce costs, and increase revenue, through mine optimisation, +alternative processing strategies.

      - Metallurgical test work is continuing, to further define ore characteristics, and vanadium recoveries.

      - The PFS is proceeding on schedule, which will allow AVL to move quickly into piloting, and Definitive Feasibility Study, upon completion.

      - Detailed infill drilling on the inferred component of the current production scenario is complete, awaiting assay results.



      - Planned vanadium pentoxide(V2O5) refinery @Gabanintha site with a production rate of approximately 22.5Mlb V2O5(10,100t) per annum over an initial mine life of 17 years, with potential to extend operations along strike for an additional 8km which could extend the mine life.

      - Open pit mining and beneficiation operation producing approximately 900,000 tonnes per annum @a planned grade of 1.39% V2O5 of magnetic concentrate.

      - Average operating expenses estimated @US$4.13/lb V2O5 equivalent(±35%), competitive with the world’s lowest quartile producers.

      - Capital costs of approximately US$360M(±35%). This includes owner’s costs, contingencies and gas pipeline investment.

      - The Net Present Value(NPV) ranges between US$191 million and $2.37 billion dollars, depending on the pricing assumption. The NPV is estimated @US$1.1Busing a Life of Mine V2O5 commodity price forecast of US$13/lb. @current V2O5 market prices of US$20/lb, project NPV is US$2.4B, highlighting the project’s upside potential. At a US$8/lb V2O5 price, the NPV is US$191M, indicating a robust project.

      Other financial parameters are:
      [/url]


      www.asx.com.au/asxpdf/20180926/pdf/43yn52t4fndnfx.pdf
      www.proactiveinvestors.com.au/companies/news/205700/australi…

      www.australianvanadium.com.au/wp-content/uploads/2018/09/AVL…

      www.australianvanadium.com.au/asset-overview/project-summary…

      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 06:17:34
      Beitrag Nr. 5.410 ()
      Antwort auf Beitrag Nr.: 58.674.018 von Popeye82 am 11.09.18 20:07:58NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Short Story, looooooooooooooooooooooooooooooooong: Ein(neben, m.K., 2 Weiteren, bis Jetzt) Celsius Opuwo "Area" Play.
      Kann Was werden. Dann auch Big. Kann auch schiefgehen.
      FIRST pass drilling STARTS.
      ---->ENDE<----.







      Namibia Critical Metals











      www.namibiacriticalmetals.com/upload/19.September_24_2018_Dr…

      www.namibiacriticalmetals.com/upload/6._October__2017_Namibi…

      www.namibiacriticalmetals.com/upload/NMI_Corporate_Overview_…

      www.namibiacriticalmetals.com/overview.asp

      www.namibiacriticalmetals.com

      252 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 06:39:46
      Beitrag Nr. 5.411 ()
      Antwort auf Beitrag Nr.: 58.762.729 von Popeye82 am 21.09.18 15:39:10Axiom Mining



      www.axiommining.com.au/irm/showdownloaddoc.aspx?AnnounceGuid…
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 08:08:42
      Beitrag Nr. 5.412 ()
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 08:22:54
      Beitrag Nr. 5.413 ()
      Antwort auf Beitrag Nr.: 58.767.907 von Popeye82 am 21.09.18 23:54:18Cypress Development
































      www.criticalinvestor.eu/analysis/lithium/cypress-development…

      https://theprospectornews.com/?p=22627
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 13:17:25
      Beitrag Nr. 5.414 ()
      Antwort auf Beitrag Nr.: 58.744.057 von Popeye82 am 19.09.18 23:15:28Development Interessierte mit Sheffield MAL BESCHÄFTIGEN.
      Ein Potenzielles PremiumpremiumProjekt.
      ___________________________________________







      Sheffield Resources
















      www.sheffieldresources.com.au/irm/PDF/3091_0/ThunderbirdMini…
      http://www.dmirs.wa.gov.au/
      https://stockhead.com.au/resources/sheffield-gets-mineral-sa…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 13:54:14
      Beitrag Nr. 5.415 ()
      Hmmmm ... Sheffield sieht wirklich interessant aus - siehe auch:

      http://www.sheffieldresources.com.au/irm/PDF/3050_0/Diggersa…

      Wäre mir jetzt lieber als Ventnor ... ;-))))
      Avatar
      schrieb am 26.09.18 14:53:04
      Beitrag Nr. 5.416 ()
      Antwort auf Beitrag Nr.: 58.798.412 von Popeye82 am 25.09.18 22:50:27Denison Mines



      www.mining.com/denison-mines-flags-first-deposit-isr-mining-…
      Avatar
      schrieb am 26.09.18 16:17:39
      Beitrag Nr. 5.417 ()
      Antwort auf Beitrag Nr.: 58.040.344 von Popeye82 am 22.06.18 05:15:36Alderon Iron Ore


      - NPV at 8% discount rate: $1,698 M
      - IRR: 24.6%
      - Projected Years to Payback: 4.0 years
      - Total Estimated Capital Cost (excluding sustaining capital and closure costs): $982.41 M
      - Average Estimated Operating Costs (loaded in ship Port of Sept-Îles): $/dmt30.72
      . CFR Concentrate Sales Price Forecast - based on three year trailing average CFR benchmark price of $63.30/dmt @ 62% Fe, adjusted for Kami Fe grade, and HBIS and Glencore agreement terms: $/dmtCFR $89.67(FOB $73.17)
      - Estimated Mine Life: 23 years
      - Final Product Iron Grade (%Fe): 65.2%
      - Measured and Indicated Resource of the Rose Deposit(COG=15%, 29.6% Total Fe): 1,093.2 Mt
      - Proven and Probable Mineral Reserves (COG=15%, 28.8% Total Fe, 3.4% Dilution, 2.5% Ore Loss): 517.2 Mt
      - Annual Concentrate Production Rate (average life of mine, post ramp-up year): 7.84 Mtpa

      www.alderonironore.com/news/2018/504-alderon-announces-resul…
      http://www.bba.ca/
      http://www.hbisco.com/site/en/groupintro/index.html
      http://www.glencore.com/
      https://nlhydro.com/
      http://www.portsi.com/?lang=en
      http://www.dfdurofelguera.com/
      http://www.qnsl.ca/
      http://gemtec.eu/
      http://www.golder.com/
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 18:22:03
      Beitrag Nr. 5.418 ()
      Antwort auf Beitrag Nr.: 58.029.256 von Popeye82 am 20.06.18 20:34:57e3 Metals


      development plan for E3 Metals for the next 6 months includes:

      1) Demonstrating repeatability of the University of Alberta’s extraction technology development at commercial facilities (GCC – AI and NRC – IRAP)
      2) Increasing the performance efficiencies of the ion-exchange process by increasing recovery, concentration factor and lithium uptake
      3) Developing a commercially scalable ion-exchange sorbent material
      4) Constructing ion-exchange equipment in a lab environment to refine the mass balance and generate volumes of concentrate
      5) Producing lithium hydroxide at the lab scale
      6) Finalizing the lithium production process flow sheet
      7) Finalizing the design of the pilot plant



      https://e3metalscorp.com/wp-content/uploads/2018/09/26-09-18…
      http://www.greencentrecanada.com/
      http://www.nrc-cnrc.gc.ca/
      https://albertainnovates.ca/
      http://www.nrc-cnrc.gc.ca/eng/irap/
      http://www.ualberta.ca/
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 26.09.18 21:49:29
      Beitrag Nr. 5.419 ()
      Antwort auf Beitrag Nr.: 58.686.363 von Popeye82 am 12.09.18 23:02:12Hill End Gold













      www.asx.com.au/asxpdf/20180926/pdf/43yngbqgkv9nwy.pdf
      http://www.cioe.cn/en/
      https://thebatteryshow.com/
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.09.18 20:36:14
      Beitrag Nr. 5.420 ()
      Antwort auf Beitrag Nr.: 58.483.449 von Popeye82 am 19.08.18 15:53:09Verde Agritech outlines ambitious expansion plans as sales ramp up (Video)
      http://www.proactiveinvestors.com/companies/stocktube/10640/…
      Avatar
      schrieb am 27.09.18 20:46:07
      Beitrag Nr. 5.421 ()
      Antwort auf Beitrag Nr.: 58.705.740 von Popeye82 am 15.09.18 03:11:24Jangada Mines plc
      Fundraise Package of £2.1 Million Agreed and Notice of General Meeting
      https://polaris.brighterir.com/public/jangada_mines/news/rns…
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.09.18 21:03:39
      Beitrag Nr. 5.422 ()
      Antwort auf Beitrag Nr.: 58.799.063 von Popeye82 am 26.09.18 04:30:59Sirius Minerals on track to complete Yorkshire mine but still chasing up to $600m
      http://www.cityam.com/263868/sirius-minerals-track-complete-…

      Sirius Minerals Plc: Half year results for period ended 30 June 2018
      https://otp.tools.investis.com/clients/uk/sirius_minerals/rn…
      Avatar
      schrieb am 27.09.18 21:10:48
      Beitrag Nr. 5.423 ()
      Antwort auf Beitrag Nr.: 58.712.191 von Popeye82 am 16.09.18 16:53:46DRA Global confirmed as preferred EPCM contractor for Colluli
      http://www.miningweekly.com/article/dra-global-confirmed-as-…
      http://www.danakali.com.au/images/stories/axs-announcements/…
      Avatar
      schrieb am 27.09.18 22:28:38
      Beitrag Nr. 5.424 ()
      Antwort auf Beitrag Nr.: 58.705.740 von Popeye82 am 15.09.18 03:11:24
      Verbrecher
      They CAN'T even confirm, JUST hope, it's a World Class Project:mad::mad::mad::mad::mad:







      Jangada Mines Plc



      https://polaris.brighterir.com/public/jangada_mines/news/rns…
      25 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.09.18 22:39:30
      Beitrag Nr. 5.425 ()
      Antwort auf Beitrag Nr.: 58.818.242 von Popeye82 am 27.09.18 22:28:38aha du willst doch noch rein ;)
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.09.18 22:52:27
      Beitrag Nr. 5.426 ()
      Antwort auf Beitrag Nr.: 58.787.366 von Popeye82 am 24.09.18 22:22:28Tando Resources













      www.tandoresources.com.au/sites/default/files/asx-announceme…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 27.09.18 23:39:27
      Beitrag Nr. 5.427 ()
      Antwort auf Beitrag Nr.: 58.818.377 von Boersiback am 27.09.18 22:39:30Bin aktuell TOTAL ausgebucht.
      So EIne brit Food Specialty Firma; CrapshootKING(aber Die AGREEments Der Firma laufen sich heisser als Die Sonne;) ); Sowie 1 kanadische Specialty Med Firma kamen zuletzt noch Dazu.
      Und noch SEHR Viel auf Arbeits/MAYbe Zettel.
      Aber würde Jangada an sich spekulativ kaufen.
      Ich habe Einen ziemlich, ziemlich Guten Eindruck von Ihrem Projekt.


      p.S.
      Letzte G1A Meldung vielleicht auch mal "checken".
      Habe Hier defizitären Rückstand.:mad::mad::mad::mad::mad:
      Avatar
      schrieb am 28.09.18 02:24:06
      Beitrag Nr. 5.428 ()
      45 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 04:06:19
      Beitrag Nr. 5.429 ()
      Antwort auf Beitrag Nr.: 58.684.497 von Popeye82 am 12.09.18 19:31:25ZincX Resources



      www.zincxresources.com/news/index.php?content_id=327
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 04:18:25
      Beitrag Nr. 5.430 ()
      Kann Hier EVT noch Thema werden.





      Constantine Metal Resources

      http://constantinemetals.com/news/2018/index.php?content_id=…


      "CONSTANTINE ANNOUNCES SIGNIFICANTLY EXPANDED MINERAL RESOURCE ESTIMATE FOR THE PALMER PROJECT, SOUTHEAST ALASKA

      4.68 MILLION TONNES INDICATED AT 11.7% ZINC EQUIVALENT
      5.34 MILLION TONNES INFERRED AT 9.9% ZINC EQUIVALENT



      September 27, 2018
      PDF

      Vancouver, BC – Constantine Metal Resources Ltd. (TSX Venture – CEM) ("Constantine" or the "Company") is pleased to announce an updated mineral resource estimate for the Palmer Copper-Zinc-Gold-Silver deposit, located in a very accessible area of coastal Southeast Alaska. A separate maiden resource for the nearby AG Zone discovery has been deferred until later this year to include recent 2018 drill results that have significantly expanded the extent of this new area of mineralization first identified in 2017.

      Palmer Deposit Resource Update Highlights:

      Indicated Resource of 4,677,000 tonnes grading 11.67% zinc equivalent (3.84% CuEq). This represents the first Indicated Resource for Palmer, and accounts for 47% of the total resource.

      Inferred Resource of 5,338,000 tonnes grading 9.90% zinc equivalent (3.26% CuEq). This includes the addition of new areas of Inferred resource totaling 1.89 million tonnes, for a total tonnage increase of 23%*.

      First resource to report barite mineralization for the Palmer deposit, highlighting the opportunity for barite to contribute value as an industrial mineral co-product.

      Palmer Deposit Mineral Resource Estimate at a $75/t NSR Cutoff
      (effective Date September 27, 2018)
      Category Tonnes Zn Cu Ag Au Barite ZnEq CuEq
      (1,000s) (%) (%) (g/t) (g/t) (BaSO4 %) (%) (%)
      Indicated 4,677 5.23 1.49 30.8 0.30 23.9 11.67 3.84
      Inferred 5,338 5.20 0.96 29.2 0.28 22.0 9.90 3.26
      Contained Metal
      Category Zn Cu Ag Au Barite ZnEq CuEq
      (M lbs) (M lbs) (M oz) (K oz) (K tonnes) (M lbs) (M lbs)
      Indicated 539 154 4.2 40.9 1,116 1,203 396
      Inferred 612 113 4.5 43.6 1,174 1,166 383

      Notes

      The cut-off date for drill data included in the resource is May 1, 2018.
      Net Smelter Return (“NSR”) equals (US$16.01 x Zn% + US$48.67 x Cu% + US$23.45 x Au g/t + US$0.32 x Ag g/t). NSR formula is based on estimated metallurgical recoveries, assumed metal prices, and assumed offsite costs that include transportation of concentrate, smelter treatment charges, and refining charges.
      Assumed metal prices are US$1.15/lb for zinc (Zn), US$3.00/lb for copper (Cu), US$1250/oz for gold (Au), US$16/oz for silver (Ag).
      Estimated metal recoveries are 93.1% for zinc, 89.6% for copper, 90.9% for silver (70.8% to the Cu concentrate and 20.1% to the Zn concentrate) and 69.6% for gold (49.5% to the Cu concentrate and 20.1% to the Zn concentrate) as determined from metallurgical locked cycle flotation tests completed in 2018.
      Barite is not included in the NSR value.
      Zinc equivalent (ZnEq%) and Copper equivalent (CuEq%) values calculated based on the NSR formula above plus an assumed net-value for barite as described below (e.g. CuEq = (total NSR value + BaSO4 net-value)/US$48.67.
      BaSO4 net-value equals US$0.566 x BaSO4% (e.g. a resource grade of 24% BaSO4 x $0.566 = US$13.6 per tonne or 0.85% ZnEq). Formula based on barite recovery of 91.1% from metallurgical tests, assumed wholesale drilling-grade barite price in nearest North American markets of US$227/metric tonne, and assumed all-in transportation cost of US$150/tonne.
      Mineral resources as reported are undiluted.
      Mineral resource tonnages have been rounded to reflect the precision of the estimate.
      Readers are cautioned that mineral resources that are not mineral reserves do not have demonstrated economic viability.

      Garfield MacVeigh, President and CEO of the Company states: “We are very pleased to report that this latest update significantly expands and enhances the resource base at the Palmer Project. There is excellent opportunity to continue to expand the current resource, to add to the resource base with the planned maiden resource estimate for the AG Zone, and to make additional deposit discoveries. We are excited to incorporate these positive developments in the Preliminary Economic Assessment, establishing the path forward for this important high-grade base metal asset.”

      Resource Model

      The mineral resource estimate prepared by James N. Gray of Advantage Geoservices Ltd. is reported in accordance with Canadian Securities Administrators' NI 43-101 and conforms to the Canadian Institute of Mining "Estimation of Mineral Resources and Mineral Reserves Best Practices" guidelines. The resource incorporates all exploration drilling in the Palmer Deposit area completed to the end of 2017. One hundred and eight exploration diamond drill holes for 44,868 meters and geological surface mapping were used to generate the geological and structural model for the South Wall and RW zones. Sixty of the holes intersect the interpreted mineralized solids. Outlier assays were capped and all assays within the mineralized zones composited to 1.5-meter lengths. Metal grades were estimated using inverse distance cubed interpolation into a 3D block model with block dimensions of 6 x 6 x 6 meters. Density was estimated by inverse distance squared interpolation, with unique density values determined by conventional analytical methods for all assay samples. Three dimensional geologic solids were constructed by Darwin Green, Vice President of Exploration and reviewed by QP Ian Cunningham-Dunlop, and, in general, were limited to material grading > 0.5% Cu or > 2% Zn that could be demonstrated to be correlative with definable stratabound zones. As a general rule, solids were extended no more than 50 meters up-dip, down-dip and along strike from a drill hole except where geology supports extension in the plunge direction of mineralization.

      Indicated Resources include only a portion of the upper part of the South Wall Zone, where drill density and confidence in the geological model are highest. Indicated Mineral Resource blocks meet the criteria of being a minimum 25-meter distance away from the outer edge of the mineralized geological solid, estimated by a minimum of 3 holes, and have a maximum average distance to the third hole of less than or equal to 50 meters; remaining estimated blocks are classified as Inferred Mineral Resource. A total of four solids were constructed for sulphide mineralization: South Wall Zone 1, South Wall Zone 2-3-EM, RW West, and RW East. The complete NI 43-101 Technical Report will be released within 45 days of this news release.

      Ian Cunningham-Dunlop, P.Eng, Vice President of Advanced Projects to Constantine Metal Resources Ltd., is a Qualified Person as defined by NI 43-101 for the Palmer project. James N. Gray, P.Geo of Advantage Geoservices Ltd. is the Qualified Person as defined by NI 43-101 for the resource estimate discussed above. They have reviewed and approved the contents of this release.

      About the Palmer Project

      Palmer is a high-grade volcanogenic massive sulphide-sulphate (VMS) project being advanced as a joint venture between Constantine (51%) and Dowa Metals & Mining Co Ltd. (49%), with Constantine as operator. The Project is located in a very accessible part of coastal Southeast Alaska, with road access to the edge of the property and within 60 kilometers of the year-round deep-sea port of Haines. A Preliminary Economic Assessment study has been initiated on the Project expected for completion late Q4 2018 to early Q1 2019. Mineralization at Palmer occurs within the same belt of rocks that is host to the Greens Creek mine, one of the world’s richest VMS deposits. VMS deposits are known to occur in clusters, and with at least 25 separate base metal and/or barite occurrences and prospects on the Project, there is abundant potential for discovery of multiple deposits at Palmer.

      About the Company

      Constantine is a mineral exploration company led by an experienced and proven technical team with a focus on premier North American mining environments. In addition to the Company’s flagship copper-zinc-silver-gold Palmer Joint Venture Project, Constantine also controls a portfolio of high-quality, 100% owned, gold projects that the Company intends to spin out into a separate entity. These include the very high-grade Johnson Tract Au-Ag-Zn-Cu-Pb deposit, located in coastal south-central, Alaska and projects in the Timmins, Ontario gold camp that include the large, well-located Golden Mile property and the Munro Croesus Gold property, which is renowned for its exceptionally high-grade past production. Management is committed to providing shareholder value through discovery, meaningful community engagement, environmental stewardship, and responsible mineral exploration and development activities that support local jobs and businesses.

      Please visit the Company’s website (www.constantinemetals.com) for more detailed company and project information.

      On Behalf of Constantine Metal Resources Ltd.

      “Garfield MacVeigh”

      President

      For further information, please visit the Constantine Metal Resources website at www.constantinemetals.com, or contact:

      Naomi Nemeth
      Vice President, Investor Relations
      Email: info@constantinemetals.com
      Phone: +1 604 629 2348

      Or

      Garfield MacVeigh, President
      Email: info@constantinemetals.com
      Phone: +1 604 629 2348"
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 04:44:49
      Beitrag Nr. 5.431 ()
      Antwort auf Beitrag Nr.: 58.777.691 von Popeye82 am 24.09.18 00:57:10Tawana Resources NL/Panoramic Resources NL/Hill End Gold



      https://stockhead.com.au/resources/high-voltage-heres-all-th…
      Avatar
      schrieb am 28.09.18 06:11:02
      Beitrag Nr. 5.432 ()
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 07:45:00
      Beitrag Nr. 5.433 ()
      Antwort auf Beitrag Nr.: 58.689.237 von Popeye82 am 13.09.18 11:08:28Birimian



      http://birimian.com/pdfs/UpdateOnAirborneMagneticAndRadiomet…
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 09:26:55
      Beitrag Nr. 5.434 ()
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 19:39:26
      Beitrag Nr. 5.435 ()
      Antwort auf Beitrag Nr.: 58.734.589 von Popeye82 am 19.09.18 09:09:11Africa’s HOTTEST emerging potash player













      Emmerson Plc





      www.miningreview.com/emmerson-plc-africas-hottest-emerging-p…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 22:26:10
      Beitrag Nr. 5.436 ()
      Antwort auf Beitrag Nr.: 58.802.849 von Popeye82 am 26.09.18 13:17:25ONE of the world’s largest mineral sands deposits







      Sheffield Resources













      www.sheffieldresources.com.au/irm/PDF/3093_0/ThunderbirdGran…
      http://www.dmirs.wa.gov.au/
      www.premier.wa.gov.au/Ministers/Stephen-Dawson/Pages/default…
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 23:31:34
      Beitrag Nr. 5.437 ()
      Antwort auf Beitrag Nr.: 58.778.420 von Popeye82 am 24.09.18 08:18:01SolGold


      :eek::eek::eek::eek::eek:
      www.mining-journal.com/project-finance/news/1347601/mather-w…
      28 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 23:35:35
      Beitrag Nr. 5.438 ()
      Antwort auf Beitrag Nr.: 58.829.591 von Popeye82 am 28.09.18 23:31:34
      Zitat von Popeye82: SolGold


      :eek::eek::eek::eek::eek:
      www.mining-journal.com/project-finance/news/1347601/mather-w…


      kannst du weiterlesen ??
      login erforderlich...

      aber geht wohl in die richtung dass sie das ding selber bauen wollen vom design her beim hochgradigen kern anfangen
      Avatar
      schrieb am 28.09.18 23:46:11
      Beitrag Nr. 5.439 ()
      Antwort auf Beitrag Nr.: 58.829.591 von Popeye82 am 28.09.18 23:31:34SolGold













      www.rns-pdf.londonstockexchange.com/rns/1492C_1-2018-9-27.pd…
      26 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 28.09.18 23:58:21
      Beitrag Nr. 5.440 ()
      Antwort auf Beitrag Nr.: 58.799.009 von Popeye82 am 26.09.18 02:28:26Advantage Lithium





      www.streetwisereports.com/article/2018/09/24/drill-results-s…
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 00:02:30
      Beitrag Nr. 5.441 ()
      Avatar
      schrieb am 29.09.18 01:45:28
      Beitrag Nr. 5.442 ()
      Antwort auf Beitrag Nr.: 58.666.146 von Popeye82 am 11.09.18 03:05:23Prospect Resources



      www.prospectresources.com.au/sites/default/files/asx-announc…
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 02:01:28
      Beitrag Nr. 5.443 ()
      Antwort auf Beitrag Nr.: 58.829.639 von Popeye82 am 28.09.18 23:46:11kannst du weiterlesen ??
      login erforderlich...

      aber geht wohl in die richtung dass sie das ding selber bauen wollen vom design her beim hochgradigen kern anfangen
      ______________________________________________________________________________





      Also ich habe ein bisschen Was, Wenig, im Abo,
      Das aber nicht. Auch nur "Beschränkten" Zugang.
      Man muss sich Seine Resourcen schon auch einteilen, aber "Long" habe ich da noch ein "paar Bunte Vorstellungen".
      2, 3 Spezifische Publikationen hätte ich, verdammt, gern, aber Die haben ein Price 'Tag", da kannst Du Dir, für Jahressumme, schon ein Hässliches Auto für kaufen.
      Wär "drin", aber Mir noch zu früh.

      Mir ging es aber, auch, "nur um Die Headline" im Prinzip, wenn Du so willst.
      (Der Rest(Ersichtliches, jedenfalls) ist ja im "Prinzip Verweis auf Annual Report", wenn Du so willst)
      Das ist schon Eine Fette Aussage.


      Zu Cascabel
      Das ist nicht ganz so einfach. Hatte da Rolli schon mal Einiges zu geschrieben.
      Hatte Mich Damals wg genau Diesem Thema;
      nach es sich nicht einfach machen, und sehr, sehr langen Überlegungen;
      zum Verkauf entschieden. Keine Ahnung ob Das Die "Korrekte" Entscheidung war, aber bin fully fine mit.
      Unabhängig Davon bin ich aber sehr, sehr gespannt ob Sie Cascabel "hinkriegen". Und, wenn, Wie.
      Kannn Das vielleicht nochmal Einiges kürzer, aus Meiner Sicht, zusammenfassen.
      Avatar
      schrieb am 29.09.18 03:23:45
      Beitrag Nr. 5.444 ()
      Antwort auf Beitrag Nr.: 58.737.046 von Popeye82 am 19.09.18 12:36:51Amur Minerals



      https://amurminerals.com/content/wp-content/uploads/RNS-Amur…
      6 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 04:30:03
      Beitrag Nr. 5.445 ()
      Antwort auf Beitrag Nr.: 58.656.885 von Popeye82 am 09.09.18 23:10:55NEXT Bumsbude.
      eine Weitere, Die ich Hier 1mal PRE "Feasibility" hinzufügen möchte.

      Botswana, sehr Grosse Landholdings, ziemlich, ziemlich Highgrade.
      Ich denke Das KÖNNTE mal ein ziemlich Geiles Deposit(s) werden.
      CEO "Duarne Parnham".
      Im Hauptprospect steht jetzt langsam mal Eine Erste Resource an.
      Die werden aber schon noch ein Weilchen brauchen.
      Das Pilot Ding interessiert Mich nicht, WENN nur richtig.
      _________________________________________________





      ich finds NOCH ein bisschen wenig.


      Giyani Metals



      http://giyanimetals.com/giyani-announces-maiden-mineral-reso…
      http://msagroupservices.com/






      "Giyani Announces Maiden Mineral Resource Estimate For The K.Hill Manganese Deposit


      OAKVILLE, ONTARIO – September 28, 2018 – Giyani Metals Corp. (TSXV:WDG, GR: A2DUU8) (“Giyani” or the “Company”) is pleased to announce its maiden mineral resource estimate for its 88% owned K.Hill manganese deposit in Botswana. The mineral resource estimate, prepared by the South Africa based MSA Group, includes an inferred resource of 1.1 million tonnes grading 31.2% manganese oxide (MnO) at a cut-off grade of 18% MnO.

      Robin Birchall, CEO of Giyani Metals Corp. commented:

      “This maiden resource at K.Hill represents a significant milestone in the development of our company. The scale of this resource gives us confidence to immediately proceed with a preliminary economic assessment (PEA). We now have a proven tangible asset that adds intrinsic value to our shareholders. Giyani will grow from this point onwards with the goal of becoming an independent, vertically integrated, manganese supplier to the battery market. By developing the K.Hill prospect into its full potential and continuing to prove other prospects within our large property, we are putting Giyani on the map as an active player in the growing battery electric vehicle market.”

      Mineral Resource summary

      The Mineral Resource estimate was based on geochemical analyses and density measurements of core samples obtained by diamond drilling undertaken by Giyani from 16 April 2018 to 2 July 2018. A total of eighteen vertical holes were drilled at K-Hill. Two of the drill holes were collared outside the Mineral Resource area, one was drilled for metallurgical purposes and twelve of the drill holes intersected the manganese shale. The intersections obtained from ten drill holes were used to estimate the grade of the Mineral Resource. The remainder were used in defining the extent of the mineralization.

      A three dimensional geological model of the major stratigraphic units was constructed using the drillhole logging data. The mineralized envelope within the manganese shale was defined by a 15% MnO threshold and a three dimensional mineralization model was constructed. The grades of MnO, Fe2O3, Al2O3, SiO2 as well as Loss on Ignition (LOI) and density were estimated using inverse distance squared into a block model based on the geological and mineralization model. An adjustment to the modelled tonnage was made in order to account for depletion by historical mining.

      The Mineral Resource was estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Best Practice Guidelines and is reported in accordance with the 2014 CIM Definition Standards, which have been incorporated by reference into National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101). The Mineral Resource is classified into the Inferred category as shown in Table 1 below.




      Footnotes:

      All tabulated data have been rounded and as a result minor computational errors may occur.
      Mineral Resources which are not Mineral Reserves have no demonstrated economic viability.
      LOI = Loss on ignition.
      Density determination was on undried samples and tonnages are reported as wet.


      The cut-off grade calculation was based on the following assumptions: EMM price of USD2,500/t (FOB), mining cost of USD35/t, processing cost of USD75/t, G&A cost of USD20/t, transport cost of USD50/t EMM, metallurgical recovery of 60% of the contained manganese.

      Dr. Ian Flint, who lead Giyani’s hydrometallurgical testing, states that “ the laboratory scale test-work on samples from the hole drilled for metallurgical test-work indicates that the manganese mineralization and leach chemistry are well suited for solvent extraction. A manganese recovery of over 95% was achieved at this stage.: It is envisaged that this would be further processed to electrolytic manganese metal (EMM).

      The Mineral Resource is reported at a cut-off grade of 18% MnO, which is the lowest grade block estimate within the mineralization model. Given reasonably assumed high-level cost and revenue assumptions, MSA considers that mineralization at this cut-off grade will satisfy the test for reasonable prospects for eventual economic extraction.

      The Inferred Mineral Resource has been tabulated using a number of cut-off grades as shown in Table 2.




      Footnotes:

      All tabulated data have been rounded and as a result minor computational errors may occur.
      Mineral Resources which are not Mineral Reserves have no demonstrated economic viability.
      LOI = Loss on ignition.
      Density determination was on undried samples and tonnages are reported as wet.


      Giyani will be filing an NI 43-101 Technical Report on the K-Hill Project within 45 days of this news release.

      QUALIFIED Persons / NI 43-101 Statements

      Jeremy C. Witley, Pr Sci Nat. of MSA Group is the Company’s Qualified Person (as that term is defined by National Instrument 43-101) for the K-Hill Project. Mr. Witley has reviewed and approved the scientific and technical content contained in this press release, and verified the underlying technical data. Mr. Witley is independent of the Company.

      Drill cores were sawn in half and one half was sampled and placed in a plastic bag along with a sample tag. Bags were sealed with a single use tie. Samples were securely stored prior to shipping to SGS laboratories in Randfontein, Johannesburg, South Africa. Samples were crushed and milled prior to analysis by borate fusion and XRF. The samples were subjected to a quality assurance and quality control (QAQC) program consisting of the insertion of blank samples, certified reference materials and coarse duplicates. The primary laboratory assay values were confirmed by 40 duplicate samples assayed by a second laboratory (Intertek Genalysis, Maddington, Australia). The Qualified Person is satisfied that the assay results are of sufficient accuracy and precision for use in Mineral Resource estimation.

      About Giyani

      Giyani Metals Corp. is a Canadian based junior exploration company focused on creating shareholder value by accelerating the development of its battery-grade manganese projects in the Kanye Basin, Botswana, Africa.

      Additional information AND corporate documents maaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaay be found:eek::eek::eek: , on ------> www.sedar.com and on Giyani Metals Corp. website: ------> http://giyanimetals.com/.

      On behalf of the Board of Directors of Giyani Metals Corp.

      Robin Birchall, CEO

      Contact:


      Giyani Metals Corporation
      Robin Birchall
      CEO, Director
      ------> +447711313019
      ------> rbirchall@giyanimetals.com

      Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release."
      14 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 14:20:47
      Beitrag Nr. 5.447 ()
      Antwort auf Beitrag Nr.: 58.405.545 von Popeye82 am 08.08.18 23:54:17Nzuri Copper



      https://finfeed.com/opinion/nzuri-advanced-copper-cobalt-pla…
      9 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 14:36:31
      Beitrag Nr. 5.448 ()
      Antwort auf Beitrag Nr.: 58.760.482 von Popeye82 am 21.09.18 12:16:23Harte Gold


      www.axino.de/index.php/mediathek/axino-youtube/video/85-hart…

      Avatar
      schrieb am 29.09.18 15:59:49
      Beitrag Nr. 5.449 ()
      Antwort auf Beitrag Nr.: 58.799.063 von Popeye82 am 26.09.18 04:30:59Sirius Minerals Plc


      :):):)

      34 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 16:32:55
      Beitrag Nr. 5.450 ()
      Antwort auf Beitrag Nr.: 58.829.129 von Popeye82 am 28.09.18 22:26:10Sheffield Resources
















      www.sheffieldresources.com.au/irm/PDF/3092_0/BridgeStreetCap…
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 17:18:12
      Beitrag Nr. 5.451 ()
      Antwort auf Beitrag Nr.: 58.832.300 von Popeye82 am 29.09.18 15:59:49Sirius Minerals Plc



      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 18:49:30
      Beitrag Nr. 5.452 ()
      Antwort auf Beitrag Nr.: 58.829.639 von Popeye82 am 28.09.18 23:46:11SolGold



      www.mining.com/solgold-loss-almost-doubles-goes-ecuador-proj…
      23 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 19:13:58
      Beitrag Nr. 5.453 ()
      Antwort auf Beitrag Nr.: 58.832.825 von Popeye82 am 29.09.18 18:49:30den Teil vielleicht auch mal in der Birne abspeichern.


      " “After delivery of Cobre Panama (with the main ramp early next year) we are left with a gap until we see the next batch of 200ktpa-plus projects in 2022-23. This is when the likes of Kamoa, Oyu Tolgoi Phase 2, and QB2 are likely to offer meaningful supply growth,” Hamilton said in April."
      Avatar
      schrieb am 29.09.18 20:55:07
      Beitrag Nr. 5.454 ()
      Antwort auf Beitrag Nr.: 58.774.673 von Popeye82 am 23.09.18 14:33:52Canyon Resources



      www.asx.com.au/asxpdf/20180928/pdf/43yt1t4rrg4s1x.pdf
      33 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 21:12:50
      Beitrag Nr. 5.455 ()
      Antwort auf Beitrag Nr.: 58.588.343 von Boersiback am 01.09.18 02:03:26GUTE werte sollte man weitgehend DURCHhalten


      Lieber Boersiback

      Ich will Jetzt gar Keine Kauf/Verkauf/Handlungsempfehlung geben. Nix Dergleichen.
      Das soll auch nicht die Angebershow sein.
      Aber mal rein konzeptuell gesprochen.
      Ich weiss Jetzt gar nicht genau wie man es ausdrücken soll. Ich versuche es mal.
      Das ist ein Punkt den ich mit Dir schon lange mal auf die Couch kriegen wollte.

      Du tradest ja immer super.
      Für Mich sieht Das aber schon DEUTLICHES STück Anders noch aus.
      Also Diese Hier Genannten Zahlen sind rein konzeptuell. Und durch zig Andere Kombinationen austauschbar.

      Angenommen Du kaufst eine Aktie. Bei 1$.
      Die geht auf 5. Alles supi.
      Jetzt fängt Sie aber an zu "bröckeln".
      4,50, 4,00, 3,50, 3,00, 2,50, 2,00.................................................................
      Du hast Die Schnauze voll
      (siehst vielleicht auch ein bisschen Die Felle wegschwimmen).
      Reissleine. Raus. Bei 2.

      Fundamental läuft die Story aber EIGENTLICH gut.
      Die Firma macht weiter Ihre Schritte. Ist auf dem Weg.
      Irgendwann dreht Das Sentiment wieder.
      Der "Markt" ist nicht mehr permanent depressivparanoid. Alles wieder bisschen freundlicher.
      Deine (Ex)Firma entwickelt sich weiter.
      Der Kurs fängt wieder an Ein bisschen anzuziehen. Und noch ein bisschen mehr, und noch ein bisschen mehr.
      Nach laaaaaaaaaaaaaaanger Zeit, mit Viiiiiiiiiiiiiiiiiiiielen Auf und Abs landet die Aktie bei 10. $.

      Weil Dich Das irgendwie angek

      hat, warst Du von "7 auf 10" (nochmal) Dabei.
      Ein Anderer, aber, hat Diese Aktie zur Gleichen Zeit wie Du erworben. Aber NIE verkauft.

      Kassensturz, jetzt gucken Wir mal.
      Was hast Du gemacht? Eingesackt?
      Was Er?
      Der Einfachheithalber wird Eine Ausgangssumme von 1.000$ angenommen. Gebühren, Weitere Abzüge usw. Nichts Dergleichen.


      Boersiback:
      von 1 auf 2 = 2.000$
      von 7 auf 10 = Nochmal 856 Plus.
      =, Summe: 2.856$.

      Der Andere Typ:
      von 1 auf 10 = 10.000$.
      =, Summe: 10.000$.

      See SOMEthing?


      Es geht Jetzt nicht Darum Dicke Hose zu machen. Oder Was auch immer.
      Aber Was ich Dir SEHR, SEHR sagen will:
      Wenn ich Eine Aktie kaufen, ist vielleicht sehr gut "gelaufen", und dann steht Eine "Schwäche"phase an. Fällt, fällt noch mehr, Verselbstständigt sich vielleicht auch.
      Wenn ich denke dass Das Potenzial deutlich über Die Hochs hinaus(d.h. man muss sich dann aber auch an Seiner Eigenen Meinung(Beurteilung) messen:) ) ist,
      dann überlege ich Mir mindestens DREI, FÜNF, ZEHN, oder Mehr, Mal ob Man Diese Aktie wirklich verkauft.

      Wenn man mal Einen "Ordentlichen Xbagger" hat;
      Du darfst glauben dass Mir Das nicht vollumfänglich unbekannt ist;
      (aktuell 4 >5bagger(aber noch ne Menge im "Ofen":). Dafür gibt es auch Verluste. Aber nicht Viele. Aber die Gesamtrechnung ist ein ziemlich, ziemlich Geiles DIng.)
      und Die Aktie macht Intraday 2%. Aber Du machst 10%. DAS sind Feiertage.

      Die Sache ist dass man sich dann nicht (mehr einfach) Alles "Chart"brainwashen kann. Sondern dann HÄNGT man, auch, an Seiner Einschätzung.
      Kann auch schiefgehen. Und Das tut es auch mal.
      Das ist zum Beispiel Warum ich bei Celsius eine GANZ, GANZ Andere Meinung habe. Und Die nicht verkauft hab.


      Ich will nicht sagen
      - Wie "mans machen soll".
      - Nicht die "Welt" erklären.
      - Nicht 1stein "nacheifern".
      - Nix. Derart.

      Aber(und Das gern auch in PRAKTISCHEN Dimensionen mal Mehr durchgehen) verstehst Du den PUNKT?????
      __________________________________________________________________________





      WeltenRetter(Teddy) BBack

      Zu Dem Oben Geschriebenen(Kassensturz) gibt es bei Mir im Moment gerade ein Beispiel.
      Ich will gern dass Du DEN Punkt KAPIERST.

      Soll ich Dir Das mal zeigen?
      Ich Bitte um Eine Antwort, auf Das Schreiben/die Frage.
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 21:24:06
      Beitrag Nr. 5.456 ()
      Antwort auf Beitrag Nr.: 58.833.551 von Popeye82 am 29.09.18 21:12:50ich bin eher typisch fürs gegenteil

      Celsius hab ich immer noch Stand 50% Teilverkauf
      und der verkauf war bei 0,20/21 AUD
      kauf war 0,07 oder 0,075 AUD (Stand +67,56% grad geschaut)

      Silver Bear einst das gleiche 80% down... bei 0,02 nachkauf dann schwuzps dicke grün.

      was ich neulich gemacht hatte war panik.
      depoststand ging geradewegs von 385K auf 295K down...
      da krieg ich halt die düse..

      2008 gings depot von 90K auf 30K runter. so schnell konnte ich gar nicht gucken.
      da kommen halt erinnerungen hoch... und ich verkaufe dann eher richtung
      "hau raus egal was" oft auch gerne gewinner. meist gemischt mit verlierern.

      aber ansonsten mach ich ja grad das gegenteil... wenn was extrem steigt dann halt
      raus... so hab ich 2016 bei goldwerten teils auch gehandelt nach dem starken up.

      der markt übertreibt halt in beide richtungen... das kann man nutzen
      nur wenns gesamte depot scheppert dann krieg ich schweisstropfen und handle schonmal
      etwas panisch... eben wegen diesen erfahrungen...
      und ein big crash ist immer noch so ein ding was passieren könnte... 2008 nur schlimmer..
      allerdings waren damals rohstoffwerte weitaus höher bewertet als heute im schnitt
      (topwert sind heute nicht schlecht bewertet)
      Avatar
      schrieb am 29.09.18 23:21:59
      Beitrag Nr. 5.457 ()
      Antwort auf Beitrag Nr.: 58.597.926 von Popeye82 am 03.09.18 03:16:51ONE of the (world’s) largest Rare Earth projects, outside of China







      Boersiback,

      Nicht vergessen: Verkaufen den Shice!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!


      Lindian Resources













      www.asx.com.au/asxpdf/20180927/pdf/43ypn6x4d700vg.pdf
      www.malawi.gov.mw/index.php?option=com_content&view=article&…
      http://www.lynascorp.com/Pages/Home.aspx
      http://www.brgm.fr/














      www.asx.com.au/asxpdf/20180927/pdf/43yqrx8cldqkh4.pdf
      8 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 29.09.18 23:38:10
      Beitrag Nr. 5.458 ()
      Antwort auf Beitrag Nr.: 58.833.965 von Popeye82 am 29.09.18 23:21:59aber nicht doch... da wird eher ein nachkauf getimed
      werde einiges nachkaufen hab noch einiges cash das will verballert werden :cool:

      ich krieg nur panik bei unter 300K jetzt wo ich wieder drüber bin bin ich ganz entspannt :laugh:

      der drecksbörse werd ich noch zeigen wer hier der boss is :mad:
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 00:54:49
      Beitrag Nr. 5.459 ()
      Antwort auf Beitrag Nr.: 58.833.998 von Boersiback am 29.09.18 23:38:10der drecksbörse werd ich noch zeigen wer hier der boss is :mad:
      ________________________________________________



      Langsam wirds ja wieder, mit Der Einstellung.:)

      Aber auch nicht zu "brutal" rangehen.
      Man muss versuchen die Kräfte FÜR sich zu nutzen.
      Für Mich hat Das ehrlich gesagt bildlich und vom Gefühl Einiges mit WELLENSURFEN zu tun.
      Wenn man Respekt hat, Die Dinge richtig deutet usw, kann man Die Kräfte ununheimlich nutzen.
      Aber Das ist Alles nicht so einfach, und Das BRAUCHT ES AUCH.
      Also man muss sich versuchen IM Einklang mit den Dingen zu bewegen.
      Aber wenn man im "Richtigen" Swing, Rhythmusgefühl, @Whatever ist, kann man Diese Dinge, "Kräfte", @Whatever, ununheimlich nutzen.

      Weiss nicht ob Du Das verstehst, aber ich glaube es ist gut wenn man Das versteht.



      2, 3 Sachen mal kurz.


      aber nicht doch... da wird eher ein nachkauf getimed
      werde einiges nachkaufen hab noch einiges cash das will verballert werden :cool:
      ______________________________________________________________



      Also ist Ein Entwickler. Die haben schon noch Einiges "Hausaufgaben" zu erledigen, sage ich mal.
      Aber unter Berücksichtigung Dessen, denke Das ist Jetzt "langsam mal wieder Ordentliches Denken".
      Keine Ahnung Was 2070 ist, aber ich würde sagen mutmasslich Eine Gute - vielleicht sehr, sehr Gute Entscheidung.



      ich krieg nur panik bei unter 300K jetzt wo ich wieder drüber bin bin ich ganz entspannt :laugh:
      __________________________________________________________________________



      Sie hatten mal geschrieben Einige Jahre Vorher von 30k aus gestartet,
      ging es dann auf knapp 400(??)k. Dann unter 300.
      Da machte dann Der Herzschrittmacher nicht mehr mit.

      Wenn Es nicht zu Privat ist:

      Von 30 aufs High, oder "aktuell":
      kam Das auch durch Reinzahlungen; Job, Lohn, @Was auch immer; zustande,
      Größtenteils durch Börse?
      Oder Wie gross war Der Börsenanteil Dabei??

      Täte Mich mal interessieren,
      Mein Faktor ist inzwischen nicht so klein.
      Und der Backebackeofen ist VOLLaktiv.
      Avatar
      schrieb am 30.09.18 02:11:57
      Beitrag Nr. 5.460 ()
      Antwort auf Beitrag Nr.: 58.688.019 von Popeye82 am 13.09.18 09:08:09Korab Resources



      www.asx.com.au/asxpdf/20180927/pdf/43ypz66sgsybt5.pdf
      12 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 02:26:14
      Beitrag Nr. 5.461 ()
      Antwort auf Beitrag Nr.: 58.832.507 von Popeye82 am 29.09.18 17:18:12Sirius UNable to beat Tesla, in Money Moneyng:mad::mad::mad::mad::mad:







      Sirius Minerals Plc



      www.proactiveinvestors.co.uk/companies/market_reports/206005…
      32 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 04:06:45
      Beitrag Nr. 5.462 ()
      Antwort auf Beitrag Nr.: 58.827.785 von Popeye82 am 28.09.18 19:39:26Emmerson Plc



      https://polaris.brighterir.com/public/emmerson_plc/news/rns/…
      4 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 15:54:54
      Beitrag Nr. 5.463 ()
      Antwort auf Beitrag Nr.: 58.724.365 von Popeye82 am 18.09.18 08:55:15Strandline Resources



      www.strandline.com.au/irm/showdownloaddoc.aspx?AnnounceGuid=…
      21 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 17:33:48
      Beitrag Nr. 5.464 ()
      Antwort auf Beitrag Nr.: 58.799.165 von Popeye82 am 26.09.18 06:17:34DyprWWWWWWWWWWWWWWWWWWTF???????????????????????????????????????????







      Namibia Critical Metals





      http://northernminerals.com.au/wp-content/uploads/2018/09/Dy…
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 30.09.18 17:47:52
      Beitrag Nr. 5.465 ()
      Antwort auf Beitrag Nr.: 58.833.998 von Boersiback am 29.09.18 23:38:10Hast Du Deine Tharisa noch?
      Nach Meinem Eindruck Ein Interessantes Ding.
      Habe bis Jetzt Einen ziemlich Guten Eindruck.
      Avatar
      schrieb am 30.09.18 22:58:23
      Beitrag Nr. 5.466 ()
      Antwort auf Beitrag Nr.: 58.834.220 von Popeye82 am 30.09.18 02:26:14Sirius Minerals Plc



      https://event.on24.com/eventRegistration/EventLobbyServlet?t…
      31 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 01:12:23
      Beitrag Nr. 5.467 ()
      Antwort auf Beitrag Nr.: 58.537.086 von Popeye82 am 26.08.18 14:02:54Prophecy Development


      https://independentspeculator.com/independent-speculator-int…

      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 02:45:57
      Beitrag Nr. 5.468 ()
      Antwort auf Beitrag Nr.: 58.733.461 von Popeye82 am 19.09.18 06:45:47New Century Resources













      https://wcsecure.weblink.com.au/pdf/NCZ/02029175.pdf
      3 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 02:58:27
      Beitrag Nr. 5.469 ()
      Antwort auf Beitrag Nr.: 58.799.042 von Popeye82 am 26.09.18 03:29:44Ventnor Resources



      https://clients3.weblink.com.au/pdf/VRX/02028682.pdf
      27 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 05:12:45
      Beitrag Nr. 5.470 ()
      Antwort auf Beitrag Nr.: 58.798.994 von Popeye82 am 26.09.18 02:11:34ONE of the MOST important new lithium raw material developments(globally)


      as said, bin mit Der Richtung Hier SEHR, SEHR zufrieden.
      langsam mehren sich Die (Voraussichtlichen) Produzenten Hier.
      and it' JUST a Start.
      _____________________________________________







      Pilbara Minerals
















      www.pilbaraminerals.com.au/site/showdownloaddoc.aspx?Announc…
      http://www.porthedland.wa.gov.au/
      www.marinetraffic.com/de/ais/details/ships/shipid:755730/imo…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 07:18:00
      Beitrag Nr. 5.471 ()
      Antwort auf Beitrag Nr.: 58.836.636 von Popeye82 am 30.09.18 17:33:48Namibia Critical Metals













      www.miningreview.com/namibia-critical-metals-first-phase-dri…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 08:55:41
      Beitrag Nr. 5.472 ()
      Antwort auf Beitrag Nr.: 58.777.751 von Popeye82 am 24.09.18 02:36:03Orion Minerals













      www.asx.com.au/asxpdf/20181001/pdf/43yw11ljthqf72.pdf

      www.gov.za/sites/default/files/41714_gon611.pdf
      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 10:33:14
      Beitrag Nr. 5.473 ()
      Antwort auf Beitrag Nr.: 58.794.149 von Popeye82 am 25.09.18 16:13:21FYI Resources



      18 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 01.10.18 20:32:21
      Beitrag Nr. 5.474 ()
      Antwort auf Beitrag Nr.: 58.817.333 von rolleg am 27.09.18 20:46:07Jangada gains enviro approval for trial mining
      http://www.miningweekly.com/article/jangada-gains-enviro-app…
      Avatar
      schrieb am 01.10.18 20:33:57
      Beitrag Nr. 5.475 ()
      Antwort auf Beitrag Nr.: 58.742.989 von Popeye82 am 19.09.18 21:13:23Ivanhoe Mines announces the Makoko Copper Discovery on its 100%-owned Western Foreland exploration licences near Kamoa-Kakula in the Democratic Republic of Congo
      https://www.ivanhoemines.com/news/2018/ivanhoe-mines-announc…
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 08:21:51
      Beitrag Nr. 5.476 ()
      Antwort auf Beitrag Nr.: 58.845.750 von rolleg am 01.10.18 20:33:57Interessant.
      Na mal gucken, Was nach Kamoa, Kamoa-Kakula da noch kommt.

      "Given the early drilling success at Makoko, we are highly confident that we have the secret blueprint for additional exploration successes in the Western Foreland area in 2019 and beyond."

      Ja, den EIndruck hat man.
      Avatar
      schrieb am 02.10.18 11:25:46
      Beitrag Nr. 5.477 ()
      Antwort auf Beitrag Nr.: 58.838.316 von Popeye82 am 01.10.18 02:58:27ERSTresources


      Das ist Jetzt Eine "big, big" News.
      Silica Interessierten rate ich AUSDRÜCKLICH Sie zu LESEN.







      Ventnor Resources













      https://clients3.weblink.com.au/pdf/VRX/02029610.pdf
      26 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 11:46:29
      Beitrag Nr. 5.478 ()
      Antwort auf Beitrag Nr.: 58.850.361 von Popeye82 am 02.10.18 11:25:46Naaaaa Boersiback

      Zufrieden, sooooo far??
      So LÄSST sich Kohle machen.
      Aber: Das "Ende" der Geschichte ist TROTZdem noch nicht erzählt.
      Man muss immer, immer weiter Step BY Step gucken.

      Wenn Du "fett" Vorn sein solltest, nimm vielleicht irgendwann mal Den Einsatz vom Tisch,
      aber ich würde "weiter"laufen lassen.
      Avatar
      schrieb am 02.10.18 13:29:05
      Beitrag Nr. 5.479 ()
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 13:44:03
      Beitrag Nr. 5.480 ()
      Antwort auf Beitrag Nr.: 58.766.146 von Popeye82 am 21.09.18 20:18:17Continental Gold



      www.continentalgold.com/en/continental-gold-extends-bmz1-by-…
      30 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 17:07:49
      Beitrag Nr. 5.481 ()
      Antwort auf Beitrag Nr.: 58.481.479 von Popeye82 am 19.08.18 00:07:44Rock Tech Lithium




      - Life of Mine Revenue is $1,136 million;
      - Annual EBITDA is $64.2 million;
      - Pre-production capital is $65.3;
      - Sustaining capital is $62 million;
      - Pre-tax NPV (8% discount rate) of $312 million and an IRR of 62.2%;
      - Post-tax NPV (8% discount rate) of $210 million and an IRR of 48.1%;
      - Positive cash flow is realized in Year 3 of the project;
      - 11-year mine life including open pit and underground operations for the Main Resource Zone;
      - Total production of 1.1 million tonnes of chemical grade spodumene concentrate of 6.2% Li2O (96.000 t/a).











      http://rocktechlithium.com/rock-tech-lithium-presents-result…
      http://www.dmt-group.com/de.html
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 17:25:26
      Beitrag Nr. 5.482 ()
      Antwort auf Beitrag Nr.: 58.481.290 von Boersiback am 18.08.18 22:39:01ich sag ja nur ...mehr traden...
      am besten mit aktien die man eh nicht will
      _________________________________





      Das hört sich aber auch verlockend nach Einem GIGANTISCH Gutem Konzept an.
      2 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 17:37:58
      Beitrag Nr. 5.483 ()
      Antwort auf Beitrag Nr.: 58.483.176 von Boersiback am 19.08.18 14:25:34Ja, NULL Sinn!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!


      Und Wööööörte Winni


      add.
      Sheffield Resources+Korab Resources kannst(?????) Du Dir vielleicht auch 1mal ansehen.

      ich denke sowas sollte man sich in ca 10 jahren ansehen....
      nicht wieder diesen rohstoffmist mit theoretisch guten eckzahlen.
      macht 0 sinn für mich

      insgesamt trading aber ansonsten dem sektor den rücken kehren....

      ------------------------------------------------------------------------------------------------
      CLA

      falls jemand, oder winni, die noch hat einschl. mir
      --> nix wie raus
      low grade, bewertung, land, kobalt.... gruslig :mad:
      _____________________________________________





      Also passen Sie auf, ich halts Jetzt 1fach kurz:

      Sheffield: Können Sie ja mal "Performance last time" checken.

      Celsius: Ist Meine aktuelle TOPTOPTOPaktie.
      (fehlt nach aktuellem Stand nicht mehr Viel zum >10bagger)
      Und in Diese habe ich auch nicht nur 2€ reingepackt, schon ganz OK.

      Korab: Man muss sich ein "paar Sachen sehen".
      Aber im BESTfall könnte Die Aktie m.E. im Prinzip bis "zum Mond" gehen.


      Also nehmenses Mir NETT bös, aber ich habe da eher EIGENE Einschätzungen.
      Hab' gemerkt soooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo
      sehr entfernt liegen Die gar Nicht von Dieser "REALität".:)
      Und BLEIBE auch lieber bei Diesen.;););)
      Mein Portemonaie ist Mir ja schon Was wert.


      Ihr "Virtualisten" seid echt ein spassiger VErein.:D:D:D
      Avatar
      schrieb am 02.10.18 18:47:13
      Beitrag Nr. 5.484 ()
      Antwort auf Beitrag Nr.: 58.834.211 von Popeye82 am 30.09.18 02:11:57Korab Resources



      www.asx.com.au/asxpdf/20181001/pdf/43yvkrkbpl6j97.pdf
      11 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 19:01:26
      Beitrag Nr. 5.485 ()
      Antwort auf Beitrag Nr.: 58.829.978 von Popeye82 am 29.09.18 04:30:03Giyani Metals









      www.miningweekly.com/article/botswana-manganese-estimate-fir…
      13 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 20:42:10
      Beitrag Nr. 5.486 ()
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 20:54:38
      Beitrag Nr. 5.487 ()
      Antwort auf Beitrag Nr.: 58.692.648 von Popeye82 am 13.09.18 16:55:26Sigma Lithium













      http://dashboard.cormark.com/servlet/display.pdf?repid=mwhal…
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 22:09:36
      Beitrag Nr. 5.488 ()
      22 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 23:08:01
      Beitrag Nr. 5.489 ()
      Antwort auf Beitrag Nr.: 58.838.379 von Popeye82 am 01.10.18 05:12:45ONE of the MOST important new lithium raw material developments(globally)


      as said, bin mit Der Richtung Hier SEHR, SEHR zufrieden.
      langsam mehren sich Die (Voraussichtlichen) Produzenten Hier.
      and it' JUST a Start.
      _____________________________________________







      Pilbara Minerals
















      www.pilbaraminerals.com.au/site/PDF/2240_0/FirstConcentrateS…
      http://www.porthedland.wa.gov.au/
      www.marinetraffic.com/de/ais/details/ships/shipid:755730/imo…
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 23:16:05
      Beitrag Nr. 5.490 ()
      Antwort auf Beitrag Nr.: 58.854.564 von Popeye82 am 02.10.18 17:25:26
      Zitat von Popeye82: ich sag ja nur ...mehr traden...
      am besten mit aktien die man eh nicht will
      _________________________________





      Das hört sich aber auch verlockend nach Einem GIGANTISCH Gutem Konzept an.


      hat den vorteil dass man sich nur den chart ausguggt und sich darauf freut sie verticken zu können.
      beispiel commerzbank mal von 8 auf 12 und wieder rein bei 8...
      ich mein wer will schon so ne mistaktie...

      warum nicht hier und da wenn was auffällt... seis ein abwärtstrend wo man die linie wieder getestet haben will oder was auch immer.

      hat dann aber auch nixs mit sirius und sonst was zu tun... geht dabei eher um überflüssiges cash wo man grad nichts machen will... einfach so nebenher hier und da und so

      -------------------------------------------

      CLA:
      echt siehst du die dermassen top ??
      ich mag die auch schon... aber ich muss sagen geht mir so die richtung fireweed grob... nett und potenzial schaumer mal gute chancen... als toptoptop seh ich die jetzt nicht so, aber als angenehm schon

      Korab:
      ja, best case wäre mooooooooooon
      halts nur für etwas schräg... nicht ganz so versaut wie MGX vielleicht aber doch etwas schillernd evtl... also auch richtung war wohl nix tut sich nix und dem markt wirds langweilig würde mich da nicht zu sehr überaschen

      Sheffield:
      vermutlich relatiiiiiiiiiiiiv sicher... bin nur nicht so der große zirkonfan wobei ich auch nix gegen den rohstoff hab. bewertung ist halt so wie sie ist auch mal schon so ok und nicht zu wenig. wobei das ganz gut laufen könnte und dann steigt der kurs natürlich auch mit

      .....immer nur alels so lange kein böser deflacrash kommt... aber den seh ich nicht aktuell
      (ich glaub das wird eines tages unser hauptproblem werden auch wenns erst in 10 jahren ist.. das zu erkennen und sich dem sog zu entziehen)
      1 Antwort?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 23:21:51
      Beitrag Nr. 5.491 ()
      Antwort auf Beitrag Nr.: 58.840.137 von Popeye82 am 01.10.18 10:33:14FYI Resources(/"HPA" Rotze)



      http://www.wallstreet-online.de/nachricht/10901811-altech-ch…
      17 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 02.10.18 23:37:50
      Beitrag Nr. 5.492 ()
      16 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 00:57:58
      Beitrag Nr. 5.493 ()
      Antwort auf Beitrag Nr.: 58.857.732 von Popeye82 am 02.10.18 23:37:50FYI Resources














      www.goldinvest.de/videos/video/268-fyi-resources-investor-we…
      15 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 01:26:58
      Beitrag Nr. 5.494 ()
      Antwort auf Beitrag Nr.: 58.799.222 von Popeye82 am 26.09.18 06:39:46Axiom Mining



      https://stockhead.com.au/resources/nickel-turnaround-on-the-…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 01:49:08
      Beitrag Nr. 5.495 ()
      10 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 02:03:55
      Beitrag Nr. 5.496 ()
      Antwort auf Beitrag Nr.: 58.857.636 von Boersiback am 02.10.18 23:16:05Und nochwas.

      Du hattest mal Was über Six Sigma geschrieben.
      Ich will nicht sagen dass man Die "kaufen soll",
      aber Ein "Auge drauf behalten" kann man denke ich schon.
      Könnte denke ich Interessante Resource(s) werden.
      Avatar
      schrieb am 03.10.18 03:14:27
      Beitrag Nr. 5.497 ()
      Antwort auf Beitrag Nr.: 58.829.876 von Popeye82 am 29.09.18 01:45:28Prospect Resources



      www.prospectresources.com.au/sites/default/files/asx-announc…
      7 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 03:26:58
      Beitrag Nr. 5.498 ()
      Antwort auf Beitrag Nr.: 58.767.436 von Popeye82 am 21.09.18 22:23:42Armadale Capital (Plc)













      www.voxmarkets.co.uk/blogs/another-3-reasons-armadale-capita…
      5 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 04:36:14
      Beitrag Nr. 5.499 ()
      Antwort auf Beitrag Nr.: 58.836.303 von Popeye82 am 30.09.18 15:54:54as said, bin mit Der Richtung Hier SEHR, SEHR zufrieden.
      langsam mehren sich Die (Voraussichtlichen) Produzenten Hier.
      and it's JUST a Start.
      ________________________________________







      Strandline Resources













      www.strandline.com.au/irm/PDF/2666_0/FungoniProjectRutileOff…
      http://www.immco.hk/











      www.strandline.com.au/irm/PDF/2663_0/FungoniProjectUpdate
      http://www.tanzania.go.tz/
      http://www.madini.go.tz/
      http://tumemadini.go.tz/
      http://www.bot.go.tz/
      http://www.tanzania-gov.de/2-stories/documents/35-the-cabine…
      http://www.azurecapital.com.au/

      www.strandline.com.au/irm/PDF/2626_0/AustralianResourcesandI…
      20 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      Avatar
      schrieb am 03.10.18 05:30:01
      Beitrag Nr. 5.500 ()
      Antwort auf Beitrag Nr.: 58.851.870 von Popeye82 am 02.10.18 13:44:03Continental Gold



      https://gmpsecurities.bluematrix.com/sellside/EmailDocViewer…
      29 Antworten?Die Baumansicht ist in diesem Thread nicht möglich.
      • 1
      • 11
      • 21
       Durchsuchen


      Beitrag zu dieser Diskussion schreiben


      Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
      Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie
      hier
      eine neue Diskussion.
      starke, interessante, bombenstarke "Machbarkeitsstudien"