Uranium Bankable Feasibility Commenced by Equinox - 500 Beiträge pro Seite
eröffnet am 22.03.07 16:12:22 von
neuester Beitrag 23.03.07 10:19:41 von
neuester Beitrag 23.03.07 10:19:41 von
Beiträge: 6
ID: 1.120.442
ID: 1.120.442
Aufrufe heute: 0
Gesamt: 428
Gesamt: 428
Aktive User: 0
Top-Diskussionen
Titel | letzter Beitrag | Aufrufe |
---|---|---|
vor 40 Minuten | 1249 | |
vor 59 Minuten | 1050 | |
vor 40 Minuten | 1029 | |
vor 53 Minuten | 703 | |
gestern 21:10 | 537 | |
vor 1 Stunde | 532 | |
10.11.14, 14:54 | 530 | |
28.09.06, 14:49 | 506 |
Meistdiskutierte Wertpapiere
Platz | vorher | Wertpapier | Kurs | Perf. % | Anzahl | ||
---|---|---|---|---|---|---|---|
1. | 1. | 18.717,24 | -0,06 | 165 | |||
2. | 4. | 6,8790 | +42,17 | 78 | |||
3. | 3. | 159,78 | +0,28 | 73 | |||
4. | 2. | 10,200 | -0,58 | 70 | |||
5. | 5. | 0,1955 | -0,26 | 65 | |||
6. | 6. | 12,500 | +2,90 | 53 | |||
7. | 7. | 37,04 | +30,96 | 52 | |||
8. | 8. | 0,1105 | -21,63 | 45 |
Uranium Bankable Feasibility Commenced by Equinox
10:12 EDT Thursday, March 22, 2007
Equinox Minerals Limited (TSX:EQN)(ASX:EQN) ("Company" has commenced a Bankable Feasibility Study ("UFS" on the uranium resources which occur within, and adjacent to, the Lumwana Copper Project ("Lumwana" orebodies that are currently being developed in the North Western province of Zambia.
The Company completed a Bankable Feasibility Study in 2003 ("2003-BFS" at Lumwana which included work on the extraction of the uranium mineralization to produce uranium oxide ("Yellowcake", an evaluation of the Lumwana uranium resources (which entailed resource definition and metallurgical test work) and the design and costing of a separate process plant specifically for the extraction and processing of Lumwana uranium ore.
With Lumwana now fully permitted and under construction and in light of the robust and strengthening long-term uranium market, the Company has commenced the UFS to review and update the 2003-BFS.
Uranium Feasibility Study
To this end, the Company is pleased to announce that Ausenco Limited ("Ausenco" (ASX symbol: "AAX" has been contracted to manage and implement the UFS. A four phase program has been designed for the UFS to:
- Review the 2003-BFS uranium study including resources/reserves, metallurgy and process plant design;
- Conduct a further metallurgical testwork program;
- Design a processing plant and infrastructure to produce Yellowcake on-site; and
- Prepare capital and operating cost estimates with an accuracy of +15%.
Ausenco, in joint venture with Bateman Engineering NV, are currently engaged for the EPC construction contract on the Lumwana copper project. In preparation to execute this new contract, Ausenco has assembled a team with considerable uranium expertise that will work in parallel with their construction team already on-site at Lumwana. The UFS has commenced and is anticipated to be completed in Q1-2008.
Lumwana Uranium Resources
Uranium within the Malundwe and Chimiwungo copper deposits occurs as discrete uranium-enriched zones that will be separately mined during the copper mining operation. Lumwana Uranium Mineral Resources have been estimated at 9.5 million tonnes grading 0.093% U3O8 Indicated, and 2.6 million tonnes of 0.042% U3O8 Inferred, for a combined total of 21.4 million pounds of contained U3O8 (see Company press release May 02, 2005). The Lumwana uranium resource has been estimated using a 0.01% uranium cut-off grade and is consistent with JORC/NI43-101 requirements, as detailed in the Technical Report (October 2006) on www.sedar.com. An infill drilling program will be conducted as part of the UFS to facilitate mine design and develop proven and probable reserves.
Equinox President and CEO, Craig Williams commented that "the positive long-term outlook for uranium has the potential to further enhance the economics of the Lumwana Project if a uranium by-product is economically viable. The Company is evaluating this potential and considering alternatives for realizing any uranium development option. This Uranium Feasibility Study will however not impact on Equinox's current construction schedule for the commissioning of the Lumwana Project in Q2-2008."
Lumwana, owned 100% by Equinox, is located in the North Western Province of the Republic of Zambia. It is anticipated that the Lumwana mine will produce an average of 169,000 tonnes of copper metal per year contained in concentrates for the first 6 years of its 37 year mine life.
Thread: Equinox Minerals: 2,6 Millionen Tonnen Kupfer - Produktionsstart in Sicht!
10:12 EDT Thursday, March 22, 2007
Equinox Minerals Limited (TSX:EQN)(ASX:EQN) ("Company" has commenced a Bankable Feasibility Study ("UFS" on the uranium resources which occur within, and adjacent to, the Lumwana Copper Project ("Lumwana" orebodies that are currently being developed in the North Western province of Zambia.
The Company completed a Bankable Feasibility Study in 2003 ("2003-BFS" at Lumwana which included work on the extraction of the uranium mineralization to produce uranium oxide ("Yellowcake", an evaluation of the Lumwana uranium resources (which entailed resource definition and metallurgical test work) and the design and costing of a separate process plant specifically for the extraction and processing of Lumwana uranium ore.
With Lumwana now fully permitted and under construction and in light of the robust and strengthening long-term uranium market, the Company has commenced the UFS to review and update the 2003-BFS.
Uranium Feasibility Study
To this end, the Company is pleased to announce that Ausenco Limited ("Ausenco" (ASX symbol: "AAX" has been contracted to manage and implement the UFS. A four phase program has been designed for the UFS to:
- Review the 2003-BFS uranium study including resources/reserves, metallurgy and process plant design;
- Conduct a further metallurgical testwork program;
- Design a processing plant and infrastructure to produce Yellowcake on-site; and
- Prepare capital and operating cost estimates with an accuracy of +15%.
Ausenco, in joint venture with Bateman Engineering NV, are currently engaged for the EPC construction contract on the Lumwana copper project. In preparation to execute this new contract, Ausenco has assembled a team with considerable uranium expertise that will work in parallel with their construction team already on-site at Lumwana. The UFS has commenced and is anticipated to be completed in Q1-2008.
Lumwana Uranium Resources
Uranium within the Malundwe and Chimiwungo copper deposits occurs as discrete uranium-enriched zones that will be separately mined during the copper mining operation. Lumwana Uranium Mineral Resources have been estimated at 9.5 million tonnes grading 0.093% U3O8 Indicated, and 2.6 million tonnes of 0.042% U3O8 Inferred, for a combined total of 21.4 million pounds of contained U3O8 (see Company press release May 02, 2005). The Lumwana uranium resource has been estimated using a 0.01% uranium cut-off grade and is consistent with JORC/NI43-101 requirements, as detailed in the Technical Report (October 2006) on www.sedar.com. An infill drilling program will be conducted as part of the UFS to facilitate mine design and develop proven and probable reserves.
Equinox President and CEO, Craig Williams commented that "the positive long-term outlook for uranium has the potential to further enhance the economics of the Lumwana Project if a uranium by-product is economically viable. The Company is evaluating this potential and considering alternatives for realizing any uranium development option. This Uranium Feasibility Study will however not impact on Equinox's current construction schedule for the commissioning of the Lumwana Project in Q2-2008."
Lumwana, owned 100% by Equinox, is located in the North Western Province of the Republic of Zambia. It is anticipated that the Lumwana mine will produce an average of 169,000 tonnes of copper metal per year contained in concentrates for the first 6 years of its 37 year mine life.
Thread: Equinox Minerals: 2,6 Millionen Tonnen Kupfer - Produktionsstart in Sicht!
poste das doch in kanada!
hier interessiert der wert wirklich niemand:
Kurshistorie Frankfurt
Datum Erster Hoch Tief Letzter Umsatz
21.03.2007 1,35 1,35 1,35 1,35 0
20.03.2007 1,33 1,33 1,33 1,33 0
19.03.2007 1,32 1,32 1,32 1,32 0
16.03.2007 1,30 1,30 1,30 1,30 0
15.03.2007 1,27 1,27 1,27 1,27 0
14.03.2007 1,26 1,26 1,26 1,26 0
13.03.2007 1,31 1,31 1,31 1,31 0
12.03.2007 1,31 1,31 1,31 1,31 0
09.03.2007 1,31 1,31 1,31 1,31 0
08.03.2007 1,32 1,32 1,32 1,32 0
07.03.2007 1,30 1,30 1,30 1,30 0
06.03.2007 1,29 1,29 1,29 1,29 0
05.03.2007 1,30 1,30 1,30 1,30 0
02.03.2007 1,34 1,34 1,34 1,34 0
01.03.2007 1,34 1,34 1,34 1,34 0
28.02.2007 1,33 1,38 1,33 1,34 6.0k
27.02.2007 1,42 1,42 1,40 1,40 1.0k
26.02.2007 1,43 1,48 1,43 1,47 2.7k
23.02.2007 1,41 1,45 1,41 1,45 2.0k
22.02.2007 1,40 1,40 1,40 1,40 0
hier interessiert der wert wirklich niemand:
Kurshistorie Frankfurt
Datum Erster Hoch Tief Letzter Umsatz
21.03.2007 1,35 1,35 1,35 1,35 0
20.03.2007 1,33 1,33 1,33 1,33 0
19.03.2007 1,32 1,32 1,32 1,32 0
16.03.2007 1,30 1,30 1,30 1,30 0
15.03.2007 1,27 1,27 1,27 1,27 0
14.03.2007 1,26 1,26 1,26 1,26 0
13.03.2007 1,31 1,31 1,31 1,31 0
12.03.2007 1,31 1,31 1,31 1,31 0
09.03.2007 1,31 1,31 1,31 1,31 0
08.03.2007 1,32 1,32 1,32 1,32 0
07.03.2007 1,30 1,30 1,30 1,30 0
06.03.2007 1,29 1,29 1,29 1,29 0
05.03.2007 1,30 1,30 1,30 1,30 0
02.03.2007 1,34 1,34 1,34 1,34 0
01.03.2007 1,34 1,34 1,34 1,34 0
28.02.2007 1,33 1,38 1,33 1,34 6.0k
27.02.2007 1,42 1,42 1,40 1,40 1.0k
26.02.2007 1,43 1,48 1,43 1,47 2.7k
23.02.2007 1,41 1,45 1,41 1,45 2.0k
22.02.2007 1,40 1,40 1,40 1,40 0
Antwort auf Beitrag Nr.: 28.436.462 von trading2006 am 22.03.07 17:28:19Das ist nicht war,ich denke,daß Equinox sich in 1-2 Jahren verdoppelt.Die Firma hat alles um erfolgreich zu werden.
Antwort auf Beitrag Nr.: 28.437.453 von klauss51 am 22.03.07 18:10:32es gibt aber nur wenige, die in can ordern können. und wie du am umsatz sehen kannst, interessiert sich hier niemand daür.
Antwort auf Beitrag Nr.: 28.437.674 von trading2006 am 22.03.07 18:20:08Nach Resource Capital Research in einer Einordnung von Firmen im Uransektor vom 12.06 hat Equinox das meiste Kapital nach Paladin und Urasia ( ca 180 Mio ).
Ich denke ,man wird das Geld auch gewinnbringend anlegen.
Ich muß gestehen,daß ich eigentlich nur den Kurs in Australien verfolge,ist natürlich viel geringer.
Ich denke ,man wird das Geld auch gewinnbringend anlegen.
Ich muß gestehen,daß ich eigentlich nur den Kurs in Australien verfolge,ist natürlich viel geringer.
Antwort auf Beitrag Nr.: 28.437.674 von trading2006 am 22.03.07 18:20:08Nach Resource Capital Research in einer Einordnung von Firmen im Uransektor vom 12.06 hat Equinox das meiste Kapital nach Paladin und Urasia ( ca 180 Mio ).
Ich denke ,man wird das Geld auch gewinnbringend anlegen.
Ich muß gestehen,daß ich eigentlich nur den Kurs in Australien verfolge,ist natürlich viel geringer.
Ich denke ,man wird das Geld auch gewinnbringend anlegen.
Ich muß gestehen,daß ich eigentlich nur den Kurs in Australien verfolge,ist natürlich viel geringer.
Beitrag zu dieser Diskussion schreiben
Zu dieser Diskussion können keine Beiträge mehr verfasst werden, da der letzte Beitrag vor mehr als zwei Jahren verfasst wurde und die Diskussion daraufhin archiviert wurde.
Bitte wenden Sie sich an feedback@wallstreet-online.de und erfragen Sie die Reaktivierung der Diskussion oder starten Sie eine neue Diskussion.
Meistdiskutiert
Wertpapier | Beiträge | |
---|---|---|
155 | ||
75 | ||
75 | ||
73 | ||
68 | ||
52 | ||
46 | ||
45 | ||
38 | ||
36 |
Wertpapier | Beiträge | |
---|---|---|
30 | ||
26 | ||
24 | ||
23 | ||
20 | ||
19 | ||
18 | ||
18 | ||
18 | ||
17 |